HomeMy WebLinkAboutSite Certifications - 09/26/2017August 25, 2017 Mr. Dan Mogen City of Fort Collins Storm Water Division 700 Wood Street Fort Collins, CO 80524 (970) 221-6700 Re: Drainage Certification for Poudre Valley Hospital A-Wing Replacement Dear Mr. Mogen, The purpose of this letter is to provide the grading certification for the Poudre Valley Hospital A-Wing Replacement, located at 1024 Lemay Avenue in Fort Collins, Colorado in Fort Collins, Colorado. Aspen Engineering has made a number of site visits between December 2, 2016 and August 24, 2017 to verify the constructed condition. Aspen has reviewed the record survey prepared by King Surveyors, Inc., dated January 25, 2017 and the supplemental survey data dated March 30, 2017. Based on visual observation, Aspen asserts the site appears to be in general conformance with the approved drainage and grading plans. Please refer to the As-built Drainage Exhibit and relined copy of the As-built Drainage Exhibit for surveyed site grades and calculated slopes. Aspen is providing the following assessment of the drainage on the Poudre Valley Hospital A-Wing Replacement comprised of the north parking lot and building expansion, plaza, drive aisles and green space. 1) The finished floor elevation as constructed varies from 4972.60 to 4972.68 on the west and north sides respectively and varies from 4972.15 to 4972.28 on the east side. The design elevation is 4972.58. The finished floor elevation is 0.02 feet to 0.10 feet higher than design on the on the west and north sides respectively and approximately 0.43 feet to 0.30 feet lower than design on the east Accepted 9/26/2017 WL 12/15 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 12/15 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 12/15 Page 3 4.Outlet Structure Certification a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 12/15 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 12/15 Page 5 V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All inlet covers are stenciled or stamped with the following designation: NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Vol.2, Ch.9 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 12/15 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 12/15 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A. Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1.All fabric was installed per the details on the approved construction plans. XIII.Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV.Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf *INDICATES OUT OF TOLERANCE 63 98 90-100 90-100 - 3" 75 100 100 100 BEST ENGINEERING SOLUTIONS AND TECHNOLOGIES AGGREGATE SUMMARY SHEET 2015 Aggregate Qualification Client Name:Albert Frei and Sons FLAT AND/OR ELONGATED PARTICLES TEST (ASTM D 4791) 2" 50 43 35-70 N/A N/A 3.0% Max SPECIFICATION Weighted Percent (mass)2.7% N/A N/A PASS/FAILRESULTS Weighted Percent (count) 1.0 Max LIGHTWEIGHT PARTICLES (ASTM C 123) RESULTS 0 3.5% Weighted Particles 0.1% 