Loading...
HomeMy WebLinkAboutLot Certifications - 09/10/2007INTERWEST September 5, 2007 Mr. Jay Barber City of Fort Collins Stormwater 700 Wood Street Fort Collins, Colorado RE: Drainage Certification Holsinger Drywall (Prospect Industrial Park, Lot 19 Replat) Dear Jay: C O N S U L T I N G G R O U P STORMWATER RECEIVED SEP 10 Z007 y// V% Please accept this letter and the attached documents as the Drainage Certification for the above project. Based on the survey provided by RJL Surveys, a site visit, and discussions with the contractor regarding the presents of buried riprap, the project is in substantial conformance with the approved plans and drainage report. The attached documents show handwritten as built elevations for the site on the approved grading plan as well as calculations for the detention and water quality pond. The only issue with the original construction was that the east berm of the pond was lower than the design. This has been rectified and was checked with a construction level on September 5, 2007. The culvert, parking lot, and all trickle pans drain per plan. The detention pond has been built correctly, the water quality component is slightly less than the design size, but two 8'x4'x7' pits were constructed in the pond and filled with rock to further enhance water quality. Each of these has about 100 cubic feet of available storage, so the intent of the pond has been achieved. Please review this information and give me a call if you have any questions. Sincerely, Michael Oberlander, PE 1218 WEST ASH, SUITE C WINDSOR, COLORADO 80550 TEL. 970.674.3300 • FAX. 970.674.3303 RECORD Detention Pond - Stage/Storage LOCATION: Lot 19, Prospect Industrial Park PROJECT NO: 1053-038-00 COMPUTATIONS BY: MPO DATE: 9/5/2007 WQ WSEL- 100-yr WSEL- SPILLWAY - TOP OF BERM - V = 1/3 d (A + B + sgrt(A'B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour WATER QUALITY READ: 862 (ft) DETENTION REGD: 7865 (ft) TOTAL REQD: 8727 (ft) STORMWAT ER RECEIVED SEP 10 2007 Stage (ft) Surface Area (ft`) Incremental Storage (ft) Detention Storage (ft) Total Storage (ft) 4894.84 0 4895.00 277 15 15 4895.50 1863 476 491 4895.60 2237 205 0 696 4896.00 6420 1660 1660 2355 4896.50 13470 4865 6524 7220 4896.60 15055 1426 7950 8646 ASB detention.xls LOT 2 i LOT 9 I LOT B V/AO/NT fX DMA EX fFHK RJ A'EYMI - - - - - - - - - - f EX MCM RDfSIAL m.iEVAM'. Ex aEMmwe we< m rcvAxv _ EX 75'VE Ex M T.IL mR w x _ _ _ _ (A ST &cvAnm - BY oK$Cl __ ___ _ ____—_ _____ T =. � PVI AT 1 / � I I_..------- I I� I 4 / I EX LOT20 r -JI LOTIB LOTis :I HOLSINGER DRYWALL UMOFFICE/WAREHOUSE INIPENNGSAN I I I I I r A SE 11 r WTI AND � DA R / g PUT VAIE ♦ m "AD S JAG AND RIAN15. w1N 0Ac OF cmale m B NOTES: 1. PAVEMENTSECTONSPERGEOTECHNICALREPORr(B"FORILANDCEMENT CONCRETE B 4.000 PSD, 2. LIMITS OF STREET OUT SHOWN ARE APPROXIMATE FINALUMISARETOBE DETERMINED IN THE FIELD BY THE CITY ENGINEERINGINSPECTOR. ALL REPAIRS SHALL BE IN ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS. & DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIORTO CONSTRUCTION. AS WELLASSTREETS. SIDEWALKS. CURBSAND GUTTERS. DESTROYED. DAMAGED, OR REMOVED DUETO CONSTRUCTION OF THIS PROJECT. SHALL BE REPLACED OR RESTORED IN LIKE KINDATTHE DEVELOPER'S DIPENBE PRIORTOTHEACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCEOFTHE FIRST CERTIFICATE OF OCCUPANCT. THE LIMBS OFTHE REPAIRS WILL BE IDENTIFIED IN THE FIELD BYTHE CRY ENGINEERING INSPECTOR PRIORTOAND OVERTHE COURSE OF THE PROJECTAND WILL NOT SE SHOWN ON THE PLAITS. 20 10 0 20 40 4. ALL DISTURBED AREAS(ON AND OFF STD SHALL BE RESEEDED AND MULCHED(SEE LANDSCAPEPLANANDDRAINAGEANDEROSIONCONTROLPL ), SCALE: 1"'20' 5. THE FINISHED FLOOR MINIMUM OPENING ELEVATION SHOWN ISTHE MINIMUM ELEVATION REQUIRED FOR PROTECTION FROMTHE IOOYEAR STORM. S. NOGRADINGSHALLOCCURONAOJACENTPROPEATI CEPTASSHOWN. 1 r,r.j w fj BI!CIgICM IMMINI MAN plimarm WATER QUALITY AND DETENTION OUTLET STRUCTURE CTA DN w00 CO 0o EOc 3 Q ❑ OT cd O n°v A i W aUo w Z� z 33z 0 Nua =m0 ^U. CALL UlUTY D CENTER OF COLORADO 1.800-922=1987 ro a amB --- Ex rAJIAO'AD W-K _ L�OR x- DID OAn IN ADVANCE --- _ _ Trn MG uArxwc rc uxDDOseuxD �_—• • MILBA UID➢ES \ _ � 6 WHJ( CN • ' � J A5'n-R �ve. �RaTso�C 0-1 D _ w,GO DCURS Ii1TIFA idx lxST.WAMM < s 5 BO' mw s = + 3 DM£ s NB 00MCN T CITY OF FORT COLLINS. COLORADO G U — / MmPo//yTOp/y[,rIXB s s s �RJE� �TL�-VE�S BI I UTILITY PLAN APPROVAL W W W / _�— _________` — w— — —w w U / / -7 PROVED w ------------- w rIf1D � an awxDx as F_ T ___ --.' 1 ---11 o __ _ ______________i.b_---_l_ y— CHECEED BY: Wean SWASIEWAMR UMITY DAM 1 — — _ _ a _ _ _ _ —I,fk 49D1 _T a— CHECKED By: 1 0 e tMMUMAIFA "nlrtY DAM xi 1 . I I I — — — - [ CHECKED BY: FmxS W TIE UI DAM OT27 I 1 LOTZB I I x�M,T $.G PTwt HG. IOBsaBIHxo 1 I I I I f l LCT29 `!T4IfI0�' CHECKED BY: DAM 1 mARM ___________� L I I E+<+ worm 60F9 CHECKED BY: SEP 10 Z007