HomeMy WebLinkAboutSite Certifications - 08/20/2020 (2)1/19 Page 1
OVERALL SITE and DRAINAGE CERTIFICATION
Commercial, Multi-Family and Subdivision Certification Form and Checklist
Project Name:
Date:
Building Permit Numbers:
(Commercial or multi-family)
Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as-
built construction to the approved drainage and grading plans, please fill in all applicable items in this
Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be
verified during construction. A copy of the approved grading plan must be submitted with the as-built grading
plan. (As-built elevations must be written in red next to the approved elevations.)
x Use “Yes” for items completed as described.
x Use “N/A” for items that are not applicable to the site being certified.
x If any blanks are “No,” attach an explanation referencing the item number below.
Attach an explanation or description of the as-built condition for any items listed or for anything not listed but
shown on the approved construction plans.
Provide an as-built redline or Mylar drawing with the following:
I. Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7
For multiple detention basins on a site, provide the following for each basin separately:
A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and
volume verification calculations for the water quality capture volume and the 100-year detention storage
volume.
1. Detention basin topography was prepared by a professional land surveyor registered in the state
of Colorado.
2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for
proposed and solid lines for as-built).
3. All critical spot elevations as shown on the approved construction plans have been verified and
the as-built elevations are shown on the plan sheet.
4. Stage-storage-discharge tables are provided on a separate document.
5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92-
602(8) is attached and has been uploaded to the Statewide Compliance Portal
(tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include:
a. The cover sheet from the approved drainage report
b. The stamped certification page from the approved drainage report
c. As-built topographic survey
d. Stamped certification page from the Overall Site & Drainage Certification
e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet
Union Place Subdivision Filing 1 and 2
10/28/2019
N/A - Residential Subdivision
Yes
Yes
Yes
Yes
Yes
No
1/19 Page 2
B. Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is
a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of
the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2%
grade requirement.
1. Low Flow: Choose one of the following detention basin low flow options as applicable:
a. Turf swale for low flow path in detention basin.
There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade
is .
b. Concrete pan for low flow in detention basin.
There is a concrete pan installed that meets the grades as shown on the approved construction
plans. (Show as-built spot elevations.)
c. Soft pan for low flow in detention basin.
x Verify and document the soft pan material gradation, trench width and depth - to be verified
during construction by engineer. Picture documentation is preferred or engineer’s statement of
visual inspection and compliance. (Choose one below.)
o There is a soft pan with an underdrain installed that meets the design on the approved
construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations,
bends, cleanouts, etc.)
o There is soft pan installed without an underdrain but there is a type A or B soil. The soil
type must be documented by supplying verification from a registered professional geotechnical
engineer.
NOTE: Spot elevations are to be within 0.2 ft. +/-.
2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown.
Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed
is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re-
graded. Provide documentation if a variance was granted for steeper slopes during the design process.
3. Spillway: The following items must be field verified:
a. The location of the spillway is indicated on the as-built plan.
b. The width of the spillway is indicated on the as-built plan.
c. The elevation(s) of the spillway is shown on the as-built plan.
d. A concrete ribbon defines the location and grade of the spillway.
e. There is downstream scour protection in the spillway as per the construction plans. Indicate
type: (riprap size “D50” gradation and bedding type, geotextile, buried
riprap with inches of bury, etc.).
f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape
features, rocks, etc.
No
No
No
Yes
No
Yes
Yes
No
N/A
N/A
N/A
N/A
N/A
1/19 Page 3
4. Outlet Structure:
a. The orifice plate for the approved release rate is installed with the correct size and location of
the orifice.
b. The orifice plate for the water quality outlet is installed with the correct hole size, number of
rows and columns of holes.
c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate
so no water ponds in front of the plate.
d. The well screen is the correct material and is installed as shown on the construction plans.
e. 100-year overflow grate elevation is . (Elev. A on detail D-46)
f. The top elevation of the water quality capture volume is . (Elev. B on detail
D-46)
g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the
top and bolted at the bottom.
h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain
runoff water and is sloped at 2% towards outlet.
II. Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0
A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet
or exceed capacity requirements shown in the approved drainage study for this project.
1. All swales are located within the drainage easements as shown on the construction plans.
2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires
longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these
criteria are not met, the certification engineer will write a justification and propose mitigation for each
instance or have the issues corrected. If variances to these criteria have previously been approved and
are shown on the construction plans, no justification is needed.
3. As-built spot elevations on channels/swales are shown that correspond to spot elevations
shown on the approved construction plans.
4. All permanent erosion control measures are installed as shown on the approved construction
plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used
as part of this verification.)
5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the
system. (Pictures at tie-in points suggested.)
6. The minimum freeboard is provided for all channels and swales as shown on the approved
construction plans or as identified in the approved drainage study. (Show the freeboard provided on
the cross-sections as on the construction plan set or attached as separate documentation.)
7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees,
shrubs, sod, etc. infringe on the low flow portion of channels or swales.)
No
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
1/19 Page 4
III. Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0
A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been
verified and meets or exceeds the capacity requirements shown in the approved drainage study for this
project.
1. All storm drain pipe sizes and materials have been verified and are in conformance with the
approved construction plans. (Indicate on the plan and profile sheets that they have been verified.)
Material and size substitutions must be approved prior to installation. If a pipe size or material was
changed during construction, the certification engineer must attach the approval documents or supply
them with this certification. Approval documents must include a calculation documenting the capacity
equivalency (equal or greater) of the substituted size.
2. The longitudinal slope of the pipe is as shown on the approved construction plans. The
acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans
must be justified with capacity calculations on an attached sheet.
3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of
the approved construction plans.
B. Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the
approved construction plans and construction specifications.
1. The minimum cover requirements for all pipes have been met as shown on the approved
construction plans. These will be called out in critical locations.
2. All encasements and clearances as specified on the approved construction plans have been met.
3. Any specific joint types or construction methods specified on the approved construction plans
have been met. (List on a separate sheet and attach to this certification.)
IV. Concrete Pans - FCSCM Ch. 8, Sec. 2.0
A. Construction/Installation: All concrete pans have been constructed in accordance with the
approved construction plans.
1. The concrete pans are the correct size/width as shown on the approved construction plans.
2. The longitudinal slopes of the pans are as shown on the approved construction plans. The
certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless
a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or
justification by separate document.
3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross-
section is “V” shaped and meets the side slope shown on the detail.)
4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4
inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide
documentation of the reinforcement used if different than shown on the details or on the approved
construction plans.)
5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as-
built drawings.
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
N/A
N/A
N/A
N/A
N/A
N/A
1/19 Page 5
V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0
A. Construction/Installation: All storm drain inlets have been constructed in accordance with the
approved construction plans and construction specifications.
1. The size and type of inlets are consistent with the inlets shown on the approved construction
plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the
inlet number(s), type and size (length). If the inlet installed is other than the one on the approved
construction plan detail sheet, provide the name and source of the detail with justification for equal or
better capacity.
2. The size of the inlet opening is consistent with the approved detail. (Check height and width.)
3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as
indicated by a spot elevation on the construction plans.
4. The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan
and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide
justification and capacity calculations to show the capacity is not affected or propose mitigation.
5. The as-built size of the inlet box is as shown on the construction plans or an explanation or
justification is attached.
6. All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or
an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER.
VI. Culverts - FCSCM Ch. 9, Sec. 4.0
A. Construction/Installation: All culverts have been constructed and/or installed in accordance with
the approved construction plans and construction specifications.
1. All culvert sizes have been verified as indicated on the as-built construction plans as correct.
2. The culvert material type for all culverts installed is as on the approved construction plans and is
indicated on the as-built plans.
3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built
construction plans.
4. The culvert headwalls or wing walls have been installed as shown on the approved construction
plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to
the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative.
An alternative to consider is a turf reinforcement mat (TRM).
