Loading...
HomeMy WebLinkAboutLot Certifications - 04/29/20252/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes M.R. M.R. Minor differences occur greater than 0.2' but drainage plan is not adversely affected. M.R. M.R. M.R. M.R. M.R. M.R. Drainage, in some locations, designed to flow onto sidewalks or sidewalk chases closer than 5' from building. The northeast corner is less than minimum slope due to conflicts with conduits and electric meters. There is minimal stormwater runoff at that location and downspouts have been routed directly to the sidewalk chase. No adverse effects are foreseen. Concrete pans used in this area adjacent to structure 1% swale slope utilized along west side of building. Swale conveys minimal stormwater runoff and no runoff from downspouts. No adverse effects forseen and drainage will be directed per the approved grading plan. Concrete pans used for grades < 1% Grading/Stormwater Certification Accepted (Certificat e of Occupancy Released) Accepted by: Date : ☐ Escrow was held for CO and is now released we mkapp 04/29/2025 4 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date Cleanup has been completed around Building 1 and the area needed for residents to access. Construction fencing has been placed to isolate the building from any ongoing construction activities at the site and other buildings. M.R. M.R. M.R. M.R. M.R. 3 EASEMENT EXCLUSION EASEMENT EXCLUSION NOTE #1 2 Story Wood w/ Covered Porches, No Basement S89°20'46"E 79.25' S00°39'14"W 179.50' N89°20'46"W 79.25' N00°39'14"E 179.50' 4.2' 13 . 3 ' 4.2' 11 . 6 ' 6.3' 54 . 3 ' 4.7' 9. 8 ' 4.7' 27 . 2 ' 6.2' 11 . 6 ' 4.2' 13 . 3 ' 4.2' 15 . 2 ' 25.6' 1. 7 ' 9.6' 1. 7 ' 36.0' 15 . 2 ' 6.2' 24 . 1 ' 6.2' 15 . 5 ' 6.2' 22 . 1 ' 6.2' 15 . 5 ' 6.3' 24 . 0 ' 6.2' 15 . 5 ' 6.2' 24 . 1 ' 6.2' 15 . 2 ' 36.0'1. 7 ' 9.6' 1. 7 ' 25.6' 15 . 2 ' 90 . 5 8 88. 5 5 TF/FF=91.75 TF/FF=92.25 TF/FF=93.25 ENTRY=90.50 ENTRY=91.24 ENTRY=91.70 ENTRY=91.66 88. 6 4 88.92 88.55 90. 8 1 90. 8 1 90.65 90.70 90.68 90. 6 4 90. 6 8 90 . 6 8 90 . 7 2 90.8 0 90 . 6 0 90.8 6 90 . 5 90.83 90 . 4 90.9 4 90 . 2 90.9 7 91. 5 5 91. 6 6 90 . 6 5 90 . 7 2 91 . 0 0 91. 1 5 90.0 9 RIM 91.46 91.5 3 91.5 2 91 . 3 3 91.5 1 91. 4 90 . 5 7 RIM91 . 3 5 91 . 5 2 92 . 0 4 92 . 4 5 93 . 2 1 93 . 4 4 92. 0 7 93. 0 9 93 . 