HomeMy WebLinkAboutLot Certifications - 06/18/1995AIRES
ASSOCIATES
June 27, 1995
Mr. Basil Harridan
City of Fort Collins
Stormwater Utility
235 Mathews
Fort Collins, Colorado 80524
Re: Lot 147,-Huntington-Hill5-Filing
Dear Basil,
As required by the hold placed on the certificationof occupancy (CO), we surveyed the Swale
along the east side of Lot 147 this morning to ensure that the swale has 5H:1V sideslopes and
at least one foot of depth. We surveyed the flowline elevation and elevations 5 feet on either
side of the flowline at the most constricted location along the swale (at the northeast corner of
the patio on Lot 147). The swale is nearly perfect; on the west side (Lot 147), the sideslope is
indeed 5H:1V while on the east side, the sideslope is 5.56HAV. I have included a picture. of the
swale for your review.
It is our recommendation to release the hold on the CO for Lot 147 since the swale has been
constructed such that it meets the design configuration. If you have any questions, please call
me.
Sincerely,
Owen Ayres Associates, Inc.
f rmerly Re rce Consultants &Engineers
Scott Queen, E.
Civil Engineer
SQ:sp
Enclosure
cc: Dennis Morgan, Geneva Homes
Owen Ayres & Associates, Inc.
Engineers/Scientists/Surveyors
3665 JFK Parkway, Building 2, Suite 300, P.O. Box 270460, Fort Collins, CO 80527
(970) 223-5556, Denver Metro (303) 572-1806, FAX (970) 223-5578
c:\data\wp51 \hamd627a.1tr
34-0236.00
Printed on recycled paper
�^� r. M � � ..�_.
�� �ls �� ����