Loading...
HomeMy WebLinkAboutLot Certifications - 06/03/20165/26/16 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2. Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for:  Top of foundation/finished floor  Finished grade on each side of the structure  Quarter points along each lot line (not more than 50 feet apart)  Break points/high points  Swales  Berms  Retaining walls  Air conditioning pads  Window wells  Any other appurtenance(s) within an easement 3. All elevations are within a 0.2 foot tolerance of the approved grading plan. 4. The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 25% (4:1). 7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8. All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes June 2, 2016 Preston-Kelley 2nd 4380 Zeigler Road B1505681 Fort Collins, CO 80525 87333-27-002 2- N.A. Nicholas W. Haws 05.18.16 N.A. NWH 5/26/16 Page 2 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12. Final site cleanup has been completed. 13. I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14. Based on this information, I certify that (check one):  The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached).  The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date 06.02.16 NWH NWH N.A. NWH NWH ✔ Nicholas W. Haws nick@northernengineering.com 970.568.5414 Northern Engineering 301 N. Howes Street, Suite 100 Fort Collins, CO 80525 REVISIONS SHEET CONTENTS DRAWN CHECKED DATE SHEET NO. REUSE OF DOCUMENTS: THE IDEAS AND DESIGN INCORPORATED HEREON, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF ARCHITECTURE PLUS AND IS NOT TO BE USED FOR ANY OTHER PROJECT WITHOUT PRIOR WRITTEN AUTHORIZATION OF ARCHITECTURE PLUS 4380 Ziegler Rd. Ft. Collins, CO Avago 90-Day Waste Storage 07/21/2015 S.CROMLEY P.BUCKLEY 100% CONSTRUCTION DOCUMENT SET 4380 Ziegler Rd. Fort Collins, CO 80525 NO. BY DESCRIPTION DATE 1 ADDENDUM #1 08/13/2015 2 ADDENDUM #2 10/10/2015 3 ASI-01 12/03/2015 C1.1 UTILITY, LAYOUT AND GRADING PLAN 811 # A A NO STORMWATER APPROVED DRAINAGE PLAN PROVIDED. CERTIFICATION IS BASED UPON THIS SHEET FROM THE PERMIT DRAWINGS E A B D F C NOTES: A. 6" vertical curb not constructed as shown on permit drawings. B. Raised island not constructed as shown on permit drawings. C. Flowline not formed down center of concrete replacement as shown on permit drawings. D. Additional downspout not shown on permit drawings. May add more flow to alcove. E. Concrete flume built without inverted crown, despite verbal request by design engineer. F. Lambs tongue discharge from existing building to the south not shown on permit drawings. May add more flow to alcove. Combined with Items D & E, this area could experience winter icing and/or other maintenance/nuisance issues. * The as-constructed elevations and drainage patterns are in general conformance with the permit drawings. In my professional judgment the elevations and grading of the site are functionally adequate and equivalent to the permit drawings (except as noted above), and will affect stormwater drainage on and off the site in a manner consistent with the permit drawings. A NWH N.A. N.A. NWH N.A. NWH