1 4 91.5 1 92.3 6 92.4 1 92.4 8 92. 8 92 . 0 6 92 . 1 5 92 . 6 1 93. 2 0 93.25 92 . 5 8 92.98 92.72 93.04 91.12 92.58 92.70 92.65 ENTRY=92.68 92 . 7 5 92.07 92.51 92.59 92.54 92. 5 1 92. 5 5 92. 6 0 92.58 92.6 3 92.41 92.30 91. 8 2 91 . 8 6 91.79 91. 3 5 91.61 91. 1 5 91 . 4 7 91.34 90. 9 1 91 . 1 7 91.06 90. 6 0 90 . 1 8 90 . 0 1 89 . 5 0 93 . 0 9 92 . 0 6 91.3 4 91.3 0 91 . 6 2 91 . 5 9 91 . 6 3 91 . 1 4 89. 6 6 89.51 88. 9 0 89.04 88.4 2 88. 5 4 89.86 92 . 0 4 RIM 92.25 91.25 91.21 91.65 91 . 6 1 90.98 91.21 89 . 7 6 90.71 90 . 9 90 . 8 90.7 92. 3 0 92.3592.5192.71 92.1592 . 7 0 92 . 5 8 93.2 2 93.20 92.7 0 93. 1 2 92 . 2 4 92.54 92.6 9 92 . 6 2 91. 7 5 91.61 91 . 5 9 91.68 89.0 5 89.88 89.95 89.86 DSDS DS DS DS DS DS 89.1 2 89 . 4 2 90. 8 2 DS DS DS DS DS DS DS DS 92. 5 92. 7 DS DS DS DS DS DS DS 89.24 AS-BUILT ELEVATIONS FOR A DRAINAGE CERTIFICATE for CALCON CONSTRUCTORS No.REVISION BY DATE DATE: 11/07/2024DRAWN BY: MAKPROJECT #: 1870-002 SCALE 1" = 20' -TOP OF FOUNDATION: 5093.25, 5092.25, 5091.75 -GARAGE: N/A -MOE: 5090.50NOTICE: ALL BEARINGS, DISTANCES, AND EASEMENTS ARE PER THE SUBDIVISION PLAT UNLESS OTHERWISE NOTED CALCON CONSTRUCTORS INFORMATION RECORDED ON: JANUARY 7, 2025 THE ATTACHED DRAWING SHOWS THE ELEVATIONS AND DRAINAGE PATTERNS THAT ARE THE REGISTERED LAND SURVEYORS CERTIFIED FINDINGS OF THE FINISHED GROUND GRADES FOR THE ABOVE DESCRIBED PROPERTY ON THE DATE PROVIDED ABOVE. THE ELEVATIONS AS DEPICTED HEREON MAY CHANGE SUBSEQUENT TO THE DATE OF THE SURVEY DUE TO NATURAL AND/OR ARTIFICIAL ACTIONS. COLORADO P.L.S. NO. 38316 MATT E. LOCKWOOD DATE _________________________________ ___________ PROFESSIONAL LAND SURVEYOR -FINISHED FLOOR: 5093.25, 5092.25, 5091.75 FORT COLLINS | GREELEY | MESA | GOODYEAR | TUSCON | NORTH PHOENIX | FORT WORTH northernengineering.com970.221.4158 LEGAL DESCRIPTION: A PORTION OF LOT 1, BLOCK 1 (BUILDING C), IMPALA REDEVELOPMENT, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO ADDRESS: 306 IMPALA CIRCLE 04/10/2025 NO SWALE TO CHASE XXXXXXXXXXXXXXX DS DS DS DS DS DS DS DS DSDSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E S S X X X X X X X X X X X X X 8" S S 8" SS 8" SS 8" SS S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S X X E E E E E E E E E E E E E E E E E E UD UD UD FFE=96.15 FFE=92.25 FFE=93.73 FFE=91.75 FFE=93.25 FFE=95.48 IMPALA CIRCLE SO U T H I M P A L A D R I V E 26' EMERGENCY ACCESS EASEMENT 26' PUBLIC ACCESS & EMERGENCY ACCESS EASEMENT 20' FL-FL 7' SIDEWALK 6' SIDEWALK 7' SIDEWALK 6' S I D E W A L K 6' S I D E W A L K 8. 