2.0% Max Pass Unit Weight (pcf)87 1.2% 47%Percent Voids PASS/FAIL 0.3% 12% Max Pass -Weighted Loss (%) Percent Voids 18% Max Pass - RESULTS SPECIFICATION Weighted Loss (%) RESULTS SPECIFICATION - 0-15 - 0-5 - - MAGNESIUM SULFATE SOUNDNESS (ASTM C 88) PASS/FAIL35-70 - ASTM C 33 SPEC 3 0.2 AASHTO (CDOT) SPEC 0-15 - 0-5 PERCENT PASSING 0.2 2.5" Loose METRIC Tons per cubic yard 25 193/4" MATERIAL TYPE: Unit Weight (pcf) 1" Rodded 100% RESULTS SPECIFICATION PASS/FAIL 98.1 N/A N/A 40% 1.32 Grading 1 N/A N/A N/A N/A1.17 26% PERCENTAGE OF FRACTURED PARTICLES (ASTM D 5821) 50% Max N/A Pass Tons per cubic yard RESULTS LOS ANGELES ABRASION (ASTM C 535) Percent Loss Percent Fractured 2 Or More Faces SPECIFICATION PASS/FAIL N/AN/A - SPECIFICATION 1.0 Max N/A 2.64 0.4% N/A RESULTS SPECIFICATION PASS/FAIL UNIT WEIGHT AND VOIDS IN AGGREGATE (ASTM C 29) N/A N/A N/A N/A N/A N/A RESULTS SPECIFICATION PASS/FAIL Pass PASS/FAIL PASS/FAIL PASS/FAILRESULTS SPECIFICATION 0.5% Max Pass Specific Gravity 2.4 Specific Gravity 2.0 SIEVE SIZE 0 38 US STD 1.5" SPECIFIC GRAVITY AND ABSORPTION (ASTM C 127) CLAY LUMPS AND FRIABLE PARTICLES (ASTM C 142) SODIUM SULFATE SOUNDNESS (ASTM C 88) SAMPLE LOCATION: MECHANICAL SIEVE ANALYSIS (ASTM C 136 & ASTM C 117) No. 2 Stone PROJECT NUMBER: Pit 6 - Idaho Springs Quarry, 33501 US Highway 6 15-1004 PROJECT INFORMATION PROJECT NAME: SPECIFICATION N/ASpecific Gravity Absorption (%) NO. 200 0.20.075 RESULTS Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf B.E.S.T. 377 Spring Creek Road  Silverthorne, Colorado 80498 Psalm 20  Phone: 970.409.9670  mbest.concrete@gmail.com                                                 ATTACHMENT A   LABORATORY TEST RESULTS                Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf 2 - - 1.1% 0.0% 2.5 Inch 2 - - 0.3% 0.0% 1 Inch 3 - - 1.4% 0.0% 1.5 Inch 41 1037.8 1023.5 1.4% 0.6% - 0.4% 0.0% 2 Inch 54 7126.9 7046.2 1.1% 0.6% 2.5 Inch 7210 0.3% 0.2% 1.5 Inch 41 1012.9 1009.3 0.4% 0.1% - - - 2 Inch 54 7234.2 1 Inch 3 - 2015 Aggregate Qualification Client Name:Albert Frei and Sons SAMPLE LOCATION:Pit 6 - Idaho Springs Quarry, 33501 US Highway 6 BEST ENGINEERING SOLUTIONS AND TECHNOLOGIES AGGREGATE SUMMARY SHEET PROJECT INFORMATION UNIT WEIGHT AND VOIDS IN AGGREGATE (ASTM C 29) 98 Sample 2 Sample 3 98.1Sample 1 98.10 1 1 98.098.00 98.75 Rodded Sample Weight (lbs) Bucket Volume (ft3) Unit Weight (pcf) 1 98.8 - - Total Grading 100 Total Weighted Loss 0.1% - No. 4 - - Passing No. 200 Sieve (%) bsorption (%) 7433.5 0.2% SPECIFIC GRAVITY AND ABSORPTION (ASTM C 127) 7446.2 SPECIFICATION PASS/FAIL Specific Gravity 2.0 19198.5 19282.5 11979.5 2.64 0.4% LIGHTWEIGHT PARTICLES (ASTM C 123) RESULTS 0.5% Max Pass Average Unit Weight Loose Sample Weight (lbs) Bucket Volume (ft3) Sample 1 Sample 2 85.70 Unit Weight (pcf) Specific Gravity 2.4 0.0% 3.0% Max Pass Initial Dry Weight (g) 86.60 1 86.6 0.0% PROJECT NAME: Material Finer Than No. 200 Sieve (ASTM C 117) No. 2 Stone - Percent Grading 1 85.7 Sample 3 87.55 1 87.6 87Average Unit