VII. Sub-Drains
A. Construction/Installation: All sub-drains shown on the construction plans have been installed in
accordance with those plans and the construction specifications. Sub-drains installed with the sanitary
sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE:
Indicate any sub-drains installed after the plans were approved on the as-built plans.)
1. The size of the sub-drains are as approved on the construction plans and are indicated on the as-
built plans.
2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are
as indicated on the approved construction plans.
Yes
No
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
N/A
N/A
N/A
N/A
1/19 Page 6
3. The cover requirements per the construction plans are provided.
4. The cleanouts have been installed at the locations shown on the construction plans and are
accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations
marked.)
5. The backfill materials for sub-drains are as shown on the approved construction plans. (This
includes the type, depth and width.)
6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless
shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material
is accepted only if approved prior to installation.)
VIII. Curb Cuts
A. Construction: All curb cut openings are constructed in accordance with the approved construction
plans and construction specifications.
1. The size (width) of the curb cut opening is as shown on the approved construction plans.
2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth
transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb
cut.
IX. Sidewalk Culverts & Chases
A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the
approved construction plans.
1. The size (width and length) of the culverts are as shown on the approved construction plans.
2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the
detail shown on the approved construction plans or per the City’s detail.
3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the
as-built plans.
4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s
detail.
5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no
obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert.
X. Site Grading - FCSCM Ch. 8
A. Construction: All common open spaces have been graded in accordance with the approved
construction plans.
1. The grading on all common open spaces bordering private lots has been verified as correct and
the as-built rear lot corner elevations have been shown on the as-built plans.
N/A
N/A
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
1/19 Page 7
2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all
common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the
situation for noncompliance and when it may be corrected. An escrow for overlot grading may be
required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site
Certification. It is understood that residential lots will be brought to final grade once the foundation is
backfilled so they may be lower than the plan shows at this Overall Site Certification stage.)
3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction
plans and the slopes are stabilized.
XI. Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0
A. Construction: All permanent erosion control BMPs have been installed per the approved
construction plans.
1. All riprap has been installed in the locations and sizes indicated on the approved construction
plans.
2. All fabric has been installed in the locations and sizes indicated on the approved construction
plans.
a. All fabric was installed per the details on the approved construction plans.
XII. Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0
A. Construction: All construction debris and obstructions of any kind have been removed from
drainage paths.
1. All construction debris has been removed except in staging area(s).
2. All ruts have been smoothed out in all construction areas.
3. All areas needing reseeding have been identified and future stabilization goals have been
coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note
the area needing stabilization in the narrative.
XIII. Certification of LID and Water Quality Facilities - FCSCM Ch. 7
A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and
other items to be verified during construction, along with pictures and other required documentation.
XIV. Certification of Other Permanent BMPs
A. The construction of other permanent BMPs not specifically addressed in this certification is in
accordance with the approved plan. This may include grade control structures, rundowns, bridges, stream
access/improvements, etc.
Please specify other permanent BMPs included on this site:
Yes
N/A
Yes
Yes
N/A
N/A
Yes
Yes
Yes
Yes
Yes
N/A
O VERALL S ITE AND D RAINAGE C ERTIFICATION N ARRATIVE
U NION P LACE S UBDIVISION F ILING 1 AND F ILING 2
F ORT C OLLINS , CO
1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com
10/28/2019
MR. DAN MOGEN
STORMWATER DEPARTMENT
CITY OF FORT COLLINS UTILITIES
700 WOOD STREET
FORT COLLINS, CO 80521
RE: OVERALL SITE AND DRAINAGE CERTIFICATION NARRATIVE
UNION PLACE SUBDIVISION FILING 1 AND FILING 2
FORT COLLINS, CO
Dear Dan,
The purpose of this narrative is to provide additional documentation in support of the Overall Site and Drainage Certificatio n
Form and Checklist for Union Place Subdivision Filing 1 and Filing 2. We have used the most recent checklist dated January
2019. There are a number of items on the current checklist that may not apply to this project as the First Filing was originally
designed in 2009 and construction started in 2010. Additional minor revisions were approved in 2010, a Minor Amendment
was processed in 2014 and a Major Amendment processed as Filing 2 was completed in 2015.