5 ' S I D E W A L K 5' S I D E W A L K 8. 5 ' S I D E W A L K 5' S I D E W A L K 24' EMERGENCY ACCESS EASEMENT 5' S I D E W A L K PUBLIC ACCESS EASEMENT (WIDTH VARIES) 3' CRUSHER FINES 94 . 5 1 92.93 95. 4 8 94.8 1 94.2 5 95.22 95 . 0 5 93.05 93.6 8 1.7% 88. 1 9 88. 4 5 88. 6 0 90 . 1 8 90 . 6 0 92.8 492.8 8 88.7 8 (88 . 0 0 ) (88 . 4 2 ) (92 . 6 9 ) (94 . 9 2 ) 91.68 92.75 92.7 3 92.5 8 91.7 5 91.07 90.5 0 89.5 8 1.9%1.9%0.6% 94.5 9 (94 . 2 2 ) 1.8% 0. 7 % 1. 9 % 1. 5 % 1.9% 0. 9 % 0.6% 0. 5 % 88.36 1.3% 0.5%2.2%2.6% 0. 7 % (0 . 2 % ) 4.0% 5.1% 3.1% 2. 0 % 1. 9 % 2.0% 4.4% (88 . 3 1 ) OWNER: POUDRE R-1 SCHOOL DISTRICT OWNER: TRISSELL, NICOLE/COGELL, CHRISTOPHER 408 S IMPALA DR. (92 . 9 6 ) (93 . 1 1 ) (93 . 2 9 ) (93 . 6 4 ) (93.68) (93 . 8 9 ) (94 . 1 0 ) FFE=92.23 93. 0 6 93.0 6 90.86 92.23 94.0 9 94.3 9 93.0 6 92.6 9 92.5 7 92.8 7 91.9 5 91.7 8 91.5 8 91.4 7 91.3 6 90.9 2 90.7 8 90.4 4 90.2 4 89 . 8 6 89.6 8 90.3 7 90.32 88.8 2 88.6 4 89.4 7 89.42 87.44 86.8 6 88.38 89 . 1 5 94.6 4 94.00 93.35 93.6 4 93.1 8 92.1 5 92.1 0 92.48 92.3 1 92.1 3 91.7 6 91.7 0 92.0 9 92.0 6 91.6 4 91.5391.84 91.0 9 90.7 2 90.72 91.0 9 90.13 89.43 88.6 0 88. 2 1 87.4 0 88.4 5 (92 . 8 4 ) 88.6 8 (88 . 1 6 ) 89.7 3 89.7 3 90.54 92. 7 3 94.0 7 92.9 2 91.14 90.3 4 88.9 4 91.9 0 91.9 3 0.5% 92.5 9 1. 4 % 1. 4 % 1. 4 % 1. 4 % 1. 4 % 1.8% 2.2% 1.8% 91.4 8 91.1 5 92.2 0 92.3 0 1.7%1.1%0.6% 3.3 % 0.6% 1.9% 0.1% 0. 3 % 1.2% 1. 5 % 1.9% 1. 2 % 1.7%1.5% 1. 4 % 1. 2 % 0.4% 1. 5 % 2.1% 0.5% 94.5 9 94.63 0. 5 % 1. 0 % 0. 2 % 0. 3 % (0 . 4 % ) (1 . 1 % ) (0 . 3 % ) (0 . 4 % ) 2. 8 % 94.6 5 1.2% 2.0% 2.1%1.1 % 1.6 % 1. 6 % 2.4% 2.4% 1.8 % 2.4% 2.2% 4.3 % 1.9% 3.3% 5.1% 2.7% 4.1% 4.2% 2.7% 1. 2 % 2.1% 2.4% 0. 1 % 3.3% 3.5% 2.1%4.0% 3.9% 2.0% 2.9% 2.2% 1.7% 1.5% 0. 5 % 2.1% 0. 5 % 3. 1 % 1. 0 % 1.8% 2. 0 % 0.9% 89.0 9 3.0%2.2% 2.0%1.7 % 2.2% 5.0% 3.8% 2.7% 2.2 % 0.8% 2.2% 94.6 9 94.7 5 (94 . 4 1 ) (94 . 9 0 ) (94 . 6 5 ) 93.4 4 92.3 1 94.04 94.0 0 94.30 94.5 1 1. 6 % 1. 5 % 1.8% 0.8% 1. 3 % 3.2% 1.5% 1.4% 1.8% 1. 8 % 1.7% 1. 8 % 1. 8 % 2.0% 1.5% 1. 