HomeMy WebLinkAboutSite Certifications - 11/22/20221/19 Page 1 of 2 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. · Use “Yes” for items completed as described. · Use “N/A” for items that are not applicable to the site being certified. · If any blanks are “No,” attach an explanation referencing the item number below. Project Name: Landmark PUD Minor Amendment Date: 7/8/22 Building Permit Numbers: Varies by unit number. B2203700 representative. I. Compaction A. N/A All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II. Storm Drain Pipe Installation Requirements A. N/A The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0 A. Riprap 1. N/A The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. 2. N/A A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. 3. N/A The riprap is the gradation shown on the approved construction plans with a D50 of #57. 4. N/A The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. 5. N/A The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 1. N/A All fabric was installed per manufacturer’s specifications. 1/19 Page 2 of 2 IV. Other Permanent BMPs A. N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes.) V. Extended Detention Basins A. N/A Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality control box(es). Provide date of inspection and name of inspector: Martha Cruse 7/6/22 Included certification sheet(s): Please check the appropriate box(es) for the Low Impact Development (LID) facilities found on this site and complete the corresponding certification sheets. ☒ Permeable Interlocking Concrete Pavers ☐ Bioretention Cells (Rain Gardens) ☐ Sand Filters ☐ Vegetated Buffers ☐ Underground Infiltration ☐ Other LID – For certification of Dry Wells, Tree Filters, Constructed Wetland Channels & Ponds, etc., contact City Staff to determine requirements to exhibit the LID facility has been constructed and functions as intended per the approved drainage report. *Please provide photographic documentation of the installation of all stages of all LID facilities. **Please contact the City Stormwater Inspector at stormwaterinspection@fcgov.com to discuss inspection requirements for each LID facility and request inspections. ***All facilities being certified must be “clean” – free of sediment & construction debris – prior to certification or acceptance of the facility. Completed by: Name: Dave Carlson / Harrison Farr Title: Senior Project Manager Email: dcarlson@bristleconeconstruction.com Phone: 970-566-1087 Company: Bristlecone Construction Address: 5601 S Broadway, Suite 170 Littleton, CO 80121 1/19 Page 1 of 2 Permeable Interlocking Concrete Pavers Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☒ ☐ ☐ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Onsite, 7/6/22, Martha Cruse Sub-surface inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and sub-base courses (per design in Final Plan Documents) ☒ ☐ ☐ Record date(s) of inspection and inspector’s name 7/6/22, Martha