September 4,2002
City of Folt Collins
Stormwater Utility
700 wood Street
Fort Collins, CO 80526
117_0CLN fri LL awo_
RE: Re -Certification for Big Horn Village IL located directly east of City Park Avenue and a few
hundred fed south of University Avenue.
Dear Sirs:
On September 4, 2002, we observed the site located at Big Norn Village 11. We observed the site
during a warm partly sunny day. Our observatiom were limited to those items that was not properly
installed at out August 16,2002 site visit: Please refer to ourAugust 16,2002 certification letter. The
following underlined items were deficient at our August 16dobservation.
Detention.Pond A:
The Water Quafity Plate wasmo6natalled vtoperly. — We observed the orifice platetoday and
it appeared to be installed as designed. Also, a trash rack has been added,
Detention Pond B-
e The Orifice
the �pipe _illlireyy nsstrictina the --flow even more. Today we obs.oved that the orifice opening
has been- cleaned out and the orificeplatewas adjusted. However, the bottom of the orifice
opening is still slightly below the invert of the -outlet pipe. With the cleaner opening, we
believe Oat the orifice opening will operate in at acceptable n=nerand, will not be
detrimental to the downstrem properties.
Our recommendations were based on out observation on the date noted above. If you have any
questions, Please contact me at: the above. aftess or phone number.
Sincerely, N\ I JJ%J ki I I I i fit,
0)"v Ri I
4w,w dad A&ceaa4,.,,A44
James R. L Onan, P.E.
% AL
Azu�_-Idl UL ?bib
4
1630 S. ed&9e Aepme
. 0. Sax .07095P
(970) 493-2808
3, Z (970) 495- 9735
August 16, 2002
City of Fort. Collins
Stormwater Utility
700 Wood Street
Fort Collins, CO 80526
RE: Drainage Certification for Big Horn. Village II, located directly east of City Park Avenue and a
few hundred feet south of University Avenue.
Dear Sirs:
On August 16, 2002, we observed the site located at Big Horn Village IL We observed the site during
a warm sunny day. The site had been final graded. In addition to our observation, RJL Surveying
obtained spot elevations at numerous spots throughout the site. Please refer to the attached elevation_
sheet. Based on our observation and the attached surveyed information, the site appeared to drain
away from each.of the buildings as.follows:
Building 1-5:
The area drained away from the buildings, typically as designed with a few changes.
• The swales located east of the building (between Buildings 1 and 2) was not as deep as
designed, however; we believe that it will still function..
Detention Pond A:
• The Water Quality Plate were not installed properly. The grading of the pond appeared to
generally conform with the grading plan. The emergency overflow has, been constructed.
Please refer to the attached calculations and drawings.
• The calculated detention volume are greater than the required amount.
Detention Pond B:
• The Orifice Plate were not installed properly — the opening in the plate is below the invert of
the pipe thereby restricting the flow even more.. The grading of the pond appeared to generally
conform with.the grading plan. Please refer to the attached calculations and drawings.
• The calculated detention volume are greater than the required amount.
Our recommendations were based on our observation on the date noted above. If you have any
questions, please contact me at the above address or phone number.
\\\\\ 0ylll I l
Sincerely ` �PO0, RED/s
000 �GHAW3% �F
I�VM�iYNY MW / '�/ I rylil �O p ` O /
ZZ
James R. Loonan, P.E.
BIGHORN VILLAGE II
Detention Pond.V_oltmes -.POND B
Delta Volume=(D/3)(Al+A2+SQRT(AIA2))
FT
FT
. 228 - 0 0_ 0
23 55.24 4 4
24 71.9.01 325 328
25. 1702.42 L, 06 1,504
R �? �D Vv c
. Z Al 5 r7
BIGPOND4.txt
BIGHORN VILLAGE 2
DETENTION POND AS BUILT VOLUME
14 AUGUST 2002 GSF
CONTOUR AREA.(SQ FT)
VOLUME(AVG)
VOLUME(CONIC)
27.5000 16960.8801
39950.15365
39125.4595
27.0000 157852026
31764.0159
30940.6982
26..0000 13326.8754
17207.9769
16401.9893
25.0000 964.4.2568
5722.4108
4965.9417
24.0000 1196.9589
301.8029
219.6652
23.5000 .10.2527
0.0000
0.0000
r�S.
= Z �• y3
i
11F
bldg. edge 0"
EXISTING f PARKING L
"URE
v X 3q, �S
LO LINE 3'
"TYP 6" cub (tYP) `
FF45 38.65
�. 4 c nc. waI
o
cC 38.80 J. 36 O d
r •• I -- 35
37.37 .78 E
37.37 36.5$. 36
( + _
CL
I�
bldq
clsp o (ty
MISHED SHA RED
�T TO R£M
-✓ N
M
1r?
28
i
m
a
UM , I,
a
a
w
b/dg
4CONC. WALK
TYP INTER/ORS
' C �-
i
12,
Y �
I bl \ I
�J C.
