Loading...
HomeMy WebLinkAboutSite Certifications - 10/13/2025Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as- built construction to the approved drainage and grading plans, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 11/19 Northfield Commons 10/2/25 (Please see table below) N/A N/A N/A N/A N/A N/A Note: Northfield Pond D is to be certified with the Northfield Overall Site Certification. This certification does include the Pond D rain garden. Grading/Stormwater Certification Accepted (Certificat e of Occupancy Released) Accepted by: Date: ☐ Escrow was held for CO and is now released we Dan Mogen 10/13/2025 4 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 11/19 N/A N/A N/A N/A N/A N/A Yes N/A N/A N/A N/A N/A N/A There are many elevations not w/in the 0.2 ft tolerance. There were construction busts that were resolved w/ the owner & contractor to achieve acceptable slopes and grades Page 3 4.Outlet Structure: a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 11/19 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Page 4 III.Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 11/19 Yes No No Yes Yes Yes N/A N/A Yes Yes Yes Yes Yes Please reference the included memo describing the discrepancies and asbuilt SWWM model results. HDS did not observe the installation of the concrete pans There are concrete drain pans throughout the site that are contained within areas of Lot Grading Certifications. Reference the individual Lot Grading Certifications for acceptance of those pans. Page 5 V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 11/19 Yes Yes Yes Yes No Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 11/19 N/A N/A N/A N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes N/A There was a small sidewalk culvert proposed in the southeast corner of Tract C that was not installed. The area intended to drain to this culvert is relatively flat unimproved native turf area. I don't believe that this culvert is detrimental to the neighboring properties and majority of the rainfall will infiltrate. Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1.All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2.All fabric has been installed in the locations and sizes indicated on the approved construction plans. a.All fabric was installed per the details on the approved construction plans. XII.Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII.Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. B.Attached is verification of the rain garden and/or sand filter flat surface area(s) and ponding volume(s). This verification includes survey of critical elevations. C.Attached is verification of the underground infiltration required volume(s), weir elevations, orifices, inspection ports and filtering fabric. This verification includes survey of critical elevations. D.All visible LID design features were verified as part of the engineer's site visit. 11/19 N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes 11/19 Page 8 XIV.Certification of Other Permanent BMPs A.The construction of other permanent BMPs not specifically addressed in this certification is in accordance with the approved plan. This may include grade control structures, rundowns, bridges, stream access/improvements, etc. Please specify other permanent BMPs included on this site: XV. Certification and Erosion Control Measures - FCSCM Ch. 3 A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing this certification there are any erosion control measures still remaining on the site, please note them in the narrative and verify that they need to remain at this time. If in doubt as to the need for any control measure, please consult with the Erosion Control Inspector at erosion@fcgov.com. XVI.Statement of Compliance - FCSCM Ch. 3 A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage facilities are as described in the above form and in the enclosed as-built plans. B.Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. XVII. Signature and Stamp by a Colorado-Registered Professional Engineer Engineer’s contact information: Name: Email: Phone: Company: Address: PE Stamp N/A Jason T. Claeys, P.E. jclaeys@highland-ds.com 970.674.7570 Highland Development Services 6355 Fairgrounds Ave, Suite 200 Windsor, CO 80550 1/19 Page 1 of 2 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. • Use “Yes” for items completed as described. • Use “N/A” for items that are not applicable to the site being certified. • If any blanks are “No,” attach an explanation referencing the item number below. Project Name: Northfield Commons Apartments – Mercy Housing Date: 8/21/2023 Building Permit Numbers: B2110016, B2110018, B2110019, B2110021, B2110022, B2110023, B2110024 I. Compaction A. Yes All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II. Storm Drain Pipe Installation Requirements A. Yes The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0 A. Riprap 1. Yes The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. 2. No A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. 3. Yes The riprap is the gradation shown on the approved construction plans with a D50 of 9. 4. Yes The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. 5. Yes The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 1. Yes All fabric was installed per manufacturer’s specifications. 1/19 Page 2 of 2 IV. Other Permanent BMPs A. N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes.) V. Extended Detention Basins A. N/A Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality control box(es). Provide date of inspection and name of inspector: Included certification sheet(s): Please check the appropriate box(es) for the Low Impact Development (LID) facilities found on this site and complete the corresponding certification sheets. ☐ Permeable Interlocking Concrete Pavers ☐ Bioretention Cells (Rain Gardens) ☐ Sand Filters ☐ Vegetated Buffers ☐ Underground Infiltration ☐ Other LID – For certification of Dry Wells, Tree Filters, Constructed Wetland Channels & Ponds, etc., contact City Staff to determine requirements to exhibit the LID facility has been constructed and functions as intended per the approved drainage report. *Please provide photographic documentation of the installation of all stages of all LID facilities. **Please contact the City Stormwater Inspector at stormwaterinspection@fcgov.com to discuss inspection requirements for each LID facility and request inspections. ***All facilities being certified must be “clean” – free of sediment & construction debris – prior to certification or acceptance of the facility. Completed by: Name: Devin Lang Title: Assistant Project Manager Email: dlang@dohnconstruction.com Phone: (970) 566-3071 Company: Dohn Construction Address: 2642 Midpoint Drive Fort Collins, CO 80525 X Geotechnical Engineering and Materials Testing Cole Garner Geotechnical 1070 W. 124th Ave, Ste. 300 Westminster, CO 80234 303.996.2999 March 17, 2023 Mercy Housing 1600 Broadway, Suite 2000 Denver, CO 80202 Attn: Kuhl Brown Re: Compliance Letter for Special Inspection and Materials Tests Northfield Commons Residential Development - Building 1, Permit No.: B2110016 728 Mangold Lane Fort Collins, CO 80524 CGG Project No: 22.23.109 At your request, Cole Garner Geotechnical (CGG) was retained to provide construction observations and materials testing for the above-named project. Observation and special inspection services were performed as scheduled by the contractor during the construction of the following elements: Earthwork - observation during building overexcavation Reinforced Concrete - inspection of reinforcing steel and concrete placement for foundations and slabs Concrete Encased Grounding Rod - inspection of placement of Ufer ground rod in foundation Wood Framing - visual inspection of holdowns, anchors, hardware and strapping, shearwall framing and panels, roof sheathing, mechanical fasteners and diaphragm nailing In addition, materials tests were periodically conducted for the following elements: Earthwork - classification (gradation and Atterberg limits) proctor, in-situ moisture and density (nuclear gauge) Concrete - temperature, slump, air content, unit weight and compressive strength The results of our materials tests and special inspections are available upon request and were noted to comply with approved project plans, specifications and relevant sections of the International Building Code. We trust that the information presented herein satisfies your present needs. Sincerely, Cole Garner Geotechnical Thomas C. Cole, P.E. Principal 03/17/23 Geotechnical Engineering and Materials Testing Cole Garner Geotechnical 1070 W. 124th Ave, Ste. 300 Westminster, CO 80234 303.996.2999 March 17, 2023 Mercy Housing 1600 Broadway, Suite 2000 Denver, CO 80202 Attn: Kuhl Brown Re: Compliance Letter for Special Inspection and Materials Tests Northfield Commons Residential Development - Building 2, Permit No.: B2110018 722 Mangold Lane Fort Collins, CO 80524 CGG Project No: 22.23.109 At your request, Cole Garner Geotechnical (CGG) was retained to provide construction observations and materials testing for the above-named project. Observation and special inspection services were performed as scheduled by the contractor during the construction of the following elements: Earthwork - observation during building overexcavation Reinforced Concrete - inspection of reinforcing steel and concrete placement for foundations and slabs Concrete Encased Grounding Rod - inspection of placement of Ufer ground rod in foundation Wood Framing - visual inspection of holdowns, anchors, hardware and strapping, shearwall framing and panels, roof sheathing, mechanical fasteners and diaphragm nailing In addition, materials tests were periodically conducted for the following elements: Earthwork - classification (gradation and Atterberg limits) proctor, in-situ moisture and density (nuclear gauge) Concrete - temperature, slump, air content, unit weight and compressive strength The results of our materials tests and special inspections are available upon request and were noted to comply with approved project plans, specifications and relevant sections of the International Building Code. We trust that the information presented herein satisfies your present needs. Sincerely, Cole Garner Geotechnical Thomas C. Cole, P.E. Principal 03/17/23 Geotechnical Engineering and Materials Testing Cole Garner Geotechnical 1070 W. 124th Ave, Ste. 300 Westminster, CO 80234 303.996.2999 March 17, 2023 Mercy Housing 1600 Broadway, Suite 2000 Denver, CO 80202 Attn: Kuhl Brown Re: Compliance Letter for Special Inspection and Materials Tests Northfield Commons Residential Development - Building 3, Permit No.: B2110019 716 Mangold Lane Fort Collins, CO 80524 CGG Project No: 22.23.109 At your request, Cole Garner Geotechnical (CGG) was retained to provide construction observations and materials testing for the above-named project. Observation and special inspection services were performed as scheduled by the contractor during the construction of the following elements: Earthwork - observation during building overexcavation Reinforced Concrete - inspection of reinforcing steel and concrete placement for foundations and slabs Concrete Encased Grounding Rod - inspection of placement of Ufer ground rod in foundation Wood Framing - visual inspection of holdowns, anchors, hardware and strapping, shearwall framing and panels, roof sheathing, mechanical fasteners and diaphragm nailing In addition, materials tests were periodically conducted for the following elements: Earthwork - classification (gradation and Atterberg limits) proctor, in-situ moisture and density (nuclear gauge) Concrete - temperature, slump, air content, unit weight and compressive strength The results of our materials tests and special inspections are available upon request and were noted to comply with approved project plans, specifications and relevant sections of the International Building Code. We trust that the information presented herein satisfies your present needs. Sincerely, Cole Garner Geotechnical Thomas C. Cole, P.E. Principal 03/17/23 Geotechnical Engineering and Materials Testing Cole Garner Geotechnical 1070 W. 124th Ave, Ste. 300 Westminster, CO 80234 303.996.2999 March 27, 2023 Mercy Housing 1600 Broadway, Suite 2000 Denver, CO 80202 Attn: Kuhl Brown Re: Compliance Letter for Special Inspection and Materials Tests Northfield Commons Residential Development - Building 4, Permit No.: B2110021 710 Mangold Lane Fort Collins, CO 80524 CGG Project No: 22.23.109 At your request, Cole Garner Geotechnical (CGG) was retained to provide construction observations and materials testing for the above-named project. Observation and special inspection services were performed as scheduled by the contractor during the construction of the following elements: Earthwork - observation during building overexcavation Reinforced Concrete - inspection of reinforcing steel and concrete placement for foundations and slabs Concrete Encased Grounding Rod - inspection of placement of Ufer ground rod in foundation Wood Framing - visual inspection of holdowns, anchors, hardware and strapping, shearwall framing and panels, roof sheathing, mechanical fasteners and diaphragm nailing In addition, materials tests were periodically conducted for the following elements: Earthwork - classification (gradation and Atterberg limits) proctor, in-situ moisture and density (nuclear gauge) Concrete - temperature, slump, air content, unit weight and compressive strength The results of our materials tests and special inspections are available upon request and were noted to comply with approved project plans, specifications and relevant sections of the International Building Code. We trust that the information presented herein satisfies your present needs. Sincerely, Cole Garner Geotechnical Thomas C. Cole, P.E. Principal 03/27/23 Geotechnical Engineering and Materials Testing Cole Garner Geotechnical 1070 W. 124th Ave, Ste. 300 Westminster, CO 80234 303.996.2999 March 17, 2023 Mercy Housing 1600 Broadway, Suite 2000 Denver, CO 80202 Attn: Kuhl Brown Re: Compliance Letter for Special Inspection and Materials Tests Northfield Commons Residential Development - Building 5, Permit No.: B2110022 703 Mangold Lane Fort Collins, CO 80524 CGG Project No: 22.23.109 At your request, Cole Garner Geotechnical (CGG) was retained to provide construction observations and materials testing for the above-named project. Observation and special inspection services were performed as scheduled by the contractor during the construction of the following elements: Earthwork - observation during building overexcavation Reinforced Concrete - inspection of reinforcing steel and concrete placement for foundations and slabs Concrete Encased Grounding Rod - inspection of placement of Ufer ground rod in foundation Wood Framing - visual inspection of holdowns, anchors, hardware and strapping, shearwall framing and panels, roof sheathing, mechanical fasteners and diaphragm nailing In addition, materials tests were periodically conducted for the following elements: Earthwork - classification (gradation and Atterberg limits) proctor, in-situ moisture and density (nuclear gauge) Concrete - temperature, slump, air content, unit weight and compressive strength The results of our materials tests and special inspections are available upon request and were noted to comply with approved project plans, specifications and relevant sections of the International Building Code. We trust that the information presented herein satisfies your present needs. Sincerely, Cole Garner Geotechnical Thomas C. Cole, P.E. Principal 03/17/23 Geotechnical Engineering and Materials Testing Cole Garner Geotechnical 1070 W. 124th Ave, Ste. 300 Westminster, CO 80234 303.996.2999 July 18, 2023 Mercy Housing 1600 Broadway, Suite 2000 Denver, CO 80202 Attn: Kuhl Brown Re: Compliance Letter for Special Inspection and Materials Tests Northfield Commons Residential Development - Building 6, Permit No.: B2110023 802 Mangold Lane Fort Collins, CO 80524 CGG Project No: 22.23.109 At your request, Cole Garner Geotechnical (CGG) was retained to provide construction observations and materials testing for the above-named project. Observation and special inspection services were performed as scheduled by the contractor during the construction of the following elements: Earthwork - observation during building overexcavation Reinforced Concrete - inspection of reinforcing steel and concrete placement for foundations and slabs Concrete Encased Grounding Rod - inspection of placement of Ufer ground rod in foundation Wood Framing - visual inspection of holdowns, anchors, hardware and strapping, shearwall framing and panels, roof sheathing, mechanical fasteners and diaphragm nailing In addition, materials tests were periodically conducted for the following elements: Earthwork - classification (gradation and Atterberg limits) proctor, in-situ moisture and density (nuclear gauge) Concrete - temperature, slump, air content, unit weight and compressive strength The results of our materials tests and special inspections are available upon request and were noted to comply with approved project plans, specifications and relevant sections of the International Building Code. We trust that the information presented herein satisfies your present needs. Sincerely, Cole Garner Geotechnical Thomas C. Cole, P.E. Principal 07/18/23 Geotechnical Engineering and Materials Testing Cole Garner Geotechnical 1070 W. 124th Ave, Ste. 300 Westminster, CO 80234 303.996.2999 July 18, 2023 Mercy Housing 1600 Broadway, Suite 2000 Denver, CO 80202 Attn: Kuhl Brown Re: Compliance Letter for Special Inspection and Materials Tests Northfield Commons Residential Development - Building 7, Permit No.: B2110024 808 Mangold Lane Fort Collins, CO 80524 CGG Project No: 22.23.109 At your request, Cole Garner Geotechnical (CGG) was retained to provide construction observations and materials testing for the above-named project. Observation and special inspection services were performed as scheduled by the contractor during the construction of the following elements: Earthwork - observation during building overexcavation Reinforced Concrete - inspection of reinforcing steel and concrete placement for foundations and slabs Concrete Encased Grounding Rod - inspection of placement of Ufer ground rod in foundation Wood Framing - visual inspection of holdowns, anchors, hardware and strapping, shearwall framing and panels, roof sheathing, mechanical fasteners and diaphragm nailing In addition, materials tests were periodically conducted for the following elements: Earthwork - classification (gradation and Atterberg limits) proctor, in-situ moisture and density (nuclear gauge) Concrete - temperature, slump, air content, unit weight and compressive strength The results of our materials tests and special inspections are available upon request and were noted to comply with approved project plans, specifications and relevant sections of the International Building Code. We trust that the information presented herein satisfies your present needs. Sincerely, Cole Garner Geotechnical Thomas C. Cole, P.E. Principal 07/18/23 1/19 Page 1 of 3 Bioretention Cells (Rain Gardens) Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☒ ☐ ☐ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) 2/21/2023 – Adam Camp, Jobsite Trailer Underdrain and basecourse inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and base course (per design in Final Plan Documents) ☒ ☐ ☐ Record date(s) of inspection and inspector’s name 9/8/2023 – Amy Dolinger (30” Below TOE Cert.) Pea gravel and BSM inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pea gravel and bioretention sand media ☒ ☐ ☐ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction) ☒ ☐ ☐ No heavy equipment encroached into excavated area. Bottom of cell was “ripped” after excavation ☒ ☐ ☐ Provide photographs before and after “ripping” Photos attached Bottom surface of cell is flat and level ☒ ☐ ☐ Provide photograph Photos attached Excavated area is protected/surrounded by sediment/runoff control measures during construction ☒ ☐ ☐ Provide photograph Photos attached Intake Upstream catchment drains to inlet/bioretention cell per plan and flows are fully captured ☒ ☐ ☐ Photos attached. Forebay Forebay is installed according to design specifications ☒ ☐ ☐ Provide photograph 9/14/23 – Photos attached. There is a minimum 3” drop at the forebay entrance ☒ ☐ ☐ Provide photograph 9/14/23 – Photos attached. Forebay will drain fully and not hold standing water ☒ ☐ ☐ 9/14/23 – Photos attached. Outlet Structure/Overflow 1/19 Page 2 of 3 Emergency overflow elevation is confirmed ☒ ☐ ☐ Measure and record distance from overflow to top of media filter; provide photograph Surveyed. Photos attached. Overflow inlet elevation is set above bioretention media per plan ☐ Provide photograph Photos attached. Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) ☐ Measure and record distance between inlet and top of containment wall/berm; provide photograph Surveyed. Photos attached. Overflow path and check dams, if used, are armored to protect from erosion and maintain elevations ☒ ☐ ☐ Provide photograph Photos attached. Impermeable Liner Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered material N/A Impermeable liner is appropriately anchored ☐ ☐ ☒ Provide photograph N/A Impermeable liner is buried with no exposure ☐ ☐ ☒ N/A Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☐ ☒ Provide photograph (if necessary) N/A Underdrain System Underdrain pipe meets design specifications ☒ ☐ ☐ Provide photograph Photos attached. At least one cleanout is provided per underdrain lateral ☒ ☐ ☐ Provide photograph Photos attached. Cleanout pipe is solid (not perforated/slotted) ☒ ☐ ☐ Provide photograph Photos attached. Cleanout covers are installed and watertight ☒ ☐ ☐ Provide photograph Photos attached. Verify the underdrain is NOT wrapped in geotextile fabric ☒ ☐ ☐ Provide photograph Photos attached. Verify there is no orifice plate on the underdrain outfall ☒ ☐ ☐ Provide photograph Photos attached. Underdrain integrity tested after backfilling using TV and/or water test ☒ ☐ ☐ Provide documentation of test results GC observation. Filter Media and Aggregate Reservoir aggregate layer (ASTM #57 or #67): - meets design specifications - is installed to the required design depth ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed Attached. Diaphragm aggregate layer (“Pea Gravel” with gradation ASTM #8, #89, or #9): - meets design specifications - is installed to the required design depth ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed Attached. Bioretention Sand Media (BSM) composition: - meets design specifications - is installed to the required design depth ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed Attached. BSM was “machine mixed” by supplier prior to delivery ☒ ☐ ☐ Provide load ticket Attached. ☒ ☐ ☐ ☒ Overflow weir utilized rather than overflow inlet Overflow weir utilized rather than overflow inlet 1/19 Page 3 of 3 BSM is installed flat and level ☒ ☐ ☐ Provide photograph Photos attached. Other Structural Components Containment wall/berm is continuous and level ☒ ☐ ☐ Photos attached. Landscaping Verify final landscaping is free of sod ☐ ☐ ☒ If sod is used, it must be shown to be “sand-grown” N/A By others. Final landscaping (non-floatable mulch) is flat and level ☐ ☐ ☒ Provide photograph N/A By others. Vegetation is planted according to landscape design specifications and final landscaping plan ☒ ☐ ☐ Provide photograph Photos attached. Verify that weed barrier is NOT installed ☒ ☐ ☐ Temporary irrigation installed ☒ ☐ ☐ If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell ☒ ☐ ☐ NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN EXCAVATION 9/7/2023 NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN 30" BELOW TOE CERTIFICATION & UNDERDRAIN STAKE. CITY OF FORT COLLINS SENIOR EROSION CONTROL INSPECTOR AMY DOLINGER OBSERVED ON 9/8/2023 NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN JET AND CAMERA 500 LF OF STORM RUNNING EAST-WEST 9/13/2023 NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN (Cole Garner Geo technical - 3rd party testing) Tested 4,000 PSI concrete, rebar, and compaction. Landscape Concepts poured forebay, outlet, and set 18"x6" stones. 9/14/2023. NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN - Landscape Concepts is installing geotextile liner on the sides only and a small amount on bottom to help keep in place per Amy Dolinger email 9/14/2023. Installing reservoir aggregate #57 Gradation 9/18/2023. 1 Devin Lang From:Amy Dolinger <adolinger@fcgov.com> Sent:Thursday, September 14, 2023 12:05 PM To:Devin Lang Cc:Tony Norby; Brian Bledsoe; John Rehmer; Austyn Jones Subject:RE: Dohn Rain Garden Devin, I spoke with Brian and told him that placing the geotextile on the sides only and just a little on the bottom so the media helps keep it in place will work for this particular rain garden. Thanks and keep in touch when you have started to install the fabric Amy Dolinger Senior Erosion Control Inspector Environmental Regulatory Affairs City of Fort Collins Stormwater 970-631-2236 adolinger@fcgov.com Erosion Control Resources may be accessed through www.fcgov.com/erosion Soil Amendment Resources may be accessed through www.fcgov.com/soil-amendment Stormwater Inspection Resources may be found at: www.fcgov.com/stormwaterinspection From: Devin Lang <dlang@dohnconstruction.com> Sent: Wednesday, September 13, 2023 4:21 PM To: Amy Dolinger <adolinger@fcgov.com> Cc: Tony Norby <tony@landscapeconceptsnoco.net>; Brian Bledsoe <bbledsoe@dohnconstruction.com>; John Rehmer <jrehmer@dohnconstruction.com>; Austyn Jones <ajones@dohnconstruction.com> Subject: [EXTERNAL] RE: Dohn Rain Garden Amy, Please see the attached rain garden drawings for the project. Thank you, Lang NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN - Landscape Concepts is installing diaphragm aggregate #8 Gradation 9/19/2023. NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN - Landscape Concepts installed Bioretention media. 9/22/2023 Home Office 3441 E. Harbour Drive, Phoenix, AZ 85034 602.437.9530 Ewingoutdoorsupply.com INVOICE ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌█▌ █▌▌▌▌▌ █▌▌█▌█▌▌ ▌█▌▌▌ ▌█▌█▌▌ 1 of 1 ORDER #16974648 09/21/2023 20639490Ewing Fort Collins South 3501 E. Prospect Rd Fort Collins, CO 80525 PHN 9702217173 FAX 314 #3234658 CREDIT ACCT PAGE SHIP TO:LANDSCAPE CONCEPTS NOCO LLC 808 Schlagel St Fort Collins, CO 80524-4192 PH 970-227-9030 #3234658 SOLD TO:LANDSCAPE CONCEPTS NOCO LLC 526 BASIL LN FORT COLLINS, CO 80521 PH 9702279030 DELIVERY INSTRUCTIONS:Delivery 09/21. See Contractor on arrival. PO#:BUYER:PH: BY:QUOTE#:EIP#:P21 JOB: (970) 227-9030 CYNTHIA C Tony Norby EWING JOB:JOB REF:Schlagel 80524 QTY ORDER QTY SHIP QTY B/O ITEM DESCRIPTION NET EXTENDED LINE# 94094289 1 25.73 0.00 25.73 48.5000 BSM BIORETENTION SAND MEDIA TON SUB-TOTAL:1,247.91 TOTAL FREIGHT:153.92 Total tax for invoice : 0.28: 1,496.32AMOUNT DUE: FILLED BY DATE DELIVERED BY DATE # CARTONS SIGNATURE PRINT NAME No recommendation has been made by, or provided to, the seller concerning the use of the pesticide covered by this invoice. PROPOSITION 65 WARNING: Some of the products on your order may expose you to chemicals that are known to the State of California to cause cancer, birth defects and reproductive harm. Learn more at https://www.p65warnings.ca.gov/ Acknowledgement of receipt of goods listed above. NO CASH REFUNDS. Sale subject to terms and conditions on reverse REMIT TO: Ewing Irrigation Products Inc. P.O. Box 208728 Dallas, TX 75320-8728 * * * REPRINT * * * 2019.1 - 2019-07-05 Home Office 3441 E. Harbour Drive, Phoenix, AZ 85034 602.437.9530 Ewingoutdoorsupply.com INVOICE ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ 1 of 1 ORDER #16943274 09/20/2023 20631836Ewing Fort Collins South 3501 E. Prospect Rd Fort Collins, CO 80525 PHN 9702217173 FAX 314 #3234658 CREDIT ACCT PAGE SHIP TO:LANDSCAPE CONCEPTS NOCO LLC 808 Schlagel St Fort Collins, CO 80524-4192 PH 9702279030 #3234658 SOLD TO:LANDSCAPE CONCEPTS NOCO LLC 526 BASIL LN FORT COLLINS, CO 80521 PH 9702279030 DELIVERY INSTRUCTIONS:Delivery 9/20 See Contractor on arrival PO#:BUYER:PH:New Construction BY:QUOTE#:EIP#:P21 JOB: (970) 227-9030 ANDREA C Tony Norby EWING JOB:JOB REF:Schlagel St 80524 