Loading...
HomeMy WebLinkAboutLot Certifications - 11/05/2025 (2)2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes 11/4/25 Heart of the Rockies Third Subdivision 1027 Brittany Street B2500412 9612433005 5 2 Jason Claeys 10/31/25 Grading/Stormwater Certification Accepted (Certificate of Occupancy Released) Accepted by: Date : ☐ Escrow was held for CO and is now released we mkapp 11/05/2025 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date Volunteers 4 Jason T. Claeys jclaeys@highland-ds.com 970.674.7550 Highland Development Services, Inc. 6355 Fairgrounds Ave, Suite 200 Windsor, CO 80550 BRITTANY STRE E T BRITTANY STREET FG=4914.78 TF=4915.45 FF=4916.76 CURVE TABLE CURVE LENGTH RADIUS DELTA BEARING CHORD PLOT PLAN FOR HABITAT FOR HUMANITY PARCEL DESCRIPTION: LOT 5, BLOCK 2 OF HEART OF THE ROCKIES THIRD SUBDIVISION, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO HIGHLAND DEVELOPMENT SERVICES 6355 FAIRGROUNDS AVENUE, SUITE 200 | WINDSOR, CO 80550 PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com DRAWN BYDATE SCALE (H)HDS PROJ # OFSHEET HEART OF THE ROCKIES THIRD SUBDIVISION 1027 BRITTANY STREET 12/20/24 1" = 15' VS 21-1045-02 PLOT PLAN 1 1 N W E S NOTE: 1.PROVIDE A MINIMUM OF 10% GRADE AWAY FROM FOUNDATIONS AND WINDOW WELLS FOR THE FIRST 5 TO 10 FEET, UNLESS OTHERWISE APPROVED. 2.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM 6 INCHES BELOW THE TOP OF FOUNDATION (TF). 3.MINIMUM SLOPES ON THE LOT SHALL NOT BE LESS THAN 2% GRADE. 4.FF IS BASED ON TRUSS FLOOR SYSTEM W/ DUAL SILL PLATES (TF+3.0" SILL+12" TRUSS + 0.75" SUB-FLOOR). DRIVEWAYS, RAMPS AND SLOPES ARE SHOWN ACCORDINGLY. 5.DRIVEWAY SLOPES & STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND TO BE VERIFIED IN THE FIELD. 6.DRIVEWAY SLOPES ARE A MINIMUM OF 2% AND A MAXIMUM OF 10%, UNLESS OTHERWISE APPROVED. 7.THIS PLOT PLAN IS IN REFERENCE TO THE APPROVED GRADING PLAN WITHIN THE "HEART OF THE ROCKIES THIRD SUBDIVISION," PREPARED BY HIGHLAND DEVELOPMENT SERVICES, DATED SEPTEMBER 27, 2023. 8.LOT LINE HIGH POINTS MOVED TO ACHIEVE MINIMUM SLOPES IN SWALES. ABBREVIATIONS UE&DE UTILITY & DRAINAGE EASEMENT FF FINISHED FLOOR ELEVATION FG FINISHED GRADE SF SQUARE FOOT TF TOP OF FOUNDATION UE UTILITY EASEMENT AE ACCESS EASEMENT RISER HEIGHT (IN) NO. OF RISERS STEP NOTATION SCALE 1" = 07.5 15' 15