TRAS,
FF=5 36. 0
FF_@ DC
4.68
6» S
I
FF= 5035.10 I
1 � �
+
ACCES �D AS, U I
I ^ry
N �
FF=5c
EMTGE Y� CESSokASEM NT
� M \
3
/-� % % .� [777/7/--�7
bldg./
E
1�
9PAK/G
r1' 9•,
"F=
%IJ C-IYi 1
IT
/ '41 1
18
T7A
L 1 PA K! AC 6s
N
�g�
b aq / P—/ 7-�T
f/ b/dq. /
n
Vp 9. I
g Q FF= 5029.70
s�
0,Q
�a •FF— C
ORS$
F
z8e
OOR
29-U
9.00'�@Dio
ry
8.80
ti
0
_30 a e
S
T % T/71�)
i-/7-/-
Al�
bldg.
n
j
7-/ 7-/�
� . ..-
bld
9
/
/
,�
_ .-
i
b/dg.
conc. pad /
lec. transforrpe/ I bldg.
11&-Z11zzz-z
I
1 s l \ 5 p25
1
~ p0O-'CON, ,�, e. ge of asp alt
:ND OF `Sp2 RETPROAINING WALL BETE +"�
'ROPOSED `� I
;ETAINING �SE.F- DESIGN BY,
JALL TERRACON/DETAIL ON END OF PROPOSED
SHEET 15) ,_ °� RETAINING WALL
=5029.70
F-7--
q0t
P
W
\� U
S
DTI
r
10 bldg. Aso v o f
CO
\ . 1.7 °
- 1
15' 6» curb t
,. gravel drive
i \ 3' 'UTILITY EEMENT
RNCEPTION # 94055498
housea w.. � � II
ry
25 .
conc. /
patio
conc. walk.
,0 JO� 1
i / 2 _
�, �
a:.
\ \ > r I
\ � f
i� 9' ADDITIO AL R/W
RECEP ON # 9 55497 _
1
September 4, 2002.
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, CO 80526
1630 S. ed&9e si cow
5-76e ems, e0 80527
(970) 493-2808
57(970) 495- 9735
RE: Re=Certification for Big Horn Village II, located directly east of City Park Avenue and a few
hundred feet south of University Avenue.
Dear Sirs:
On September 4, 2002, we observed the site located at Big Horn Village H. We observed the site
during a warm partly sunny day. Our observations were limited to those items that was: not properly
installed at our August 16, 2002 site visit. Please refer to our August 16, 2002 certification letter. The
following underlined items were deficient at our August 16t', observation.
Detention Pond k
• The Water Quality Plate was not installed properly: — We observed the orifice plate today and
it appeared to be installed as designed: Also, a trash rack has been added.
Detention Pond B:
• The Orifice Plate was not installed -properly — the opening in the plate -was below the invert of
the pipe thereby restricting the flow even more. — Today we observed that the orifice opening
has been cleaned out and. the orifice plate was adjusted. However, the bottom of the orifice
opening is still slightly below the invert of the outlet pipe. With the cleaner opening, we
believe -that the orifice opening will operate in an acceptable manner and will not be -
detrimental to the downstream properties,
Our recommendations were based on our observation on the date noted above. If you have, any
questions, please contact. me at the above address or phone number.
Sincerely, \l�����a��u i i i iui,
zadwrao� aqd r�MM&a. �Q0 RE'
James R. Loonan, P�ssj
�i,,���4NA L'EN
1630 S e'P1w'4"Nue
P. 0..Vn 270952
56t eO 90527
(970) 493-2908
30 (970) 495- 9735
September 4, 2002
City of Fort Collins
Stormwater Utility
700 Wood. Street
Fort. Collins, CO 80526
RE: Re -Certification for Big Hom Village` II, located directly east of City Park Avenue and a few
hundred feet south of University Avenue.
Dear Sirs:
On September 4, 2002, we observed the site located at Big Horn Village IL We observed the site
during a warm partly sunny day. Our observations were limited to those items that was not properly
installed at our August 1.6, 2002 site visit. Please refer to our August 16, 2002 certification letter. The
following underlined items were deficient at our August I e observation.
Detention Pond A:
• The Water Quality Plate was not installed properly. — We observed the orifice plate today and
it appeared to be installed as designed. Also, a trash rack has been added.
Detention Pond B:
• The Orifice Plate was not installed nronerly —
the pipe merely resmcung ine now even more. — i oaay we opservea max ine ounce opening
has been cleaned out and the orifice plate was adjusted. However, the bottom of the orifice
opening is still slightly below the invert of the outlet pipe.. With the cleaner opening, we
believe that the orifice opening will operate in an acceptable manner and will not be
detrimental to the downstream properties.
Our recommendations were based on our observation on the date noted above. If you have any
questions, please contact me at the above address or phone number.
Sincerely,
.L�ocoian aacd s�aeaetated,
James R. Loonan, P.E.
e," 0NAL