Cruse Surface inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pavers and joint fill material ☒ ☐ ☐ Record date(s) of inspection and inspector’s name 7/7/22, Martha Cruse Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction) ☒ ☐ ☐ No Did not encroach. Bottom of cell was “ripped” after excavation ☒ ☐ ☐ Provide photographs before and after “ripping” Photos included Bottom surface of cell is flat and level ☒ ☐ ☐ Provide photograph attached Impermeable Liner Impermeable liner meets design specifications ☐ ☒ ☐ Provide specifications of delivered material Geptextile fabic installed Impermeable liner is attached to concrete perimeter wall ☐ ☒ ☐ Provide photograph Impermeable liner is buried with no exposure ☐ ☒ ☐ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☒ ☐ Provide photograph (if necessary) See photo Edge Restraint and Concrete Cut-Off Wall The required edge restraint meets design specifications ☒ ☐ ☐ Provide specification of installation See Pics Plus Plan Concrete cut-off wall meets design specifications for: ☐ ☒ ☐ Provide specification of installation Edge Restraint Per Plan - Dimensions ☒ ☐ ☐ 21” north side, 14” South - Reinforcement ☒ ☐ ☐ Rebar - Footings ☒ ☐ ☐ Thickenedge Underdrain System Underdrain pipe meets design specifications ☒ ☐ ☐ Provide photograph Attached At least one cleanout is provided per underdrain lateral ☒ ☐ ☐ Provide photograph Attached 1/19 Page 2 of 2 Cleanout pipe is solid (not perforated/slotted) ☒ ☐ ☐ Provide photograph Attached Cleanout covers are installed and watertight ☒ ☐ ☐ Provide photograph Attached Verify the underdrain is NOT wrapped in geotextile fabric ☒ ☐ ☐ Provide photograph attached Verify there is no orifice plate on the underdrain outfall ☒ ☐ ☐ Provide photograph Verified Underdrain integrity tested after backfilling using TV and/or water test ☒ ☐ ☐ Provide documentation of test results Aggregate Sub-base Course(e.g., #2/4): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is installed to the required design depth ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed Attached Basecourse (e.g., #57): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is installed to the required design depth ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed Attached Leveling Course / Joint Fill (e.g., crushed #89): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is dry screened - Is installed to the required design depth and to the top of the paver joints ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed attached Aggregate materials are installed and compacted according to manufacturer’s and/or design specifications ☒ ☐ ☐ Provide photographs and documentation of compaction attached Protection During Construction PICP area is protected from construction site sediment, including runoff from the upstream catchment and construction equipment traffic ☒ ☐ ☐ Specify how the area was covered and/or otherwise protected to prevent construction runoff from entering