Loading...
HomeMy WebLinkAboutLot Certifications - 03/22/2023 (3)2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes 10/26/2022 Hansen Farm 1945 KNOBBY PINE DRIVE B2202288 8607101002 9 1 Hayley Young 10/25/2022 HY HY HY HY HY HY HY HY downspouts not yet installed discharge will follow indicated paths and is not directed to neighboring property- see attached letter 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date Autumn Landscaping 4 HAYLEY YOUNG hyoung@bjsurvey.net 303-850-0559 B&J Surveying, Inc. 6841 South Yosemite Street Suite 100 HY HY HY HY 10/26/2022 HY B&J Surveying, Inc. 6841 S. Yosemite Street; Suite 100 Centennial, CO 80112 October 27, 2022 FORT COLLINS UTILITIES 700 Wood Street Fort Collins, Colorado. 80521 RE: Lot 2 Block 1 Hansen Farm, 1945 KNOBBY PINE DRIVE The purpose of this letter is to clarify conditions in the certification for 1945 KNOBBY PINE DRIVE for DR Horton. Upon grade inspection of the home, downspouts had yet to be installed. The locations for the downspouts appear clear and there are no issues inspected with the future installation of the downspouts. During our site visit, the site was clean, but as landscaping and finishing touches for the home are still in progress, final site cleanup is also still in progress. Drainage was substantially compliant with plan as all grades are within 0.2’ of plan, and drainage patterns match the grading plan of record. It is my professional opinion to approve the certification for this home. Sincerely, Hayley Young, PE B&J Surveying, Inc. Phone: 303.850.0559 hyoung@bjsurvey.net BLOCK 1 2 59' R.O.W.KNOBBY PINE DRIV E 5,910 SQFT 5,871 SQFT 59' R.O.W. KNOBBY PINE DRIVE TRACT J CO V ER E D PO R C 59' R.O.W. KNOBBY PINE DRIVE ET. COVERED PORC TOF=4966.51 #1945 urveyin& Specializing in Home Builder Services Since 1985. B Inc.S N C:\Users\valde\ACCDocs\B&J Surveying Inc\HANSEN FARM\Project Files\BLOCK 1.dwg, 10/27/2022 2:24:10 PM, valde