Loading...
HomeMy WebLinkAboutLot Certifications - 05/02/2025 (4)Date: Address: December 23,2024 Subdivision: Old Town North - Third Filing B.2104912Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) 438 Osiander Street Fort Collins 9701 38501 8 Lot:18 Block: l, (print) Rodney A' Harr, P.E', a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City's No _ Yes RAH Building Department does not approve grading plans). 2. Certification includes the attached as-built survey 661s6 1212012024 (must be within 60 No - Yes RAH days of the date the certification is submitted) accurately and truthfully depicting elevations for: e Top of foundation/finished floor r Finished grade on each side of the structure r Quarter points along each lot line (not more than 50 feet apart) r Break points/high points o Swales o Berms e Retaining walls o Air conditioning pads o Window wells o Any other appurtenance(s) within an easement 3. All elevations are within a 0"2 foot tolerance of the approved grading plan. 4. The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5. There is a minimum grade of SYo away from the structure within the first 5 to 10 feet adjacent to the residence. 6. All slopes meet or exceed the minimum requirement of 2yo tL% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8. All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. 2/14/17 No Yes RAH No_ Yes RAH No _ Yes RAH No Yes RAH No _ Yes RAH No RAH Yes Page I t cERTlFrcauoN oF Lor GRADING : l |t- , Ybf r_I tt IYriar,IV.t-! Yr htY ri Yrlrr.Erf !v . .*l I eursuant to Fort Collins City Code I26-544 & City Land Use Code 5 3.3.2 (e) Grading/Stormwater Certification Accepted (Certificate of Occupancy Released) Accepted by: Date: ☐ Escrow was held for CO and is now released we mkapp 05/02/2025 9. 10. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. The grading of this lot does not adversely affect neighboring properties or City infrastructure. No _ Yes RAH No_ yes RAH 11. Landscaping has been completed prior to survey. lf not, please indicate who will be No RAH Yes No _ Yes RAH No Yes RAH responsible for completing landscaping: 12. Finalsite cleanup has been completed. Revelation Homes 13. I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions. 14. Based on this information, I certify that (check one): tr The elevations and drainage patterns of the lot/site are in substantialconformance with the City approved drainage and grading plan for the property (information attached). E The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drairnage plan with exceptions (information attached). ln my professionaljudgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Rodney A. Harr, P.E. Email: harrski@q.com phone: (970) 699-2779 Company:Snyder Land Surveying, lnc. Address: 2061 Sandwater Court Wndsor, CO 80550 PE Stamp Sign and date NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) Wate rUtilitiesEng@fcgov.com. Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 97A-22L-6700 F8iriboIins'E-*- SW :;t6;;iis$',- vrln 't rt,il.t 2/ t4/17 Page2 CITY OF FORT COLLINS CERTIFICATION OF LOT GRADING EXPLANATIONS 1.The Grading Plan is not attached but there are spot elevations on the lot lines of the Plot Plan the correspond to the Grading Plan. 8.The downspout locations are not shown but are at the corners of the structure and discharge into the 4’ drainage easement along the side yards. 11.Revelation Homes will provide the Landscaping for the site.