The explanations below correspond to the Overall Site and Drainage Certification Checklist:
I.A.5. This pond was designed and approved in 2009 and constructed in 2010 before this statute went into effect. The existing
outlet is 2’ higher than the bottom of the pond. There was a plan in place to have a pump if the bottom of the pond didn’t
drain, but the Type B soils present in the pond have drained well over the last 9 years. In the future, a lower regional storm
sewer system is planned in Mason Street that will allow the bottom of the pond to drain.
I.B. The bottom of the pond was designed and approved with 0.5% grades.
I.B.1.c. The original geotechnical report (included as an attachment) references Type B and C Soils in the area. The pervious
pavement design reports (included as an attachment) included four infiltration tests throughout the site and did not
recommend underdrains below the pervious pavements. Due to this an underdrain pipe was also not included with the soft
pans in the detention pond or the bioretention areas.
I.B.3 – There was not a formal spillway designed with this project. There was a future location of a spillway shown on the
east and west sides of Mason Street. Currently, the pond would fill to the top of pond at the south end of Mason Street and
ultimately spill into Mason Street when it extends beyond the southern curb & gutter flowline elevation of 4980.97. In the
future, when this pond becomes a regional detention pond, a spillway would be constructed and set at an elevation of
4981.30.
I.b.4.a. – The orifice plate was constructed with a 7 ¾” diameter instead of 7” diameter. The planned 7” opening along with
the 6” opening on the other outlet structure would limit the release rate to 2.19 cfs from the site. The 7 ¾” opening along
with the 6” opening will cause an increase in the potential runoff rate from the site from 2.19 cfs to 2.48 cfs. We are not
recommending replacement of the orifice plate due to the fact that the increase in runoff rate is fairly minor and there is 2 ’
of retention (1.31 ac-ft) below the outfall that significantly reduces the probability of the pond ever filling up to the maximum
detention elevation in a 100-year event.
I.b.4.b. – There is 2’ of retention that provides water quality, therefore no water quality plate was designed with either outlet
structure.
O VERALL S ITE AND D RAINAGE C ERTIFICATION N ARRATIVE
U NION P LACE S UBDIVISION F ILING 1 AND F ILING 2
F ORT C OLLINS , CO
1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com
II.A.2. – The swale running through Tract K was originally designed with a longitudinal slope of 1.09%. The as -built slope is
1.04% and the cross section differs from the original design. However, there is adequate capacity in the swale for 1.33 times
the 100-Year flow rate and it is entirely contained within the 20’ drainage easement as shown in the attached calculations.
II.A.3. – Some of the small landscaped swales that were shown in the parkway strip between the curb & gutter and sidewalk
were removed. These include the swales in Tract G, Tract I, Tract H, and the swales along the south side of Greenleaf Street
and both sides of Urban Prairie Street. These were originally planned as an additional water quality component (not calculated
or accounted for to achieve water quality volume), but they were removed during construction and a straight grade is now
shown between the sidewalk and curb & gutter in most locations. This does not negatively affect the drainage on site and
there is still some component of water quality that is happening to the stormwater sheet flowing over the landscaped
parkway.
II.A.4. See pictures included below of rip rap locations. The rip rap appears to be the correct size as indicated on the pla ns.
