Loading...
HomeMy WebLinkAboutLot Certifications - 04/25/2003April 22, 2003 Y 2�e•✓ Mr. Jay Barber City Of Fort Collins Stormwater Utility Department P.O. Box 580 Fort Collins, Co 80522-0580 Re: Brookfield Lot 31-36 Stormwater Cerfification Project No. 0893-003 Dear Mr. Barber. Please find enclosed our compliance check. of Lots 31 through 36 for the Brookfield project for the as -built condition. TST, Inc. surveyed the finished floor, the top of foundation and perimeter grading of the building on April 11, 2003, as constructed by the contractors. The follow ing is the finished floor elevations of the building: Lot No. As -built FF Design FF 31-36 4902.20, 4902.00 The majority of the grading has been completed around the front of the building, however grading at the rear of the building near the garages have not been completed. This grading will be completed once the detached garages have been completed. The 'detached garages are separate building permits and stormwater certifications will follow once the grading has. been completed around the garages. Landscaping is still required however all storm drainage facilities are in place and should function as designed. Please contact me if you have any questions. Sincerely, TST, INC. CONSULTING ENGINEERS *StI6Vn'9XA4.' Wen, P.E. SAS/sik cc: Doug Barkus, Chateau Development TST, INC. 748 Whalers Way - Building D Consulting Engineers Fort Collins, CO 80525 (970) 226-0557 Metro (303) 595-9103 Fax (970) 226-0204 r Email info@tstinexom W W W:tstinccom