HomeMy WebLinkAboutLot Certifications - 07/10/2025 (4)2/14/17 Page 1
CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2.Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
Top of foundation/finished floor
Finished grade on each side of the structure
Quarter points along each lot line (not more than 50 feet apart)
Break points/high points
Swales
Berms
Retaining walls
Air conditioning pads
Window wells
Any other appurtenance(s) within an easement
3.All elevations are within a 0.2 foot tolerance of the approved grading plan.
4.The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 33% (3:1).
7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8.All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
EM
EM
EM
multiple entry points to building dictated FG around the building to match FFE
pavement and sidewalk adjacent to all faces of
building dictate 2% or less around the building
EM
EM
EM
EM
EM
Grading/Stormwater Certification Accepted
(Certificat e of Occupancy Released)
Accepted by:
Date :
☐ Escrow was held for CO and is now released
we mkapp
07/10/2025
4
2/14/17 Page 2
9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10.The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11.Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping:
12.Final site cleanup has been completed.
13.I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions..
No Yes
No Yes
No Yes
No Yes
No Yes
14.Based on this information, I certify that (check one):
□The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
□The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
Email:
Phone:
Company:
Address:
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
PE Stamp
Sign and date
EM
EM
EM
EM
EM
06/13/2025
CO
CO
E
CO
CO
E
JRC
PJD
GRADING PLAN-1
SCALE: 1"=30'
0 15 30
STAMP
H:
\
K
\
K
i
n
g
S
o
o
p
e
r
s
-
C
i
t
y
M
a
r
k
e
t
\
C
O
,
F
o
r
t
C
o
l
l
i
n
s
-
K
S
S
0
0
0
1
4
6
-
#
1
8
C
o
l
l
e
g
e
&
D
r
a
k
e
\
C
A
D
D
\
3
-
C
D
\
K
s
s
1
4
6
_
P
_
1
0
-
G
r
a
d
.
d
w
g
-
Er
l
a
n
d
M
o
w
i
n
c
k
e
l
-
6/
1
2
/
2
0
2
5
Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5500 Greenwood Plaza Blvd, Suite 200
Greenwood Village, CO 80111
303.770.8884
Date:
Drawn By:
Project No:
Checked By:
KSS000146
FI
N
A
L
U
T
I
L
I
T
Y
P
L
A
N
S
F
O
R
MI
D
T
O
W
N
G
A
R
D
E
N
S
M
A
R
K
E
T
P
L
A
C
E
KI
N
G
S
O
O
P
E
R
S
M
A
R
K
E
T
P
L
A
C
E
#
1
4
6
S.
C
O
L
L
E
G
E
A
V
E
.
&
D
R
A
K
E
R
D
.
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
DECEMBER 27, 2024
01/05/2024 WALL DETAIL REVISIONS PJD
03/21/2024 FUEL CENTER SAN LINE PJD
05/09/2024 RFI 79 - COLLEGE AVE INLET PJD
05/20/2024 RFI 102 - WT & FIRE SVC RELO PJD
06/26/2024 RFI 78 & RFI 120 PJD
07/12/2024 RFI MEDIAN TIE-IN PJD
07/16/2024 RFC 18-CANOPY SLAB PJD
07/30/2024 RFI 127 - ROOF DRAINS PJD
08/13/2024 RFI 137 & 139 PJD
08/13/2024 TRASH ENCL. FOUNDATION PJD
08/26/2024 GRADING ELEVATIONS ADDED PJD
08/29/2024 ADA PARKING REVISION PJD
10/04/2024 RFI 159 & 165 PJD
10/17/2024 RETAIL CURB GRADING PJD
11/18/2024 RFI 178 PJD
12/13/2024 WATER & SANITARY AS-BUILTS PJD
12/05/2024 RFI 185 - SPEED HUMP SIGNAGE PJD
12/27/2024 FUEL ROOF DRAIN PJD
01/06/2025 PROPANE TANK BOLLARDS PJD
01/15/2025 WATER X-ING AS-BUILT PJD
C2.0
RECORD DRAWING
RECORD DRAWING STATEMENT
I, PHIL DALRYMPLE, CERTIFY ALL GRADING AND STORM
SEWER IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL
CONFORMANCE WITH THE DESIGN/CONSTRUCTION
DOCUMENTS, PURSUANT TO THIS RECORD DRAWING
COPY OF THE FINAL GRADING AND STORM SEWER
PLANS.