QTY ORDER QTY SHIP QTY B/O ITEM DESCRIPTION NET EXTENDED LINE# 94094289 1 24.97 0.00 24.97 48.5000 BSM BIORETENTION SAND MEDIA TON SUB-TOTAL:1,211.05 TOTAL FREIGHT:153.22 Total tax for invoice : 0.28: 1,455.99AMOUNT DUE: FILLED BY DATE DELIVERED BY DATE # CARTONS SIGNATURE PRINT NAME No recommendation has been made by, or provided to, the seller concerning the use of the pesticide covered by this invoice. PROPOSITION 65 WARNING: Some of the products on your order may expose you to chemicals that are known to the State of California to cause cancer, birth defects and reproductive harm. Learn more at https://www.p65warnings.ca.gov/ Acknowledgement of receipt of goods listed above. NO CASH REFUNDS. Sale subject to terms and conditions on reverse REMIT TO: Ewing Irrigation Products Inc. P.O. Box 208728 Dallas, TX 75320-8728 * * * REPRINT * * * 2019.1 - 2019-07-05 Home Office 3441 E. Harbour Drive, Phoenix, AZ 85034 602.437.9530 Ewingoutdoorsupply.com INVOICE ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌▌█▌ ▌▌█▌█▌▌ ▌█▌▌▌█▌ ▌█▌▌▌ ▌█▌█▌▌ 1 of 1 ORDER #16943289 09/20/2023 20631842Ewing Fort Collins South 3501 E. Prospect Rd Fort Collins, CO 80525 PHN 9702217173 FAX 314 #3234658 CREDIT ACCT PAGE SHIP TO:LANDSCAPE CONCEPTS NOCO LLC 526 BASIL LN FORT COLLINS, CO 80521 PH 9702279030 #3234658 SOLD TO:LANDSCAPE CONCEPTS NOCO LLC 526 BASIL LN FORT COLLINS, CO 80521 PH 9702279030 DELIVERY INSTRUCTIONS:Delivery 9/20 See Contractor on arrival PO#:BUYER:PH:New Construction BY:QUOTE#:EIP#:P21 JOB: (970) 227-9030 ANDREA C Tony Norby EWING JOB:JOB REF:Schlagel St 80524 QTY ORDER QTY SHIP QTY B/O ITEM DESCRIPTION NET EXTENDED LINE# 94094289 1 23.86 0.00 23.86 48.5000 BSM BIORETENTION SAND MEDIA TON SUB-TOTAL:1,157.21 TOTAL FREIGHT:153.22 Total tax for invoice : 0.28: 1,398.08AMOUNT DUE: FILLED BY DATE DELIVERED BY DATE # CARTONS SIGNATURE PRINT NAME No recommendation has been made by, or provided to, the seller concerning the use of the pesticide covered by this invoice. PROPOSITION 65 WARNING: Some of the products on your order may expose you to chemicals that are known to the State of California to cause cancer, birth defects and reproductive harm. Learn more at https://www.p65warnings.ca.gov/ Acknowledgement of receipt of goods listed above. NO CASH REFUNDS. Sale subject to terms and conditions on reverse REMIT TO: Ewing Irrigation Products Inc. P.O. Box 208728 Dallas, TX 75320-8728 * * * REPRINT * * * 2019.1 - 2019-07-05 Home Office 3441 E. Harbour Drive, Phoenix, AZ 85034 602.437.9530 Ewingoutdoorsupply.com INVOICE ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ █▌█▌▌█▌▌ ▌▌█▌▌ ▌█▌█▌▌ 1 of 1 ORDER #16943301 09/20/2023 20631849Ewing Fort Collins South 3501 E. Prospect Rd Fort Collins, CO 80525 PHN 9702217173 FAX 314 #3234658 CREDIT ACCT PAGE SHIP TO:LANDSCAPE CONCEPTS NOCO LLC 808 Schlagel St Fort Collins, CO 80524-4192 PH 9702279030 #3234658 SOLD TO:LANDSCAPE CONCEPTS NOCO LLC 526 BASIL LN FORT COLLINS, CO 80521 PH 9702279030 DELIVERY INSTRUCTIONS:Delivery 9/20 See Contractor on arrival PO#:BUYER:PH:New Construction BY:QUOTE#:EIP#:P21 JOB: (970) 227-9030 ANDREA C Tony Norby EWING JOB:JOB REF:Schlagel St 80524 QTY ORDER QTY SHIP QTY B/O ITEM DESCRIPTION NET EXTENDED LINE# 94094289 1 25.45 0.00 25.45 48.5000 BSM BIORETENTION SAND MEDIA TON SUB-TOTAL:1,234.33 TOTAL FREIGHT:153.22 Total tax for invoice : 0.28: 1,481.02AMOUNT DUE: FILLED BY DATE DELIVERED BY DATE # CARTONS SIGNATURE PRINT NAME No recommendation has been made by, or provided to, the seller concerning the use of the pesticide covered by this invoice. PROPOSITION 65 WARNING: Some of the products on your order may expose you to chemicals that are known to the State of California to cause cancer, birth defects and reproductive harm. Learn more at https://www.p65warnings.ca.gov/ Acknowledgement of receipt of goods listed above. NO CASH REFUNDS. Sale subject to terms and conditions on reverse REMIT TO: Ewing Irrigation Products Inc. P.O. Box 208728 Dallas, TX 75320-8728 * * * REPRINT * * * 2019.1 - 2019-07-05 Home Office 3441 E. Harbour Drive, Phoenix, AZ 85034 602.437.9530 Ewingoutdoorsupply.com INVOICE ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌▌ ▌█▌█▌▌▌ █▌▌█▌▌ ▌█▌█▌▌ 1 of 1 ORDER #16943374 09/21/2023 20633905Ewing Fort Collins South 3501 E. Prospect Rd Fort Collins, CO 80525 PHN 9702217173 FAX 314 #3234658 CREDIT ACCT PAGE SHIP TO:LANDSCAPE CONCEPTS NOCO LLC 808 Schlagel St Fort Collins, CO 80524-4192 PH 9702279030 #3234658 SOLD TO:LANDSCAPE CONCEPTS NOCO LLC 526 BASIL LN FORT COLLINS, CO 80521 PH 9702279030 DELIVERY INSTRUCTIONS:Delivery 9/21 See Contractor on arrival PO#:BUYER:PH:New Construction BY:QUOTE#:EIP#:P21 JOB: (970) 227-9030 ANDREA C Tony Norby EWING JOB:JOB REF:Schlagel St 80524 QTY ORDER QTY SHIP QTY B/O ITEM DESCRIPTION NET EXTENDED LINE# 94094289 1 25.79 0.00 25.79 48.5000 BSM BIORETENTION SAND MEDIA TON SUB-TOTAL:1,250.82 TOTAL FREIGHT:153.22 Total tax for invoice : 0.28: 1,498.76AMOUNT DUE: FILLED BY DATE DELIVERED BY DATE # CARTONS SIGNATURE PRINT NAME No recommendation has been made by, or provided to, the seller concerning the use of the pesticide covered by this invoice. PROPOSITION 65 WARNING: Some of the products on your order may expose you to chemicals that are known to the State of California to cause cancer, birth defects and reproductive harm. Learn more at https://www.p65warnings.ca.gov/ Acknowledgement of receipt of goods listed above. NO CASH REFUNDS. Sale subject to terms and conditions on reverse REMIT TO: Ewing Irrigation Products Inc. P.O. Box 208728 Dallas, TX 75320-8728 * * * REPRINT * * * 2019.1 - 2019-07-05 Home Office 3441 E. Harbour Drive, Phoenix, AZ 85034 602.437.9530 Ewingoutdoorsupply.com INVOICE ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ ▌ ▌█▌█▌▌█▌▌ ▌▌█▌▌█▌ █▌▌▌▌█▌ ▌█▌▌▌▌ █▌▌█▌█▌█▌ ▌▌▌█▌█▌ ▌▌▌▌█▌ ▌█▌▌▌▌ █▌█▌▌▌ ▌█▌█▌▌ 1 of 1 ORDER #16943390 09/21/2023 20634919Ewing Fort Collins South 3501 E. Prospect Rd Fort Collins, CO 80525 PHN 9702217173 FAX 314 #3234658 CREDIT ACCT PAGE SHIP TO:LANDSCAPE CONCEPTS NOCO LLC 808 Schlagel St Fort Collins, CO 80524-4192 PH 9702279030 #3234658 SOLD TO:LANDSCAPE CONCEPTS NOCO LLC 526 BASIL LN FORT COLLINS, CO 80521 PH 9702279030 DELIVERY INSTRUCTIONS:Delivery 9/21 See Contractor on arrival PO#:BUYER:PH:New Construction BY:QUOTE#:EIP#:P21 JOB: (970) 227-9030 ANDREA C Tony Norby EWING JOB:JOB REF:Schlagel St 80524 QTY ORDER QTY SHIP QTY B/O ITEM DESCRIPTION NET EXTENDED LINE# 94094289 1 25.59 0.00 25.59 48.5000 BSM BIORETENTION SAND MEDIA TON SUB-TOTAL:1,241.12 TOTAL FREIGHT:153.22 Total tax for invoice : 0.28: 1,488.32AMOUNT DUE: FILLED BY DATE DELIVERED BY DATE # CARTONS SIGNATURE PRINT NAME No recommendation has been made by, or provided to, the seller concerning the use of the pesticide covered by this invoice. PROPOSITION 65 WARNING: Some of the products on your order may expose you to chemicals that are known to the State of California to cause cancer, birth defects and reproductive harm. Learn more at https://www.p65warnings.ca.gov/ Acknowledgement of receipt of goods listed above. NO CASH REFUNDS. Sale subject to terms and conditions on reverse REMIT TO: Ewing Irrigation Products Inc. P.O. Box 208728 Dallas, TX 75320-8728 * * * REPRINT * * * 2019.1 - 2019-07-05 NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN - Landscape Concepts Seeded. 9/25/2023 NORTHFIELD COMMONS APARTMENTS - (DOHN CONSCTRUCTION) RAIN GARDEN - Landscape Concepts Installed control blanket, and HPTRM Pyramat 75 10/31/2023 DOHN CONSTRUCTION, I NC. SUBMITTED FOR APPROVAL By: Dohn Construction, Inc. 2642 Midpoint Drive Fort Collins, CO 80525 Attention: Ian Shuff alm2s 123 N. College Ave; Ste 204 Fort Collins, CO 80524 RE: Project: Northfield Commons Apartments Subcontractor/Supplier: Landscape Concepts NoCo., 970-227-9030 Submittal #: 329000.02, Revision: 2 Please review the following submittal(s) and return to Devin Lang by 8/19/2023. Submittal Item Status Date Submitted Spec. No. 4 : Rain Garden - Revised Product Data For Approval 08/09/2023 329000-002 R2 General Contractor: Architect/Engineer: DOHN CONSTRUCTION, I NC. REJECTED NO EXCEPTIONS TAKEN MAKE CORRECTION NOTED REVISE AND RESUBMIT BY Devin Lang DATE 8/9/2023 Remarks: Pea Gravel/Diaphragm Aggregate Gradation is ASTM #8, and Reservoir aggregate Gradation is ASTM #57. This review was performed only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Modifications or comments made on the shop drawings and product data during this review do not relieve the Contractor from responsibility for compliance with the requirements of the plans and specifications. Contractor is responsible for: dimensions and quantities; information that pertains solely to the fabrication processes or to the means and methods of construction; coordination of the work of all trades. HIGHLAND DEVELOPMENT SERVICES NO EXCEPTIONS TAKEN BY DATE EXCEPTIONS NOTED REJECTED REVISE & RESUBMIT FOR INFORMATION ONLY 4 jclaeys 8/9/2023 Gradation tests/sieve analysis were not provided for review. The standards noted are acceptable. 1 Devin Lang From:Austyn Jones Sent:Monday, July 17, 2023 12:05 PM To:Devin Lang Subject:FW: RE: NFC - Rain Garden Submittal Attachments:BSM Formula.pdf From: Basil Hamdan <BHAMDAN@fcgov.com> Sent: Monday, July 17, 2023 11:43 AM To: Jason Claeys <jclaeys@highland-ds.com> Cc: Karen Horner <khorner@ewingirrigation.com>; Zach Wiele <zwiele@highland-ds.com>; Brian Bledsoe <bbledsoe@dohnconstruction.com>; John Rehmer <jrehmer@dohnconstruction.com>; Ian Shuff <ishuff@alm2s.com>; Austyn Jones <ajones@dohnconstruction.com>; Kyle Schwall <kschwall@alm2s.com>; gary truitt <gary.truitt@outlook.com>; Joey Trinity <Joey.Trinity@mercyhousing.org> Subject: RE: RE: NFC - Rain Garden Submittal Jason, Due to the difficulty of sourcing sand with a lower PH level we will accept the mix with the current level of PH. Ewing will continue to monitor their PH levels and will provide a mix with the lowest PH possible. Thanks for watching out for this. basil . . . . . . . . . . . . . . . . . . . Basil Hamdan P.E. Stormwater Quality Engineer, Utilities City of Fort Collins 970-222-1801 mobile bhamdan@fcgov.com From: Karen Horner <khorner@ewingirrigation.com> Sent: Monday, July 17, 2023 11:37 AM To: Basil Hamdan <BHAMDAN@fcgov.com> Cc: Jason Claeys <jclaeys@highland-ds.com> Subject: [EXTERNAL] Re: RE: NFC - Rain Garden Submittal Basil, As per our conversation this morning because sand has a higher pH and add all the other ingredients causes the pH to be out of range. We have several sources for sand and will monitor pH levels during production. 2 Jason, I have attached the BSM formula we us when making the BSM for your records. If you have any questions please let me know. Karen Karen Horner Branch Manager | Ewing Outdoor Supply 3501 E. Prospect Rd Fort Collins, CO 80525 P: 970-221-7173 | M: 970-566-5720 | F: khorner@ewingirrigation.com | ewingoutdoorsupply.com This email and any files transmitted with it are confidential and intended solely for the use of the individuals or entities to whom they are addressed too. All content sent from Ewing Irrigation Products Inc. is the sole property of Ewing Irrigation and may not be reproduced or used in any manner without express written permission from Douglas W. York or Richard York. From: Basil Hamdan <BHAMDAN@fcgov.com> Sent: Monday, July 10, 2023 9:39 AM To: Karen Horner <khorner@ewingirrigation.com> Cc: Jason Claeys <jclaeys@highland-ds.com> Subject: Re: RE: NFC - Rain Garden Submittal Karen The engineer rejected the mix due to it not meeting the City specs. Can you respond to the issues and clarify the questions that Jason Claeys raised Thanks Basil On Jul 10, 2023, at 9:19 AM, Jason Claeys <jclaeys@highland-ds.com> wrote: Good Morning All, Attached is what was submitted for the bioretention sand media. The pH is outside of the acceptable range and there was no breakdown of composition (sand/mulch/topsoil/compost). Diaphragm aggregate Glacier Pea Gravel Gradation - ASTM #8 Reservoir aggregate Wyoming Mountain Granite Gradation - ASTM #57 DOHN CONSTRUCTION, I NC. SUBMITTED FOR APPROVAL By: Dohn Construction, Inc. 2642 Midpoint Drive Fort Collins, CO 80525 Attention: Ian Shuff alm2s 123 N. College Ave; Ste 204 Fort Collins, CO 80524 RE: Project: Northfield Commons Apartments Subcontractor/Supplier: Landscape Concepts Submittal #: 329000.03, Revision: 0 Please review the following submittal(s) and return to Devin Lang by 11/17/2023. Submittal Item Status Date Submitted Spec. No. Rain Garden Control Blanket & Pyramat - Product Data For Approval 11/07/2023 329000-003 General Contractor: Architect/Engineer: DOHN CONSTRUCTION, I NC. REJECTED NO EXCEPTIONS TAKEN MAKE CORRECTION NOTED REVISE AND RESUBMIT BY Devin Lang DATE 11/7/2023 Remarks: This review was performed only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Modifications or comments made on the shop drawings and product data during this review do not relieve the Contractor from responsibility for compliance with the requirements of the plans and specifications. Contractor is responsible for: dimensions and quantities; information that pertains solely to the fabrication processes or to the means and methods of construction; coordination of the work of all trades. HIGHLAND DEVELOPMENT SERVICES NO EXCEPTIONS TAKEN BY DATE EXCEPTIONS NOTED REJECTED REVISE & RESUBMIT FOR INFORMATION ONLY 4 jclaeys 11/9/2023 HDS - It appears the proposed EroNet S150 is an acceptable substitution to the Landlok S2 ECB specified on the approved plans. F F F W W W F FF F WW W SS SS SS SS SS W SS SSSS h2o W CS CSCS W W h2o h2o h2o W CS ELECELEC ELEC CSW CS W CS W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 162.29 LF 8" PVC @ 0.40% 59.32 LF 8 " PVC @ 0. 5 2 % 123.82 LF 8" PVC @ 0.39% 50.37 LF 8 " PVC @ 0 . 3 2 % SS S S S S S S HYD W W W W W W W HYD HYD 8' ' W EL E C EL E C ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC W S S S D D S S ST ST ST ST ST ST ST ST ST ST STORM MH RIM=4957.61 INV=4951.30 (W) INV=4951.30 (E) 196.4 LF 30" ADS @ 0.27% STORM MH RIM=4957.32 INV=4951.38 (W) INV=4951.38 (E) STORM INLET RIM=4955.77 INV IN=4952.12 (NW) INV OUT=4952.00 (E) 98.6 LF 18" ADS @ 0.63% FF=4959.56 FF=4958.52 FF=4958.56FF=4958.59 FF=4959.51 FF=4959.45 63.4 4 L F 1 8 " A D S @ 0 . 