HomeMy WebLinkAboutSite Certifications - 02/20/1995 (2)Engineering Consultants
209 S. Meldrum
Fort Collins, Colorado 80521
303/482-592~
FAX: 303/482-6368
January 12, 1995
Mr. Basil Hamdan
City of Fort Collins
Utility Services Stormwater
235 Mathews Street
Fort Collins, Colorado 80522
RE: he Gates at Woodridge, Third Filing
Drainage Certification -Phase 2 Construction Only
PROJECT NO.: 434-008
Dear Basil:
Please find attached sheet 5 of 21 from the Gates at Woodridge
P.U.D. (FHA Grading Plan). Indicated in red on the sheets are the
elevations and verifications of the Storm Drainage Facilities. Also
attached are the field survey notes in spreadsheet form.
As of January 12, 1995 the following items indicated on the FHA
Grading Plan have been completed per the Utility plans:
The rear lot swale separating the first and second filings of
the Gates at Woodridge P.U.D.
Thank you for your time and consideration of this Certification
submittal.
Sincerely,
~-Engineering
~~OJ.,~~
Roger Curtiss, P.E.
Consultants
_,
cc: Mr. Mike smiley, Woodcraft Homes
Denver 303/458-5526