9 % 89.1 8 91.48 90.21 0.5% 4.9%5.6% 8.1% 3.5 % 5.1% 2.5% 0.6 %2.8 % 2.4% 6. 2 % 4.3% 4: 1 8.3% 10.3% 1.8% 1.6% 1.6% 2. 6 % 1.1 % 1. 0 % 90.71 92.0 5 2.6% 4.8% 7.4% 4.8% 6. 7 % 6.6% 4: 1 6. 5 % 0. 8 % (1. 2 % ) (0.8%) (2 . 9 % ) (0 . 6 % ) (1.9%) (1.6%) (0.6%) 91.01 12.0% 9.3% 3. 7 % 95.4 8 96.1 5 96.0 4 96.15 96.04 96.15 95.3 7 95.48 95.3 795.48 95.4 8 95.4895.37 95.4 8 94.8 1 96.0 4 96.1 5 91.7 5 92.2 5 92.2 5 93.2 5 92.7 5 92 . 4 4 93.7 3 93. 0 6 93.73 92.2 3 89.8 2 93.7 3 87.2 1 1.0% 89. 5 1 89 . 6 2 FG 91.75 FG 92.2 7FG 90.58 FG 91.09 FG 94 . 9 1 FG 94.5 7FG 94.42 FG 94.3 8FG 94.46 FG 94.5 5 FG 94.3 6 FG 94.18 FG 91.7 5 88.9 0 89.8 2 88.2 388.28 88.2 6 88.20 88.2 6 88. 2 0 88.24 88 . 2 0 1.8% 94.5 1 93.6 4 2.0% 95.1 8 94.8 3 94.4 9 94.8 1 94.81 94 . 8 1 6.3% 14.5% 6.2% 3.8% 9.6% 3.5 % 4.4% 5.7% 6.1% 9.8% 6.4% 93.7 3 93.7 3 91.94 91.7591.6 8 91.7591.6 4 92.25 93.2 5 93.1 5 93.2 593. 1 8 92.25 92.1 4 93.2 5 93.1 4 93.2 5 93.1 0 95.48 95.3 7 96.1 5 91.7 5 91.7 0 91.75 91.6 4 89.8 1 89. 5 6 89.8 6 89.6 1 4. 7 % 1. 4 % 93.40 FG 90.6 1 91.1 7 92. 2 5 92.3 5 92.5 1 92.3 7 92.0 6 93.6 2 92.9 4 92.8 4 92. 8 4 92.5 7 93.7 3 93.62 92.9 4 92.7 5 92.6 8 92 . 9 4 94.1 0 93.8 8 93.6 0 92.93 93.63 93.5 2 93.91 93.9 2 92.6 1 93.0 6 93.0 6 93 . 7 3 93.7 3 93 . 0 6 92.76 93.67 93.5 1 93.4 6 93.29 92.2 8 92.5 5 93.39 93.30 93.00 92.95 93.7 3 93.6 2 92.81 92.4 2 91.8 9 92.2 6 92.4 4 93.0 4 92.44 92.8 9 92.0 2 91 . 9 8 91.2 3 93 . 7 3 93.62 92.1 2 91.1 0 90.9 6 90.80 91.8 1 89 . 9 2 90.27 92.1 3 92.13 90.1 0 90.01 90.38 89.7 0 90.0 7 91.8 9 91.94 90. 0 6 89.1 7 89 . 0 6 88.5 6 88.8 1 88.8988.7 9 88.1 1 88.0 7 88.7 6 89.1 9 89.12 92.23 92.0 5 91.9 4 90.04 91.85 92.0 5 92.2 3 92.23 89.1 3 88.9 8 89.0 1 89.04 88.9 8 89.34 89.4 8 90.04 91.8591. 8 5 91.5 7 90.5 790.57 90.4 8 90.48 90.2 6 90.63 90.74 90.65 92.05 92.05 93.16 87.6 9 87.6 6 88 . 2 4 88.2 4 88.24 88.7 4 88.70 88.21 91.25 95.3 2 91.5 0 88.4 3 88.5 2 88.6 088.7 7 90 . 4 6 90.60 HP 91 . 0 8 91.00 90.17 90.11 92.14 91.46 90.9 8 90.8 3 90.73 92.58 92.7 1 92.7 1 92.1 4 FFE=92.75 FFE=90.50 92.7 2 92. 1 8 92.5 5 92.2 9 90.6 9 91.2 1 91.12 91.1 1 91.2 6 91.2 5 91.7 7 91.74 90.84 89.1 0 90.96 FG 1.4% 2.6 % 90.7 5 91.1 9 91.3 3 91.00 91.13 92.58 94.6 1 95.2 3 95.4 8 96.0 0 95.01 94.8 0 94.7 2 94.6 2 95.22 95. 1 794.69 94.16 94.31 94 . 