Loading...
HomeMy WebLinkAboutSite Certifications - 09/27/1995STEWc S 1,010-5 September 27, 1995 Consulting Engineers anti Surveyors VFSVk- Mr. Basil. Hamdan V Stormwater Utility City of Fort Collins P.O. Box 590 Fort Collins, CO 80522 Re: As Built Grading on Lots 4 and 5, Boardwalk Crossing 2 1< Dear Basil: On September 21, 1095 Wd completed it "As Built" Survey owbots�.4.and -5, jr:�� and found the following: 1. Spot shots in the East and West detention areas found the ponds to be constructed as designed. 2. The storm sewer system has been installed as designe(L 3. The outlet to Detention Pond C is in place and to grade. 4. The spillway for Pond 9 has been constructed as desigiied. 5. The restriction plates have been installed in both ponds. 6. The drain swale to the South of the building has been constructed. We find that the drainage and grading final construction conforms to the design plan and therefore is in compliance with the City. A blueprint of the "As guilt" elevations has been included for your use. if you have any questions regarding this "As Built,` please let me know. HNI Sincerely, D. Ff= D. Blake, P.E. & L. S. r 9ecretary/Treasurer J& 783 9S rs_c enclosure James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482m9331 Fax 303/482-9382