the pavement Existing parking lot wattles placed as needed. Close Out Cracked/broken paver units have been removed and replaced ☒ ☐ ☐ Paver height offsets are no more than 1/4” between adjacent units & surface contains no deformations (depressions/settlement) exceeding 1/2" ☒ ☐ ☐ Upstream catchment is stabilized prior to diverting runoff into PICP system ☒ ☐ ☐ VAULT ELEC CONTROL IRR E C ELEC CONTROL IRR CONTROL IRR HYD HYD ELEC C T E H2OW CONTROL IRR CONTROL IRR ELECTC EE CONTROL IRR CONTROL IRR WH2O S MH G E E E CT V CT V TTEE EE E E T T T T T TCT V E E CT V CT V E EE E E E EE 8" S S 8" S S 8" S S 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS UD UD UD UD UD UD UD UD UD X X X X X X W W W E E T G / / / / / / / / / / / / / / / / E E T G 8" W 8" W 8" W 8" W WWMW CO WWM EPEPEPEP EPEMEMEPEPEP EMEMEPEP EP EPEP EPEMEM ST S S W W ST S WMW TRFOR S WWM TRCRFOR TR CRTR CRTR EV V V WMW CR HYD ST WMW WMW V V S S S ST ST VCR CR TFV WM TR TRCR V V TR ER X X XX XXX X X X X X X XXX XXXXXXXX S S S FD C FD C FDC MH MH MH S MH E E E UD UD / / / / / / / / UD 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S UD UD UD UD UD UD UD UD UD UD UD 8" SS 8" SS 8" SS 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" SS 8" SS 8" SS 8" SS ST WS V WS V WS V WS V WS V WS V WS V WS V WS V WS V WS V WS V 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W WS V WSV WSV 8" SS 8" SS 8" SS 8" S S 8" S S 8" S S SS V SS V SSV SSV SSV SSV WS V WS V WS V WS VW 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W WS V WS V WS V WS V UD UD UD UD UD UD UD 8" W WS V WS V UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD SS V SS V 8" W 8" W 8" W 8" W W WS V HYD UD UD C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C SO U T H S H I E L D S S T R E E T WEST PROSPECT ROAD HOBBIT STREET EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING CITY OF FORT COLLINS 100-YR FLOODWAY CITY OF FORT COLLINS 100-YR FLOODPLAIN POOL DOG PARK SEE AREA DETAIL 1 - SHEET GU1 SEE AREA DETAIL 2 - SHEET GU1 SEE AREA DETAIL 3 - SHEET GU1 SEE AREA DETAIL 4 - SHEET GU1 SEE AREA DETAIL 5 - SHEET GU1 SEE AREA DETAIL 6 - SHEET GU1 SEE AREA DETAIL 7 - SHEET GU1 FH ASSEMBLY N:1449879.67 E:3113122.15 WET TAP TO EXISTING 8" WATER LINE N:1449867.67 E:3113122.15 6" GATE VALVE (N) N:1449870.67 E:3113122.15 PROPOSED PVC UNDERDRAIN PROPOSED BIKE RACKS 14' (TYP.) 14' (TYP.) 16' 19' (TYP.) 8.5' (TYP.) 17' (TYP.) 9' (TYP.) 19' (TYP.) 8' (TYP.) 17' (TYP.) 8' (TYP.) 19' (TYP.) 8' (TYP.) 2' 19' (TYP.) 8.5' (TYP.) 14' (TYP.) 16' PROPOSED 24' EMERGENCY ACCESS EASEMENT PROPOSED 24' EMERGENCY ACCESS EASEMENT PROPOSED 24' EMERGENCY ACCESS EASEMENT PROPOSED 24' EMERGENCY ACCESS EASEMENT 6.5' 19' (TYP.) PROPOSED 24' EMERGENCY ACCESS EASEMENT PROPOSED 24' EMERGENCY ACCESS EASEMENT 5' 8' 8' 8.5' (TYP.) 17' (TYP.) 19' (TYP.) 8' (TYP.) 8' (TYP.) 8' 19' 19' 9' 15' 9' (TYP.) 17' (TYP.) 8' 76.24' 16.86' HANDICAP PARKING SIGNS VAN-ACCESSIBLE HANDICAP PARKING SIGN 3' SIDEWALK RELOCATED LIGHT