Loading...
HomeMy WebLinkAboutLot Certifications - 11/18/2002 (2)November 14, 2002 Mr. Jay Barber Fort Collins Utilities P.O. Box 580 Dear Jay, STEWART&SSOCIATES Consulting Engineers and Surveyors S RECEIVED R NOV 14 2002 Please find enclosed "AS BUILT" survey of the grading for Lot 1 of the Greens at Collindale P.U.D., First Replat, which is 4014 S. Lemay Ave, FortCollins, Colorado. The grading is in substantial compliance with the flow directions of the grading planapproved by Storm Water Utility on February 7, 2001. The finished floor of the residence is 4989.6 which is 1.0 foot above the finished floor shown on the grading plan. The separated garage floor residence is 4988.1 which is 0.5 feet below said grading plan, both of which are okay. The lowest window well elevation is 4987.4, which is 0.5 feet above the swale invert that is 13 feet away. If you have any questions regarding this certification, please call. Sincerely, Franklin D. FDB/mgr P E ZK119 James H. Stewart and Associates, Inc. 103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522 970/482-9331 • Fax 970/482-9382 GRADING CERTIFICATION LOT 1, THE GREENS AT COLLINDALE P. U.D. FIRST REPLAT 86.J J 9 Q 8e.1 , �pR �p 06h 61h 8Z 8 vP' 3Sg,1p fie. � 89.63 o08 E s rucc0 NT oe woo 8Z4 ONNlbp�SE \ 8Z4 �1 1 A cTy ' 86.5. Z4 6 06' a a� 4,0 •o � C�1 "AS BUILT" SURVEY °9E�fF//VG NOVEMBER l3, 2002 o - , a� 8 e • V v m�a.. G 11delot FA rm F. F. 88.60 1 1i City of Ft Collins, Colorado UTILITY PLAN APPROVAL APPROVED: '/ Director of Engineer' �' Date D .-BY: � �_Z'n er h aste el�r/ Uti�`ty Date tQED BY: _`---� Stormwa Utility Date � H Par c Recreation Date ECKED BY: Date NECKED BY: i Date City of Ft. Collins, Colorado 'Y APPROVAL APPROVED: �- Q Z 7Z •d Director of Engineeiltft Date CHECKED BY: _ K'IA water k W stewater Utility ate CHECKED BY; Foj2640,S ZL7101 Stormwater Utility Date CHECKED BY: Parks & Recreation Date CHECKED BY: CHECKED BY: Date Date JOB M SCA 771 NEE' 1 1 IN U _ 3