Bioretention Area near Urban Prairie and Alley:
Sidewalk Chase on west side of Mason Street
south of Willox:
O VERALL S ITE AND D RAINAGE C ERTIFICATION N ARRATIVE
U NION P LACE S UBDIVISION F ILING 1 AND F ILING 2
F ORT C OLLINS , CO
1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com
Inlet FES P1 – east side of Mason Street:
South end of Mason Street on east side
South end of Mason Street on West Side:
Outlet FES D
O VERALL S ITE AND D RAINAGE C ERTIFICATION N ARRATIVE
U NION P LACE S UBDIVISION F ILING 1 AND F ILING 2
F ORT C OLLINS , CO
1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com
Outlet FES E
Outlet FES G1
Outlet FES P2 – east side of Mason Street:
Outlet Structure Pond P
O VERALL S ITE AND D RAINAGE C ERTIFICATION N ARRATIVE
U NION P LACE S UBDIVISION F ILING 1 AND F ILING 2
F ORT C OLLINS , CO
1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com
Sidewalk Chase Outlet into Pond off Greenleaf
III.A.2. Two pipes were design at 0.3% and 0%, but were built at 0.32% and 0.1% so they are acceptable. Line SD -03 is a
private line that was designed at 0.40%, but was built at 0.21%. However, the capacity of this pipe was analyzed and is
adequate. There could be increased maintenance expected on this pipe, but it doesn’t appear to be causing any issues at this
time and appears to be adequate as constructed.
III.B.3 We believe so, but we were not onsite during construction of the pipe.
V.A.1 The modified Type R Inlet (SDI-G1) was not constructed as shown in the construction plans. A Single Curb Inlet was
constructed at this location. The single curb inlet provides adequate capacity as shown in the attached calculations.
V.A.6. “No Dumping – Drains to Poudre River” is not stenciled or stamped on any of the inlets. This is not shown on the
originally approved plans and appears to be a new requirement since 2009. It is our understanding that the City is
retroactively adding stamp to older inlets and would be able to do that on these inlets as well.
VIII. No, there were some curb cuts that were omitted from the plans. These were designed to take flows from the street to
the landscaped area behind the curb & gutter or vice versa for additional water qual ity as discussed in item II.A.3. These
items were removed during construction and do not pose any drainage issues. All critical curb cuts were constructed in
accordance with the approved construction plans.
X.A. As stated previously with checklist item II.A.3, some of the small landscaped swales were removed from the plans during
construction. These include the swales in Tract G, Tract I, Tract H, and the swales along the south side of Greenleaf Street
and both sides of Urban Prairie Street. This does not negatively affect the drainage in these tracts and is adequate for drainage
purposes. All other common open spaces have been graded in accordance with the approved construction plans.
1/19 Page 1 of 2
DURING CONSTRUCTION INSPECTION CHECKLIST
To be completed by Construction Superintendent
This checklist is to be completed during construction and included with the Overall Site and Drainage Certification.
• Use “Yes” for items completed as described.
• Use “N/A” for items that are not applicable to the site being certified.
• If any blanks are “No,” attach an explanation referencing the item number below.
Project Name: Union Place Subdivision Filing 1 and 2 Date: 10/9/2019
Building Permit Numbers:
I. Compaction
A. N/A All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the
City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content
and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction.
Provide testing log from contractor/engineer.
II. Storm Drain Pipe Installation Requirements
A. N/A The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction
Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas
are to be at 90%, both in accordance with ASTM D698).
III. Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0
A. Riprap
1. N/A The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans.
2. N/A A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an
approved equal. Provide documentation for an approved equal.
3. N/A The riprap is the gradation shown on the approved construction plans with a D50 of .
4. N/A The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown.
5. N/A The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.)
B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7
1. N/A All fabric was installed per manufacturer’s specifications.
1/19 Page 2 of 2
IV. Other Permanent BMPs
A. N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch
crossings of storm drain pipes.)
V. Extended Detention Basins
A. N/A Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality
control box(es). Provide date of inspection and name of inspector:
Included certification sheet(s):
Please check the appropriate box(es) for the Low Impact Development
(LID) facilities found on this site and complete the corresponding
certification sheets.
☒ Permeable Interlocking Concrete Pavers
☒ Bioretention Cells (Rain Gardens)
☐ Sand Filters
☐ Vegetated Buffers
☐ Underground Infiltration
☐ Other LID – For certification of Dry Wells, Tree Filters,
Constructed Wetland Channels & Ponds, etc., contact City Staff
to determine requirements to exhibit the LID facility has been
constructed and functions as intended per the approved
drainage report.
