Loading...
HomeMy WebLinkAboutLot Certifications - 08/16/1996 STORMWATER RECEIVED 0MAUG 14 1996 August 13, 1996 � Mr. Basil Hamden � � Stormwater Utility City of Fort Collins Old 235 Mathews P.O. Box 580 Fort Collins, Colorado 80522-0580 Re: Drainage Certificate for 1906 Canopy Court for issuance of C.O. Ian low SP(Ar'%3 Dear Basil: We have recently surveyed the existing condition of the storm drainage facilities in and adjacent to 1906 Canopy Court (lot 59, Willow Springs Phase One) for certification to allow the issuance of the Certificate of Occupancy. We found the 10' curb inlet to be per plan and in working order. This inlet drains into storm sewer line ST-2B which was designed as a 15" line at 4.58%. We as- built this 15" line at 4.75%. We found manhole 2E at the terminus of this line to be in working order with a grated cover to catch surface flow. The swale between lot 59 and lot 60 was designed as 0.7' deep with a"V" shape and top width of 8.5'. The slope was designed as 7.5% using front of lot and rear of lot elevations. This lot however, was intended to be, and is, a walk out lot. We therefore have a gradual grade front and back with 6' of drop along side the house. We have asbuilt this swale and shot relevant elevations on the house. We used a relative bench mark of 100.00 at top back of sidewalk. I have attached hereto a drawing depicting our findings. I have also included a Xerox of the grading plan and an analysis of normal depth in the channel. As you can see, the channel has very little grade for the first 50' (1.42%). This area requires 1.62 feet of depth at 0+25 and 1.94 feet at 0+50. We currently have 1.48' and 1.93' respectively. The grade from the top of bank continues up from the top of channel to the structure and therefore the 0.01' to 0.14' of depth above the channel is still confined between the houses. You may also notice that the channel is only 3' wide from flow line on lot 60. This lot is currently under construction and final lot grading is not complete. I would expect this slope to be laid back at final grading thus increasing the capacity and lowering normal depth of flow. The channel in the back yard is approximately 0.3' deep and our calculations show a normal depth of 0.47', The grade of the yard, away from the house and toward the open space, will assure sheet flow into the open space and towards the detention pond. TST INC. 748 Whalers Way—Building D 102 Inverness Terrace East Fort Collins,CO 80525 Suite 105 Consulting Engineers (970)226-0557 Englewood,Co 80112 Metro Denver(303)595-9103 (303)792-0557 Fax(970)226-0204 Fax(303)792-9489 TST, INC. Though this existing situation does not conform to the original design, I believe that the storm drainage facilities are in fact adequate to assure proper drainage. Please feel free to contact me if you should have any questions or concerns. Respectfully, TST. INC. CONSULTING ENGINEERS Steve F. Humann, P.E. SFH/ds \\\\`����Uuuuu►►►►gbgqi �pp0 RF. EG Enclosure cc: Mr. Brian Spoelma, Stoneybrook Homes = 2502 ; ,ST,INC. Consulting Engineers .{� ^ CLIENT l�136t V= 06V e::5 JOB NO. PROJECT Gill cc.occJ SP/�-I CALCULATIONS FOR MADE BY�` DATE g-Ia- 9r7 CHECKED BY DATE SHEET OF hJiL�u� Si°�l�lq 10/7�45_ /90 to C,4 N fir"Y 1,0 rJ✓�7' ` �- STA. f 4 � � 14 i 5 -47 �� G u-' �Osyy T no- 76 ----> 'S'i �'I, cklb • � W lu�ou� w�u. E—��GpwLtnJE D� D+t L•� roF fs�t-c K o•c'S�n�cc��4c�C Cv><t3 tuLET ►£ ti qz, rZ GO507'3-84 1 ti MH-20 5 .8 - _ ' � - L, J 48.7 O -4s: C� 47.E 56 FF = 57.0 1 � � � I FF .6 47.7 48.4 59 FF = 56.2 MH-2E FF = 55.6 FF = 55. 55.6 48.7 s.�\ C I 10, -54.9 - - � NLET ------ 5 OC i 60 54.4 5,5 1 FF = 55. I 64 \ FF = 56.6 6 i 54.5 54.8 5 � FF = 56.1 FF = 57.1 ! 54.6 53.-7-- .55..3 49 - �� \ 62 53.0 - 6 , FF = 55.8 r-54= 55.6 r INLET 1 O INSTALL 10' TYPE " INLET55.1 - - 51.5 f .53.5 M4I 54 \ 52:6 • 686 7 66 � �; _.5}-2 \ �N _ S� � ' �`_ .,q.n ', FF TST,INC. Consulting Engineers CLIENT �l N �' Lk m r:-7S _ JOB NO. PROJECT Q CALCULATIONS FOR MADE BY s�fT DATE t/^(/c2- 12 CHECKED BY DATE SHEET OF t. s i e STD. 1+30Lj O[�GR1trE Lor� D /NL6T t #"?" —; t 44 TFI In _ T � r3 ,--T 61 )too qs�. you _ �- 64 6-11- Of } n �� _.. r o4So ots2 19oL �A"J A-P%1 CvvKT I I � Gt 25 IA)L1AuG Oftr i ToP 13�t-c�t opt—,S�D�ulkl�f CviCg IuLgT G050713.84 Path: C:\UTILS File: WS_L59 1 , 823 .a. . 8-13-96 11 : 40 : 56 am Page 1 WILLOW SPRINGS --- LOT 59 OVERFLOW SWALE INPUT DATA: V oZ> DISCHARGE = 10 . 000000 CFS BOTTOM WIDTH = 0 . 000000E+00 FT BED SLOPE = 1 . 600000E-03 FT/FT SIDE SLOPE = 4 . 500000 MANNINGS N = 6 . 000000E-02 RESULTS: 1 NORMAL DEPTH = 1 . 619770 FT �Auo✓. = U• rf• t CNo) FLOW VELOCITY = 8 . 470984E-01 FPS HYDR. DEPTH = 8 . 097861E-01 FT TOP WIDTH = 14 . 577930 FT FROUDE NUMBER = 1 . 658902E-01 SPECIFIC ENERGY= 1 . 630913 FT INPUT DATA: 0 + J V DISCHARGE = 10. 000000 CFS BOTTOM WIDTH = 0 . 000000E+00 FT BED SLOPE = 1 . 200000E-03 FT/FT SIDE SLOPE = 3 . 250000 MANNINGS N = 6 . 000000E-02 RESULTS: NORMAL DEPTH = 1 . 941643 FT A lto�. j• ¢¢{�Cti� FLOW VELOCITY = 8 . 162306E-01 FPS HYDR. DEPTH = 9 . 707432E-01 FT TOP WIDTH = 12.620680 FT FROUDE NUMBER = 1 . 459932E-01 SPECIFIC ENERGY= 1 .951988 FT INPUT DATA: DISCHARGE = 10.000000 CFS BOTTOM WIDTH = 0 . 000000E+00 FT BED SLOPE = 8.000000E-02 FT/FT SIDE SLOPE = 16 . 750000 MANNINGS N = 6 . 000000E-02 Path: C:\UTILS File: WS_L59 1 , 823 .a. . 8-13-96 11 : 40 : 56 am Page 2 RESULTS: NORMAL DEPTH = 4 .725019E-01 FT AICow, d. 3 o Ft ��✓) FLOW VELOCITY = 2 . 673518 FPS HYDR. DEPTH = 2 . 363026E-01 FT TOP WIDTH = 15.828810 FT FROUDE NUMBER = 9 .692168E-01 SPECIFIC ENERGY= 5. 834910E-01 FT