WeightLOS ANGELES ABRASION (ASTM C 535) Grading Initial Weight (g) Final Weight (g) Percent Loss (%) - - - - - PERCENTAGE OF FRACTURED PARTICLES (ASTM D 5821) Initial Weight (g) Final Weight (g) Fractured Particles Minimum 2 Faces (%) - 1 9957.2 7412.7 25.6 Oven Dry Weight (g) MATERIAL TYPE: SSD Weight (g) Submerged Weight (g) Bulk (SSD) Specific Gravit Final Dry Weight (g) Weighted Loss (%) Intial Weight (g) Final Weight (g) Percent Loss SODIUM SULFATE SOUNDNESS (ASTM C 88) Retained Sieve Size PROJECT NUMBER: - - - - - 15-1004 - - - -- - - - No. 4 Total Grading 100 0.3%Total Weighted Loss - ¾ Inch ⅜ Inch No. 4 60214.8 60214.8 100% Final Weight (g) Percent Loss Weighted Loss (%) CLAY LUMPS AND FRIABLE PARTICLES (ASTM C 142) MAGNESIUM SULFATE SOUNDNESS (ASTM C 88) Weighted Loss (%) 0.1%5021.1 - - - - - - - ⅜ Inch Total Grading 100 Total Weighted Loss - - - - - 1.5 Inch 97 5027.1 - - - 0.1% Retained Sieve Size Percent Grading Intial Weight (g) 1.2% Retained Sieve Size Percent Grading Intial Weight (g) Final Weight (g) 0.1% Percent Loss No. 4 - 0.0%- ¾ Inch - - - ¾ Inch 3 ⅜ Inch - - - - - - No. 4 - - No. 4 - - Figure A-1 Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf 2015 Aggregate Qualification Client Name:Albert Frei and Sons SAMPLE LOCATION:Pit 6 - Idaho Springs Quarry, 33501 US Highway 6 BEST ENGINEERING SOLUTIONS AND TECHNOLOGIES AGGREGATE SUMMARY SHEET PROJECT INFORMATION PROJECT NAME: No. 2 StoneMATERIAL TYPE: PROJECT NUMBER:15-1004 Retained Sieve Size Number of Particles Intial Weight (g) 1.3% Percent Flat and/or Elongated (by mass) Percent Flat and/or Elongated (by count) 0.5% 4.1% Weighted Percent (by mass) 2.2% FLAT AND/OR ELONGATED PARTICLES TEST (ASTM D 4791) Weighted Percent (by count) 2 Inch 54 100 31997.6 1309.0 5 Percent Grading Flat and/or Elongated Particles (g) Flat and/or Elongated Particles (count) 5.0% 2.7% ½ Inch 34 99 13854.7 184.6 2 2.0% 0.8% Total Weighted Average Flat and/or Elongated Particles 2.7% 3.5% Figure A-2 Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf *INDICATES OUT OF TOLERANCE NO. 200 1.00.075 RESULTS PROJECT NUMBER: SODIUM SULFATE SOUNDNESS (ASTM C 88) MECHANICAL SIEVE ANALYSIS (ASTM C 136 & ASTM C 117) PASS/FAIL - Pit 6 - Idaho Springs Quarry, 33501 US Highway 6 15-1004 PROJECT INFORMATION PROJECT NAME: 0 US STD SPECIFIC GRAVITY AND ABSORPTION (ASTM C 127) CLAY LUMPS AND FRIABLE PARTICLES (ASTM C 142) Absorption (%) N/ASpecific Gravity PASS/FAILRESULTS SPECIFICATION 0.5% Max Pass Specific Gravity 2.4 Specific Gravity 2.0 RESULTS SPECIFICATION PASS/FAIL Pass PASS/FAILSPECIFICATION - UNIT WEIGHT AND VOIDS IN AGGREGATE (ASTM C 29) N/A N/A N/A N/A Unit Weight (pcf)1.0 Max N/A 2.61 1.5% N/A RESULTS SPECIFICATION PASS/FAIL N/A RESULTS LOS ANGELES ABRASION (ASTM C 131) Percent Loss Percent Fractured 2 Or More Faces 42% PERCENTAGE OF FRACTURED PARTICLES (ASTM D 5821) 50% Max N/A Pass SPECIFICATION PASS/FAIL N/A Grading C N/A N/A N/A N/A1.19Tons per cubic yard N/A RESULTS SPECIFICATION PASS/FAIL 96 N/A N/A 40% 1.30 N/A 5 