1 0 94.81 94.6 0 94.0 7 94.8 1 94.5 4 94.5 7 94.8 1 94.65 FFE=93.10 FFE=93.68 FFE=95.06 93.6 8 93.1 0 92.8 7 93. 3 3 92.8 1 94 . 6 6 94.5 2 94.9 4 FG 90 . 0 9 90. 1 7 90. 2 1 90. 3 0 90.6 0 92.8893.16 93.07 93.2 0 93.2 893.89 93.5 9 12.8% 13.5% 18 . 2 % 20 . 1 % 92.1 9 93.14 22 . 8 % 26 . 3 % 15 . 8 % 14 . 2 % 0.5% 90.7 5 94.17 93.61 93.5 7 (93.41) (93.79) (93.95) (94.20) 93.97 93.8 4 93.68 94.4 3 5.9% 95.0 0 94.37 94.4 7 94.01 94.8 4 95.48 3.9% 94. 6 1 94.0 8 94. 2 1 94.7 5 95.48 94.9 3 94.39 94.3 6 94.42 94.8 2 94.92 94.4 9 94.5 5 94. 8 8 95. 0 0 94 . 5 9 92.22 94.8 6 94.4 2 95. 0 4 17.06 LF 12" HDPE @ 0.50% 94.5 6 95.4 8 5. 8 % 5.0 % 91.99 90.20 FG 90.03 FG 90.45 FG 91. 0 1 FG 91.25 FG 92.0 9FG 90.8 6 2. 3 % 1. 5 % 10.6% 90.7 91.8% 94. 3 7 FG 94 . 4 8 FG 2.5 % 93.94 FG 90. 3 5 90.7 5 90. 8 2 90.79 90.0 0 90.81 90.98 90.74 15.2% 8.7% 16.4% 2.7%5.0% 91.77 91.78 1.5% 1.8%1.3% 1.1% 1.8% 1.5 % 91.82 5. 6 % 1. 8 % 91.4 8 90.0 4 91.85 88.5 3 91.7 2 91.28 91.56 1.0% 1.0% 1. 8 % 4. 8 % 2. 9 % 3. 3 % 5. 1 % 5. 9 % 5. 7 % 1. 8 % 90.75 91.8 5 91 . 8 9 92.5 492.2 6 9.7% 93.9 5 94.5 0 94.8 7 94.6 7 5. 3 % 94.0 0 2.1% 4. 9 % 4. 3 % 1.7% 1.9% 90.56 8.0%8.1% 89.24 89. 1 3 8.3%8.3% 88.1 4 1.8% 1.8% PROPOSED 6' CONCRETE PAN EASEMENT EXCLUSION EASEMENT EXCLUSION EASEMENT EXCLUSION PROPOSED AREA DRAIN (TYP.) ADA RAMP W/ HANDRAILS EXISTING 30" DRIVE-OVER CURB & GUTTER EXISTING VERTICAL CURB & GUTTER PROPOSED SAWCUT (TYP.) PROPOSED CHASE PROPOSED 3'X7' CONCRETE RUNDOWN W/ FOREBAY PROPOSED 1' CHASE PROPOSED FENCE (TYP.)PROPOSED GATE ADA RAMP W/ HANDRAILS PROPOSED ROCK WALL INNER CRITICAL ROOT ZONE (TYP.) OUTER CRITICAL ROOT ZONE (TYP.) STORM DRAIN 2-2 SEE SHEET C 312 STORM DRAIN 2-4 SEE SHEET C 312 PROPOSED 3' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE (TYP) PROPOSED 1' SIDEWALK CHASE (TYP) PROPOSED 1' SIDEWALK CHASE (TYP) PROPOSED 1' SIDEWALK CHASE (TYP) PROPOSED 1' SIDEWALK CHASE (TYP) PROPOSED 1' SIDEWALK CHASE (TYP) PROPOSED 1' SIDEWALK CHASE (TYP) EASEMENT EXCLUSION PROPOSED 2' CONCRETE PAN PROPOSED 1' SIDEWALK CHASE (TYP) PIPE CONNECTION TO SIDEWALK CHASE PIPE CONNECTION TO SIDEWALK CHASE 1' RIBBON CURB SEAT WALL (1.5' ABOVE SIDEWALK TYP.) SEE LANDSCAPE PLANS PROPOSED TRASH ENCLOSURE 2 (EAST) PROPOSED TRASH ENCLOSURE 1 (NORTH) STORM DRAIN 2 SEE SHEET C 311 3.2% 91.1 0 9.3 % 11 . 