SIGNATURE & SEAL
AS-BUILT INFORMATION SHOWN HEREON IS
BASED ON SURVEY DATA PERFORMED BY PLS
CORPORATION ON 01/02/2025-01/15/2025 AND
PROVIDED ON 01/15/2025
RECORD DRAWING STATEMENT
I CERTIFY ALL GRADING AND STORM SEWER
IMPROVEMENTS SHOWN HEREIN, INCLUDING ANY
NOTED CHANGES OR REVISIONS, ARE IN GENERAL
CONFORMANCE WITH THE DESIGN/CONSTRUCTION
DOCUMENTS, PURSUANT TO THIS RECORD DRAWING
COPY OF THE FINAL GRADING AND STORM SEWER
PLANS.
SIGNATURE & SEAL
06/13/2025
COCO
JRC
PJD
GRADING PLAN-2
SCALE: 1"=30'
0 15 30
STAMP
H:
\
K
\
K
i
n
g
S
o
o
p
e
r
s
-
C
i
t
y
M
a
r
k
e
t
\
C
O
,
F
o
r
t
C
o
l
l
i
n
s
-
K
S
S
0
0
0
1
4
6
-
#
1
8
C
o
l
l
e
g
e
&
D
r
a
k
e
\
C
A
D
D
\
3
-
C
D
\
K
s
s
1
4
6
_
P
_
1
0
-
G
r
a
d
.
d
w
g
-
Er
l
a
n
d
M
o
w
i
n
c
k
e
l
-
6/
1
2
/
2
0
2
5
Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5500 Greenwood Plaza Blvd, Suite 200
Greenwood Village, CO 80111
303.770.8884
Date:
Drawn By:
Project No:
Checked By:
KSS000146
FI
N
A
L
U
T
I
L
I
T
Y
P
L
A
N
S
F
O
R
MI
D
T
O
W
N
G
A
R
D
E
N
S
M
A
R
K
E
T
P
L
A
C
E
KI
N
G
S
O
O
P
E
R
S
M
A
R
K
E
T
P
L
A
C
E
#
1
4
6
S.
C
O
L
L
E
G
E
A
V
E
.
&
D
R
A
K
E
R
D
.
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
DECEMBER 27, 2024
01/05/2024 WALL DETAIL REVISIONS PJD
03/21/2024 FUEL CENTER SAN LINE PJD
05/09/2024 RFI 79 - COLLEGE AVE INLET PJD
05/20/2024 RFI 102 - WT & FIRE SVC RELO PJD
06/26/2024 RFI 78 & RFI 120 PJD
07/12/2024 RFI MEDIAN TIE-IN PJD
07/16/2024 RFC 18-CANOPY SLAB PJD
07/30/2024 RFI 127 - ROOF DRAINS PJD
08/13/2024 RFI 137 & 139 PJD
08/13/2024 TRASH ENCL. FOUNDATION PJD
08/26/2024 GRADING ELEVATIONS ADDED PJD
08/29/2024 ADA PARKING REVISION PJD
10/04/2024 RFI 159 & 165 PJD
10/17/2024 RETAIL CURB GRADING PJD
11/18/2024 RFI 178 PJD
12/13/2024 WATER & SANITARY AS-BUILTS PJD
12/05/2024 RFI 185 - SPEED HUMP SIGNAGE PJD
12/27/2024 FUEL ROOF DRAIN PJD
01/06/2025 PROPANE TANK BOLLARDS PJD
01/15/2025 WATER X-ING AS-BUILT PJD
C2.1
RECORD DRAWING
RECORD DRAWING STATEMENT
I, PHIL DALRYMPLE, CERTIFY ALL GRADING AND STORM
SEWER IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL
CONFORMANCE WITH THE DESIGN/CONSTRUCTION
DOCUMENTS, PURSUANT TO THIS RECORD DRAWING
COPY OF THE FINAL GRADING AND STORM SEWER
PLANS.
