Loading...
HomeMy WebLinkAboutLot Certifications - 05/05/2016/15 Page 1 Pursuant CERTIFICATION to City Code § 26-544 OF & City LOT Land Use GRADING Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer (on development County Reception agreement) #: I, of (print) all stormwater facilities and grading is complete , a and Colorado hereby registered submit this professional certification. engineer, verify that construction Please explanation answer detailing the following how this questions will affect by stormwater initialing the drainage appropriate for this response. lot and For any each adjacent question lots. initialed “No,” attach an 1. BuildingCity’s Certification Department includes does attached not approve Stormwater-grading approved plans). grading plan. (NOTE: 2. days Certification of date of includes certification) attached accurately as-built survey and truthfully dated depicting elevations (must be for: within 60 Top Finished of foundation/grade on each finished side floor of the structure Quarter Break points/points high along points each lot line (not more than 50 feet apart) Swales Berms Retaining Air conditioning walls pads Window Any other wells appurtenance(s) within an easement 3. All elevations are within a 0.2 foot tolerance of the approved grading plan. 4. structure. The top of foundation is at least 6 inches above the highest grade surrounding the 5. adjacent There is a to minimum the residence. grade of 5% away from the structure within the first 5 to 10 feet 6. family All slopes lots meet when or the exceed swale the is draining minimum the requirement runoff from of only 2% two (1% adjoining is acceptable properties) on single and are not steeper than 25% (4:1). 7. elevation All flow lines of ground of stormwater adjacent drainage to the structure swales are and a will minimum direct of drainage 6 inches as below shown the on the Stormwater-approved grading plan. 8. Runoff All downspout is not directed locations toward and discharge neighboring directions properties. are shown on the as-built survey. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes (CONCRETE CORNER OF TRICKLE SITE NOT PAN YET AT INSTALLED) SOUTHEAST NWH NWH NWH NWH NWH NWH NWH NWH /15 Page 2 9. A smooth transition (no grade break) is provided to all adjacent properties. 10. infrastructure. The grading of this lot does not adversely affect neighboring properties or City 11. responsible Landscaping for has completing been completed landscaping: prior to survey. If not, please indicate who will be 12. Final site cleanup has been completed. 13. opinion, I personally the visited as-built the survey site as is an part accurate of the certification representation process, of the and site in conditions. my professional . No Yes No Yes No Yes No Yes No Yes 14. Based on this information, I certify that (check one): The approved elevations drainage and and drainage grading patterns plan for of the the property lot/site are (information in substantial attached)conformance . with the City The City elevations approved drainage and drainage plan with patterns exceptions of the lot/(information site as measured attached)are . In in my general professional conformance judgment with the the elevations specifically and approved grading drainage of the lot/plan, site and as constructed will affect stormwater are functionally drainage adequate on and and off equivalent the lot/site to in the a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: for the A lot/complete site, including, certification but not must limited be submitted to, drawings at least of the two lot/weeks site showing prior to the a request approved for design a Certificate and as-of built Occupancy surveyed elevations information of necessary all structures, to confirm drainage the and above grading certification features, to: written information/explanation of discrepancies, and other Email WaterUtilitiesEng@(preferred) fcgov.com Mailing Fort Collins Address Utilities ATTN: 281 North Water College Utilities Avenue Engineering Fort Collins, CO 80521 Questions? 970-221-6700 Sign PE and Stamp date 05.05.16 NWH NWH NWH NWH NWH THE CURRENTLY CLOUDED BEING AREA USED IS FOR LANDSCAPED, STAGING. NOR IT IS HAS NOT FINAL OCCURRED. SITE CLEANUP BUILDER MAINTAIN NEEDS A CLEAR TO FLOW MANAGE PATH EROSION AND UNTIL PAN IS THE CONSTRUCTED. PERMANENT OF NOTE: OCCUPANCY CERTIFICATE FOR BUILDING WILL BE 2 HELD / LOT 2 LISTED UNTIL THE ABOVE ITEMS ARE COMPLETED CERTIFIED. AND