Rodded NO. 4 NO. 8 100% - 1.0 Max SPECIFICATION 20-5520-55 MATERIAL TYPE: SIEVE SIZE SAMPLE LOCATION: No. 89 Stone ASTM C 33 SPEC 0.3 0.6 METRIC NO.16 NO. 30 Tons per cubic yard 4 1/2" 2.36 100 0.15 NO. 50 NO. 100 PERCENT PASSING 48 Loose 12.5 9.5 4.75 1.18 100 100 AASHTO (CDOT) SPEC 100 3/8"90-10090-100 RESULTS SPECIFICATION Weighted Loss (%) RESULTS SPECIFICATION MAGNESIUM SULFATE SOUNDNESS (ASTM C 88) PASS/FAIL 3.7 5-30 0-10 - - 3.3 0-10 0-5 - 5-30 - PASS/FAIL 1.9% 12% Max Pass Weighted Loss (%) 0-5 18% Max Pass - - 3.3% 45%Percent Voids - - - - Percent Voids Weighted Percent (count) 1.0 Max LIGHTWEIGHT PARTICLES (ASTM C 123) RESULTS 0 2.6% Weighted Particles 0.5% 2.0% Max Pass Weighted Percent (mass)2.6% N/A N/A PASS/FAIL No. 89 Stone RESULTS N/A N/A N/A 3.0% Max DETERMINATION OF MOISTURE CONTENT OF SOIL AND ROCK (ASTM D 2216) RESULTS SPECIFICATION 0.8% SPECIFICATION BEST ENGINEERING SOLUTIONS AND TECHNOLOGIES AGGREGATE SUMMARY SHEET 2015 Aggregate Qualification CLIENT NAME:Albert Frei and Sons FLAT AND/OR ELONGATED PARTICLES TEST (ASTM D 4791) PASS/FAIL N/A Unit Weight (pcf)88 Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf B.E.S.T. 377 Spring Creek Road  Silverthorne, Colorado 80498 Psalm 20  Phone: 970.409.9670  mbest.concrete@gmail.com                                                   ATTACHMENT A   LABORATORY TEST RESULTS                Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf 2015 Aggregate Qualification CLIENT NAME:Albert Frei and Sons SAMPLE LOCATION:Pit 6 - Idaho Springs Quarry, 33501 US Highway 6 BEST ENGINEERING SOLUTIONS AND TECHNOLOGIES AGGREGATE TESTING RESULTS PROJECT INFORMATION UNIT WEIGHT AND VOIDS IN AGGREGATE (ASTM C 29) 96 Sample 2 Sample 3 95.6Sample 1 23.91 0.25 0.25 96.624.14 24.07 Rodded Sample Weight (lbs) Bucket Volume (ft3) Unit Weight (pcf) 0.25 96.3 0.8% 0.0% Total Grading 100 Total Weighted Loss 1.0% - No. 16 2 - - Passing No. 200 Sieve (%) Absorption (%) 997.0 1.0% SPECIFIC GRAVITY AND ABSORPTION (ASTM C 127) 1006.7 SPECIFICATION PASS/FAIL Specific Gravity 2.0 2083.5 2115.3 1305.0 2.61 1.5% LIGHTWEIGHT PARTICLES (ASTM C 123) RESULTS 0.5% Max Pass Average Unit Weight Loose Sample Weight (lbs) Bucket Volume (ft3) Sample 1 Sample 2 21.85 Unit Weight (pcf) Specific Gravity 2.4 0.0% 3.0% Max Pass Initial Dry Weight (g) 21.92 0.25 87.7 0.0% PROJECT NAME: Material Finer Than No. 200 Sieve (ASTM C 117) No. 89 Stone 0.4% Percent Grading 0.25 87.4 Sample 3 21.99 0.25 88.0 88Average Unit Weight LOS ANGELES ABRASION (ASTM C 131) Grading Initial Weight (g) Final Weight (g) Percent Loss (%) PERCENTAGE OF FRACTURED PARTICLES (ASTM D 5821) Initial Weight (g) Final Weight (g) Fractured Particles Minimum 2 Faces (%) 100.244 - No. 8 C 4999.5 2916.3 41.7 Oven Dry Weight (g) MATERIAL TYPE: SSD Weight (g) Submerged Weight (g) Bulk (SSD) Specific Gravity Final Dry Weight (g) Weighted Loss (%) Intial Weight (g) Final Weight (g) Percent Loss SODIUM SULFATE SOUNDNESS (ASTM C 88) Retained Sieve Size PROJECT NUMBER: 2 - - 3.3% 0.1% 