6 6 % 37.3 LF 30" ADS @ 0.22% FF=4958.66 ACACACACACAC AC AC AC AC AC ACACAC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC W AC AC AC AC AC AC ACACACACACAC FF=4959.78 STORM INLET WEST GRATE FLOWLINE=4955.69 EAST GRATE FLOWLINE=4955.62 INV OUT=4952.54 (SE) ST ST SAN MH RIM=4957.18 INV IN=4953.08 (W) INV OUT=4952.83 (E) SAN MH RIM=4956.37 INV IN=4951.40 (W) INV OUT=4951.33 (E)SAN MH RIM=4956.95 INV IN=4951.17 (W) INV OUT=4950.95 (E) SAN MH RIM=4957.99 INV IN=4950.47 (W) INV OUT=4950.21 (E) SAN MH RIM=4957.40 INV IN=4949.90 (W) INV OUT=4949.78 (E) 357.02 LF 8" PVC @ 0.40% F F W W F W F W F W F W SS SS SS SS SS SS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS CS W CS Wh2o h2o h2o h2o WW CS CS CS W h2o h2o W CS ELEC ELEC ELEC ELEC ELEC SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 332.09 LF 8" PVC @ 0.42% 162.29 LF 8" PVC @ 0.40% 59.32 LF 8 " PVC @ 0. 5 2 % S S S S S S S S S SS HYD W W WW W W HYD 24 ' ' S S 24 ' ' S S 24 ' ' S S 24 ' ' S S 24 ' ' S S 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC 8' ' W 8' ' W IRR 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD EL E C EL E C EL E C S S F E S F E S ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST FL=4946.92 STORM MH RIM=4951.55 INV IN=4947.06 (W) INV OUT=4946.95 (E) 22.8 LF 30" ADS @ 0.13% STORM MH RIM=4954.73 INV IN=4949.91 (S) INV IN=4950.00 (W) INV OUT=4949.88 (E) FL=4949.3662.8 LF 1 2 " A D S @ 0 . 8 3 % STORM MH RIM=4953.77 INV S=4947.77(S) INV OUT=4947.72(E) STORM MH RIM=4954.11 INV IN=4948.61 (W) INV OUT=4948.56 (N) STORM MH RIM=4955.06 INV IN=4949.88 (W) INV OUT=4949.84 (E) 276.0 LF 30" ADS @ 0.45% STORM INLET RIM=4954.87 INV=4950.76 (W, E) 182.5 LF 30" ADS @ 0.48% STORM MH RIM=4957.61 INV=4951.30 (W) INV=4951.30 (E) 196.4 LF 30" ADS @ 0.27% FF=4959.45 126.3 LF 30" ADS @ 0.52% 11 9 . 6 L F 3 0 " A D S @ 0 . 6 6 % FF=4958.66 INV=4951.00 INV=4950.85 23.2 LF 12" ADS @ 0.64% 23.4 LF 12" ADS @ 0.51% INV IN=4950.73 INV OUT=4950.68 INV=4950.56 INV=4950.50 INV=4950.16 17.5 LF 12" ADS @ 0.69% 17.8 LF 12" ADS @ 0.34% 29.3 LF 12" ADS @ 1.16% 16.3 LF 12" ADS @ 0.98% ST ST ST INLET RIM=4955.33 INV=4952.10 INLET RIM=4954.32 INV=4952.84 INLET RIM=4955.53 INV=4952.66 INLET RIM=4955.43 INV=4952.27 26.8 LF 12" ADS @ 0.67% 24.3 LF 12" ADS @ 1.60%18.6 LF 12" ADS @ 0.91% 96.4 LF 12" ADS @ 1.32% ST ST ST ST FL=4955.48 127.0 LF 12" ADS @ 2.08% NOT SHOT SAN MH RIM=4957.99 INV IN=4950.47 (W) INV OUT=4950.21 (E) SAN MH RIM=4957.40 INV IN=4949.90 (W) INV OUT=4949.78 (E) SAN MH RIM=4958.89 INV IN=4949.13 (W) INV OUT=4949.03 (NE) SAN MH RIM=4958.17 INV IN=4948.71 (SW) INV OUT=4948.61 (E) SAN MH RIM=4956.04 INV IN=4947.21 (W) INV OUT=4947.03 (S) SAN MH RIM=4956.53 INV IN=4946.79 (N) INV OUT=4946.56 (E) EX. SAN MH RIM=4956.56 INV IN=4946.25 (W) INV IN=4945.37 (E) INV IN=4945.12 (N) INV OUT=4945.07 (S) 59.93 LF 8" PVC @ 0.40% 59.08 LF 8" PVC @ 0.54% 52.60 LF 8" PVC @ 0.58% SAN MH RIM=4956.17 NORTH Sheet Of 2 Sheets AS - B U I L T S U R V E Y NO T I C E : Ac c o r d i n g t o C o l o r a d o l a w y o u m u s t c o m m e n c e a n y l e g a l a c t i o n b a s e d up o n a n y d e f e c t i n t h i s s u r v e y w i t h i n t h r e e y e a r s a f t e r y o u d i s c o v e r s u c h de f e c t . I n n o e v e n t m a y a n y a c t i o n b a s e d u p o n a n y d e f e c t i n t h i s s u r v e y be c o m m e n c e d m o r e t h a n t e n y e a r s a f t e r t h e d a t e o f t h e c e r t i f i c a t e s h o w n he r e o n . NORTHFIELD COMMONS, LOCATED IN THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO AS-BUILT SURVEY NOTES: 1) This survey does not constitute a title search by Northern Engineering to determine ownership or easements of record. 2) Site layout shown for reference only. 3) The lineal unit of measure for this survey is U.S. Survey Feet. 1 NO R T H F I E L D C O M M O N S FO R T C O L L I N S , C O L O R A D O HDS Comment: Sidewalk culvert was not installed F W F F F F W W W SS SS SS SS SS W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS DSTSTSTST FF=4959.56 FF=4958.52 FF=4958.56FF=4958.59 FF=4959.51 ACACACACACAC AC AC AC AC AC ACACAC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC ACACACACACAC FF=4959.78 ST ST ST F F W W F W F W F W F W SS SS SS SS SS SS SS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD 24 ' ' S S 24 ' ' S S 24 ' ' S S 24 ' ' S S 24 ' ' S S 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS EL E C EL E C EL E C ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC 8' ' W 8' ' W IRR 4'' UD 4'' UD 4'' UD 4'' UD 4'' UD ELEC ELEC D D F E S F E S ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST FF=4959.56 FF=4959.45 FF=4958.66 ST ST STSTSTSTST BUILDING UNDER CONSTRUCTION BUILDING UNDER CONSTRUCTION BUILDING UNDER CONSTRUCTION BUILDING UNDER CONSTRUCTION NORTH Sheet Of 2 Sheets AS - B U I L T S U R V E Y NO T I C E : Ac c o r d i n g t o C o l o r a d o l a w y o u m u s t c o m m e n c e a n y l e g a l a c t i o n b a s e d up o n a n y d e f e c t i n t h i s s u r v e y w i t h i n t h r e e y e a r s a f t e r y o u d i s c o v e r s u c h de f e c t . I n n o e v e n t m a y a n y a c t i o n b a s e d u p o n a n y d e f e c t i n t h i s s u r v e y be c o m m e n c e d m o r e t h a n t e n y e a r s a f t e r t h e d a t e o f t h e c e r t i f i c a t e s h o w n he r e o n . NORTHFIELD COMMONS, LOCATED IN THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO AS-BUILT SURVEY NOTES: 1) This survey does not constitute a title search by Northern Engineering to determine ownership or easements of record. 2) Site layout shown for reference only. 3) See individual buildings as-builts for detailed grading. 4) The lineal unit of measure for this survey is U.S. Survey Feet. The Datum used is NAVD 88. 2 NO R T H F I E L D C O M M O N S FO R T C O L L I N S , C O L O R A D O RAIN GARDEN Tract W (D,U,&AE) Design contours shown in blue COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT BLDG 1 COMMUNITY CENTER BLDG 2 BLDG 3 BLDG 4 BLDG 5 MANGOLD LANE SUNIGA ROAD (115' ROW) ROCKY MOUNTAIN RAPTOR PROGRAM LAK E C A N A L MA T C H L I N E SE E T H I S S H E E T ST E E L E Y D R I V E D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS COMPACT COMPACT COMPACT COMPAC T COMPAC T COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACTCOMPACT COMPACT COMPA C T COMP A C T COM P A C T COM P A C T COMMUNITY BLDG 6 BLDG 7 BLDG 10a BLDG 11a BLDG 13a BLDG 12a MANGOLD LANE SUNIGA ROAD (115' ROW) LA N D M A R K W A Y MA R T I N E Z S T R E E T SWARTZ, DAVID A, MILCAN, SUSAN MARIE LOT 29 MONDRAGON, LUCY V / CHRISTINA M, LOT 28 ROCKY MOUNTAIN RAPTOR PROGRAM MA T C H L I N E SE E T H I S S H E E T ST E E L E Y D R I V E RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 1 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NO R T H F I E L D C O M M O N S DE T A I L E D G R A D I N G P L A N 3/15/22 1" = 40' N/A ACB1 JTC 21-1037-00 C2.01 6 17 1 RF I - 0 0 3 R E S P O N S E - R E V I S E D S D - 0 1 O U T L E T JT C 6/ 2 0 / 2 2 2 CO R R E C T E D S P O T E L E V A T I O N S JT C 7/ 1 8 / 2 2 3 RF I - 0 2 9 S W C H A S E C L A I R I F I C A T I O N PH S 12 / 1 2 / 2 2 N W E S0 SCALE: 1" = 40' 80402040 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR NOTES 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 2.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 3.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 4.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 5.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. 6.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. PROPOSED NORTHFIELD MAJOR CONTOUR PROPOSED NORTHFIELD MINOR CONTOUR NATURAL HABITAT BUFFER ZONE F F W W F W F W F W F W F F W COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPAC T COMPAC T COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACTCOMPACT COMPACT COMPA C T COMP A C T COM P A C T COM P A C T SS W SS SS SS SS SS SS SS ST E E L E Y D R I V E TRACT A TRACT B TRACT C (D&UE) POND D BLDG 1 COMMUNITY CENTER BLDG 6 BLDG 7 BLDG 10a BLDG 11a BLDG 13a BLDG 12a MANGOLD LANE SD01 PROFILE 4945 4950 4955 4960 4965 4945 4950 4955 4960 4965 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+5019+0019+5020+0020+5021+0021+50 F W W D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NORTHFIELD TRACT W (D,U,&AE) POND D BLDG 7 BLDG 10a BLDG 12a SD02 PROFILE 4945 4950 4955 4960 4965 4945 4950 4955 4960 4965 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+50 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 1 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) NO R T H F I E L D C O M M O N S ST O R M P L A N & P R O F I L E 3/15/22 1" = 40' 1" = 4' ACB1 JTC 21-1037-00 C3.03 10 17 1 RF I - 0 0 3 R E S P O N S E - R E V I S E D S D - 0 1 O U T L E T JT C 6/ 2 0 / 2 2 N W E S CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' NOTES: 1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED. 3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE SPRINGLINE OF THE PIPE. CONSTRUCTION NOTES: WRAP SSWR JOINTS 10' EACH SIDE OF CROSSING WITH 12" WIDE BUTYL ADHESIVE TAPE (EZ WRAP OR EQUIVALENT). NO CASING OR ENCASEMENT REQUIRED UNDER ADS HP STORM ONLY, SPECIFIC APPROVAL NEEDED UNDER RCP. RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, HIGHLAND DEVELOPMENT SERVICES AND THE CERTIFYING ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING DUE TO ANY ERRORS OR OMISSIONS THAT MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT OF INCORRECT INFORMATION PROVIDED TO HIGHLAND DEVELOPMENT SERVICES AND THE CERTIFYING ENGINEER. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY. DATE: DENOTES RECORDED DATA PER 4/18/25 NORTHERN ENGINEERING / DOMINANT DIRTWORK I, JASON T. CLAEYS, CERTIFY ALL PUBLIC WATER, WASTEWATER AND STORMWATER SYSTEM IMPROVEMENTS SHOWN HEREIN, INCLUDING ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE WITH THE DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS RECORD DRAWING COPY OF THE FINAL UTILITY PLANS. Highland Development Services, Inc. 6355 Fairgrounds Avenue, Suite 200 | Windsor, CO 80550 | 970.674.7550 Memorandum TO: Dan Mogen – Fort Collins Utilities FROM: Jason T. Claeys, P.E., LEED AP DATE: 8/29/25 PROJECT: Northfield Commons HDS JOB NO: 21-1037-00 SUBJECT: Overall Site Certification The memo has been prepared to provide supplemental information for acceptance of the Overall Site Certification for Tracts A, B, & C of the Northfield Commons, a multi-family residential project located in Fort Collins, CO, south of Suniga Rd and along the east & west sides of Steely Dr. The storm infrastructure was installed by the subcontractors of Dohn Construction. Asbuilt surveyed surface elevations, and the storm drain inverts were provided by Northern Engineers. The asbuilt storm invert elevations were transposed onto the design profiles and are included for reference. The original asbuilt storm survey determined that the pipe between Inlet-D03 and Inlet-D04, under Steely Drive, was constructed with an adverse slope. Dohn has corrected the inlets and reset the pipe as necessary. This correction is represented in the storm drain record drawing and asbuilt survey included. During construction, there was a lead time issue on receiving and installing the section of horizontal elliptical reinforced concrete pipe (HERCP) under the rain garden. The storm drain alignment was adjusted to maintain the pipe out from under the rain garden, a manhole was added, and the 24”x38” HERCP was substituted with a 30” HP Storm pipe. To confirm the effects of the pipe adjustment near the rain garden, the SWMM model was updated. While updating the SWMM model, it came to our attention that the original approved model had pipe sections modeled larger than presented on the construction plans and ultimately constructed. The SWMM-ASB model represents the asbuilt conditions accordingly and the hydraulic performance during a 100-yr storm. The adjusted pipe alignment at the rain garden also performs hydraulically as originally intended. The smaller pipe sizes do cause flooding at (2) locations, SWMM ID FESD03 and ID01, and causes a hydraulic line at Inlet-D07 (not modeled in SWMM) to exceed the rim elevation. SWMM ID FESD03 correlates with the construction plans FES-D03 and is located adjacent to the sidewalk and rain garden. The pipe leaving this node was originally modeled as an 18” pipe and was constructed as a 12” pipe per the construction plans, causing the node to flood. The flooding NFC – Overall Site Cert 8/29/25 Page 2 of 2 at this location will spill at elevation 4953.67 ft over the sidewalk and into the rain garden, ultimately to the detention pond. Minor ponding in Mangold Ln occurs at the very east end of the drive and does not exceed 0.3 ft in depth (4”). The ponding does not inundate any adjacent buildings and is contained onsite without creating significant hazard during a 100-yr storm event. SWMM ID ID01 correlates with the construction plans INLET-D01 and is located on the east side of Tract A within the parking area. The (2) segments of pipe downstream of this inlet were originally modeled as 24” pipes and were constructed as 18” pipes per the construction plans, causing flooding at this node. It was iteratively determined that the flooding occurs for a short time period of 4 minutes between minutes 38 and 42. The flooding volume, determined by SWMM, is 6,000 gallons, which converts to approximately 802 cu-ft of volume. It is estimated that this volume ponds to an approximate depth of 0.72 ft (approximately 9”) within the parking lot. The ponding does not inundate any adjacent buildings, is below the allowed parking lot ponding depth of 1.0 ft (12”). The ponding is contained onsite without creating significant hazard during a 100-yr storm event. As coordinated, parking lot ponding signs have been installed, delineating the limits of potential flooding in the parking lot. Reference the attached exhibit. The individual yard drains were not modeled due to the small basin area contributing to each yard drain inlet. The model applies the compiled yard basins into SWMM ID06, which correlates to INLET-D16 of the construction plans. The (2) segments of pipe downstream of this inlet were originally modeled as 18” pipes and were constructed as a 12” pipe per the