POLE N:1449832.56 E:3113120.66 VAN-ACCESSIBLE HANDICAP PARKING SIGN PROPOSED TRASH ENCLOSURE PROPOSED TRASH ENCLOSURE PROPOSED TRASH ENCLOSURE PROPOSED TRASH ENCLOSURE PERMEABLE PAVERS 1' RIBBON CURB ADA RAMPS LANDMARK APARTMENTS EXPANSION 1' LANDSCAPE WALL 9' 17' EXISTING UTILITY EASEMENT EXISTING UTILITY EASEMENT EXISTING 70' DRAINAGE EASEMENT EXISTING UTILITY EASEMENT EXISTING EMERGENCY ACCESS EASEMENTCANAL IMPORTATION CHANNEL 8' (TYP.) 11.5' 19' (TYP.) 14' (TYP.) PAVEMENT MARKING FOR COMPACT SPACES (TYP.) OWNER: EWAN, JOHN L/YVONNE S 1005 W PROSPECT ROAD, FORT COLLINS, CO, 80526 OWNER: CHIU, SHEAN TSONG 1015 W PROSPECT ROAD, FORT COLLINS, CO, 80526 OWNER: BAR RESCUE, LLC 1001 W PROSPECT ROAD, FORT COLLINS, CO, 80526 OWNER: EWAN, JOHN L/YVONNE S 929 W PROSPECT ROAD, FORT COLLINS, CO, 80526 LANDMARK APARTMENTS EXPANSION 8' (TYP.) 10' 9' HANDICAP PARKING SIGN 16' Sheet LA N D M A R K P U D M I N O R A M E N D M E N T E N G I N E E R N G I E H T R O N R N FO R T C O L L I N S : 3 0 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 , 8 0 5 2 1 GR E E L E Y : 8 2 0 8 t h S t r e e t , 8 0 6 3 1 97 0 . 2 2 1 . 4 1 5 8 no r t h e r n e n g i n e e r i n g . c o m of 3 12/21/21 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet03030 30 60 90 OGU1 AN D U T I L I T Y P L A N O V E R A L L G R A D I N G 1 PROPOSED CONTOUR EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD-88. PROJECT BENCHMARK FORT COLLINS 29-92: APPROXIMATE 300 FEET SOUTH OF WEST PROSPECT RD. AND SHIELDS ST., ON THE NORTH END OF THE WEST BRIDGE PARAPET WALL 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 6.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 7.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 8.CURVES AND LINES ARE MEASURED AT FLOWLINE, CERNTERLINE, OR EDGE OF WALK. 9.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 10.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY OF FORT COLLINS STREET REPAIR STANDARDS. 11.REFER TO THE DRAINAGE MEMO DATED DECEMBER 21ST, 2021 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 12.TOTAL DISTURBED AREA = 5254.23 SQUARE FEET. 13.CONTRACTOR SHALL PROVIDE STREET SWEEPING DURING WORKING HOURS AND AS NECESSARY TO CONTROL SEDIMENT ON ROADWAYS. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION 33.43 PROPOSED RIGHT OF WAY LEGEND: EASEMENTS / / / / / / / /PROPOSED EDGE OF PAVEMENT EXISTING ELECTRIC E GEXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT VAULT ELEC CONTROL IRR EXISTING FIBER OPTIC FO PROPOSED ASPHALT PAVING PROPOSED CONCRETE PAVING LIMITS OF DISTURBANCE PROPOSED PERMEABLE PAVER AREA City of Fort Collins, CO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER,APPROVED SHEETS DATE APPROVED: WATER & WASTEWATER UTILITY,APPROVED SHEETS DATE APPROVED: STORMWATER UTILITY,APPROVED SHEETS DATE APPROVED: PARK PLANNING & DEVELOPMENT,APPROVED SHEETS DATE APPROVED: TRAFFIC OPERATIONS,APPROVED SHEETS DATE APPROVED: ENVIRONMENTAL PLANNER,APPROVED SHEETS DATE RECORD DRAWING CRTR UD UD UD UD C C C C C 16.6 7 16.2 8 16.3 4 16.7 8 16.7 7 16.6 5 16.5 7 ADA RAMPS 2.0% 0. 