1 % 92.8 4 93.2 3 94.57 94.60 2.5 % 10.4 % 12.7 % 93.1 6 92.7 5 90.9 0 6" CONCRETE EDGE (SEE LANDSCAPING PLANS) 3.9 % 91.45 91.20 90.04 90.3790.39 90. 0 6 (88 . 8 2 ) ±31' FL-FL (TYP.) 86.70 86 . 8 6 5.7% 2.5% 4: 1 8: 187 . 7 0 87.7 0 88 . 3 0 2.8% 87.7 0 TOP OF CONDUIT = 5084.88 94. 4 8 FG 2.1% (3.7% ) (3 . 0 % ) UD UDUDUD TEE 2-2-0 INV. IN=5088.80 (W) INV. IN=5088.80 (N) INV. OUT=5088.80 (S) FG=5089.97 5.48 LF 4" HDPE @ 0.20% 90° BEND 2-2-0.1 INV. IN=5088.81 (N) INV. OUT=5088.81 (E) FG=5090.68 32.82 LF 4" SLOTTED HDPE @ 0.20% 90° BEND 2-2-0.2 INV. IN=5088.88 (W) INV. OUT=5088.88 (S) FG=5089.60 CO 2-2-0.3 INV. OUT=5089.16 (E) FG=5089.88 17.28 LF 4" SLOTTED HDPE @ 1.63% DS DS UDUD INLINE DRAIN A4 w/ 12" NYLOPLAST PEDESTRIAN GRATE ASSEMBLY w/ FRAME AND ADAPTOR TO CONNECT TO 6" HDPE INV. IN=5089.09 (S) INV. OUT=5089.09 (N) FG=5091.78 INLINE DRAIN A6 w/ 12" NYLOPLAST PEDESTRIAN GRATE ASSEMBLY w/ FRAME AND ADAPTOR TO CONNECT TO 6" HDPE INV. OUT=5089.18 (N) FG=5091.77 CLEANOUT A2-1 INV. OUT=5088.96 (E) FG=5091.30 TEE A3 (6"X4") INV. IN=5088.91 (S) INV. IN=5088.91 (W) INV. OUT=5088.91 (N) FG=5089.50 CONCRETE HEADWALL A1 INV. IN=5088.52 (SW) FG=5089.12 5.45 LF 6" HDPE @ 1.64% 10.99 LF 6" HDPE @ 1.63% 7.81 LF 6" HDPE @ 0.50% 26.16 LF 4" SLOTTED HDPE @ 0.20% 1.7% 1.8%1.3% 1.1% 1.8% 1.6% FFE=92.23 PROPOSED WALL SEE LANDSCAPE PLANS FOR DETAIL 0.5% 1.5 % 0.9% PROPOSED WALL SEE LANDSCAPE PLANS FOR DETAIL. PLACE GRAVEL BACKFILL FROM AROUND SLOTTED PIPE TO FINISHED GRADE. CONTRACTOR SHALL PROVIDE SLEEVE FOR STORM SEWER WALL PENETRATION 18 . 1 4 L F 6" H D P E @ 1 . 6 3 % 45° BEND A2 INV. IN=5088.61 (S) INV. OUT=5088.61 (NE) FG=5089.21 1.8% 1.6% 92.0 5 91.9 4 90. 0 6 91. 8 9 90. 0 4 90. 0 6 91. 8 9 91. 9 4 92.0 592. 2 3 92 . 2 3 91.8 5 91.2 1 91.8 2 91.8 5 91.85 91.85 91.78 91.77 TEE A5 (6"X6") INV. IN=5089.13 (W) INV. IN=5089.13 (S) INV. OUT=5089.13 (N) FG=5089.77 10.55 LF 6" HDPE @ 0.50%15.28 LF 6" HDPE @ 0.50% RD A5-1 INV. OUT=5089.20 (E) FG=5089.80 91.85 90. 0 4 NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 KEYMAP Sheet IM P A L A R E D E V E L O P M E N T of 32 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.PROJECT DATUM: NAVD88 BENCHMARK 25-97 AT THE SOUTHWEST CORNER OF MULBERRY ST. AND TAFT HILL RD., ON A CONCRETE TRAFFIC SIGNAL BASE. ELEVATION = 5071.25 BENCHMARK 24-97 ON A