construction plans. The smaller pipes caused the 100-yr hydraulic grade line (HGL) to be higher than intended per the original SWMM model. The higher HGL causes some minor ponding at the yard drains with the greatest depth, between the inlet rim and the 100-yr HGL, at INLET-D07. The 100-yr HGL is estimated to be at elevation 4955.59 ft. The ponding does not inundate any adjacent buildings and is contained onsite without creating significant hazard during a 100-yr storm event. Please reference the attached supporting SWMM models, exhibits, and calculations. Though there are discrepancies between the construction plans, the original SWMM model, and asbuilt elevations, we believe that the asbuilt storm system will hydraulically perform in a manner that will not exceed the City’s allowed parking lot ponding depths and structures are elevated such that there is no adverse effect during a 100-yr storm event. The remaining items that needed to be addressed and have been completed include: - The rain garden low spot has been filled and seeded with erosion protection (TRM) intact. This area will be irrigated to assist in the seed becoming established. - The “no dumping” medallions have been added to the Type C inlets. - The parking lot ponding signs have been installed. - The wood appears to have been removed from the inlet at Steely Drive. - The outlet flared end section, FES-01, has been corrected to eliminate the ponding within the flared end section. Please reference the included Pond Outfall Correction Detail that includes a photo of completion. Original Approved SWMM Model 18-1000-00 NF Commons SWMM.inp [TITLE] ;;Project Title/Notes Northfield 100-yr Storm Routing 9/27/19 [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING DYNWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 03/11/2019 START_TIME 00:00:00 REPORT_START_DATE 03/11/2019 REPORT_START_TIME 00:00:00 END_DATE 03/11/2019 END_TIME 06:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 00:05:00 WET_STEP 00:05:00 DRY_STEP 00:05:00 ROUTING_STEP 0:01:00 RULE_STEP 00:00:00 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.566 MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- CONSTANT 0.0 DRY_ONLY NO [RAINGAGES] Page 1 18-1000-00 NF Commons SWMM.inp ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- CoFC_100-yr INTENSITY 0:05 1.0 TIMESERIES CoFC_100-yr [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- D02 CoFC_100-yr ID03 0.074 100 29 1.62 0 D03 CoFC_100-yr ID04 0.074 100 28 1.62 0 D05 CoFC_100-yr FESD02 0.811 40.7 97 1.00 0 D06 CoFC_100-yr ID06 .16 42.5 40 1.08 0 D07 CoFC_100-yr FESD03 1.908 69.8 109 0.84 0 D14 CoFC_100-yr VD1 2.77 4.3 173 1.03 0 E06 CoFC_100-yr IE02 1.15 81.8 100 0.5 0 E08 CoFC_100-yr IE01 1.35 67.8 118 0.5 0 D01 CoFC_100-yr ID01 3.15 48.5 236 1.34 0 D04 CoFC_100-yr ID05 0.235 17.2 50 1.78 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- D02 0.01 0.1 .1 .3 1 OUTLET D03 0.01 0.1 .1 .3 1 OUTLET D05 0.01 0.1 .1 .3 1 OUTLET D06 0.01 0.1 .1 .3 1 OUTLET D07 0.01 0.1 .1 .3 1 OUTLET D14 0.01 0.1 .1 .3 1 OUTLET E06 0.01 0.1 .1 .3 1 OUTLET E08 0.01 0.1 .1 .3 1 OUTLET D01 0.01 0.1 0.1 0.3 1 OUTLET D04 0.01 0.1 0.1 0.3 1 OUTLET [INFILTRATION] ;;Subcatchment MaxRate MinRate Decay DryTime MaxInfil ;;-------------- ---------- ---------- ---------- ---------- ---------- D02 3.0 0.5 6.48 7 0 D03 3.0 0.5 6.48 7 0 D05 3.0 0.5 4 7 0 D06 3.0 0.5 4 7 0 D07 3.0 0.5 4 7 0 D14 3.0 0.5 6.48 7 0 E06 3.0 0.5 4 7 0 E08 3.0 0.5 4 7 0 D01 3.0 0.5 4 7 0 D04 3.0 0.5 4 7 0 [JUNCTIONS] ;;Name Elevation MaxDepth InitDepth SurDepth Aponded ;;-------------- ---------- ---------- ---------- ---------- ---------- FESD03 4952.21 1 0 0 0 FESD02 4955.43 1 0 0 0 Page 2 18-1000-00 NF Commons SWMM.inp ID04 4951.21 6.35 0 0 0 ID03 4951.38 6.18 0 0 0 ID02 4951.86 4.27 0 0 0 ID06 4949.97 3.23 0 0 0 IE01 4944.6 6.6 0 0 0 IE02 4944.77 6.2 0 0 0 MHD03 4947.52 6.56 0 0 0 MHD01A 4949.83 3.97 0 0 0 MHD02 4948.10 6.19 0 0 0 MHD01 4949.41 5.81 0 0 0 OD1 4945.11 5.89 0 0 0 ID05 4950.26 4.68 0 0 0 ID01 4952.17 2.71 0 0 0 [OUTFALLS] ;;Name Elevation Type Stage Data Gated Route To ;;-------------- ---------- ---------- ---------------- -------- ---------------- Out3 4943.69 TIMESERIES NECCO_A7 NO [STORAGE] ;;Name Elev. MaxDepth InitDepth Shape Curve Name/Params N/A Fevap Psi Ksat IMD ;;-------------- -------- ---------- ----------- ---------- ---------------------------- -------- -------- -------- -------- VD1 4945.65 5.38 0 TABULAR Pond_D 0 0 [CONDUITS] ;;Name From Node To Node Length Roughness InOffset OutOffset InitFlow MaxFlow ;;-------------- ---------------- ---------------- ---------- ---------- ---------- ---------- ---------- ---------- PD03 ID03 ID04 36 .012 0 0 0 0 PD06 MHD01 MHD02 278.26 .012 0 0 0 0 PD07 MHD02 MHD03 123.61 .012 0 0 0 0 PD08 MHD03 VD1 154.42 .016 0 0 0 0 PD13 OD1 IE02 48 .012 0 .1 0 0 PD09 FESD02 ID06 130.04 .012 0 0 0 0 PD10 ID06 MHD01A 17 .012 0 0 0 0 PD11 FESD03 MHD01A 14 .012 0 0 0 0 PD12 MHD01A VD1 65.47 .012 0 0 0 0 PE01 IE02 IE01 65 .012 0 0 0 0 PE02 IE01 Out3 22 .016 0 0 0 0 PD04 ID04 ID05 201.22 0.012 0 0 0 0 PD05 ID05 MHD01 181.20 0.012 0 0 0 0 PD02 ID02 ID03 102.27 0.012 0 0 0 0 PD01 ID01 ID02 66.90 0.012 0 0 0 0 [ORIFICES] ;;Name From Node To Node Type Offset Qcoeff Gated CloseTime ;;-------------- ---------------- ---------------- ------------ ---------- ---------- -------- ---------- OutD1 VD1 OD1 SIDE -.51 0.65 NO 0 [XSECTIONS] ;;Link Shape Geom1 Geom2 Geom3 Geom4 Barrels Culvert ;;-------------- ------------ ---------------- ---------- ---------- ---------- ---------- ---------- Page 3 18-1000-00 NF Commons SWMM.inp PD03 CIRCULAR 2.5 0 0 0 1 PD06 CIRCULAR 2.5 0 0 0 1 PD07 CIRCULAR 2.5 0 0 0 1 PD08 HORIZ_ELLIPSE 2.000 3.167 4 0 1 PD13 CIRCULAR 1.5 0 0 0 1 PD09 CIRCULAR 1 0 0 0 1 PD10 CIRCULAR 1.5 0 0 0 1 PD11 CIRCULAR 1.5 0 0 0 1 PD12 CIRCULAR 1.5 0 0 0 1 PE01 CIRCULAR 2.5 0 0 0 1 PE02 CIRCULAR 2.5 0 0 0 1 PD04 CIRCULAR 2.5 0 0 0 1 PD05 CIRCULAR 2.5 0 0 0 1 PD02 CIRCULAR 2.0 0 0 0 1 PD01 CIRCULAR 2.0 0 0 0 1 OutD1 CIRCULAR 0.3958 0 0 0 [CURVES] ;;Name Type X-Value Y-Value ;;-------------- ---------- ---------- ---------- ;Pond D Pond_D Storage 0 0 Pond_D .38 953 Pond_D 0.88 4839 Pond_D 1.38 8716 Pond_D 1.88 10860 Pond_D 2.38 19723 Pond_D 2.88 29964 Pond_D 3.38 42821 Pond_D 3.88 52864 Pond_D 4.38 59809 Pond_D 4.88 65735 Pond_D 5.38 74113 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- ;CoFC Rainfall Data CoFC_100-yr 0:5 1.00 CoFC_100-yr 0:10 1.14 CoFC_100-yr 0:15 1.33 CoFC_100-yr 0:20 2.23 CoFC_100-yr 0:25 2.84 CoFC_100-yr 0:30 5.49 CoFC_100-yr 0:35 9.95 CoFC_100-yr 0:40 4.12 CoFC_100-yr 0:45 2.48 CoFC_100-yr 0:50 1.46 CoFC_100-yr 0:55 1.22 CoFC_100-yr 0:60 1.06 CoFC_100-yr 1:05 1.00 Page 4 Pond D Outlet Structure 100-yr Orifice Diameter Modeled as 24" pipes, installed per construction plans as 18" pipes Due to product availability, this pipe was adjusted to a 30". Alignment was adjusted & manhole added to manage pipe cover Modeled as 18" pipes, installed per construction plans as 12" pipes 18-1000-00 NF Commons SWMM.inp CoFC_100-yr 1:10 0.95 CoFC_100-yr 1:15 0.91 CoFC_100-yr 1:20 0.87 CoFC_100-yr 1:25 0.84 CoFC_100-yr 1:30 0.81 CoFC_100-yr 1:35 0.78 CoFC_100-yr 1:40 0.75 CoFC_100-yr 1:45 0.73 CoFC_100-yr 1:50 0.71 CoFC_100-yr 1:55 0.69 CoFC_100-yr 2:00 0.67 ; NECCO_A7 FILE "NECCO A7 HGL.dat" [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS -3908.103 305.049 14377.949 10305.049 Units Feet [COORDINATES] ;;Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ FESD03 6155.843 3257.701 FESD02 4380.843 3320.872 ID04 3377.528 2581.392 ID03 3232.605 2581.392 ID02 2801.551 2578.915 ID06 6085.239 3313.441 IE01 7717.391 3716.421 IE02 7717.391 3460.461 MHD03 6132.308 3090.482 MHD01A 6155.843 3312.202 MHD02 6129.831 2572.722 MHD01 4970.445 2575.199 OD1 7711.599 3239.121 ID05 4216.459 2577.632 ID01 2590.979 2767.191 Out3 7678.866 3850.518 VD1 7380.785 3141.386 [VERTICES] ;;Link X-Coord Y-Coord ;;-------------- ------------------ ------------------ Page 5 18-1000-00 NF Commons SWMM.inp [Polygons] ;;Subcatchment X-Coord Y-Coord ;;-------------- ------------------ ------------------ D02 3022.186 2334.342 D03 3653.581 2288.346 D05 4047.074 3141.975 D05 4047.074 3141.975 D05 4047.074 3141.975 D05 4041.798 3139.337 D05 4041.798 3139.337 D05 4039.160 3139.337 D05 4025.971 3152.527 D05 4049.712 3147.251 D05 4047.074 3136.700 D05 4041.798 3139.337 D06 5929.168 3189.774 D06 5926.530 3200.325 D06 5929.168 3195.049 D06 5939.720 3189.774 D06 5926.530 3187.136 D06 5923.892 3197.687 D07 5929.438 3037.799 D07 5947.903 3048.350 D07 5947.903 3037.799 D07 5937.351 3037.799 D07 5937.351 3050.988 D14 9344.320 2878.413 E06 8089.409 3467.568 E06 8099.960 3454.379 E06 8084.133 3457.017 E06 8092.047 3470.206 E08 8113.150 3731.355 E08 8121.063 3731.355 E08 8126.339 3731.355 E08 8113.150 3715.528 E08 8097.323 3731.355 E08 8102.598 3731.355 D01 2279.456 2839.653 D01 2568.064 2764.095 D04 4137.238 2587.721 D04 3993.622 2769.634 [SYMBOLS] ;;Gage X-Coord Y-Coord ;;-------------- ------------------ ------------------ CoFC_100-yr 4485.211 4295.822 [PROFILES] ;;Name Links ;;-------------- ---------- Page 6 18-1000-00 NF Commons SWMM.inp "South Main " PD01 PD02 PD03 PD04 PD05 "South Main " PD06 PD07 PD08 OutD1 PD13 "South Main " PE01 PE02 Page 7 18-1000-00 NF Commons SWMM.rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.013) -------------------------------------------------------------- NF Commons 100-yr Storm Routing 9/8/21 ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Surcharge Method ......... EXTRAN Starting Date ............ 03/11/2019 00:00:00 Ending Date .............. 03/11/2019 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 00:05:00 Routing Time Step ........ 60.00 sec Variable Time Step ....... YES Maximum Trials ........... 8 Number of Threads ........ 1 Head Tolerance ........... 0.005000 ft ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 3.572 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 1.046 1.074 Surface Runoff ........... 2.503 2.572 Final Storage ............ 0.046 0.047 Page 1 18-1000-00 NF Commons SWMM.rpt Continuity Error (%) ..... -0.640 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 2.503 0.816 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 1.127 0.367 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 1.377 0.449 Continuity Error (%) ..... -0.018 ************************* Highest Continuity Errors ************************* Node MHD03 (1.73%) Node MHD02 (1.32%) *************************** Time-Step Critical Elements *************************** Link PE02 (52.22%) Link PD11 (47.14%) ******************************** Highest Flow Instability Indexes ******************************** Link PE02 (6) Link PE01 (4) Link PD13 (3) ************************* Routing Time Step Summary ************************* Minimum Time Step : 0.50 sec Average Time Step : 1.22 sec Maximum Time Step : 60.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 2.04 Percent Not Converging : 0.40 Page 2 18-1000-00 NF Commons SWMM.rpt *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ D02 3.67 0.00 0.00 0.00 3.59 0.00 3.59 0.01 0.74 0.979 D03 3.67 0.00 0.00 0.00 3.59 0.00 3.59 0.01 0.74 0.979 D05 3.67 0.00 0.00 1.19 1.46 1.00 2.46 0.05 4.89 0.671 D06 3.67 0.00 0.00 1.12 1.53 1.02 2.55 0.01 1.19 0.694 D07 3.67 0.00 0.00 0.61 2.51 0.50 3.01 0.16 13.79 0.821 D14 3.67 0.00 0.00 1.90 0.15 1.62 1.77 0.13 5.85 0.483 E06 3.67 0.00 0.00 0.36 2.94 0.32 3.26 0.10 9.53 0.888 E08 3.67 0.00 0.00 0.65 2.44 0.54 2.98 0.11 9.91 0.812 D01 3.67 0.00 0.00 1.05 1.74 0.86 2.60 0.22 19.68 0.709 D04 3.67 0.00 0.00 1.62 0.62 1.45 2.07 0.01 1.33 0.563 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- FESD03 JUNCTION 0.13 0.55 4952.76 0 00:40 0.55 FESD02 JUNCTION 0.12 0.57 4956.00 0 00:40 0.57 ID04 JUNCTION 0.33 1.56 4952.77 0 00:40 1.51 ID03 JUNCTION 0.33 1.54 4952.92 0 00:40 1.51 ID02 JUNCTION 0.35 1.73 4953.59 0 00:40 1.70 ID06 JUNCTION 0.18 0.92 4950.89 0 00:40 0.91 IE01 JUNCTION 2.00 5.49 4950.09 0 00:39 3.71 IE02 JUNCTION 1.85 2.66 4947.43 0 00:44 2.63 MHD03 JUNCTION 1.63 2.01 4949.53 0 02:20 2.00 MHD01A JUNCTION 0.20 0.95 4950.78 0 00:40 0.95 MHD02 JUNCTION 1.19 1.56 4949.66 0 00:41 1.42 MHD01 JUNCTION 0.35 1.59 4951.00 0 00:41 1.46 OD1 JUNCTION 1.52 3.74 4948.85 0 00:38 2.30 ID05 JUNCTION 0.34 1.60 4951.86 0 00:40 1.51 ID01 JUNCTION 0.36 1.83 4954.00 0 00:40 1.82 Out3 OUTFALL 2.88 3.69 4947.38 0 00:44 3.68 VD1 STORAGE 3.34 3.87 4949.52 0 02:21 3.87 Page 3Pond D 100-yr WSE 18-1000-00 NF Commons SWMM.rpt ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- FESD03 JUNCTION 13.79 13.79 0 00:40 0.156 0.156 0.001 FESD02 JUNCTION 4.89 4.89 0 00:40 0.0542 0.0542 0.000 ID04 JUNCTION 0.74 21.05 0 00:40 0.00722 0.237 -0.002 ID03 JUNCTION 0.74 20.35 0 00:40 0.00722 0.23 -0.006 ID02 JUNCTION 0.00 19.64 0 00:40 0 0.222 0.003 ID06 JUNCTION 1.19 6.05 0 00:40 0.0111 0.0653 -0.000 IE01 JUNCTION 9.91 24.29 0 00:39 0.109 0.366 -0.233 IE02 JUNCTION 9.53 10.39 0 00:38 0.102 0.258 0.281 MHD03 JUNCTION 0.00 21.76 0 00:41 0 0.248 1.762 MHD01A JUNCTION 0.00 19.73 0 00:40 0 0.221 -0.010 MHD02 JUNCTION 0.00 22.17 0 00:41 0 0.251 1.334 MHD01 JUNCTION 0.00 22.30 0 00:41 0 0.25 -0.108 OD1 JUNCTION 0.00 3.12 0 00:38 0 0.157 0.064 ID05 JUNCTION 1.33 22.38 0 00:40 0.0132 0.25 -0.001 ID01 JUNCTION 19.68 19.68 0 00:40 0.222 0.222 0.004 Out3 OUTFALL 0.00 33.77 0 00:38 0 0.367 0.000 VD1 STORAGE 5.85 44.65 0 00:41 0.133 0.598 0.956 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- IE01 JUNCTION 0.58 2.989 1.111 IE02 JUNCTION 0.09 0.159 3.541 OD1 JUNCTION 3.32 2.239 2.151 ********************* Node Flooding Summary ********************* No nodes were flooded. Page 4 Pond D Peak Inflow 18-1000-00 NF Commons SWMM.rpt ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- VD1 54.398 33 0 0 71.557 43 0 02:21 1.20 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- Out3 99.90 3.22 33.77 0.367 ----------------------------------------------------------- System 99.90 3.22 33.77 0.367 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- PD03 CONDUIT 20.34 0 00:40 6.39 0.67 0.62 PD06 CONDUIT 22.17 0 00:41 6.84 0.73 0.63 PD07 CONDUIT 21.76 0 00:41 8.26 0.71 0.68 PD08 CONDUIT 21.50 0 00:41 4.99 0.57 1.00 PD13 CONDUIT 2.93 0 00:37 2.04 0.36 1.00 PD09 CONDUIT 4.86 0 00:40 7.83 0.61 0.74 PD10 CONDUIT 6.13 0 00:40 5.37 0.59 0.62 PD11 CONDUIT 13.79 0 00:40 15.70 0.29 0.50 PD12 CONDUIT 19.78 0 00:40 12.82 0.69 0.82 PE01 CONDUIT 15.01 0 00:39 4.27 0.66 1.00 PE02 CONDUIT 33.77 0 00:38 7.52 0.50 1.00 PD04 CONDUIT 21.11 0 00:40 6.52 0.69 0.63 PD05 CONDUIT 22.30 0 00:41 6.79 0.73 0.63 PD02 CONDUIT 19.63 0 00:40 7.21 1.17 0.81 PD01 CONDUIT 19.64 0 00:40 6.69 1.18 0.88 OutD1 ORIFICE 1.19 0 05:51 1.00 Page 5 Pond D 100-yr Detention Volume 18-1000-00 NF Commons SWMM.rpt *************************** Flow Classification Summary *************************** ------------------------------------------------------------------------------------- Adjusted ---------- Fraction of Time in Flow Class ---------- /Actual Up Down Sub Sup Up Down Norm Inlet Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl ------------------------------------------------------------------------------------- PD03 1.00 0.00 0.00 0.00 0.52 0.48 0.00 0.00 0.64 0.00 PD06 1.00 0.00 0.00 0.00 0.79 0.21 0.00 0.00 0.71 0.00 PD07 1.00 0.00 0.00 0.00 0.84 0.16 0.00 0.00 0.05 0.00 PD08 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.09 0.00 PD13 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.01 0.03 0.00 PD09 1.