15-1004 96.9 3.3% 1.4% 100 1.9%Total Weighted Loss No. 4 No. 8 52 305.6 303.3 0.8% 218.5 218.5 100% Final Weight (g) Percent Loss Weighted Loss (%) CLAY LUMPS AND FRIABLE PARTICLES (ASTM C 142) MAGNESIUM SULFATE SOUNDNESS (ASTM C 88) Weighted Loss (%) Total Grading 5.2%- - 0.2% No. 8 Total Grading 100 Total Weighted Loss 2.2%44 100.5 52 309.2 304.0 Retained Sieve Size Percent Grading Intial Weight (g) 3.3% Retained Sieve Size Percent Grading Intial Weight (g) Final Weight (g) 0.4% Percent Loss No. 16 5.2% 0.2%1009.9 No. 41005.8 1.9% 0.8% No. 4 52 95.344 46.7 45.8 - No. 8 2 1.7% 0.9% Initial Weight (g) DETERMINATION OF MOISTURE CONTENT OF SOIL AND ROCK (ASTM D 2216) Moisture Content (%) Final Weight (g) 1247.8 1238.1 0.8% Figure A-1 Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf 2015 Aggregate Qualification CLIENT NAME:Albert Frei and Sons SAMPLE LOCATION:Pit 6 - Idaho Springs Quarry, 33501 US Highway 6 BEST ENGINEERING SOLUTIONS AND TECHNOLOGIES AGGREGATE TESTING RESULTS PROJECT INFORMATION PROJECT NAME: No. 89 StoneMATERIAL TYPE: PROJECT NUMBER:15-1004 Retained Sieve Size Number of Particles Intial Weight (g) Percent Flat and/or Elongated (by mass) Percent Flat and/or Elongated (by count) Weighted Percent (by mass) FLAT AND/OR ELONGATED PARTICLES TEST (ASTM D 4791) Weighted Percent (by count) Percent Grading Flat and/or Elongated Particles (g) Flat and/or Elongated Particles (count) 5.1% 2.6%No. 4 52 100 29.1 1.5 5 5.0% Total Weighted Average Flat and/or Elongated Particles 2.6% 2.6% 2.6% Figure A-2 Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Certified Properties ASTM PVC 10 PVC 20 PVC 30 PVC 40 PVC 50 PVC 60 Thickness D-5199 10 +/- 0.5 mil 0.25 +/- .013mm 20 +/- 1 mil 0.51 +/- .03 mm 30 +/- 1.5 mil 0.76 +/- .04 mm 40 +/- 2 mil 1.02 +/- .05 mm 50 +/- 2.5 mil 1.27 +/- .06 mm 60 +/- 3 mil 1.52 +/- .08 mm Tensile Properties Strength at Break Elongation Modulus at 100% D-8824 Min 24 lbs/in 4.2 kN/m 250% 10 lbs/in 1.8 kN/m 48 lbs/in 8.4 kN/m 360% 21 lbs/in 3.7 kN/m 73 lbs/in 12.8 kN/m 380% 32 lbs/in 5.6 kN/m 97 lbs/in 17.0 kN/m 430% 40 lbs/in 7.0 kN/m 116 lbs/in 20.3 kN/m 430% 50 lbs/in 8.8 kN/m 137 lbs/in 24.0 kN/m 450% 60 lbs/in 10.5 kN/m Tear Strength D-10044 Min 2.5 lbs 11 N 6 lbs 27 N 8 lbs 35 N 10 lbs 44 N 13 lbs 58 N 15 lbs 67 N Dimensional Stability D-12044 Max Chg 4% 4% 3% 3% 3% 3% Low Temperature Impact D-17904 Pass -10o F -23o C -15o F -26o C -20o F -29o C -20o F -29o C -20o F -29o C -20o F -29o C Index Properties ASTM PVC 10 PVC 20 PVC 30 PVC 40 PVC 50 PVC 60 Specific Gravity D-792 Typical 1.2 g/cc 1.2 g/cc 1.2 g/cc 1.2 g/cc 1.2 g/cc 1.2 g/cc Water Extraction Percent Loss (max) D-12394 Max Loss 0.15% 0.15% 0.15% 0.20% 0.20% 0.20% Average Plasticizer Molecular Weight D-21244,5 400 400 400 400 400 400 Volatile Loss Percent Loss (max) D-12034 Max Loss 1.5% 0.9% 0.7% 0.5% 0.5% 0.5% Soil Burial Break Strength Elongation Modulus at 100% G1604 Max Chg 5% 20% 20% 5% 20% 20% 5% 20% 20% 5% 20% 20% 5% 20% 20% 5% 20% 20% Hydrostatic Resistance D-7514 Min 