SIGNATURE & SEAL
AS-BUILT INFORMATION SHOWN HEREON IS
BASED ON SURVEY DATA PERFORMED BY PLS
CORPORATION ON 01/02/2025-01/15/2025 AND
PROVIDED ON 01/15/2025
RECORD DRAWING STATEMENT
I CERTIFY ALL GRADING AND STORM SEWER
IMPROVEMENTS SHOWN HEREIN, INCLUDING ANY
NOTED CHANGES OR REVISIONS, ARE IN GENERAL
CONFORMANCE WITH THE DESIGN/CONSTRUCTION
DOCUMENTS, PURSUANT TO THIS RECORD DRAWING
COPY OF THE FINAL GRADING AND STORM SEWER
PLANS.
SIGNATURE & SEAL
06/13/2025
E
E
E
E
E
TL
TL
TL
TV
E
E
E
E
E
TL
TL
TL
TV
JRC
PJD
GRADING PLAN-3
SCALE: 1"=30'
0 15 30
STAMP
H:
\
K
\
K
i
n
g
S
o
o
p
e
r
s
-
C
i
t
y
M
a
r
k
e
t
\
C
O
,
F
o
r
t
C
o
l
l
i
n
s
-
K
S
S
0
0
0
1
4
6
-
#
1
8
C
o
l
l
e
g
e
&
D
r
a
k
e
\
C
A
D
D
\
3
-
C
D
\
K
s
s
1
4
6
_
P
_
1
0
-
G
r
a
d
.
d
w
g
-
Er
l
a
n
d
M
o
w
i
n
c
k
e
l
-
6/
1
2
/
2
0
2
5
Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5500 Greenwood Plaza Blvd, Suite 200
Greenwood Village, CO 80111
303.770.8884
Date:
Drawn By:
Project No:
Checked By:
KSS000146
FI
N
A
L
U
T
I
L
I
T
Y
P
L
A
N
S
F
O
R
MI
D
T
O
W
N
G
A
R
D
E
N
S
M
A
R
K
E
T
P
L
A
C
E
KI
N
G
S
O
O
P
E
R
S
M
A
R
K
E
T
P
L
A
C
E
#
1
4
6
S.
C
O
L
L
E
G
E
A
V
E
.
&
D
R
A
K
E
R
D
.
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
DECEMBER 27, 2024
01/05/2024 WALL DETAIL REVISIONS PJD
03/21/2024 FUEL CENTER SAN LINE PJD
05/09/2024 RFI 79 - COLLEGE AVE INLET PJD
05/20/2024 RFI 102 - WT & FIRE SVC RELO PJD
06/26/2024 RFI 78 & RFI 120 PJD
07/12/2024 RFI MEDIAN TIE-IN PJD
07/16/2024 RFC 18-CANOPY SLAB PJD
07/30/2024 RFI 127 - ROOF DRAINS PJD
08/13/2024 RFI 137 & 139 PJD
08/13/2024 TRASH ENCL. FOUNDATION PJD
08/26/2024 GRADING ELEVATIONS ADDED PJD
08/29/2024 ADA PARKING REVISION PJD
10/04/2024 RFI 159 & 165 PJD
10/17/2024 RETAIL CURB GRADING PJD
11/18/2024 RFI 178 PJD
12/13/2024 WATER & SANITARY AS-BUILTS PJD
12/05/2024 RFI 185 - SPEED HUMP SIGNAGE PJD
12/27/2024 FUEL ROOF DRAIN PJD
01/06/2025 PROPANE TANK BOLLARDS PJD
01/15/2025 WATER X-ING AS-BUILT PJD
C2.2RECORD DRAWING
RECORD DRAWING STATEMENT
I, PHIL DALRYMPLE, CERTIFY ALL GRADING AND STORM
SEWER IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL
CONFORMANCE WITH THE DESIGN/CONSTRUCTION
DOCUMENTS, PURSUANT TO THIS RECORD DRAWING
COPY OF THE FINAL GRADING AND STORM SEWER
PLANS.
SIGNATURE & SEAL
AS-BUILT INFORMATION SHOWN HEREON IS
BASED ON SURVEY DATA PERFORMED BY PLS
CORPORATION ON 01/02/2025-01/15/2025 AND
PROVIDED ON 01/15/2025
RECORD DRAWING STATEMENT
I CERTIFY ALL GRADING AND STORM SEWER
IMPROVEMENTS SHOWN HEREIN, INCLUDING ANY
NOTED CHANGES OR REVISIONS, ARE IN GENERAL
CONFORMANCE WITH THE DESIGN/CONSTRUCTION
DOCUMENTS, PURSUANT TO THIS RECORD DRAWING
COPY OF THE FINAL GRADING AND STORM SEWER
PLANS.