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.97 0.00 PD10 1.00 0.00 0.00 0.00 0.52 0.48 0.00 0.00 0.65 0.00 PD11 1.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.98 0.00 PD12 1.00 0.00 0.00 0.00 0.81 0.19 0.00 0.00 0.93 0.00 PE01 1.00 0.00 0.00 0.00 0.94 0.06 0.00 0.00 0.00 0.00 PE02 1.00 0.00 0.00 0.00 0.97 0.03 0.00 0.00 0.05 0.00 PD04 1.00 0.00 0.00 0.00 0.53 0.47 0.00 0.00 0.89 0.00 PD05 1.00 0.00 0.00 0.00 0.52 0.48 0.00 0.00 0.89 0.00 PD02 1.00 0.00 0.00 0.00 0.50 0.50 0.00 0.00 0.26 0.00 PD01 1.00 0.00 0.00 0.00 0.57 0.43 0.00 0.00 0.88 0.00 ************************* Conduit Surcharge Summary ************************* ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- PD08 0.11 0.11 5.36 0.01 0.01 PD13 3.32 3.32 3.85 0.01 0.01 PD12 0.01 0.01 5.43 0.01 0.01 PE01 0.09 0.09 0.57 0.01 0.01 PE02 0.57 0.57 4.28 0.01 0.01 PD02 0.01 0.01 0.01 0.05 0.01 PD01 0.01 0.01 0.01 0.05 0.01 Analysis begun on: Thu Sep 2 15:13:46 2021 Analysis ended on: Thu Sep 2 15:13:46 2021 Total elapsed time: < 1 sec Page 6 D02 D03 D05 D06 D07 D14 E06 E08 D01 D04 PD03 PD06 PD07 PD08 PD13 PD09 PD10PD11 PD12 PE01 PE02 PD04 PD05PD02 PD01 4 OutD1 FESD03 FESD02 ID04ID03ID02 ID06 IE01 IE02 MHD03 MHD01A MHD02MHD01 OD1 ID05 ID01 MHD03a Out3 VD1 CoFC_100-yr 03/11/2019 00:05:00 NF Commons SWMM 5.1 Page 1 Revised pipe alignment at rain garden Asbuilt SWMM Model 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp [TITLE] ;;Project Title/Notes NF Commons 100-yr Storm Routing - Asbuilt 5/13/25 [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING DYNWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 03/11/2019 START_TIME 00:00:00 REPORT_START_DATE 03/11/2019 REPORT_START_TIME 00:00:00 END_DATE 03/11/2019 END_TIME 06:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 00:05:00 WET_STEP 00:05:00 DRY_STEP 00:05:00 ROUTING_STEP 0:01:00 RULE_STEP 00:00:00 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.566 MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- CONSTANT 0.0 DRY_ONLY NO [RAINGAGES] Page 1 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- CoFC_Rainfall INTENSITY 0:05 1.0 TIMESERIES CoFC_100-yr [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- D02 CoFC_Rainfall ID03 0.07 100 29 1.62 0 D03 CoFC_Rainfall ID04 0.07 100 28 1.62 0 D05 CoFC_Rainfall FESD02 0.81 40.7 97 1.00 0 D06 CoFC_Rainfall ID06 0.16 42.5 40 1.08 0 D07 CoFC_Rainfall FESD03 1.91 69.8 109 0.84 0 D14 CoFC_Rainfall VD1 2.77 4.3 173 1.03 0 E06 CoFC_Rainfall IE02 1.15 81.8 100 0.5 0 E08 CoFC_Rainfall IE01 1.35 67.8 118 0.5 0 D01 CoFC_Rainfall ID01 3.15 48.5 236 1.34 0 D04 CoFC_Rainfall ID05 0.24 17.2 50 1.78 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- D02 0.01 0.1 .1 .3 1 OUTLET D03 0.01 0.1 .1 .3 1 OUTLET D05 0.01 0.1 .1 .3 1 OUTLET D06 0.01 0.1 .1 .3 1 OUTLET D07 0.01 0.1 .1 .3 1 OUTLET D14 0.01 0.1 .1 .3 1 OUTLET E06 0.01 0.1 .1 .3 1 OUTLET E08 0.01 0.1 .1 .3 1 OUTLET D01 0.01 0.1 0.1 0.3 1 OUTLET D04 0.01 0.1 0.1 0.3 1 OUTLET [INFILTRATION] ;;Subcatchment Param1 Param2 Param3 Param4 Param5 ;;-------------- ---------- ---------- ---------- ---------- ---------- D02 3.0 0.5 4 7 0 D03 3.0 0.5 4 7 0 D05 3.0 0.5 4 7 0 D06 3.0 0.5 4 7 0 D07 3.0 0.5 4 7 0 D14 3.0 0.5 4 7 0 E06 3.0 0.5 4 7 0 E08 3.0 0.5 4 7 0 D01 3.0 0.5 4 7 0 D04 3.0 0.5 4 7 0 [JUNCTIONS] ;;Name Elevation MaxDepth InitDepth SurDepth Aponded ;;-------------- ---------- ---------- ---------- ---------- ---------- FESD03 4952.21 1.5 0 0 0 FESD02 4955.43 1 0 0 0 Page 2 Asbuilt inverts & depths 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp ID04 4951.30 6.31 0 0 0 ID03 4951.38 5.94 0 0 0 ID02 4952.00 3.77 0 0 0 ID06 4950.16 3.34 0 1 0 IE01 4944.6 6.6 0 0 0 IE02 4944.77 6.2 0 0 0 MHD03 4947.72 6.56 0 0 0 MHD01A 4949.88 4.94 0 0 0 MHD02 4948.56 6.19 0 0 0 MHD01 4949.84 5.81 0 0 0 OD1 4945.11 5.89 0 0 0 ID05 4950.76 4.68 0 0 0 ID01 4952.54 3.12 0 0 0 MHD03a 4946.95 4.6 0 0 0 [OUTFALLS] ;;Name Elevation Type Stage Data Gated Route To ;;-------------- ---------- ---------- ---------------- -------- ---------------- Out3 4943.69 NORMAL NO [STORAGE] ;;Name Elev. MaxDepth InitDepth Shape Curve Type/Params SurDepth Fevap Psi Ksat IMD ;;-------------- -------- ---------- ----------- ---------- ---------------------------- --------- -------- -------- -------- VD1 4945.65 5.38 0 TABULAR Pond_D 0 0 [CONDUITS] ;;Name From Node To Node Length Roughness InOffset OutOffset InitFlow MaxFlow ;;-------------- ---------------- ---------------- ---------- ---------- ---------- ---------- ---------- ---------- PD03 ID03 ID04 36 0.012 0 0 0 0 PD06 MHD01 MHD02 278.26 0.012 0 0 0 0 PD07 MHD02 MHD03 123.61 0.012 0 0 0 0 PD08 MHD03 MHD03a 124 0.012 0 0 0 0 PD13 OD1 IE02 48 0.012 0 0.1 0 0 PD09 FESD02 ID06 130.04 0.012 0 0 0 0 PD10 ID06 MHD01A 17 0.012 0 0 0 0 PD11 FESD03 MHD01A 14 0.012 0 0 0 0 PD12 MHD01A VD1 65.47 0.012 0 0 0 0 PE01 IE02 IE01 65 0.012 0 0 0 0 PE02 IE01 Out3 22 0.016 0 0 0 0 PD04 ID04 ID05 201.22 0.012 0 0 0 0 PD05 ID05 MHD01 181.20 0.012 0 0 0 0 PD02 ID02 ID03 102.27 0.012 0 0 0 0 PD01 ID01 ID02 66.90 0.012 0 0 0 0 4 MHD03a VD1 21 0.012 0 1.27 0 0 [ORIFICES] ;;Name From Node To Node Type Offset Qcoeff Gated CloseTime ;;-------------- ---------------- ---------------- ------------ ---------- ---------- -------- ---------- OutD1 VD1 OD1 SIDE -.51 0.65 NO 0 [XSECTIONS] Page 3 Asbuilt inverts & depths 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp ;;Link Shape Geom1 Geom2 Geom3 Geom4 Barrels Culvert ;;-------------- ------------ ---------------- ---------- ---------- ---------- ---------- ---------- PD03 CIRCULAR 2.5 0 0 0 1 PD06 CIRCULAR 2.5 0 0 0 1 PD07 CIRCULAR 2.5 0 0 0 1 PD08 CIRCULAR 2.5 0 0 0 1 PD13 CIRCULAR 1.5 0 0 0 1 PD09 CIRCULAR 1 0 0 0 1 PD10 CIRCULAR 1 0 0 0 1 PD11 CIRCULAR 1 0 0 0 1 PD12 CIRCULAR 1 0 0 0 1 PE01 CIRCULAR 2.5 0 0 0 1 PE02 CIRCULAR 2.5 0 0 0 1 PD04 CIRCULAR 2.5 0 0 0 1 PD05 CIRCULAR 2.5 0 0 0 1 PD02 CIRCULAR 1.5 0 0 0 1 PD01 CIRCULAR 1.5 0 0 0 1 4 CIRCULAR 2.5 0 0 0 1 OutD1 CIRCULAR 0.3958 0 0 0 [CURVES] ;;Name Type X-Value Y-Value ;;-------------- ---------- ---------- ---------- ;Pond D Pond_D Storage 0 0 Pond_D .38 953 Pond_D 0.88 4839 Pond_D 1.38 8716 Pond_D 1.88 10860 Pond_D 2.38 19723 Pond_D 2.88 29964 Pond_D 3.38 42821 Pond_D 3.88 52864 Pond_D 4.38 59809 Pond_D 4.88 65735 Pond_D 5.38 74113 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- ;CoFC Rainfall Data CoFC_2-yr 0:05 0.29 CoFC_2-yr 0:10 0.33 CoFC_2-yr 0:15 0.38 CoFC_2-yr 0:20 0.64 CoFC_2-yr 0:25 0.81 CoFC_2-yr 0:30 1.57 CoFC_2-yr 0:35 2.85 CoFC_2-yr 0:40 1.18 CoFC_2-yr 0:45 0.71 CoFC_2-yr 0:50 0.42 Page 4 Asbuilt pipe sizes Pipe size for revised rain garden pipe alignment Add'l pipe for revised rain garden alignment 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp CoFC_2-yr 0:55 0.35 CoFC_2-yr 1:00 0.30 CoFC_2-yr 1:05 0.20 CoFC_2-yr 1:10 0.19 CoFC_2-yr 1:15 0.18 CoFC_2-yr 1:20 0.17 CoFC_2-yr 1:25 0.17 CoFC_2-yr 1:30 0.16 CoFC_2-yr 1:35 0.15 CoFC_2-yr 1:40 0.15 CoFC_2-yr 1:45 0.14 CoFC_2-yr 1:50 0.14 CoFC_2-yr 1:55 0.13 CoFC_2-yr 2:00 0.13 ; ;CoFC Rainfall Data CoFC_5-yr 0:05 0.40 CoFC_5-yr 0:10 0.45 CoFC_5-yr 0:15 0.53 CoFC_5-yr 0:20 0.89 CoFC_5-yr 0:25 1.13 CoFC_5-yr 0:30 2.19 CoFC_5-yr 0:35 3.97 CoFC_5-yr 0:40 1.64 CoFC_5-yr 0:45 0.99 CoFC_5-yr 0:50 0.58 CoFC_5-yr 0:55 0.49 CoFC_5-yr 1:00 0.42 CoFC_5-yr 1:05 0.28 CoFC_5-yr 1:10 0.27 CoFC_5-yr 1:15 0.25 CoFC_5-yr 1:20 0.24 CoFC_5-yr 1:25 0.23 CoFC_5-yr 1:30 0.22 CoFC_5-yr 1:35 0.21 CoFC_5-yr 1:40 0.20 CoFC_5-yr 1:45 0.19 CoFC_5-yr 1:50 0.19 CoFC_5-yr 1:55 0.18 CoFC_5-yr 2:00 0.18 ; ;CoFC Rainfall Data CoFC_10-yr 0:05 0.49 CoFC_10-yr 0:10 0.56 CoFC_10-yr 0:15 0.65 CoFC_10-yr 0:20 1.09 CoFC_10-yr 0:25 1.39 CoFC_10-yr 0:30 2.69 CoFC_10-yr 0:35 4.87 CoFC_10-yr 0:40 2.02 CoFC_10-yr 0:45 1.21 Page 5 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp CoFC_10-yr 0:50 0.71 CoFC_10-yr 0:55 0.60 CoFC_10-yr 1:00 0.52 CoFC_10-yr 1:05 0.39 CoFC_10-yr 1:10 0.37 CoFC_10-yr 1:15 0.35 CoFC_10-yr 1:20 0.34 CoFC_10-yr 1:25 0.32 CoFC_10-yr 1:30 0.31 CoFC_10-yr 1:35 0.30 CoFC_10-yr 1:40 0.29 CoFC_10-yr 1:45 0.28 CoFC_10-yr 1:50 0.27 CoFC_10-yr 1:55 0.26 CoFC_10-yr 2:00 0.25 ; ;CoFC Rainfall Data CoFC_25-yr 0:05 0.63 CoFC_25-yr 0:10 0.72 CoFC_25-yr 0:15 0.84 CoFC_25-yr 0:20 1.41 CoFC_25-yr 0:25 1.80 CoFC_25-yr 0:30 3.48 CoFC_25-yr 0:35 6.30 CoFC_25-yr 0:40 2.61 CoFC_25-yr 0:45 1.57 CoFC_25-yr 0:50 0.92 CoFC_25-yr 0:55 0.77 CoFC_25-yr 1:00 0.67 CoFC_25-yr 1:05 0.62 CoFC_25-yr 1:10 0.59 CoFC_25-yr 1:15 0.56 CoFC_25-yr 1:20 0.54 CoFC_25-yr 1:25 0.52 CoFC_25-yr 1:30 0.50 CoFC_25-yr 1:35 0.48 CoFC_25-yr 1:40 0.47 CoFC_25-yr 1:45 0.45 CoFC_25-yr 1:50 0.44 CoFC_25-yr 1:55 0.42 CoFC_25-yr 2:00 0.41 ; ;CoFC Rainfall Data CoFC_50-yr 0:05 0.79 CoFC_50-yr 0:10 0.90 CoFC_50-yr 0:15 1.05 CoFC_50-yr 0:20 1.77 CoFC_50-yr 0:25 2.25 CoFC_50-yr 0:30 4.36 CoFC_50-yr 0:35 7.90 CoFC_50-yr 0:40 3.27 Page 6 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp CoFC_50-yr 0:45 1.97 CoFC_50-yr 0:50 1.16 CoFC_50-yr 0:55 0.97 CoFC_50-yr 1:00 0.84 CoFC_50-yr 1:05 0.79 CoFC_50-yr 1:10 0.75 CoFC_50-yr 1:15 0.72 CoFC_50-yr 1:20 0.69 CoFC_50-yr 1:25 0.66 CoFC_50-yr 1:30 0.64 CoFC_50-yr 1:35 0.62 CoFC_50-yr 1:40 0.60 CoFC_50-yr 1:45 0.58 CoFC_50-yr 1:50 0.56 CoFC_50-yr 1:55 0.54 CoFC_50-yr 2:00 0.53 ; ;CoFC Rainfall Data CoFC_100-yr 0:5 1.00 CoFC_100-yr 0:10 1.14 CoFC_100-yr 0:15 1.33 CoFC_100-yr 0:20 2.23 CoFC_100-yr 0:25 2.84 CoFC_100-yr 0:30 5.49 CoFC_100-yr 0:35 9.95 CoFC_100-yr 0:40 4.12 CoFC_100-yr 0:45 2.48 CoFC_100-yr 0:50 1.46 CoFC_100-yr 0:55 1.22 CoFC_100-yr 0:60 1.06 CoFC_100-yr 1:05 1.00 CoFC_100-yr 1:10 0.95 CoFC_100-yr 1:15 0.91 CoFC_100-yr 1:20 0.87 CoFC_100-yr 1:25 0.84 CoFC_100-yr 1:30 0.81 CoFC_100-yr 1:35 0.78 CoFC_100-yr 1:40 0.75 CoFC_100-yr 1:45 0.73 CoFC_100-yr 1:50 0.71 CoFC_100-yr 1:55 0.69 CoFC_100-yr 2:00 0.67 ; NECCO_A7 FILE "NECCO A7 HGL.dat" [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL Page 7 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp [TAGS] [MAP] DIMENSIONS -3908.103 305.049 14377.949 10305.049 Units Feet [COORDINATES] ;;Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ FESD03 6155.843 3257.701 FESD02 4380.843 3320.872 ID04 3377.528 2581.392 ID03 3232.605 2581.392 ID02 2801.551 2578.915 ID06 6085.239 3313.441 IE01 7717.391 3716.421 IE02 7717.391 3460.461 MHD03 6132.308 3090.482 MHD01A 6155.843 3312.202 MHD02 6129.831 2572.722 MHD01 4970.445 2575.199 OD1 7711.599 3239.121 ID05 4216.459 2577.632 ID01 2590.979 2767.191 MHD03a 7113.692 3067.281 Out3 7678.866 3850.518 VD1 7380.785 3141.386 [VERTICES] ;;Link X-Coord Y-Coord ;;-------------- ------------------ ------------------ [Polygons] ;;Subcatchment X-Coord Y-Coord ;;-------------- ------------------ ------------------ D02 3022.186 2334.342 D03 3653.581 2288.346 D05 4047.074 3141.975 D05 4047.074 3141.975 D05 4047.074 3141.975 D05 4041.798 3139.337 D05 4041.798 3139.337 D05 4039.160 3139.337 D05 4025.971 3152.527 D05 4049.712 3147.251 D05 4047.074 3136.700 D05 4041.798 3139.337 D06 5929.168 3189.774 D06 5926.530 3200.325 D06 5929.168 3195.049 D06 5939.720 3189.774 Page 8 18-1000-00 NF Commons SWMM - ASB (Multi Year).inp D06 5926.530 3187.136 D06 5923.892 3197.687 D07 5929.438 3037.799 D07 5947.903 3048.350 D07 5947.903 3037.799 D07 5937.351 3037.799 D07 5937.351 3050.988 D14 7596.900 2892.773 E06 8089.409 3467.568 E06 8099.960 3454.379 E06 8084.133 3457.017 E06 8092.047 3470.206 E08 8113.150 3731.355 E08 8121.063 3731.355 E08 8126.339 3731.355 E08 8113.150 3715.528 E08 8097.323 3731.355 E08 8102.598 3731.355 D01 2279.456 2839.653 D01 2568.064 2764.095 D04 4137.238 2587.721 D04 3993.622 2769.634 ;;Storage Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ [SYMBOLS] ;;Gage X-Coord Y-Coord ;;-------------- ------------------ ------------------ CoFC_Rainfall 4802.313 4542.227 [PROFILES] ;;Name Links ;;-------------- ---------- "South Main " PD01 PD02 PD03 PD04 PD05 "South Main " PD06 PD07 PD08 OutD1 PD13 "South Main " PE01 PE02 "Main " PD01 PD02 PD03 PD04 PD05 "Main " PD06 PD07 PD08 4 OutD1 "Main " PD13 PE01 PE02 Page 9 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.3) ------------------------------------------------------------ NF Commons 100-yr Storm Routing - Asbuilt (100-yr) 5/13/25 **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Surcharge Method ......... EXTRAN Starting Date ............ 03/11/2019 00:00:00 Ending Date .............. 03/11/2019 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 00:05:00 Routing Time Step ........ 60.00 sec Variable Time Step ....... YES Maximum Trials ........... 8 Number of Threads ........ 1 Head Tolerance ........... 0.005000 ft ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 3.571 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 1.095 1.125 Surface Runoff ........... 2.453 2.520 Final Storage ............ 0.045 0.047 Continuity Error (%) ..... -0.634 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Page 1 100-yr Asbuilt Results 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt Wet Weather Inflow ....... 2.453 0.799 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 1.184 0.386 Flooding Loss ............ 