Loading...
HomeMy WebLinkAboutSite Certifications - 10/27/1994Y Engineering Consultants 209 S. Meldrum Fort Collins, Colorado 80521 3031482-5922 FAX:303/482-6368 October 17, 1994 Mr. Basil Hamdan City of Fort Collins Utility Services Stormwater 235 Mathews Street Fort Collins, Colorado 80522 nat W)3 2 RE: Underhill P.U.D. Caet� Drainage Certification PROJECT NO.: 560-001� � h2Gc� �o cbo�e r � S v t1 K> L'L Dear Basil: Attached are spot elevations taken by RBD survey crews on the three new buildings of the Underhill P.U.D. and for the drainage swale at the end of Underhill Drive, as well as pictures of the building areas before and after construction. Drainage for the buildings and parking areas is directed towards Underhill Drive and then south to the end of Underhill Drive and across the New Mercer Ditch as per the drainage concept. The area was not seeded at the time the pictures were taken, but the sprinkler system appeared to be in place and I was informed by the owner that seeding was to occur sometime last week. There is a low spot in the parking lot between the northernmost building and the existing building directly to the south of it. The low spot occurs in what was already existing parking lot as is shown in the pictures. The drainage swale appeared to drain adequately as there was no ponding at the time of field inspection which was within a day or two after a rainstorm. Thank you for your time and consideration of this Certification submittal. sincerely, RBD Inc. Engineering Consultants i 7TiT7�ail-ey Curtiss, P.E. 27362 Denver3031458-5526 J- PARKING LOT NORTH OF EXISTING BUILDING PRIOR TO CONSTRUCTION PARKING LOT NORTH OF EXISTING BUILDING AFTER CONSTRUCTION PARKING LOT SOUTH OF EXISTING BUILDING AFTER CONSTRUCTION PARKING LOT BETWEEN TWO NEW BUILDINGS AF', ZR CONSTRUCTION