42 psi 290 kPa 68 psi 470 kPa 100 psi 690 kPa 120 psi 830 kPa 150 psi 1030 kPa 180 psi 1240 kPa Seam Strengths ASTM PVC 10 PVC 20 PVC 30 PVC 40 PVC 50 PVC 60 Shear Strength3 D-8824 Min 20 lbs/in 3.47 kN/m 38.4 lbs/in 6.7 kN/m 58.4 lbs/in 10 kN/m 77.6 lbs/in 14 kN/m 96 lbs/in 17 kN/m 116 lbs/in 20kN/m Peel Strength3 D-8824 Min 10 lbs/in 1.8 kN/m 12.5 lbs/in 2.2 kN/m 15 lbs/in 2.6 kN/m 15 lbs/in 2.6 kN/m 15 lbs/in 2.6 kN/m 15 lbs/in 2.6 kN/m Notes: 1. PGI 1104 replaces PGI 1103 Specification effective 1/1/04. 2. Certified properties are tested by lot as specified in PGI 1104 Appendix A. 3. Metric values are converted from US values and are rounded to the available significant digits. 4. Modifications or further details of test are described in PGI 1104 Appendix B. 5. Index properties are tested once per formulation as specified in PGI 1104 Appendix A. PPVVCC PPrroodduucctt DDaattaa SShheeeett www.coloradolining.com Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf Permeable Pavers Submittal.pdfSubmittal Package 0005 - 31 90 00 - - Permeable Pavers.pdf LID B1 LID Volume Project:PVH Awing Basin Description: B1 Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft)Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Conic Conic (cu. ft) (cu. ft) (cu. ft) (cu. ft) 70.2 10.0 N/A N/A 0 N/A 0 70.5 202.0 0 32 32 26 26 Page 1 LID B4 LID Volume Project:PVH Awing Basin Description: B4 Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft)Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Conic Conic (cu. ft) (cu. ft) (cu. ft) (cu. ft) 67.0 3.0 N/A N/A 0 N/A 0 67.5 158.0 1 40 40 30 30 68.0 114.0 1 68 108 68 98 Page 1 B6 LID Volume Project:PVH Awing Basin Description: B6 Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft)Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Conic Conic (cu. ft) (cu. ft) (cu. ft) (cu. ft) 64.6 1.0 N/A N/A 0 N/A 0 65.0 90.0 0 18 18 13 13 Page 1 LID B8 LID Volume Project:PVH Awing Basin Description: B8 Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft)Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Conic Conic (cu. ft) (cu. ft) (cu. ft) (cu. ft) 69.8 1.0 N/A N/A 0 N/A 0 70.0 39.0 0 4 4 3 3 70.5 128.0 1 42 46 40 43 Page 1 LID B13 LID Volume Project:PVH Basin Description: B13 Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft)Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Conic Conic (cu. ft) (cu. ft) (cu. ft) (cu. ft) 68.0 145.0 N/A N/A 0 N/A 0 68.5 293.0 1 110 110 107 107 69.0 469.0 1 191 300 189 296 Page 1 LE M A Y A V E N U E PVHS A-WING G G G G G G G G UG E UG E UG E UG E UG E UG E UG E UGE G G G UGE UG E UG E UGE UGE G HO S P I T A L L A N E LU K E S T R E E T 439.09 LF 8" PVC (C900) WATER LINE PROP 4" WATER SERVICE METER VAULT EX 6" WATER LINE EXIST 6" WATER LINE EX 12" WATER LINE PROP NYLOPLAST DRAIN BASIN W/ GRATE RIM =4969.00 4969.01 CONNECT PROP 8" WATER LINE TO EX 12" WATER LINE USING A 12"x8" TAPPING SADDLE W/ 8" GV (E) W/ TB (W) N= 4166.72 E = 2023.96 CONNECT PROPOSED 8" WATERLINE TO EX 6" WATERLINE INSTALL 6" x 6" TAPPING SADDLE , 6" GV (W) W/ TB & 6" x 8" REDUCER N= 4166.55 E = 2551.45 PROP 6" FIRELINE POC INSTALL 8" x 6" SWIVEL TEE W/ 6" GV (S) & TB N=4166.67 E = 2107.36 5 LF 8" PVC (C900) WATER LINE PROP 4" WATER SERVICE POC 8" x 4" TEE W/ 4" GV (S) & TB N= 4166.68 E = 2112.36 40.12 LF 6" DIP WATER LINE PROP FIRE HYDRANT N=4126.55 E= 2107.46 PROP RELOCATED FIRE HYDRANT N=4187.31 E=2536.76 SEE SHEET C-003 FOR EXISTING LOCATION. 