SIGNATURE & SEAL
06/13/2025
EVT
ECB
GM
TLTL
GM
IR
WM
EVT
ECB
GM
TLTL
GM
IR
WM
JRC
PJD
GRADING PLAN-4
SCALE: 1"=30'
0 15 30
STAMP
H:
\
K
\
K
i
n
g
S
o
o
p
e
r
s
-
C
i
t
y
M
a
r
k
e
t
\
C
O
,
F
o
r
t
C
o
l
l
i
n
s
-
K
S
S
0
0
0
1
4
6
-
#
1
8
C
o
l
l
e
g
e
&
D
r
a
k
e
\
C
A
D
D
\
3
-
C
D
\
K
s
s
1
4
6
_
P
_
1
0
-
G
r
a
d
.
d
w
g
-
Er
l
a
n
d
M
o
w
i
n
c
k
e
l
-
6/
1
2
/
2
0
2
5
Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5500 Greenwood Plaza Blvd, Suite 200
Greenwood Village, CO 80111
303.770.8884
Date:
Drawn By:
Project No:
Checked By:
KSS000146
FI
N
A
L
U
T
I
L
I
T
Y
P
L
A
N
S
F
O
R
MI
D
T
O
W
N
G
A
R
D
E
N
S
M
A
R
K
E
T
P
L
A
C
E
KI
N
G
S
O
O
P
E
R
S
M
A
R
K
E
T
P
L
A
C
E
#
1
4
6
S.
C
O
L
L
E
G
E
A
V
E
.
&
D
R
A
K
E
R
D
.
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
DECEMBER 27, 2024
01/05/2024 WALL DETAIL REVISIONS PJD
03/21/2024 FUEL CENTER SAN LINE PJD
05/09/2024 RFI 79 - COLLEGE AVE INLET PJD
05/20/2024 RFI 102 - WT & FIRE SVC RELO PJD
06/26/2024 RFI 78 & RFI 120 PJD
07/12/2024 RFI MEDIAN TIE-IN PJD
07/16/2024 RFC 18-CANOPY SLAB PJD
07/30/2024 RFI 127 - ROOF DRAINS PJD
08/13/2024 RFI 137 & 139 PJD
08/13/2024 TRASH ENCL. FOUNDATION PJD
08/26/2024 GRADING ELEVATIONS ADDED PJD
08/29/2024 ADA PARKING REVISION PJD
10/04/2024 RFI 159 & 165 PJD
10/17/2024 RETAIL CURB GRADING PJD
11/18/2024 RFI 178 PJD
12/13/2024 WATER & SANITARY AS-BUILTS PJD
12/05/2024 RFI 185 - SPEED HUMP SIGNAGE PJD
12/27/2024 FUEL ROOF DRAIN PJD
01/06/2025 PROPANE TANK BOLLARDS PJD
01/15/2025 WATER X-ING AS-BUILT PJD
C2.3
RECORD DRAWING
RECORD DRAWING STATEMENT
I, PHIL DALRYMPLE, CERTIFY ALL GRADING AND STORM
SEWER IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL
CONFORMANCE WITH THE DESIGN/CONSTRUCTION
DOCUMENTS, PURSUANT TO THIS RECORD DRAWING
COPY OF THE FINAL GRADING AND STORM SEWER
PLANS.
SIGNATURE & SEAL
AS-BUILT INFORMATION SHOWN HEREON IS
BASED ON SURVEY DATA PERFORMED BY PLS
CORPORATION ON 01/02/2025-01/15/2025 AND
PROVIDED ON 01/15/2025
RECORD DRAWING STATEMENT
I CERTIFY ALL GRADING AND STORM SEWER
IMPROVEMENTS SHOWN HEREIN, INCLUDING ANY
NOTED CHANGES OR REVISIONS, ARE IN GENERAL
CONFORMANCE WITH THE DESIGN/CONSTRUCTION
DOCUMENTS, PURSUANT TO THIS RECORD DRAWING
COPY OF THE FINAL GRADING AND STORM SEWER
PLANS.
SIGNATURE & SEAL
06/13/2025