CONCRETE HEADWALL PIPE IN ROGERS PARK. SOUTH OF THE PARKING AREA OF ROGERS PARK (150 FEET SOUTH OF LARGE BARN) 2500 BLOCK OF MULBERRY ST. ELEVATION = 5102.71 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.17' BASIS OF BEARINGS THE SOUTH LINE OF THE SOUTHEAST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M. BEARING NORTH 88°51'30", AS SHOWN ON ALTA. HORIZONTAL DATUM COORDINATE SYSTEM IS A NORTHERN ENGINEERING LOCAL COORDINATE SYSTEM BASED ON MODIFIED STATE PLANE COORDINATES SCALED AT 1.00026470 (0.99973537) ABOUT (0,0). LINEAL MEASURE IS BASED ON THE U.S. SURVEY FOOT. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.LOT GRADING IS DESIGNED FOR TYPICAL RECTANGULAR FOOTPRINT WITH DIMENSIONS AS SHOWN HEREON. SHOULD BUILDING FOOTPRINT CHANGE, GRADING SHALL BE ADJUSTED BY PLOT PLAN FOR THE SPECIFIC FOOTPRINT. ALL MINIMUM OPENINGS SHALL BE A MINIMUM OF 18" ABOVE FRONT LOT ELEVATIONS AND PLOT PLAN DESIGN SHALL MEET FHA GRADING GUIDELINES AND BUILDING CODE REQUIREMENTS. 6.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION, PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE CANAL IMPORTATION FLOODPLAIN AND FLOODWAY. ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. 7.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET, PER SECTION 10-45 OF CITY CODE. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. 8.STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK MATCH LINE - SEE SHEET C 402 C 401 GR A D I N G P L A N 17 C 401 C 402 C 403 1.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL. 2.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 3.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE. 4.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. 5.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 6.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 7.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED. 8.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW: 9.NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. IF ACTIVE NESTS ARE FOUND, THE CITY ENVIRONMENTAL PLANNER WILL DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. 10.PRIOR TO ANY ONSITE DISTURBANCE PLEASE CONTACT CITY FORESTRY AT CTOMLINSON@FCGOV.COM FOR COORDINATION OF TREE PROTECTION REQUIREMENTS. 