HomeMy WebLinkAboutLot Certifications - 11/25/2003 (2)November 25, 2003
Mr. Jay Barber
City Of Fort Collins
Stormwater Utility Department
P.O. Box 580
Fort Collins, Cc 80522-0580
Re. Brookfield
Byi7ding(Ga"rage 28 Stormwafer Certifieddori'
Project No. 0788-074
Dear Mr. Barber:
Please find enclosed our Compliance check ofi Building 28 and Garage 28 located at 5086 Brookfield Drive of
the Brookfield projed for the as -built condition. TST, Inc. surveyed the finished floor and perimeter grading of
the building on November24, 2003, as constructed by the contractors.
The following is the finished floor elevation of the building:
Lot No.
As -built FF
Design FF
Minimum
Opening Elevation
28
4896.79
4896.80
4896.30
The following is the minimum opening elevation of the garage:
Lot No.
As -built Minimum
Opening Elevation
Design Minimum
Opening Elevation
28
4895.44
4895.13
The finished floor, sidewalks, and perimeter grading appear to have been built and graded within design
parameters and construction tolerances. Finished grades around the perimeter of building and garage 28
have been verified prior to landscape installation.
Please contact me if you have any questions.
Sincerely,
TST, INC. CONSULTING ENGINEERS
adene A dower, P.E.
SAS/sjk
cc: Doug Barkus, Chateau Development
TST, INC. 748 Whalers Way - Building D
Consulting Engineers Fort Collins, CO 80525
(970) 226-0557