HomeMy WebLinkAboutLot Certifications - 12/13/1995 (2),,...— .S-4
December 12, 1995
Mr. Basil Hamdan
Stormwater Utility
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
Dear Basil:
STEWART&ASSOCATES
Consulting Engineers and Surveyors
tyt3/c3c
1 ' /z V-4 I
Re: Final drainage certification for Cobblestone -Comers.)
,`µ , c ()S
V
I have surveyed the as built grading and drainage facilities at the Cobblestone Comers
development.
All of the drainage facilities are now installed and functioning, and the grading has been in
compliance with City Criteria.
There are some revisions which have been made to the original plan.
These revisions are as follows:
(1) The emergency access road and concrete pan between lots 28 and 31 was eliminated
and replaced with a grassed swale. Also, the swale along the north side of lots 25 through 29 was
revised. A portion of the swale along the north side of lots 25 through 29 has a slope of 1.6
percent, and a variance is hereby requested for this slope which is less than the 2.0 percent
minimum required by City Criteria.
(2) The originally proposed swale between the back of lots 13 through 22 and the back of
the walk along Wabash Street has been eliminated and the rear yard flow from these lots drains
directly into the north gutter of Wabash Street. This flow is directed into the detention pond by
the sidewalk culvert located in the north gutter of Wabash Street just west of Shields Street.
Also, flows in the north gutter of Wabash Street from west of the Cobblestone Comers entrance
drive will turn into the entrance drive when flows get deeper than 1 inch in the pan crossing the
entrance drive. The north gutter of Wabash has a high point at the west line of the Cobblestone
Comers development so the area draining to the east in this gutter is small. There is an attached
calculation sheet showing the calculation of these flows.
The swales between lots 1 through 15 which flow from the rear yard to the drain pan in
the Cobblestone driveway have been graded to drain and have been sodded or surfaced with rock
mulch.
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
December 12, 1995
Page 2
I have attached a redlined print of the grading plan showing the elevations as surveyed.
Also, I have attached copies of previous certification letters submitted for this project as work
was in progress.
All of the residences are constructed on this project and Mr. Ed Seier would like to have
the final two C.O.'s on lots 1 and 2 released. The grading on these lots is substantially completed
and landscaping shall be finished as the weather allows.
Please call if you have any questions.
Sincerely, �o``�\\Q �; NOBj,��;
Phillip I. Robinson, P.E. & L.S. g $• 4 Q 2
Vice President S*
'a q
V.
rsC 5
�•'j. tit%••••�••�•••••V
enclosures
STEWART&SSOCIATES
Consulting Engineers and Surveyors
July 18, 1994
Mr. Basil Hamdan
Storm Water Utility
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Basil:
Re: Cobblestone Corners "AS BUILT" Drainage Facilities
I have surveyed the elevation and dimensions of the detention pond at
Cobblestone Corners P.U.D. and found it to be graded according to the approved
plan. The grading at this time is still a little rough, and some fine grading
is required along the concrete pans and on the berm at the east end of the
pond. Also required are the placement of rip rap at the pipe outlets and a
sediment trap over the pond outlet.
The concrete pans, the headwall with restriction plate and the sidewalk
culvert are in place.
The pond in its present condition will detain the required volume of
runoff. The remaining work on the pond area should be completed this week.
The builder, Ed Seier, would like to have additional footing and foundation
permits released for ten (10) more lots. Thanks for considering this request.
Sincerely,
Phillip I. Robinson, P.E. & L.S. �c'�t;•�i ;tisr�'
Vice President r
02 Jrr � `��`!
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
STEWART$,.SSOCWES
Consulting Engineers and Surveyors
January 13, 1995
Mr. Basil Harridan
Stormwater Utility
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
Dear Basil:
On January 12, 1995, I surveyed the elevations of the floors and lowest
openings of the residences constructed on lots 21, 22, 23 and 24 of Cobblestone
Corners P.U.D. .
The finish floor elevations on lots 21 and 22 are both 5092.68 and the
proposed plan grade is 5092.5.
The lowest openings of the basement window wells on lots 21 and 22 are
5091.25, and the detention pond high water line adjacent to these lots is
5087.00.
The garage floors on lots 21 and 22 are at elevation 5089.24, compared
to the plan grade of 5089.50. The elevation of 5089.24 maintains 1.04 feet
of freeboard above the 100 year high water elevation of 5088.2 in the drain
channel between lots 22 and 23.
The finish floors of the duplex on lots 23 and 24 are 5091.18, compared
to the plan grade of 5092.50. Lot 23 has no basement, and the window well
on lot 24 is at 5090.1. The finish floor elevations and lowest openings are
well above the maximum pond elevation of 5087.0 and the drain channel high
water elevation of 5088.2.
The garage floors on lots 23 and 24 are at 5089.60, compared to the plan
grade of 5090.0. These garage floors are 1.4 feet above the 100 year high
water elevation of 5089.2 in the drainage channel between lots 22 and 23.
