HomeMy WebLinkAboutLot Certifications - 07/14/2017 (3)Please see the attached grade certification.
July 13, 2017
Mr. Dan Mogen
City of Fort Collins Storm Water Division
700 Wood Street
Fort Collins, CO 80524
(970) 221-6700
Re: Grading Certification for 2315 Adobe Drive, Lot 15 Block 3 of the Spring Creek Farms North, Filing
No. 4 Subdivision
Dear Mr. Mogen,
The purpose of this letter is to provide the grading certification for 2315 Adobe Drive, of the Spring Creek
Farms North, Filing No. 4 Subdivision, located in Fort Collins, Colorado.
Aspen Engineering reviewed the record survey, prepared by King Surveyors, with survey measurements dated
July 13, 2017. Aspen also visited the project site on July 13, 2017 to visually observe grading within Lot 15
Block 3. Based on the provided record survey and visual observation, Aspen Engineering asserts that the
proposed grading appears to meet the intent of the approved grading and drainage plan.
Aspen is providing the following as the assessment of Lot 15 Block 3:
1) Grades along the north, south, east, and west property lines vary from approximately 0.40% to
4.55%. Grading around and adjacent to the residence appears to provide positive conveyance of
runoff away from the residence in accordance with the approved grading plan. The 0.40% grade is
along the back lot line, with prevailing grade falling to the backyard swale; therefore, the 0.40%
grade is acceptable in this location.
2) The surveyed top-of-foundation (TOF) elevation for the residence is 46.1, versus the proposed TOF
of 46.12.
3) Aspen noted that the downspouts on the southeast, southwest, northwest, and northeast corners of
the residence (4 total) appear to be located in satisfactory areas, with runoff being conveyed away
from the residence and garage.
Based on the recorded survey elevations by King Surveyors, visual observation, and the above-mentioned
variances/ modifications from the original plans, Aspen Engineering certifies that the grading for 2315 Adobe
LEGEND
4.3% = GRADE PER SURVEYED
ELEVATIONS
RD
=ROOF DRAIN
NOTE: THIS DRAWING HAS BEEN MODIFIED BY
ASPEN ENGINEERING FOR THE PURPOSES OF A
GRADING CERTIFICATION
1.99%
1.22%
2.75%
2.46%
2.46%
1.64%
2.19%
4.55%
0.
4
0
%
PLAN TOF = 46.12
22
%
20
%
30
%
4%
RD RD
RD
RD
2.40
%
2.
3
3
%
1.
6
7
%
1.6
7
%
1.9%
APPROVED PLAN ELEV (TYP)