0.079 0.026 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 1.190 0.388 Continuity Error (%) ..... 0.016 *************************** Time-Step Critical Elements *************************** Link PD11 (44.58%) Link PE02 (34.92%) Link 4 (20.30%) ******************************** Highest Flow Instability Indexes ******************************** Link PE01 (5) Link PE02 (5) Link 4 (3) Link PD08 (3) Link PD07 (3) ********************************* Most Frequent Nonconverging Nodes ********************************* Node Out3 (0.15%) Node MHD01A (0.07%) Node ID01 (0.06%) Node ID06 (0.04%) Node ID02 (0.04%) ************************* Routing Time Step Summary ************************* Minimum Time Step : 0.50 sec Average Time Step : 1.37 sec Maximum Time Step : 60.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 2.03 % of Steps Not Converging : 0.15 Time Step Frequencies : Page 2 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt 60.000 - 23.031 sec : 0.05 % 23.031 - 8.841 sec : 0.01 % 8.841 - 3.393 sec : 0.17 % 3.393 - 1.303 sec : 33.62 % 1.303 - 0.500 sec : 66.15 % *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ D02 3.67 0.00 0.00 0.00 3.59 0.00 3.59 0.01 0.70 0.979 D03 3.67 0.00 0.00 0.00 3.59 0.00 3.59 0.01 0.70 0.979 D05 3.67 0.00 0.00 1.19 1.46 1.00 2.46 0.05 4.88 0.671 D06 3.67 0.00 0.00 1.12 1.53 1.02 2.55 0.01 1.19 0.694 D07 3.67 0.00 0.00 0.61 2.51 0.50 3.01 0.16 13.80 0.821 D14 3.67 0.00 0.00 2.12 0.15 1.41 1.56 0.12 4.98 0.426 E06 3.67 0.00 0.00 0.36 2.94 0.32 3.26 0.10 9.53 0.888 E08 3.67 0.00 0.00 0.65 2.44 0.54 2.98 0.11 9.91 0.812 D01 3.67 0.00 0.00 1.05 1.74 0.86 2.60 0.22 19.68 0.709 D04 3.67 0.00 0.00 1.62 0.62 1.45 2.06 0.01 1.35 0.563 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- FESD03 JUNCTION 0.19 1.50 4953.71 0 00:36 1.50 FESD02 JUNCTION 0.12 0.73 4956.16 0 00:40 0.72 ID04 JUNCTION 0.37 1.47 4952.77 0 00:38 1.47 ID03 JUNCTION 0.37 1.49 4952.87 0 00:38 1.49 ID02 JUNCTION 0.40 2.56 4954.56 0 00:36 2.55 ID06 JUNCTION 0.32 4.19 4954.35 0 00:35 3.71 IE01 JUNCTION 0.33 0.95 4945.55 0 00:40 0.95 IE02 JUNCTION 0.46 1.13 4945.90 0 00:40 1.10 MHD03 JUNCTION 1.37 2.26 4949.98 0 02:09 2.23 MHD01A JUNCTION 0.38 3.69 4953.57 0 00:35 3.57 MHD02 JUNCTION 0.69 1.23 4949.79 0 00:39 1.23 MHD01 JUNCTION 0.34 1.36 4951.20 0 00:41 1.35 OD1 JUNCTION 0.39 0.80 4945.91 0 00:40 0.75 ID05 JUNCTION 0.33 1.33 4952.09 0 00:40 1.33 Page 3 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt ID01 JUNCTION 0.39 3.12 4955.66 0 00:37 3.12 MHD03a JUNCTION 2.04 2.57 4949.52 0 02:04 2.48 Out3 OUTFALL 0.33 0.94 4944.63 0 00:40 0.93 VD1 STORAGE 3.22 3.75 4949.40 0 02:17 3.75 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- FESD03 JUNCTION 13.80 13.80 0 00:40 0.156 0.156 -0.004 FESD02 JUNCTION 4.88 4.88 0 00:40 0.0542 0.0542 0.001 ID04 JUNCTION 0.70 16.06 0 00:40 0.00683 0.23 -0.008 ID03 JUNCTION 0.70 15.37 0 00:39 0.00683 0.223 -0.002 ID02 JUNCTION 0.00 14.82 0 00:43 0 0.216 -0.007 ID06 JUNCTION 1.19 6.04 0 00:40 0.0111 0.0653 -0.020 IE01 JUNCTION 9.91 20.69 0 00:40 0.109 0.386 0.006 IE02 JUNCTION 9.53 10.50 0 00:40 0.102 0.277 0.085 MHD03 JUNCTION 0.00 17.33 0 00:41 0 0.305 0.929 MHD01A JUNCTION 0.00 11.42 0 00:36 0 0.202 -0.011 MHD02 JUNCTION 0.00 17.34 0 00:41 0 0.27 0.400 MHD01 JUNCTION 0.00 17.38 0 00:40 0 0.243 -0.070 OD1 JUNCTION 0.00 1.21 0 02:17 0 0.175 0.048 ID05 JUNCTION 1.35 17.39 0 00:40 0.0135 0.243 0.004 ID01 JUNCTION 19.68 19.68 0 00:40 0.222 0.222 -0.004 MHD03a JUNCTION 0.00 17.33 0 00:41 0 0.315 0.820 Out3 OUTFALL 0.00 20.46 0 00:40 0 0.386 0.000 VD1 STORAGE 4.98 33.30 0 00:40 0.117 0.596 0.104 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- FESD03 JUNCTION 0.20 0.500 0.000 ID02 JUNCTION 0.18 1.064 1.206 ID06 JUNCTION 0.26 3.191 0.000 MHD01A JUNCTION 0.29 2.687 1.253 ID01 JUNCTION 0.18 1.620 0.000 Page 4 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt MHD03a JUNCTION 0.05 0.072 2.028 ********************* Node Flooding Summary ********************* Flooding refers to all water that overflows a node, whether it ponds or not. -------------------------------------------------------------------------- Total Maximum Maximum Time of Max Flood Ponded Hours Rate Occurrence Volume Depth Node Flooded CFS days hr:min 10^6 gal Feet -------------------------------------------------------------------------- FESD03 0.19 8.46 0 00:40 0.020 0.000 ID01 0.09 5.02 0 00:40 0.006 0.000 ********************** Storage Volume Summary ********************** ------------------------------------------------------------------------------------------------ Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft³ Full Loss Loss 1000 ft³ Full days hr:min CFS ------------------------------------------------------------------------------------------------ VD1 49.350 29.6 0.0 0.0 65.561 39.3 0 02:17 6.58 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- Out3 99.90 3.10 20.46 0.386 ----------------------------------------------------------- System 99.90 3.10 20.46 0.386 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Page 5 Flooding overtops to rain garden at elevation 4953.67 ft 802.1 cuft parking lot ponding (1 gallon => 0.13368 cuft) (About 9" of ponding depth, see exhibit & ponding calcs) 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- PD03 CONDUIT 15.36 0 00:40 5.13 0.73 0.59 PD06 CONDUIT 17.34 0 00:41 6.76 0.58 0.52 PD07 CONDUIT 17.33 0 00:41 6.95 0.47 0.58 PD08 CONDUIT 17.33 0 00:41 6.23 0.50 0.95 PD13 CONDUIT 1.21 0 02:17 3.28 0.15 0.60 PD09 CONDUIT 4.87 0 00:40 6.76 0.63 0.86 PD10 CONDUIT 6.04 0 00:40 7.69 1.22 1.00 PD11 CONDUIT 8.13 0 00:36 13.18 0.51 1.00 PD12 CONDUIT 11.41 0 00:36 14.53 1.16 1.00 PE01 CONDUIT 10.79 0 00:40 5.71 0.47 0.41 PE02 CONDUIT 20.46 0 00:40 12.09 0.30 0.38 PD04 CONDUIT 16.04 0 00:40 5.72 0.70 0.56 PD05 CONDUIT 17.38 0 00:40 6.46 0.55 0.54 PD02 CONDUIT 14.82 0 00:43 8.40 1.67 1.00 PD01 CONDUIT 14.82 0 00:43 8.39 1.45 1.00 4 CONDUIT 17.34 0 00:40 5.95 1.03 1.00 OutD1 ORIFICE 1.21 0 02:17 1.00 *************************** Flow Classification Summary *************************** ------------------------------------------------------------------------------------- Adjusted ---------- Fraction of Time in Flow Class ---------- /Actual Up Down Sub Sup Up Down Norm Inlet Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl ------------------------------------------------------------------------------------- PD03 1.00 0.02 0.00 0.00 0.98 0.00 0.00 0.00 0.65 0.00 PD06 1.00 0.02 0.00 0.00 0.78 0.20 0.00 0.00 0.84 0.00 PD07 1.00 0.02 0.00 0.00 0.86 0.11 0.00 0.00 0.08 0.00 PD08 1.00 0.03 0.00 0.00 0.89 0.08 0.00 0.00 0.00 0.00 PD13 1.00 0.02 0.00 0.00 0.15 0.04 0.00 0.79 0.03 0.00 PD09 1.00 0.02 0.00 0.00 0.30 0.69 0.00 0.00 0.94 0.00 PD10 1.00 0.02 0.00 0.00 0.71 0.27 0.00 0.00 0.66 0.00 PD11 1.00 0.02 0.00 0.00 0.04 0.94 0.00 0.00 0.94 0.00 PD12 1.00 0.02 0.00 0.00 0.85 0.13 0.00 0.00 0.82 0.00 PE01 1.00 0.02 0.00 0.00 0.03 0.95 0.00 0.00 0.02 0.00 PE02 1.00 0.02 0.00 0.00 0.01 0.97 0.00 0.00 0.08 0.00 PD04 1.00 0.02 0.00 0.00 0.93 0.05 0.00 0.00 0.00 0.00 PD05 1.00 0.02 0.00 0.00 0.65 0.33 0.00 0.00 0.88 0.00 PD02 1.00 0.02 0.00 0.00 0.67 0.31 0.00 0.00 0.47 0.00 PD01 1.00 0.02 0.00 0.00 0.58 0.41 0.00 0.00 0.66 0.00 4 1.00 0.03 0.00 0.00 0.87 0.00 0.00 0.09 0.00 0.00 ************************* Conduit Surcharge Summary ************************* Page 6 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- PD08 0.01 0.01 0.05 0.01 0.01 PD09 0.01 0.01 0.26 0.01 0.01 PD10 0.26 0.26 0.29 0.06 0.06 PD11 0.20 0.20 0.29 0.01 0.01 PD12 0.29 0.29 5.54 0.21 0.21 PD02 0.01 0.18 0.01 0.23 0.01 PD01 0.18 0.18 0.18 0.20 0.18 4 0.01 0.05 0.01 0.08 0.01 Analysis begun on: Tue May 13 10:36:50 2025 Analysis ended on: Tue May 13 10:36:50 2025 Total elapsed time: < 1 sec Page 7 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.3) ------------------------------------------------------------ NF Commons 100-yr Storm Routing - Asbuilt (50-yr) 5/13/25 **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Surcharge Method ......... EXTRAN Starting Date ............ 03/11/2019 00:00:00 Ending Date .............. 03/11/2019 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 00:05:00 Routing Time Step ........ 60.00 sec Variable Time Step ....... YES Maximum Trials ........... 8 Number of Threads ........ 1 Head Tolerance ........... 0.005000 ft ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 2.832 2.909 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 1.054 1.083 Surface Runoff ........... 1.749 1.796 Final Storage ............ 0.045 0.047 Continuity Error (%) ..... -0.589 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Page 1 50-yr Asbuilt Results 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt Wet Weather Inflow ....... 1.749 0.570 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 0.990 0.323 Flooding Loss ............ 0.011 0.003 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.748 0.244 Continuity Error (%) ..... 0.015 *************************** Time-Step Critical Elements *************************** Link PD11 (57.25%) Link PE02 (32.51%) Link 4 (10.06%) ******************************** Highest Flow Instability Indexes ******************************** Link PE01 (3) Link 4 (2) Link PE02 (2) Link PD08 (2) Link PD07 (1) ********************************* Most Frequent Nonconverging Nodes ********************************* Node Out3 (0.19%) Node ID01 (0.09%) Node MHD01A (0.09%) Node ID06 (0.06%) Node ID02 (0.06%) ************************* Routing Time Step Summary ************************* Minimum Time Step : 0.08 sec Average Time Step : 1.52 sec Maximum Time Step : 60.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 2.03 % of Steps Not Converging : 0.19 Time Step Frequencies : Page 2 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt 60.000 - 23.031 sec : 0.06 % 23.031 - 8.841 sec : 0.00 % 8.841 - 3.393 sec : 0.22 % 3.393 - 1.303 sec : 47.51 % 1.303 - 0.500 sec : 52.21 % *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ D02 2.91 0.00 0.00 0.00 2.83 0.00 2.83 0.01 0.56 0.973 D03 2.91 0.00 0.00 0.00 2.83 0.00 2.83 0.01 0.56 0.973 D05 2.91 0.00 0.00 1.15 1.15 0.58 1.73 0.04 3.38 0.596 D06 2.91 0.00 0.00 1.09 1.20 0.60 1.81 0.01 0.82 0.621 D07 2.91 0.00 0.00 0.59 1.97 0.29 2.27 0.12 10.19 0.779 D14 2.91 0.00 0.00 2.02 0.12 0.77 0.89 0.07 2.65 0.307 E06 2.91 0.00 0.00 0.35 2.31 0.19 2.50 0.08 7.13 0.860 E08 2.91 0.00 0.00 0.63 1.92 0.31 2.23 0.08 7.30 0.768 D01 2.91 0.00 0.00 1.01 1.37 0.49 1.87 0.16 14.05 0.642 D04 2.91 0.00 0.00 1.58 0.49 0.85 1.34 0.01 0.81 0.461 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- FESD03 JUNCTION 0.16 1.50 4953.71 0 00:38 1.50 FESD02 JUNCTION 0.11 0.50 4955.93 0 00:40 0.50 ID04 JUNCTION 0.34 1.42 4952.72 0 00:40 1.40 ID03 JUNCTION 0.35 1.44 4952.82 0 00:40 1.44 ID02 JUNCTION 0.35 2.38 4954.38 0 00:40 2.38 ID06 JUNCTION 0.24 4.34 4954.50 0 00:37 3.28 IE01 JUNCTION 0.32 0.81 4945.41 0 00:40 0.81 IE02 JUNCTION 0.44 0.98 4945.75 0 00:40 0.95 MHD03 JUNCTION 0.99 1.43 4949.15 0 02:16 1.39 MHD01A JUNCTION 0.30 3.35 4953.23 0 00:37 3.35 MHD02 JUNCTION 0.38 1.16 4949.72 0 00:41 1.06 MHD01 JUNCTION 0.31 1.28 4951.12 0 00:41 1.21 OD1 JUNCTION 0.37 0.64 4945.75 0 00:40 0.61 ID05 JUNCTION 0.30 1.26 4952.02 0 00:40 1.22 Page 3 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt ID01 JUNCTION 0.33 2.92 4955.46 0 00:40 2.92 MHD03a JUNCTION 1.64 2.05 4949.00 0 02:16 2.04 Out3 OUTFALL 0.32 0.81 4944.50 0 00:40 0.80 VD1 STORAGE 2.81 3.32 4948.97 0 02:14 3.32 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- FESD03 JUNCTION 10.19 10.19 0 00:40 0.117 0.117 -0.002 FESD02 JUNCTION 3.38 3.38 0 00:40 0.0381 0.0381 0.002 ID04 JUNCTION 0.56 15.15 0 00:40 0.00538 0.171 -0.008 ID03 JUNCTION 0.56 14.62 0 00:40 0.00538 0.165 -0.003 ID02 JUNCTION 0.00 14.06 0 00:40 0 0.16 -0.008 ID06 JUNCTION 0.82 4.18 0 00:40 0.00785 0.046 -0.027 IE01 JUNCTION 7.30 15.42 0 00:40 0.0819 0.323 0.015 IE02 JUNCTION 7.13 7.96 0 00:40 0.0781 0.241 0.074 MHD03 JUNCTION 0.00 15.72 0 00:41 0 0.199 0.744 MHD01A JUNCTION 0.00 11.46 0 00:38 0 0.16 -0.012 MHD02 JUNCTION 0.00 15.77 0 00:41 0 0.186 -0.000 MHD01 JUNCTION 0.00 15.86 0 00:40 0 0.179 -0.042 OD1 JUNCTION 0.00 1.13 0 02:14 0 0.163 0.051 ID05 JUNCTION 0.81 15.89 0 00:40 0.00874 0.179 0.005 ID01 JUNCTION 14.05 14.05 0 00:40 0.16 0.16 -0.005 MHD03a JUNCTION 0.00 15.79 0 00:41 0 0.205 0.988 Out3 OUTFALL 0.00 15.26 0 00:40 0 0.323 0.000 VD1 STORAGE 2.65 29.43 0 00:42 0.0671 0.417 0.128 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- FESD03 JUNCTION 0.10 0.500 0.000 ID02 JUNCTION 0.08 0.876 1.394 ID06 JUNCTION 0.15 3.340 0.000 MHD01A JUNCTION 0.17 2.353 1.587 ID01 JUNCTION 0.09 1.416 0.204 Page 4 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt ********************* Node Flooding Summary ********************* Flooding refers to all water that overflows a node, whether it ponds or not. -------------------------------------------------------------------------- Total Maximum Maximum Time of Max Flood Ponded Hours Rate Occurrence Volume Depth Node Flooded CFS days hr:min 10^6 gal Feet -------------------------------------------------------------------------- FESD03 0.09 2.97 0 00:40 0.003 0.000 ID06 0.01 0.70 0 00:37 0.000 1.000 ********************** Storage Volume Summary ********************** ------------------------------------------------------------------------------------------------ Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft³ Full Loss Loss 1000 ft³ Full days hr:min CFS ------------------------------------------------------------------------------------------------ VD1 33.158 19.9 0.0 0.0 45.838 27.5 0 02:14 3.14 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- Out3 99.85 2.77 15.26 0.323 ----------------------------------------------------------- System 99.85 2.77 15.26 0.323 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth Page 5 Flooding during 50-yr overtops to rain garden at elevation 4953.67 ft Short duration of flooding during 50-yr, no volume accumulation 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt ----------------------------------------------------------------------------- PD03 CONDUIT 14.60 0 00:40 5.05 0.70 0.57 PD06 CONDUIT 15.77 0 00:41 6.62 0.52 0.49 PD07 CONDUIT 15.72 0 00:41 6.77 