5 % EXISTING CURB CUT 16.5 9 8" W 8" W 8" W (14 . 4 4 ) 14.3 9 14.3 2 (14 . 3 0 ) 2' INFLOW CURB & GUTTER MH G G E E E E E E E E UD UD UD UD UD UD UD UD (18 . 9 7 ) 19.3 5 19.9 4 18.9 9 (18 . 0 6 ) 18.3 6 20.0 7 GB (19 . 1 5 ) GB 5.7% 4.2% 1' OUTFALL CURB & GUTTER 8" S S 8" S S 8" S S 8" S S S CRFOR WS V WS V WS V WS V WS V WS V 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W UD UD UD UD UD UD UD C C C C C C C C C (20 . 0 7 ) 19.9 8 18.8 3 18.6 2 18.4 8 18.7 1 19.3 1 18.80 18.15 (17.8 9 ) (17 . 5 0 ) 17.4 2 17.1 7 (17 . 1 0 ) 17.9 0 1' OUTFALL CURB & GUTTER 2' INFLOW CURB & GUTTER 4.7% 1' LANDSCAPE WALL 21.0%21.5 2TOW 19.2 3 19.3 0 19.2 1 19.5 2 19.9 4 19.7 5 20.5 9 TOW 19.8 1 20.42 TOW (19 . 8 9 ) 3' SIDEWALK 3' S I D E W A L K CC (16 . 8 5 ) 16.7 7 16.5 3 (16 . 9 7 ) 2' INFLOW CURB & GUTTER XXX 8" SS (16 . 1 9 ) (16 . 1 7 ) 16.2 2 16.2 7 16.8 1 16.7 4 16.8 6 16.8 5 1' INFLOW CURB & GUTTER ST S W WM 8" S S 8" S S 8" S S 8" S S SS V SS V SS V SS V SS V SSV SSV SSV SSV WS V WS V WS V WS V WS V WS V WS V WS V WS V WS V WS V WS V UD UD UD UD UD UD UD C C C C C C C C C C C (16 . 7 7 ) 16.7 6 16.7 2 (16 . 7 1 ) (16 . 3 0 ) 16.2 7 16.2 1 (16 . 1 5 ) (16 . 4 5 ) (16 . 3 0 ) (16 . 2 4 ) 1. 9 % 2. 2 % PERMEABLE PAVERS 1' RIBBON CURB 0.5' CURB ONLY ±10' (15 . 6 2 ) FL Sheet LA N D M A R K P U D M I N O R A M E N D M E N T E N G I N E E R N G I E H T R O N R N FO R T C O L L I N S : 3 0 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 , 8 0 5 2 1 GR E E L E Y : 8 2 0 8 t h S t r e e t , 8 0 6 3 1 97 0 . 2 2 1 . 4 1 5 8 no r t h e r n e n g i n e e r i n g . c o m of 3 12/21/21 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH GU1 & U T I L I T Y P L A N D E T A I L E D G R A D I N G 2 PROPOSED CONTOUR EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD-88. PROJECT BENCHMARK FORT COLLINS 29-92: APPROXIMATE 300 FEET SOUTH OF WEST PROSPECT RD. AND SHIELDS ST., ON THE NORTH END OF THE WEST BRIDGE PARAPET WALL 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 6.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 7.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 8.CURVES AND LINES ARE MEASURED AT FLOWLINE, CERNTERLINE, OR EDGE OF WALK. 9.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 10.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY OF FORT COLLINS STREET REPAIR STANDARDS. 11.REFER TO THE DRAINAGE MEMO DATED DECEMBER 21ST, 2021 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 12.TOTAL DISTURBED AREA = 5254.23 SQUARE FEET. 13.CONTRACTOR SHALL PROVIDE STREET SWEEPING DURING WORKING HOURS AND AS NECESSARY TO CONTROL SEDIMENT ON ROADWAYS. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION 33.43 PROPOSED RIGHT OF WAY LEGEND: EASEMENTS / / / / / / / /PROPOSED EDGE OF PAVEMENT EXISTING ELECTRIC E GEXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT VAULT ELEC CONTROL IRR EXISTING FIBER OPTIC FO PROPOSED ASPHALT PAVING PROPOSED CONCRETE PAVING LIMITS OF DISTURBANCE PROPOSED PERMEABLE PAVER AREA 101 AREA DETAIL 2 100 AREA DETAIL 1 102 AREA DETAIL 3 106 AREA DETAIL 7 105 AREA DETAIL 6 104 AREA DETAIL 5 103 AREA DETAIL 4 RECORD DRAWING 100 TYPICAL CURB AND GUTTER 101 TYPICAL SIDEWALK 102 TYPICAL ADA RAMP Transition back of walk (typ.) Broom finishBroom finish SECTION A-A MID-BLOCK LOCATION Varies * 1:12 Slope (max.) 1:50 see note 2 Fl o w l i n e (max.) Slope 1:12 5' A Varies * Wood float finish thru ramp Slo p e 1:1 2 Slope 1:12 CORNER LOCATION ramp finish thru Wood float Broom finish A Varie s * (max . ) A A 5' (m a x ) (Radius varies) (typ.) back of walk Transition 2 Br o o m f i n i s h BA C K O F W A L K / L A N D I N G Retaining Curb (Optional) 12 " (m a x . ) (m i n . ) T Walk Curb Gutter NOTES: 1. T = Concrete thickness, 6" minimum for entire ramp area. 2. 1:50 Max unless a landing behind ramp (then ramp can be 1:12 with 1:20 on the detectable warning). 3. See CONST. DWG. 1606(a) and 1607 for Fort Collins. 4. Detectable Warning to extend the full width of the ramp. Material to be approved by Local Engineer. 5. 0" Curb height, See Section A-A. 6. Standard Curb and Gutter Section , See Standard Drawing 701. 2'-0" (min) 6" Walk Gutter Curb Va r i e s * Detectable Warning 1/4" per ft. 1" per ft.1" per ft. 1" p e r f t . 1" pe r f t . On a radius hold 6" at the corners of the truncated dome warning. 2" Retaining Curb (Optional) 6" * Curb to match slope of sidewalk, Ramp length not to exceed 15'-0" See Note 6 See Note 5 See Note 5 See Note 6 Detectable Warning, See Note 4 Detectable Warning, See Note 4 Retaining Curb (Optional) to retain ground behind the walk, if needed ATTACHED SIDEWALK DETAIL Slope sidewalk to curb 1/4" per foot. NOTE: Construct sidewalk with joints at 10' intervals R 1/8" WEAKENED PLANE JOINT EXPANSION JOINT R1/4" and aligned with scoring on curb. INSTALL IN LOCATIONS SPECIFIED IN CHAPTER 22 1/2" 1/4"1/4 SLAB THICKNESS 1/4" 1/2" Expansion Joint material DETACHED SIDEWALK DETAIL Variable Landscaping Slope sidewalk to curb 1/4" per foot. 2' min. Slope: Minumum 1 4"/ft Maximum 3"/ft Curb Flare Va r i e s Curb Flare Ramp Curb Cu r b Flare Ramp Va r i e s Panels Panels 6" Ramp Width: 4.5' 5.0' 6.0' 7.0' 8.0' Note: Truncated dome panels are available in 2'x2' squares and 2'x2.5' rectangles. Combine the widths to fit the ramp. Panels may be cut to no less than a 2'x1.5' size. Panel Width Combinations: 2'+2.5' 2.5'+2.5' 2'+2'+2' 2.5'+2'+2.5' 2'+2'+2'+2' Notes: 1. Truncated dome warning panel: Install panels along with the concrete pour for the ramp. Specifications for the panel and installation instructions will be provided upon request. 