14.21 LF 6" DIP WATER LINE PROP 6" FIRELINE POC INSTALL 6" x 6" SWIVEL TEE W/ 6" GV(W) & TB N = 4187.63 E = 2550.97 “/)39& WATER SERVICE PROP 8" SAN SEWER TRAFFIC RATED CLEAN OUT. CLEANOUT SHALL BE BETWEEN THE PROPOSED SIDEWALK AND BACK OF CURB. INV=4959.68 N= 4099.86 E= 2232.86 PROP 8" SAN SEWER SERVICE 54.8 LF (SDR 35 PVC) S=2.0% EX 8" SAN SEWER PROP 8" SAN SEWER SERVICE 7.0 LF (SDR 35 PVC) S=2.0% CAP AND MARK END INV=4959.82 N= 4092.82 E= 2232.82 EX 24" RCP IRRIGATION PIPE CONNECT PROP 24" RCP TO THE EX MANHOLE. CORE OPENING TO RECEIVE RCP. CONSTRUCT WATER TIGHT JOINT WITH NON-SHRINK GROUT. RIM =4970.21 4970.30 PROP 6" SWIVEL TEE W/ 6" GV'S (S,E) & TB N= 3896.46 E= 2067.17 13.90 LF 6" DIP WATER LINE POC FOR PROP 4" WATER SERVICE 5' OUTSIDE BUILDING. SEE PLUMBING PLAN. (IF WATER SRVC. CROSS- CONNECTS WITH EXISTING SERVICE(S) IN MAIN BUILDING, ALL SERVICES WILL REQUIRE INSTALLATION OF BACKFLOW PREVENTERS) PROP ASPHALT PATCH (TYP)DOCTOR'S LANE PROP RELOCATED FIRE HYDRANT N=3882.57 E=2067.24 SEE SHEETC-004 FOR EX LOCATION. PROP FDC SEE PLUMBING PLAN. ,167$//3523 ‘0+ CONNECT PROP 8" SAN SEWER SERVICE TO EX 8" SAN SEWER LINE INV 4958.38 (E, W) INV 4958.58 (S) N 4154.64 E 2233.11 86.39 LF 8" PVC (C900) WATER LINE EX, ABONDONED IRRIGATION STRUCTURE TO BE MODIFIED. REMOVE EX GRATE, SAWCUT CONC WALLS 8" BELOW FINISHED GRADE AND INSTALL REINFORCED CONC SLAB W/ AREA INLET TO MATCH FINISH GRADE (SEE DETAIL, SHEET C-018). EX 24" RCP IRRIGATION PIPE EX IRRIGATION CONTROL BOX (SEE LANDCAPE PLANS FOR CONNECTION AND RELOCATION) 47.09 LF 6" DIP WATER LINE PROP LOCATION FOR RESET OF EX 4-PORT FDC CONNECTION (SEE PLUMBING PLAN) EX SAN SEWER MH. IF NOT USED, ABANDON EX SAN SEWER SERVICE (S & SE) AT THE MANHOLE. SEE SHEET C-003. EX 12" SAN SEWER EX 6" SAN SWR EX SAN SEWER MH IF NOT IN USE, ABANDON EX SAN SEWER SERVICE (S) AT THE MANHOLE. SEE SHEET C-003. EX FIRE LINE CONNECT PROP 4" PVC UNDERDRAIN TO THE EX 24" IRRIGATION PIPE WITH 4" SOLID PVC. CORE OPENING TO RECEIVE PVC PIPE. CONSTRUCT WATER TIGHT JOINT WITH A CONCRETE COLLAR. SEE DETAIL SHEET C-016. INSTALL 4" TRAFFIC RATED CLEAN OUT. PROPOSED TRAFFIC SIGNAL, CONTROL BOX AND RELATED ELECTRICAL BOXES TO BE RELOCATED PER DESIGN BY CITY OF FORT COLLINS TRAFFIC DEPARTMENT. LOCATION SHOWN SCHEMATICALLY. PROPERTY CORNER N 4417.62 E 2274.72 PROPERTY CORNER N 4421.08 E 2529.70 PROPOSED PROPERTY CORNER N 4193.75 E 2529.75 EX PROPERTY BOUNDARY EX PROPERTY BOUNDARY PROP PROPERTY BOUNDARY/ROW PROP PROPERTY BOUNDARY/ROW EX PROPERTY BOUNDARY PROP PROPERTY BOUNDARY/ROW PROP PROPERTY BOUNDARY/ROW BY SEPARATE DOCUMENT