11.HYDRO-EXCAVATION OR AIR SPADING SHALL BE DONE AT THE FURTHEST EDGE OF THE DISTURBANCE AREA WITHIN THE CRITICAL ROOT ZONE OF THE TREE DEFINED AS 1 FT. RADIUS FROM THE TRUNK FOR EACH INCH OF DIAMETER MEASURED AT 4.5 FT FROM THE GROUND (DBH). AT THE EDGE OF DISTURBANCE, A 2 FT DEEP AND 6 IN WIDE TRENCH WILL BE MADE TO EXPOSE ANY EXISTING ROOTS USING A PRESSURE SETTING OF LESS THAN 1800 PSI. ALL ROOTS OVER 3 INCHES IN DIAMETER WILL BE INSPECTED BY THE FORESTRY DIVISION PRIOR TO CUTTING OR DISTURBING. ANY ROOT UNDER THIS DIAMETER WILL BE CUT CLEANLY AT THE FURTHEST POSSIBLE POINT AWAY FROM THE TREE WITH A SHARP HAND SAW (NO ROTARY BLADE OR CHAINSAW). THE TREE WILL BE KEPT WELL-WATERED DURING THIS WORK MAKING SURE THE SOIL STAYS MOIST TO A DEPTH OF 12 IN UNTIL PERMANENT IRRIGATION IS INSTALLED. ALL TREE PROTECTION TO STAY IN PLACE UNTIL THIS PROCESS IS COMPLETED. PRIOR TO PERFORMING THIS ACTIVITY PLEASE CONTACT THE FORESTRY DEPARTMENT TO ENSURE THAT ALL HYDRO-EXCAVATION IS APPROVED PRIOR TO START. 12.SEE LANDSCAPE PLANS FOR TREE PROTECTION DETAIL. 13.IN AREAS WHERE THE CRITICAL ROOT ZONE WILL BE IMPACTED, CONTRACTOR SHALL HAND-EXCAVATE TO THE EXTENT POSSIBLE. IF ROOTS LARGER THAN 2" IN DIAMETER ARE ENCOUNTERED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. TREE DIAMETER AT BREAST HEIGHT (IN) AUGER DISTANCE FROM FACE OF TREE (FT) 0-2 1 3-4 2 5-9 5 10-14 10 15-19 12 OVER 19 15 TREE PROTECTION NOTES: 9. GROUND FLOOR AND PATIO ELEVATIONS ARE FLUSH WITH FINISHED FLOOR ELEVATIONS. ALL PATIOS SLOPE AWAY FROM THE BUILDING AT 2%. 10. COORDINATE BUILDING ENTRANCE AND DOOR ELEVATIONS PRIOR TO CONSTRUCTION. REFERENCE ARCH & STRUCTURAL PLANS FOR ELEVATIONS INTERNAL TO BUILDING 1 AS I - 0 1 : D O W N S P O U T R E V . MC R 07 / 1 8 / 2 0 2 3 2 AS I - 0 3 : D O W N S P O U T , S T O R M , S W C H A S E R E V . MC R 09 / 1 4 / 2 0 2 3 3 PA R K E Q U I P M E N T A N D G R A D I N G R E V I S I O N MC R 11 / 1 7 / 2 0 2 3 NORTH PARK UNDERDRAIN DETAIL BUILDING A COURTYARD DETAIL NORTH 7 AD A G R A D I N G A N D T R A S H E N C L O S U R E R E V . MC R 03 / 0 1 / 2 0 2 4 8 AS I - 0 8 : I R R I G A T I O N S I P H O N A N D P A R K R E V I S I O N MC R 05 / 0 1 / 2 0 2 4 9 AS I - 1 0 : R E T A I N I N G W A L L A N D S I D E W A L K R E V . MC R 06 / 0 3 / 2 0 2 4 REVISIONS CONTINUED: 10 GRADING REVISION MCR 08/09/2024 Building 3