I have attached a blueprint showing the surveyed elevations in red.
Please call if you need further information.
Si ncereIy,
i TEY4�.�`r 41
Phillip I. Robinson, P.E. & L.S.
Vice President
s
rsc�l^A
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
STEWARr&ASSOCIATES
Consulting Engineers and Surveyors
February 10, 1995
Mr. Basil Hamdan
Stormwater Utility
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
Dear Basil:
We have surveyed the as constructed elevations of the detention pond, outlet ditch and
street drain pan at the Cobblestone Comers development. The as built elevations are shown in
red on the attached print.
Also, we surveyed the swales between buildings and found that additional grading must be
done to provide adequate drainage. The existing elevations of the swales are shown in green on
the attached plan. I met at the site with Mr. Ed Seier and his grading contractor on February 9,
1995, and they are now doing the additional grading.
Mr. Seier has a closing scheduled for February 10, 1995 on Lot 24 and would like the
C.O. released on Lot 24. This seems a reasonable request as he is going ahead with the necessary
grading.
The detention pond volume as constructed is adequate, and he has graded the outlet ditch
along Shields to the requirement of the Engineering Inspector.
I will provide additional red lines when the swale grading is completed.
Sincerely,
Phillip I. Robinson, P.E. &L.S.
Vice President
rsc
�?�r. Q�VtSTEh+�C
4502
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
,p y.
iy $- a `. •.1
•OF CUO?.
STEWART&ASSOCIATES
Consulting Engineers and Surveyors
103 S. MELDRUM, FORT COLLINS, CO 80521
PH. 482-9331 FAX 482-9382
By: Date: Z d 91 Client: _Z )U n j Q n - S e i e t- Sheet No. of
J
Project: - Co s=o/V e Comte-S'
Subject: Tie—en4 o 4 o n t% 61M e
City of Fort Collins
DATE:
ITEM:
Utility Services
Stormwater
3-27-95
DEPARTMENT
Stormwater Utility
Cobblestone Comers P.U.D.- Landscape Administrative Change
The grading revisions have been reviewed as submitted on 3-20-95 and we have the following
comments as indicated in red on the attached print:
There is on section that has 1.6% grade. Stormwater criteria requires an underdrain or concrete
pan on grades of 2% or less. However this is privately maintained and the grades appear to be
2% or greater elsewhere. If during certification this is discussed and documented as a variance
request it would be accepted.
Some dots were shown between buildings 14 and 15 with no elevations. I believe this was an
oversight but the change from the original approved plan still needs to be addressed.
The spot elevations indicate the flow could follow the path indicated but do not document the
crossection that would contain the flow. Please provide cross sections or at least spot elevations
on either side of the invert spot to indicate that there is a Swale. During certification the capacity
will also need to be verified.
I believe Ted Shepard has been in the field to discuss berming revisions. Once the grading is
completed please submit the final site certification and reference -previous certifications so
someone pulling this info the future can find all the info. This certification is needed in order to
pull the building permits on lots 1 & 2 as agreed by Ed Seier.
All items above can be addressed with the final certification if a variance is the chosen route for
the first item.
cc: Ed Seirer
Dave Stringer
Ted Shepard
235 Mathews Street • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6589 • FAX (303) 221-6239
STEWART9,6SSOCIATES 103 PH. S. ME 3D1RFAX FORT gOLLINS, CO 80521
Consulting Engineers and Surveyors
By: Date: JZJIJ 17�-. Client: Gd Se%e 1— Sheet No. of
Project:
Subject: )�<U/► o f-�- % n t70 rn ()4ef- a'�-- L✓OII-sa.0 4 sr' .
I
�—j--C-_. ;._.: l� e O`✓_B%/ � ow l _in � � Ll/ lveWo
On��2en�0-1-
�� ; drl ve�✓a' dCca
!o;
UE
/wi^;
!EAs7 I OF: C-0! 6U S VA-1E { ENr7?4N cE
.F _ T -- --- -
17o0,sF. 4eaji_i
' 0�
1 '
—i_S io �✓)_I y r� _'_�� G'ab��Cff°"�—l—C�-r—^C�� _�e�C_%�iG�,
i_l
lo�!�Tlji_c—�+� _s�t�cl_4� �vl✓ems ' ! i i 1- ;
STEWART&ASSOCIATES 103 S. MEL33DR1FUMAX , FORT COLLINS, CO 80521
PH. 482-9482-9382
Consulting Engineers and Surveyors
By: Date: _LZJ 12 ? 5- Client: Ed S cier Sheet No. of
Project: Cabbies=one Corners
Subject: Flow 147 t-o(55 S r7o r4-4 o La 257 44, ry 2
0.4
4-
+
T
_4
n 04-ce-
r+Q
-4—
Lr' qA Q_ I.K. F-A' TO I 4 A4 r: _-3.3__LA_ _C_
_i�xl A4" Y /_x_A m
J_
44 1
d, �3 �4
T
1 7
4--
17 --- F