Loading...
HomeMy WebLinkAboutSite Certifications - 07/12/2016Project Name Final Drainage Report Project: Basin ID: Design Information (Input): From the pond site grading plan, enter water surface elevations and measured contour areas in ascending order. Water Eq-elev. Volume Surface Contour above Elevation Area Datum ft square feet acre-ft (input) (input) (output) 4899.10 1 0.00 4899.20 123 0.00 4899.30 322 0.00 4899.40 506 0.00 4899.50 682 0.00 4899.60 814 0.00 4899.70 946 0.01 Actual = 0.00670 4899.80 1,088 0.01 292.058 4899.90 1,243 0.01 4900.00 1,499 0.01 4900.10 1,918 0.02 4900.20 2,493 0.02 0.023848 1038.8005 STAGE-STORAGE FOR IRREGULAR GEOMETRY Seven Lakes P.U.D. Phase II Subdivision Amended Plan (OCR) Rain Garden As-Built Volume Detention Volume 1 Dan Mogen From: John Meyers <jmeyers@tstinc.com> Sent: Friday, May 17, 2013 11:54 AM To: Jake Coutts; Bob Thayer Subject: RE: 2414 - OCR Ft Collins - Retention Pond Attachments: SC45213051710190.pdf; Rain Graden Volume.xls; AB_0010_grading detailed-1.pdf; SC45213051709550.pdf Jake/Bob, Attached is the pond certification for OCR. Thank you for taking care of the spillway, it looks solid now. Regarding the additional inlet and pipe: I see no reason why the City would be concerned about what you are proposing, but I don’t speak for them. TST has no problem with you building it, and we can provide as‐built when it is complete. I would recommend that you reconsider the location of the inlet and suggest moving it to the front of the island to keep it away from the sanitary manhole (see attached sketch). The City’s required separation is 10’. Please let me know if there are any questions or something else you need. Have a nice weekend, John Meyers Jr. P.E. TST Inc. Consulting Engineers Phone: 970‐488‐2165 Cell: 970‐222‐1317 jmeyers@tstinc.com From: Jake Coutts [mailto:jake.coutts@neenan.com] Sent: Friday, May 17, 2013 8:33 AM To: John Meyers; Bob Thayer Subject: RE: 2414 - OCR Ft Collins - Retention Pond John, The work is completed. Bob went out and confirmed elevations so that we should be good this time. We have place seed under the mats and will be completing landscape once we know that we are tearing anything apart again. The landscape shouldn’t hold us up because we have a bond in place for the city on the landscaping. If you have any questions or concerns, please contact Bob Thayer our site superintendent. He would also like to know when the guys will be scheduled so that he can check‐in with them. Bob’s number is 303‐710‐1940. Thanks, Jake 2 From: John Meyers [mailto:jmeyers@tstinc.com] Sent: Monday, April 15, 2013 8:49 AM To: Jake Coutts Subject: RE: 2414 ‐ OCR Ft Collins ‐ Retention Pond Jake, I cannot sign off the work that was completed. That weir is the only outlet for the rain garden/ pond, meaning that any time there is a significant storm event, water will be flowing over it. It needs to be a permanent feature. The work that was done to the berm was basically to loosely shovel a little bit of dirt on the berm without any compaction effort and then a new blanket was laid on top. It would probably wash away with even a small rain. There is also no evidence of any attempt to revegetate the disturbed soil. See attached pictures. The weir for the pond needs to be a compacted, uniform weir with smooth sides and top. The fabric needs to make close contact with the soil and must be stapled per the manufacturers standards. Before the fabric is put down, the dirt needs to be seeded so that it will eventually be vegetated. The fabric should cover all of the weir, front, top, back and sides. It should be flat, tight, and smooth. Additionally, it does not appear that any seeding has been placed in the sand /peat mix in the pond. Please address these concerns and let me know when there is a permanent berm in place for certification. Regards, John From: Jake Coutts [mailto:jake.coutts@neenan.com] Sent: Friday, April 12, 2013 7:27 AM To: John Meyers Cc: Bob Thayer Subject: 2414 - OCR Ft Collins - Retention Pond John, We were able to fix the retention pond over at OCR last week. Bob believes that we are ready for your certification again. Can you please let me know if you need anything else and when you can get out to certify the pond and complete the paperwork for the city? I would like to review your package with Will Welch prior to us submitting to the city. Thanks, JAKE coutts Project Manager THE NEENAN COMPANY 2607 Midpoint Drive | Fort Collins, CO 80525 P: 970.495.6330 | C: 303.710.1940 | jake.coutts@neenan.com Visit us on the web: www.neenan.com | Blog | Twitter | Facebook | Flickr | YouTube We've moved - Please note our new address! Learn more at: www.neenan.com/goinggreen 3 No virus found in this message. Checked by AVG - www.avg.com Version: 2013.0.3336 / Virus Database: 3162/6330 - Release Date: 05/16/13 1 Dan Mogen From: Jake Coutts <jake.coutts@neenan.com> Sent: Monday, July 11, 2016 11:18 AM To: Dan Mogen Subject: FW: 2414 - OCR Ft Collins - Grading & Drainage Certification Attachments: RE: 2414 - OCR Ft Collins - Retention Pond Dan, Here is what I hope solves the outstanding issue. Thanks, JAKE coutts | project manager NEENAN ARCHISTRUCTION 3325 S. Timberline Road, Suite 100 | Fort Collins, CO 80525 c: 303.710.1940 | f: 970. 493.5869 www.neenan.com | Blog | Twitter | Facebook | LinkedIn From: John Meyers [mailto:jmeyers@tstinc.com] Sent: Wednesday, July 06, 2016 9:34 AM To: Jake Coutts <jake.coutts@neenan.com> Cc: Don Taranto <dtaranto@tstinc.com> Subject: RE: 2414 ‐ OCR Ft Collins ‐ Grading & Drainage Certification Jake, Please find the original certification that was completed May 17, 2013 attached to this email. Please let me know if you need anything else. Regards, John Meyers Jr. P.E. TST Inc. Consulting Engineers Cell: 970‐222‐1317 Phone: 970‐488‐2165 jmeyers@tstinc.com From: Don Taranto Sent: Wednesday, July 06, 2016 9:13 AM To: John Meyers <jmeyers@tstinc.com> Subject: FW: 2414 ‐ OCR Ft Collins ‐ Grading & Drainage Certification 2 John, Can you deal with this? Let me know. Thanks, Donald N. Taranto, P.E. TST, Inc. Consulting Engineers 748 Whalers Way Suite 200 Fort Collins, CO 80525 970.226.0557 (main) 970.226.0204 (fax) From: Jake Coutts [mailto:jake.coutts@neenan.com] Sent: Wednesday, July 06, 2016 8:38 AM To: Don Taranto <dtaranto@tstinc.com> Subject: 2414 ‐ OCR Ft Collins ‐ Grading & Drainage Certification Good Morning Don, I thought I had sent this out to you but maybe not. Hope things are well. Can you please review the attached certification report that the city is requiring that I never knew about. Would you please review and let me know what the cost to complete this report? Thanks, JAKE coutts | project manager NEENAN ARCHISTRUCTION 3325 S. Timberline Road, Suite 100 | Fort Collins, CO 80525 c: 303.710.1940 | f: 970. 493.5869 www.neenan.com | Blog | Twitter | Facebook | LinkedIn