*Please provide photographic documentation of the installation of all
stages of all LID facilities.
**Please contact the City Stormwater Inspector at
stormwaterinspection@fcgov.com to discuss inspection requirements
for each LID facility and request inspections.
***All facilities being certified must be “clean” – free of sediment &
construction debris – prior to certification or acceptance of the facility.
Completed by:
Name: Dave Phillips
Title: president
Email: Dave@philgreenco.com
Phone: 9702228989
Company: Philgreen Construction
Address: 1420 Blue Spruce Drive, STE G
Ft Collins CO 80524
1/19 Page 1 of 3
Permeable Interlocking Concrete Pavers
Item/Activity Yes No N/A Submittal Requirements Submitted?/Response
Stormwater Inspection
Pre-construction meeting was held with City-Stormwater
Inspector to discuss installation, inspection, checklist, and
protection from sedimentation ☐ ☐ ☒
Record date, inspector name, meeting
location (i.e. DCP, initial erosion control
inspection, etc.)
Pavers were installed in
2010 by another
contractor and we
don’t have records for
that construction.
Sub-surface inspection(s): Installation of this facility was
verified via inspection by a City-Stormwater Inspector at the
point of installation of the outlet, underdrain, geomembrane
layer, and sub-base courses (per design in Final Plan
Documents)
☐ ☐ ☒
Record date(s) of inspection and
inspector’s name
Surface inspection(s): Installation of this facility was verified via
inspection by a City-Stormwater Inspector at the point of
installation of the pavers and joint fill material
☐ ☐ ☒
Record date(s) of inspection and
inspector’s name
Excavation
Heavy equipment did not encroach into the excavated area
(prevents over-compaction) ☐ ☐ ☒
Bottom of cell was “ripped” after excavation ☐ ☐ ☒ Provide photographs before and after
“ripping”
Bottom surface of cell is flat and level ☐ ☐ ☒ Provide photograph
Impermeable Liner
Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered
material
Impermeable liner is attached to concrete perimeter wall ☐ ☐ ☒ Provide photograph
Impermeable liner is buried with no exposure ☐ ☐ ☒
Any penetrations of the impermeable liner have been sealed
and checked for water-tightness ☐ ☐ ☒ Provide photograph (if necessary)
Edge Restraint and Concrete Cut-Off Wall
The required edge restraint meets design specifications ☐ ☐ ☒ Provide specification of installation
Concrete cut-off wall meets design specifications for: ☐ ☐ ☒ Provide specification of installation
- Dimensions ☐ ☐ ☒
- Reinforcement ☐ ☐ ☒
- Footings ☐ ☐ ☒
Underdrain System
Underdrain pipe meets design specifications ☐ ☐ ☒ Provide photograph
1/19 Page 2 of 3
At least one cleanout is provided per underdrain lateral ☐ ☐ ☒ Provide photograph
Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☒ Provide photograph
Cleanout covers are installed and watertight ☐ ☐ ☒ Provide photograph
Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☒ Provide photograph
Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☒ Provide photograph
Underdrain integrity tested after backfilling using TV and/or
water test ☐ ☐ ☒ Provide documentation of test results
Aggregate
Sub-base Course(e.g., #2/4):
- Has 90% fractured faces
- Is thoroughly washed (virtually free of fine sediment)
- Is installed to the required design depth
☐ ☐ ☒
Provide load ticket, photographs, and
record depth installed
Basecourse (e.g., #57):
- Has 90% fractured faces
- Is thoroughly washed (virtually free of fine sediment)
- Is installed to the required design depth
☐ ☐ ☒
Provide load ticket, photographs, and
record depth installed
Leveling Course / Joint Fill (e.g., crushed #89):
- Has 90% fractured faces
- Is thoroughly washed (virtually free of fine sediment)
- Is dry screened
- Is installed to the required design depth and to the top
of the paver joints
☐ ☐ ☒
Provide load ticket, photographs, and
record depth installed
Aggregate materials are installed and compacted according to
manufacturer’s and/or design specifications ☐ ☐ ☒ Provide photographs and documentation
of compaction
Protection During Construction
PICP area is protected from construction site sediment,
including runoff from the upstream catchment and
construction equipment traffic ☐ ☐ ☒
Specify how the area was covered and/or
otherwise protected to prevent
construction runoff from entering the
pavement
Close Out
Cracked/broken paver units have been removed and replaced ☒ ☐ ☐
Paver height offsets are no more than 1/4” between adjacent
units & surface contains no deformations
(depressions/settlement) exceeding 1/2"
☒ ☐ ☐
Upstream catchment is stabilized prior to diverting runoff into
PICP system ☒ ☐ ☐
1/19 Page 3 of 3
1/19 Page 1 of 3
Bioretention Cells (Rain Gardens)
Item/Activity Yes No N/A Submittal Requirements Submitted?/Response
Stormwater Inspection
Pre-construction meeting was held with City-Stormwater
Inspector to discuss installation, inspection, checklist, and
protection from sedimentation ☐ ☒ ☐
Record date, inspector name, meeting
location (i.e. DCP, initial erosion control
inspection, etc.)