0.43 0.48 PD08 CONDUIT 15.79 0 00:41 6.07 0.45 0.70 PD13 CONDUIT 1.13 0 02:14 3.22 0.14 0.50 PD09 CONDUIT 3.37 0 00:40 5.58 0.43 0.75 PD10 CONDUIT 4.18 0 00:40 5.32 0.84 1.00 PD11 CONDUIT 8.17 0 00:38 13.27 0.52 1.00 PD12 CONDUIT 11.45 0 00:38 14.58 1.17 1.00 PE01 CONDUIT 8.28 0 00:40 5.31 0.36 0.36 PE02 CONDUIT 15.26 0 00:40 11.14 0.23 0.32 PD04 CONDUIT 15.10 0 00:40 5.69 0.66 0.53 PD05 CONDUIT 15.86 0 00:40 6.34 0.50 0.51 PD02 CONDUIT 14.06 0 00:40 8.00 1.59 0.98 PD01 CONDUIT 14.06 0 00:40 7.96 1.37 1.00 4 CONDUIT 15.79 0 00:42 5.76 0.94 0.82 OutD1 ORIFICE 1.13 0 02:14 1.00 *************************** Flow Classification Summary *************************** ------------------------------------------------------------------------------------- Adjusted ---------- Fraction of Time in Flow Class ---------- /Actual Up Down Sub Sup Up Down Norm Inlet Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl ------------------------------------------------------------------------------------- PD03 1.00 0.02 0.00 0.00 0.98 0.00 0.00 0.00 0.65 0.00 PD06 1.00 0.02 0.00 0.00 0.67 0.30 0.00 0.00 0.73 0.00 PD07 1.00 0.03 0.00 0.00 0.85 0.12 0.00 0.00 0.20 0.00 PD08 1.00 0.03 0.00 0.00 0.89 0.08 0.00 0.00 0.02 0.00 PD13 1.00 0.02 0.00 0.00 0.12 0.02 0.00 0.83 0.03 0.00 PD09 1.00 0.02 0.00 0.00 0.30 0.69 0.00 0.00 0.96 0.00 PD10 1.00 0.02 0.00 0.00 0.69 0.29 0.00 0.00 0.66 0.00 PD11 1.00 0.02 0.00 0.00 0.02 0.96 0.00 0.00 0.95 0.00 PD12 1.00 0.02 0.00 0.00 0.85 0.13 0.00 0.00 0.89 0.00 PE01 1.00 0.02 0.00 0.00 0.03 0.95 0.00 0.00 0.01 0.00 PE02 1.00 0.02 0.00 0.00 0.01 0.97 0.00 0.00 0.05 0.00 PD04 1.00 0.02 0.00 0.00 0.94 0.05 0.00 0.00 0.00 0.00 PD05 1.00 0.02 0.00 0.00 0.65 0.33 0.00 0.00 0.89 0.00 PD02 1.00 0.02 0.00 0.00 0.66 0.32 0.00 0.00 0.56 0.00 PD01 1.00 0.02 0.00 0.00 0.56 0.42 0.00 0.00 0.73 0.00 4 1.00 0.04 0.00 0.00 0.87 0.00 0.00 0.09 0.00 0.00 ************************* Conduit Surcharge Summary ************************* Page 6 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- PD09 0.01 0.01 0.15 0.01 0.01 PD10 0.15 0.15 0.17 0.01 0.01 PD11 0.10 0.10 0.17 0.01 0.01 PD12 0.17 0.17 5.50 0.11 0.11 PD02 0.01 0.08 0.01 0.13 0.01 PD01 0.08 0.09 0.08 0.10 0.08 Analysis begun on: Tue May 13 10:47:47 2025 Analysis ended on: Tue May 13 10:47:48 2025 Total elapsed time: 00:00:01 Page 7 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.3) ------------------------------------------------------------ NF Commons 100-yr Storm Routing - Asbuilt (25-yr) 5/13/25 **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Surcharge Method ......... EXTRAN Starting Date ............ 03/11/2019 00:00:00 Ending Date .............. 03/11/2019 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 00:05:00 Routing Time Step ........ 60.00 sec Variable Time Step ....... YES Maximum Trials ........... 8 Number of Threads ........ 1 Head Tolerance ........... 0.005000 ft ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 2.248 2.310 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 1.000 1.028 Surface Runoff ........... 1.215 1.248 Final Storage ............ 0.045 0.047 Continuity Error (%) ..... -0.551 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Page 1 25-yr Asbuilt Results 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt Wet Weather Inflow ....... 1.215 0.396 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 0.824 0.268 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.391 0.127 Continuity Error (%) ..... 0.018 *************************** Time-Step Critical Elements *************************** Link PD11 (62.23%) Link PE02 (37.64%) ******************************** Highest Flow Instability Indexes ******************************** Link PE01 (2) Link PE02 (1) ********************************* Most Frequent Nonconverging Nodes ********************************* Node Out3 (0.07%) Node MHD01A (0.06%) Node ID06 (0.04%) ************************* Routing Time Step Summary ************************* Minimum Time Step : 0.06 sec Average Time Step : 1.59 sec Maximum Time Step : 60.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 2.01 % of Steps Not Converging : 0.07 Time Step Frequencies : 60.000 - 23.031 sec : 0.06 % 23.031 - 8.841 sec : 0.00 % 8.841 - 3.393 sec : 0.75 % 3.393 - 1.303 sec : 47.78 % 1.303 - 0.500 sec : 51.41 % Page 2 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ D02 2.31 0.00 0.00 0.00 2.22 0.00 2.22 0.00 0.44 0.962 D03 2.31 0.00 0.00 0.00 2.22 0.00 2.22 0.00 0.44 0.962 D05 2.31 0.00 0.00 1.11 0.91 0.27 1.18 0.03 2.35 0.510 D06 2.31 0.00 0.00 1.05 0.94 0.30 1.24 0.01 0.54 0.537 D07 2.31 0.00 0.00 0.57 1.55 0.13 1.69 0.09 7.56 0.730 D14 2.31 0.00 0.00 1.89 0.10 0.32 0.42 0.03 1.29 0.180 E06 2.31 0.00 0.00 0.33 1.82 0.09 1.91 0.06 5.33 0.827 E08 2.31 0.00 0.00 0.60 1.51 0.15 1.66 0.06 5.41 0.717 D01 2.31 0.00 0.00 0.97 1.08 0.23 1.31 0.11 10.12 0.566 D04 2.31 0.00 0.00 1.52 0.38 0.41 0.79 0.01 0.45 0.344 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- FESD03 JUNCTION 0.13 0.66 4952.87 0 00:40 0.49 FESD02 JUNCTION 0.10 0.38 4955.81 0 00:40 0.37 ID04 JUNCTION 0.31 1.17 4952.47 0 00:40 1.14 ID03 JUNCTION 0.31 1.19 4952.57 0 00:40 1.17 ID02 JUNCTION 0.30 1.35 4953.35 0 00:40 1.32 ID06 JUNCTION 0.16 3.87 4954.03 0 00:40 0.86 IE01 JUNCTION 0.30 0.70 4945.30 0 00:39 0.70 IE02 JUNCTION 0.41 0.84 4945.61 0 00:39 0.83 MHD03 JUNCTION 0.60 1.01 4948.73 0 00:42 0.89 MHD01A JUNCTION 0.21 3.08 4952.96 0 00:40 1.16 MHD02 JUNCTION 0.25 0.96 4949.52 0 00:41 0.87 MHD01 JUNCTION 0.28 1.06 4950.90 0 00:41 0.99 OD1 JUNCTION 0.35 0.51 4945.62 0 00:40 0.50 ID05 JUNCTION 0.27 1.04 4951.80 0 00:41 1.00 ID01 JUNCTION 0.28 1.27 4953.81 0 00:40 1.27 MHD03a JUNCTION 1.23 1.57 4948.52 0 02:11 1.55 Out3 OUTFALL 0.30 0.70 4944.39 0 00:39 0.70 VD1 STORAGE 2.39 2.86 4948.51 0 02:12 2.86 Page 3 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- FESD03 JUNCTION 7.56 7.56 0 00:40 0.0875 0.0875 0.000 FESD02 JUNCTION 2.35 2.35 0 00:40 0.0259 0.0259 0.001 ID04 JUNCTION 0.44 10.91 0 00:40 0.00422 0.12 -0.011 ID03 JUNCTION 0.44 10.49 0 00:40 0.00422 0.116 -0.006 ID02 JUNCTION 0.00 10.10 0 00:40 0 0.112 0.005 ID06 JUNCTION 0.54 2.87 0 00:40 0.00539 0.0313 -0.021 IE01 JUNCTION 5.41 11.61 0 00:39 0.0607 0.268 0.019 IE02 JUNCTION 5.33 6.07 0 00:40 0.0597 0.208 0.073 MHD03 JUNCTION 0.00 11.23 0 00:42 0 0.131 0.209 MHD01A JUNCTION 0.00 10.39 0 00:40 0 0.119 -0.014 MHD02 JUNCTION 0.00 11.28 0 00:41 0 0.126 -0.030 MHD01 JUNCTION 0.00 11.34 0 00:41 0 0.125 -0.009 OD1 JUNCTION 0.00 1.05 0 02:12 0 0.148 0.049 ID05 JUNCTION 0.45 11.36 0 00:40 0.00517 0.125 0.004 ID01 JUNCTION 10.12 10.12 0 00:40 0.112 0.112 0.001 MHD03a JUNCTION 0.00 11.26 0 00:42 0 0.137 0.850 Out3 OUTFALL 0.00 11.53 0 00:39 0 0.268 0.000 VD1 STORAGE 1.29 21.41 0 00:42 0.0313 0.28 0.141 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- ID06 JUNCTION 0.03 2.867 0.000 MHD01A JUNCTION 0.05 2.082 1.858 ********************* Node Flooding Summary ********************* No nodes were flooded. Page 4 No flooding nodes during 25-yr 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt ********************** Storage Volume Summary ********************** ------------------------------------------------------------------------------------------------ Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft³ Full Loss Loss 1000 ft³ Full days hr:min CFS ------------------------------------------------------------------------------------------------ VD1 20.727 12.4 0.0 0.0 29.457 17.7 0 02:12 1.64 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- Out3 99.82 2.43 11.53 0.268 ----------------------------------------------------------- System 99.82 2.43 11.53 0.268 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- PD03 CONDUIT 10.49 0 00:40 4.60 0.50 0.47 PD06 CONDUIT 11.28 0 00:41 6.08 0.37 0.40 PD07 CONDUIT 11.23 0 00:42 6.25 0.31 0.39 PD08 CONDUIT 11.26 0 00:42 5.50 0.32 0.49 PD13 CONDUIT 1.05 0 02:12 3.15 0.13 0.41 PD09 CONDUIT 2.33 0 00:40 5.53 0.30 0.69 PD10 CONDUIT 2.92 0 00:40 4.44 0.59 1.00 PD11 CONDUIT 7.56 0 00:40 13.23 0.48 0.83 PD12 CONDUIT 10.39 0 00:40 13.23 1.06 1.00 PE01 CONDUIT 6.26 0 00:39 4.93 0.28 0.31 PE02 CONDUIT 11.53 0 00:39 10.30 0.17 0.28 PD04 CONDUIT 10.93 0 00:40 5.25 0.47 0.44 PD05 CONDUIT 11.34 0 00:41 5.81 0.36 0.42 PD02 CONDUIT 10.06 0 00:40 6.36 1.14 0.84 PD01 CONDUIT 10.10 0 00:40 6.19 0.99 0.87 4 CONDUIT 11.26 0 00:42 5.14 0.67 0.63 Page 5 18-1000-00 NF Commons SWMM - ASB (Multi Year).rpt OutD1 ORIFICE 1.05 0 02:12 1.00 *************************** Flow Classification Summary *************************** ------------------------------------------------------------------------------------- Adjusted ---------- Fraction of Time in Flow Class ---------- /Actual Up Down Sub Sup Up Down Norm Inlet Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl ------------------------------------------------------------------------------------- PD03 1.00 0.02 0.00 0.00 0.98 0.00 0.00 0.00 0.65 0.00 PD06 1.00 0.02 0.00 0.00 0.64 0.34 0.00 0.00 0.06 0.00 PD07 1.00 0.03 0.00 0.00 0.84 0.13 0.00 0.00 0.88 0.00 PD08 1.00 0.03 0.00 0.00 0.89 0.07 0.00 0.00 0.04 0.00 PD13 1.00 0.02 0.00 0.00 0.11 0.01 0.00 0.86 0.03 0.00 PD09 1.00 0.02 0.00 0.00 0.29 0.69 0.00 0.00 0.97 0.00 PD10 1.00 0.02 0.00 0.00 0.67 0.31 0.00 0.00 0.76 0.00 PD11 1.00 0.02 0.00 0.00 0.00 0.98 0.00 0.00 0.97 0.00 PD12 1.00 0.02 0.01 0.00 0.85 0.13 0.00 0.00 0.94 0.00 PE01 1.00 0.02 0.00 0.00 0.04 0.94 0.00 0.00 0.01 0.00 PE02 1.00 0.02 0.00 0.00 0.01 0.97 0.00 0.00 0.05 0.00 PD04 1.00 0.02 0.00 0.00 0.92 0.06 0.00 0.00 0.00 0.00 PD05 1.00 0.02 0.00 0.00 0.66 0.32 0.00 0.00 0.89 0.00 PD02 1.00 0.02 0.00 0.00 0.67 0.31 0.00 0.00 0.64 0.00 PD01 1.00 0.02 0.00 0.00 0.55 0.43 0.00 0.00 0.82 0.00 4 1.00 0.04 0.00 0.00 0.87 0.00 0.00 0.09 0.00 0.00 ************************* Conduit Surcharge Summary ************************* ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- PD09 0.01 0.01 0.03 0.01 0.01 PD10 0.03 0.03 0.05 0.01 0.01 PD11 0.01 0.01 0.05 0.01 0.01 PD12 0.05 0.05 5.45 0.01 0.01 PD02 0.01 0.01 0.01 0.04 0.01 Analysis begun on: Tue May 13 10:49:30 2025 Analysis ended on: Tue May 13 10:49:30 2025 Total elapsed time: < 1 sec Page 6 COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT MANGOLD LANE BLDG 2 BLDG 1 HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m DRAWN BY DATE SCALE (H) HDS PROJ # OFSHEET NO R T H F I E L D C O M M O N S PA R K I N G L O T P O N D I N G E X H I B I T 5/13/25 1" = 30' JTC 21-1037-00 EXHIBIT 1 2 N W E S 0 SCALE: 1" = 30' 3015 PARKING LOT SUBJECT TO FLOODING DURING HEAVY RAIN PARKING LOT SUBJECT TO FLOODING DURING HEAVY RAIN LEFT RIGHT HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m DRAWN BY DATE SCALE (H) HDS PROJ # OFSHEET NO R T H F I E L D C O M M O N S PA R K I N G L O T P O N D I N G E X H I B I T 5/13/25 N/A JTC 21-1037-00 EXHIBIT 2 2 SIGN DETAIL NF Commons Critical Pond Elevations - Parking Lot Ponding Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Stage Storage Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT)AREA (FT2)AREA (ACRE)VOLUME (CU-FT)DEPTH (FT)CUMULATIVE VOLUME (CU-FT) 4955.50 0 0.000 0 0.00 0 4955.60 7 0.000 0 0.10 0 4955.80 389 0.009 30 0.30 30 4956.00 1649 0.038 189 0.50 219 4956.20 3249 0.075 481 0.70 700 4956.40 5651 0.130 879 0.90 1,579 4956.50 7545 0.173 658 1.00 2,237 802 4956.22 ft Highland Development Services J.Claeys 21-1037-00 May 13, 2025 Parking Lot Ponding = Cu-Ft Interpolates to an Elev. of () 3 2121 DepthAAAAV++= 21-1037-00 PondCalcs.xls - Parking Lot Ponding (Basin D1) Page 1 of 1 Highland Development Services D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS COMPACT COMPACTCOMPACTCOMPACT COMPACT COMPA C T COMP A C T COM P A C T COM P A C T BLDG 10A MANGOLD LANE SUNIGA ROAD HIG H L A N D DEV E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m DRAWN BY DATE SCALE (H) HDS PROJ # OFSHEET NO R T H F I E L D C O M M O N S BL D G 1 0 A L O C A L I Z E D P O N D I N G 10/9/24 1" = 30' JTC 21-1037-00 EXHIBIT 1 1 N W E S 0 SCALE: 1" = 30' 3015 D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS BLDG 12A BLDG 13A MANGOLD LANE HIG H L A N D DEV E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m DRAWN BY DATE SCALE (H) HDS PROJ # OFSHEET NO R T H F I E L D C O M M O N S FE S P O N D I N G & S P I L L 10/9/24 1" = 30' JTC 21-1037-00 EXHIBIT 1 1 N W E S 0 SCALE: 1" = 30' 3015 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =55.5 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.555 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 137,259 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =2,031 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =1524 sq ft D) Actual Flat Surface Area AActual =1979 sq ft E) Area at Design Depth (Top Surface Area)ATop =2633 sq ft F) Rain Garden Total Volume VT=2,306 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) J.Claeys HDS November 1, 2024 NF Commons (Mercy) LID Facility D1 - Rain Garden (ASB) UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 21-1037-00 UD-BMP_v3.07_Pond D (ASB).xlsm, RG 11/1/2024, 12:38 PM Req'd WQCV WQCV Provided > Req'd Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes:Rain garden is proposed to be irrigated. No sprinkler heads on flat surface. Design Procedure Form: Rain Garden (RG) J.Claeys HDS November 1, 2024 NF Commons (Mercy) LID Facility D1 - Rain Garden (ASB) Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 21-1037-00 UD-BMP_v3.07_Pond D (ASB).xlsm, RG 11/1/2024, 12:38 PM NORTHFIELD TRACT W (D,U,&AE)POND D HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJ # SCALE (V) NO R T H F I E L D C O M M O N S PO N D D O U T F A L L C O R R E C T I O N 5/30/25 NTS N/A ZMW JTC 21-1037-00 PLAN 1 2 N W E S ABBREVIATIONS CONC CONCRETE EX EXISTING FES FLARED END SECTION FL FLOWLINE INV INVERT RCP REINFORCED CONCRETE PIPE SS SANITARY SEWER UD UNDER DRAIN NOTE: SPOT ELEVATIONS SHOWN WHERE PROVIDED BY SURVEYOR AND TRANSPOSED TO DESIGN LAYOUT. DISTANCES SHOWN ARE ESTIMATED BY INTERPOLATING BETWEEN SURVEY ELEVATIONS AND SHALL BE VERIFIED IN FIELD. Photo of completion as of 8/15/29 HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJ # SCALE (V) NO R T H F I E L D C O M M O N S PO N D D O U T F A L L C O R R E C T I O N 5/30/25 N/A N/A ZMW JTC 21-1037-00 DETAILS 2 2 HP STORM TO RCP FES EXAMPLES