PROP PROPERTY BOUNDARY/ROW BY SEPARATE DOCUMENT EX ROW EXISTING ACCESS, UTILITY AND DRAINAGE EASEMENT TO BE VACATED BY SEPARATE DOCUMENT. EX BUILDING ENVELOPE EX BUILDING ENVELOPE EXISTING ACCESS, UTILITY AND DRAINAGE EASEMENT TO BE VACATED BY SEPARATE DOCUMENT. PROP 30' EMERGENCY ACCESS EASEMENT, BY SEPARATE DOCUMENT T PROP 2" IRRIGATION WATER SERVICE POC INSTALL 2" x 8" TAPPING SADDLE N= 4166.70 E = 2101.32 “/)7<3(. COPPER WATER SERVICE PROP 2" IRRG SERVICE VAULT, 4' DIA. MH PROP CURB STOP CONTACT CITY OF FORT COLLINS WATER DISTRIBUTION TO MAKE WET TAP, CALL 970-221-6700 EX 6" WATERLINE EX 12" WATERLINE S PROP 5' MH W/ NEENAH R-2533 AREA INLET RIM =4971.00 4970.96 1 1 1 1 1 1 1 1 1 1 1 0'30'60' SCALE: 1" = 30' ASPEN OVERALL UTILITY PLAN OV E R A L L U T I L I T Y P L A N C-011 11 FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES. UTILITY PLAN APPROVAL City of Fort Collins, Colorado SHEET No: PO U D R E V A L L E Y H O S P I T A L , A- W I N G R E P L A C E M E N T FO R T C O L L I N S , C O L O R A D O PR O J E C T / L O C A T I O N : DR A W I N G : OF 18 CHECKED BY: DESIGNED BY: DRAWN BY: DE S C R I P T I O N O F R E V I S I O N : DA T E : RE V I S E D B Y : AP P R O V E D B Y : RE V . # 1 2 3 4 5 6 7 project no: 300-003 date: 6/16/15 JRG AGW AGW LEGEND: F S MP D G E COMM x"W 8"SA T SS x"W IRRG UTILITY NOTES: These Drawings of Record have been prepared based upon a survey by King Surveyors Inc., dated March 30, 2017. RECORD DRAWING 1 DR A W I N G O F R E C O R D 8/ 2 5 / 1 7 AG W FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES. ST O R M S E W E R A & A 2 P L A N & P R O F I L E S C-012 12 STORM SEWER A UTILITY PLAN APPROVAL City of Fort Collins, Colorado SHEET No: PO U D R E V A L L E Y H O S P I T A L , A- W I N G R E P L A C E M E N T FO R T C O L L I N S , C O L O R A D O PR O J E C T / L O C A T I O N : DR A W I N G : OF 18 CHECKED BY: DESIGNED BY: DRAWN BY: DE S C R I P T I O N O F R E V I S I O N : DA T E : RE V I S E D B Y : AP P R O V E D B Y : RE V . # 1 2 3 4 5 6 7 project no: 300-003 date: 6/16/15 JRG AGW AGW STORM SEWER A2 ASPEN RO O F D R A I N I N V . & C O N N E C T S I Z E 8/ 2 1 / 1 5 AG W These Drawings of Record have been prepared based upon a survey by King Surveyors Inc., dated March 30, 2017. RECORD DRAWING 2 DR A W I N G O F R E C O R D 1/ 3 / 1 7 AG W 2 2 2 2 2 2 2 2 2 2 2 LEGEND 4.3% = GRADE PER SURVEYED ELECTRONIC SURFACE NOTE: THIS DRAWING HAS BEEN MODIFIED BY ASPEN ENGINEERING FOR THE PURPOSES OF A GRADING CERTIFICATION 2.09 % 2.87% 2.50% 3.09% 1. 2 8 % 0. 6 9 % 0. 8 6 % 0. 8 8 % 2.33% 2.43 % 1.72% 0. 6 5 % 3.15% 0. 4 3 % 2. 2 4 % 1. 8 3 % 0.55%0.54% 1. 7 1 % 2.29%0.37% 2.1 2 % 5.13% 1.17% 3. 3 8 % 3.30% 0.72% 3. 8 4 % 2.2 5 % 1. 4 8 % 0.90% 0.86%1.02% 0.66% 2.6 5 % 4.02% 4.0 7 % 1.17% 1. 9 7 % 1. 7 6 % 2.01% 1.68% 3.01% 6.6 7 % 2.4 5 % 0. 6 7 % 0.25% 0.72 % 0. 4 2 % 4.82% 0. 8 5 % 0.40% 0. 9 3 % 1. 2 4 % 3.3 5 % 3. 4 2 % 4972.82 IL UPSTREAM CHASE 4972.31 IL DOWNSTREAM CHASE 4969.09 IL UPSTREAM CHASE DESIGN FF = 4972.58