This was done in 2009
or 2010 before we got
involved in the project
in 2014.
Underdrain and basecourse inspection(s): Installation of this
facility was verified via inspection by a City-Stormwater
Inspector at the point of installation of the outlet, underdrain,
geomembrane layer, and base course (per design in Final Plan
Documents) ☐ ☒ ☐
Record date(s) of inspection and
inspector’s name
No underdrain required
per Civil engineer. Did
not have City
Stormwater inspector
out to inspect
installations. We don’t
think this was required
at that time.
Pea gravel and BSM inspection(s): Installation of this facility
was verified via inspection by a City-Stormwater Inspector at
the point of installation of the pea gravel and bioretention
sand media
☐ ☒ ☐
Record date(s) of inspection and
inspector’s name
Project Civil Engineer
saw the installation of
each of bioretention
areas.
Excavation
Heavy equipment did not encroach into the excavated area
(prevents over-compaction) ☒ ☐ ☐
Bottom of cell was “ripped” after excavation ☒ ☐ ☐ Provide photographs before and after
“ripping”
After picture provided
Bottom surface of cell is flat and level ☒ ☐ ☐ Provide photograph Photo provided
Excavated area is protected/surrounded by sediment/runoff
control measures during construction ☒ ☐ ☐ Provide photograph Installed at landscaping
Intake
Upstream catchment drains to inlet/bioretention cell per plan
and flows are fully captured ☒ ☐ ☐
Forebay
Forebay is installed according to design specifications ☒ ☐ ☐ Provide photograph
There is a minimum 3” drop at the forebay entrance ☒ ☐ ☐ Provide photograph
Forebay will drain fully and not hold standing water ☐ ☒ ☐
Outlet Structure/Overflow
1/19 Page 2 of 3
Emergency overflow elevation is confirmed
☒ ☐ ☐
Measure and record distance from
overflow to top of media filter; provide
photograph
See as-built drawings
Overflow inlet elevation is set above bioretention media per
plan ☐ ☐ ☒ Provide photograph No inlets with these
bioretention areas
Overflow inlet invert elevation is at least 3 inches below
containment wall/berm (to direct overflow into inlet) ☐ ☐ ☒
Measure and record distance between
inlet and top of containment wall/berm;
provide photograph
No inlet
Overflow path and check dams, if used, are armored to protect
from erosion and maintain elevations ☐ ☐ ☒
Provide photograph Overflow path is at
sidewalk chase and
curb cuts
Impermeable Liner
Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered
material
No liners specified with
bioretention areaas
Impermeable liner is appropriately anchored ☐ ☐ ☒ Provide photograph
Impermeable liner is buried with no exposure ☐ ☐ ☒
Any penetrations of the impermeable liner have been sealed
and checked for water-tightness ☐ ☐ ☒ Provide photograph (if necessary)
Underdrain System
Underdrain pipe meets design specifications ☐ ☐ ☒ Provide photograph No underdrain specified
with bioretention areas
At least one cleanout is provided per underdrain lateral ☐ ☐ ☒ Provide photograph
Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☒ Provide photograph
Cleanout covers are installed and watertight ☐ ☐ ☒ Provide photograph
Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☒ Provide photograph
Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☒ Provide photograph
Underdrain integrity tested after backfilling using TV and/or
water test ☐ ☐ ☒ Provide documentation of test results
Filter Media and Aggregate
Reservoir aggregate layer (ASTM #57 or #67):
- meets design specifications
- is installed to the required design depth
☐ ☒ ☐
Provide load ticket, photographs, and
record depth installed
CDOT No. 4 aggregate
used per design. No
documentation
Diaphragm aggregate layer (“Pea Gravel” with gradation ASTM
#8, #89, or #9):
- meets design specifications
- is installed to the required design depth
☒ ☐ ☐
Provide load ticket, photographs, and
record depth installed
Pea gravel per design
used. No
documentation.