2. This drawing shows vertical curb. For Drive Over Curb the warning detection location shall be placed in the same position 6" back from the back of curb. 3. If curb and gutter are poured monolithic with ramp, place dome edge at back of curb as shown. If not poured monolithic, place dome edge 6" from back of curb. Case 1-Directional Ramps Case 2-Non-Directional Ramps Va r i e s Panels Ramp Panels Flare Curb Case 3-Mid-Block Ramps 6" Panels Panels Flare 6" Flare Va r i e s FO R T C O L L I N S O N L Y Al i g n e d w i t h Pe d e s t r i a n f l o w Gutter or Apron ℄Center line of ramp BOC-Back of Curb FOC -Face of Curb -Flow line Va r i e s 2' - 0 " 2' - 0 " A A FO C o r ℄ 2' - 0 " BOC BOC 1:12 max slope1:20 slope Panels embedded in the concrete ramps Section A-A (Center line of ramp) NTS Fl o w l i n e C u r b an d G u t t e r BO C Se e N o t e 3 6" 2"R.2" 6" 6" 12 " 1 1/2"R. 2'-6" 6" 4 1/2" 30" 9" R 0.5" 4.5" 18" 3.63" 21.75" R 0.13" 7" 2" 3.75" 12" ROLL-OVER VERTICAL (LOVELAND) Gutter edge may be tapered or battered. (Typical for all Curb & & Gutter Types) 104 TYPICAL DOME WARNING PANELS ON RAMP Sheet LA N D M A R K P U D M I N O R A M E N D M E N T E N G I N E E R N G I E H T R O N R N FO R T C O L L I N S : 3 0 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 , 8 0 5 2 1 GR E E L E Y : 8 2 0 8 t h S t r e e t , 8 0 6 3 1 97 0 . 2 2 1 . 4 1 5 8 no r t h e r n e n g i n e e r i n g . c o m of 3 12/21/21 D1 DE T A I L S 3 103 TYPICAL RIBBON CURB AT PAVER SECTION 105 INTERLOCKING CONCRETE PAVERS 106 TYPICAL OUTFALL CURB & GUTTER 107 TYPICAL INFLOW CURB & GUTTER NOTES: 1.CONTRACTOR MUST FOLLOW THE INTERLOCKING CONCRETE PAVEMENT INSTITUTE (ICPI) ASSOCIATION AND BRICK INDUSTRY ASSOCIATION CONSTRUCTION SPECIFICATIONS FOR COMPLETE INSTALLATION INFORMATION. 2.IT IS RECOMMENDED THAT A CERTIFIED PERMEABLE PAVEMENT INSTALLER PERFORM THE INSTALLATION OF THE PAVERS. 3.SUBGRADE PREPARATION: 3.1.CONTRACTOR TO VERIFY THAT SUBGRADE PREPARATION, COMPACTION DENSITY AND ELEVATIONS CONFORM TO THE APPROVED DRAWINGS AND CONSTRUCTION SPECIFICATIONS. 3.2.MINIMUM ALLOWABLE SUBGRADE SLOPE IS 0.5%. 4.EDGE RESTRAINTS: 4.1.CONCRETE EDGE RESTRAINTS (CURB AND GUTTER OR APRON) SHALL BE INSTALLED AROUND THE PERIMETER OF THE PAVER AREA TO PROVIDE FOR PROPER EDGE RESTRAINT AND ALLOW FOR ADEQUATE SEPARATIONS BETWEEN PAVERS AND OTHER SURFACE TYPES. 4.2.A LINEAR-EDGE CONCRETE COLLAR TO BE POURED AROUND ALL PENETRATIONS (INCLUDING CLEANOUTS) THROUGH THE PAVER SECTION . 4.3. 5.GEOTEXTILE LINERS: 5.5.GEOTEXTILE LINERS (PERMEABLE OR IMPERMEABLE AS PER PLAN) SHALL BE INSTALLED ALONG PERIMETER OF CROSS-SECTION OF THE PAVER AREA. 5.3.GEOTEXTILE LINERS SHALL BE PLACED IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDATIONS. ALL SEAMS AND OPENINGS IN THE LINER SHALL BE SEALED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS. 5.4.WHERE USED, IMPERMEABLE GEOMEMBRANE SHEET / LINER SHALL BE 40 MIL THICK, HIGH-DENSITY POLYETHYLENE DESIGNED SPECIFICALLY FOR FLEXIBLE GEOMEMBRANE APPLICATIONS. ADJACENT STRIPS OF IMPERMEABLE LINER SHALL OVERLAP A MINIMUM OF 18", OR PER MANUFACTURER'S SPECIFICATION. 6.AGGREGATES: 6.1.ALL AGGREGATES SHALL BE ANGULAR, CRUSHED, WASHED GRANITE ROCK AND SHALL BE WASHED ROCK, CLEAN OF DEBRIS AND WITH NO MORE THAN 1% FINES. 