Re: The Village at Willow Springs
Stormwaur Certification
Project No. 10-738-021
Dear Basil:
October 9, 1997
STOR\AWATER
RE 8clVE D
OCT 10 1997
Please find enclosed our Stormwater Drainage Certification for The Village at Willow Springs.
TST Inc. surveyed the above drainage facilities on September 26, 1997 as they were installed by
the contractor. Included are redlined prints showing the as -built conditions .
At this time minor grading and landscaping are still required , however the storm drainage facilities
are in place and should function as designed.
Please contact me at 226-0557 should you have any questions or require further information .
Sincerely,
TST, INC. CONSULTING ENGINEERS
~~
SAS/nr
Enclosures
cc: Merle Bush, The Genesee Company
TST, INC.
Consulting Engineers
748 Wha lers Way-Buildin g D
Fort Co llins, CO 80525
(970) 226-0557
Metro Denver (303) 595-9 I 03
Fax (970) 226-0204
102 In ve rn ess Terrace East
Suire I 05
Englewood, CO 80 I I 2
(303) 792-0557
Fax (303) 792-9489
DRAINAGE CERTIFICATION FORM
Please fill out all applicable items in this certification form
for single family, multi-family and commercial properties.
Write 11 OK 11 for items checked or actual number checked in field.
Use "N/A" for items t h at are not applicable to the property that
is being certified.
A. Drainage facilities certification
1. Pond Certification
-volume ver~fication
a. topographic records and volume
b. cross-sections and spot elevations
-p9sitive fall to pan
-side slo:pes
-invert elevation
-spillway elevatioq
-placement and size of riprap
-side slopes
-grading
-orifice plate installation and size
-compaction of berm
-structural integrity of pond
2. Swales
~location (are they within easement)
-dimensions and cross-section verification
-longitudinal slopes and side slopes
-spot elevations
NA
-permanent erosion control measures
(drop structures, riprap, etc .. :.)
-tie-in to pipes, pans, curbs, etc ....
-weir size (elevations, size, opening, etc ... )
-available freeboard
-landscaping infringement on swales
3. Pioes
-size and type
-slopes (as-built and comparison to minimum
0.4% slope)
-pipe capacity calculations if slopes are
significantly altered
-invert elevations
-installation and backfill material
-cover
-encasement and clearance from other utility -
lines close by
-joints
4. Concrete Pan Chan n els
-size
-slope
-super elevation
-cross-section
-thickness
-elevations
. :~ 5. Inlets .....
-size and type
-size of opening (or name of standard used)
-grate elevation
-invert elevation
-box size
6. Cross oans
-size
-type
-grade
-eievation
-cross-sectional depth
-tie-in to curb and gutter
7. Culverts
-size
-type
-invert elevation
-headwalls
8 . Underdrains
-size
-type
-cover
-backfill
. , -geotextiles
~
12L
J2L
A
A
-cleanouts
9. Curb cuts
-size
-tie in to swale, pipe, etc ....
B. Certification of Grade Elevations Adjacent to
Drainage Facilities:
-minimum opening elevations
-top of foundation elevations
-comparison to 100 year WSEL's
(Freeboard requirements and floodplain issues)
C. Certification of Erosion Control Measures:
1. Permanent Measures:
-Permanent vesetation (6 11 bare spots and weeds
under control}
-riprap
-riprap bedding
-drop sections
-sediment basins/water quality ponds
-netting mats/blankets
-mulching
lffi_
~
NA
lIB___
lffi_
llli_
lle._
.. •
·.:; ···-. 2. Ternoorary Measures:
-mulching
-inlet filter installation
-check bale darns
-seeding and temporary vegetation
J.2L
~
L
J2L
JJL -silt fence
D. Site Cleanup After Construction
-construction clean up
-s~oothing of ruts
-reseeding
E. Statement of Compliance
_1K_
JlK_
This certification is signed and stamped and by signing this
form the engineer(s) attests that to the best,of his knowledge
the ·as --builc · conditions of the drainage facilities are ··as-'--• •
described in the above form and in the redlined plans enclosed.
Failure to properly disclose all known information could
result in the rejection of this certification and prevent the
release of any Stormwater Utility holds on Building Permits
and/or Certificates of Occupancy.
F. Signature and Registered Professional