HomeMy WebLinkAboutLot Certifications - 11/13/2013 (14)Fort Collins
will
_ ��
�d utilities
f electric • stormwater • wastewater . water
Fort Collins, CO 80522
970.6700
.221U = �a 970.221.6619 fax . 970.224.6003 TDD
Ut.0 ies@fegov.coM . "fcgov.corn/ ii fes.
of 2'k- 16 _l 3 W
CERTIFICATION OF LOT GRADING
Pursuant to City Code § 26-544 and City Land Use Code § 3.2.2 (e)
Date: November 13, 2013
Permit Application No.. B 1205201, 912052OZ B 1205199, B 1206200. B 1205197, B 1205203
Address: 2103, 2105, 2107, 2109, 211 t, 2113, Nancy .Gray Ave, Fort Collins CO, 80525
Lot: 21,22,23,24A.26 Block: 1
Subdivision: Bu&Jn9- Horse Filing_ One
�,(t) Cody A. GelSendOrFer , a Colorado registered professional engineer; verify that the
above referenced property in the City of Fort Collins, Colorado, has been inspected by me or an appropriately
qualified professional under my direct supervision, and verify that construction of all stormwater facilities and
grading is complete, and that the elevations and drainage patterns shown on the attached drawing(s) which were
developed from a survey performed on (Date); i 1/11/13 , accurately and truly depict the elevations and
drainage patterns as they existed on the date of the survey. Based on this information, I certify that (check one):,
❑, The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved
drainage and grading plan for the property (information attached). SEE NOTE.
VThe elevations and drainage patterns of the lot/site as -measured are in general conformance with the City
approved drainage plan with exceptions (information attached). In my professional. judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in. a manner
consistent with the approved drainage plan. SEE NOTE.
By:
(signature, PE stamp)
1501 Academy Ct, #201, Fort Collins, CO
(address of signing party)
NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Occimm7
for the lot/site, including but not Ihnhed to drawings of the lotlsits showing the approved design and as -built surveyed
elevations of all strucdmes, drainage and grading features (e.g. swalea, retaining walls, tot corners), written
inforrmatioNexpianation of discrepancies, and other bdonnation necessary to confirm the above certification to:
9
m
v
asedaT c�taan� �aaQrT
a : pats n► sa s4 a ar oar � ENGWFERM
v ASSMTA�9LEVlfl�$QXMF M FMONS Br Date °atw,=o�.,e °0''