6.2.SUB-BASECOURSE AGGREGATE SHALL BE GRADATION ASTM #2, #3, OR #4. ASTM #4 WILL NOT BE ALLOWED FOR USE WITH SUBSURFACE STORMWATER DETENTION SYSTEMS. 6.3.BASECOURSE AGGREGATE SHALL BE GRADATION ASTM #57 OR #67. 6.4.LEVELING COURSE SHALL BE GRADATION ASTM #8, #89 OR #9. 6.5.LEVELING COURSE SHALL BE INSTALLED ALL THE WAY TO THE FINISHED GRADE SURFACE OF THE PAVERS. 6.6.THE AGGREGATE SHALL BE PLACED IN 6-INCH (MAX.) LIFTS, COMPACTING EACH LIFT WITH A 10-TON, OR HEAVIER, VIBRATING STEEL DRUM ROLLER. MAKE AT LEAST FOUR PASSES WITH THE ROLLER, WITH THE INITIAL PASSES MADE WHILE VIBRATING THE ROLLER AND THE FINAL ONE TO TWO PASSES WITHOUT VIBRATION. 6.7.CONTRACTOR MAY BE REQUIRED TO PROVIDE COMPACTION TESTING. 7.UNDERDRAIN: 7.1.UNDERDRAIN PIPE TO BE PERFORATED OR SLOTTED. PERFORATIONS OR SLOTS TO BE NO WIDER THAN 3/8" TO ENSURE AGGREGATE DOES NOT FALL INTO OR CLOG THE OPENINGS. 7.2.DO NOT WRAP UNDERDRAIN WITH GEOTEXTILE OR SOCK. 8.CLEANOUTS: 8.1.PROVIDE CLEANOUTS (AS PER PLAN) TO ALLOW INSPECTION (BY CAMERA) OF THE UNDERDRAIN SYSTEM DURING AND AFTER CONSTRUCTION. 8.2.CLEANOUTS SHALL BE PROVIDED AT EACH BEND GREATER THAN OR EQUAL TO 90° AND EVERY 100' ALONG A STRAIGHT RUN. CLEANOUT SHALL BE INSTALLED PER THE APPROVED PLANS. 8.3.CLEANOUTS SHALL BE A SOLID WALL PVC STRUCTURE FOR ALL VERTICAL SECTIONS WITH FITTINGS TO CONNECT TO DISTRIBUTION AND UNDERDRAIN PIPING MATERIALS, AS REQUIRED. 8.4.PROVIDE OBSERVATION PORT AT DOWNSTREAM END OF EACH PERMEABLE PAVEMENT SECTION, CONNECTED TO UNDERDRAIN WHEN PRESENT. 8.5.THE CLEANOUT FRAME AND COVER SHALL BE DUCTILE IRON AND STAMPED "CLEANOUT." 9.PAVERS: 9.1.CONTRACTORS MUST INSTALL A PAVER PRODUCT THAT IS APPROVED BY THE ICPI. 9.2.FINISHED GRADE OF THE PAVER SURFACE TO BE EVENLY SLOPED AND FLUSH WITH THE ADJACENT EDGE RESTRAINTS. 9.3.ALL PENETRATIONS THROUGH THE PAVER SURFACE, INCLUDING CLEANOUT LIDS, SHALL BE INSTALLED WITH A CONCRETE COLLAR POURED AROUND THE PERIMETER. 10.POST-INSTALLATION: 10.1.LOOSE MATERIALS SHALL NOT BE STORED ON THE PERMEABLE PAVEMENT AREA. 10.2.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS AND DIRT FROM ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. UNDISTURBED SOIL SUBGRADE 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 10" MIN 4" TOPSOIL MAX 1 8" WIDTH HAND-TIGHT JOINTS FILLED WITH LEVELING COURSE MATERIAL TO SURFACE 2-3" DEPTH OF LEVELING COURSE PERMEABLE INTERLOCKING CONCRETE PAVERS EDGE RESTRAINT (CONCRETE APRON OPTION) EDGE RESTRAINT (CURB AND GUTTER OPTION) 2" MIN 6" 6" MIN CLEANOUTS WITH CONCRETE COLLAR (AS PER PLAN) PERFORATED UNDERDRAIN @ 0.50% MIN SLOPE GEOTEXTILE LINER (AS PER PLAN) 12" MIN CROSS-SECTION DETAIL 20" MIN 6" APPROVED: DRAWN BY:DETAILS CONSTRUCTION DATE REVISED: DETAILSTORMWATER PERMEABLE INTERLOCKING CONCRETE PAVERS DECEMBER 2018 HEM D-54 PREPARED SUBGRADE @ 0.50% MIN SLOPE 10" MIN DEPTH OF SUB-BASECOURSE 4" DEPTH OF BASECOURSE PAVER SURFACE @ 0.50% MIN OR 3.00% MAX SLOPE RECORD DRAWING