Loading...
HomeMy WebLinkAboutLot Certifications - 09/20/2001 (6)& Associates, Inc. z AIRES ASSOCIATES September 7, 2001 Mr. Jay Barber City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Re: Drainage Certification for Building_C,. Lot.6A,_Collindale Business -Park Third Filingl Dear Jay,wAy. We recently surveyed. Building C, Lot 6A, Collindale Business Park Third Filing to verify whether the grading met the intent of the approved grading and drainage plan. Spot elevations were checked at pertinent locations and compared to the grading. plan. The enclosed drawing shows these as -built elevations. In general, the lot and building meet the requirements of the grading and drainage plan and there is positive drainage away from the building on all sides. Survey points were taken pertinent locations to verify the slope away from the building. The finished floor elevation id 4959.75, which is 0.05 feet higher than the design elevation. The west side of.the building slopes to the northwest; the north side of the building slopes to the northeast; the east side of the building slopes to the southeast;. and the south side of the building slopes to the southeast. It is my recommendation that the Certificate of Occupancy for this property be released since the Contractor graded the lot to meet design drainage patterns. If you have any questions, please call. Sincerely, Owen Project CLD:sp Owen Ayres & Associates, Inc. Engineers/Scientists/Su rveyors 3665 JFK Parkway, Building 2, Suite 200, P:O. Box 270460, Fort Collins, CO 80527 BARB9B.DOC (970) 223-5556, Denver Metro (303) 572-1806, FAX (970) 223-557832-0495.00. Printed on recycled paper - �h N DSO - h�O yam. uO ti LO Ile o LL LL CO Q LL m m C h� h� h��