Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Lot Certifications - 01/28/1998 (3)
TST January 26 1998 JAN 2 81998 Mr. Basil Hamden City of Fort Collins Stormwater Department P.O. Box 580 Fort Collins, CO 80522 RE. Brittany Knolls P. U.D. Filing No. 2-Lot 53 Drainage Project No. 10-739-100 Dear Basil: We are writing this letter to complete the drainage improvements out at Lot 53 in Brittany Knolls. The improvements for this particular lot was completed in June of 1997 in accordance with the City of Fort Collins approved design TST, Inc., Consulting Engineers submitted. All improvements were implemented and TST"s survey crew completed a "As Built" of the improvements. We have included a copy of the actual field notes of this survey. We also certify that all improvements were completed and that the drainage plan is working. We appreciate your help in getting this matter resolved and if you should have any questions or concerns please do not hesitate to call Sincerely, TST, INC. CONSULTING ENGINEERS Project Manger Enclosure: cc: Mr. Rich Djokic Mr. Dave Osborn Mr. Ben Connell TST INC. Consulting Engineers 748 Whalers Way — Building D Fort Collins, CO 80525 (970) 226-0557 102 Inverness Terrace East Suite 105 Englewood, CO 80112 Metro Denver (303) 595-9103 (303) 792-0557 Fax(970) 226-0204 Fax (303) 792-9489 No Text �=2� ��.\�� ©���2/®�\�\2/2��/3�2\. . . . 6 .: [��{�/���� : � � :� � ` �: ` © . - � `� �2 2 \ .� � 6 ?3� «%\\� :^ ��^ � � ���� ¢yam � /� � s«3«��t » » » . ... w � /� } y ���\�-� 4v «.<.2»© � .r � . - ?��� t� : « ° - � � � . .� �� ``$��� \\���� /\� \� �\\^.�--.����\� �~: d } d ) 2 } °2) 2 « ` �� � � \ \� � � 7 �\\��— �a»»%3 :I >