Loading...
HomeMy WebLinkAboutSite Certifications - 02/20/1995 (2)Engineering Consultants 209 S. Meldrum Fort Collins, Colorado 80521 303/482-592~ FAX: 303/482-6368 January 12, 1995 Mr. Basil Hamdan City of Fort Collins Utility Services Stormwater 235 Mathews Street Fort Collins, Colorado 80522 RE: he Gates at Woodridge, Third Filing Drainage Certification -Phase 2 Construction Only PROJECT NO.: 434-008 Dear Basil: Please find attached sheet 5 of 21 from the Gates at Woodridge P.U.D. (FHA Grading Plan). Indicated in red on the sheets are the elevations and verifications of the Storm Drainage Facilities. Also attached are the field survey notes in spreadsheet form. As of January 12, 1995 the following items indicated on the FHA Grading Plan have been completed per the Utility plans: The rear lot swale separating the first and second filings of the Gates at Woodridge P.U.D. Thank you for your time and consideration of this Certification submittal. Sincerely, ~-Engineering ~~OJ.,~~ Roger Curtiss, P.E. Consultants _, cc: Mr. Mike smiley, Woodcraft Homes Denver 303/458-5526