1/19 Page 3 of 3
Bioretention Sand Media (BSM) composition:
- meets design specifications
- is installed to the required design depth ☒ ☐ ☐
Provide load ticket, photographs, and
record depth installed
BSM came from
Hageman’s Earth Cycle
in Fort Collins an
approved supplier of
BSM material
BSM was “machine mixed” by supplier prior to delivery ☐ ☐ ☒ Provide load ticket Not sure. It appeared
well mixed at site.
BSM is installed flat and level ☒ ☐ ☐ Provide photograph Photo provided
Other Structural Components
Containment wall/berm is continuous and level
☒ ☐ ☐
Sidewalk, curb & gutter,
and alleys adjacent to
bioretention areas. No
walls or berms.
Landscaping
Verify final landscaping is free of sod ☒ ☐ ☐ If sod is used, it must be shown to be
“sand-grown”
No sod used
Final landscaping (non-floatable mulch) is flat and level
☒ ☐ ☐
Provide photograph 4 areas seeded and
other area has rock.
See photo.
Vegetation is planted according to landscape design
specifications and final landscaping plan ☒ ☐ ☐ Provide photograph Photo provided
Verify that weed barrier is NOT installed ☒ ☐ ☐ No weed barrier used
Temporary irrigation installed
☒ ☐ ☒
If N/A, then verify that permanent
irrigation is installed to establish/maintain
vegetation
Permanent irrigation is
installed
Close Out
Upstream catchment stabilized prior to diverting runoff into
bioretention cell ☒ ☐ ☐
Photos associated with During Construction Inspection Checklist
Bioretention East of Mason St - Excavated
Bioretention East of Mason St. – Completed:
Bioretention West of Mason St Excavated:
Bioretention West of Mason St Completed:
Bioretention Greenleaf East Excavated:
Bioretention Greenleaf East Interim
Bioretention Greenleaf East Completed:
Photos associated with During Construction Inspection Checklist
Bioretention Greenleaf West Excavated:
Bioretention Greenleaf West Interim:
Bioretention Greenleaf West Completed:
Bioretention Tract J Excavated:
Bioretention Tract J Completed:
Photos associated with During Construction Inspection Checklist
Bioretention Tract J forebay:
Photo of typical paver removal, cleaning, and
reinstallation:
From:Dave Phillips
To:Dan Mogen
Cc:Sam Eliason
Subject:FW: Union Place Site Drainage Certification
Date:Thursday, November 21, 2019 11:42:32 AM
Attachments:during-construction-inspection-checklist2.docx
Dan
Regarding the N/A portions of During Construction Checklist, I would like to state for the record that
input is because that construction was done by a previous developer. N/A means we do not have
that information. I went through check list again and updated information on bio areas.
I believe Union Place site construction occurred in 2010, that contractor went out of business, it
sat for a couple of years, and we became involved in 2014. When we started the project, the
infrastructure was almost completed. The curb, gutter and 1st lift of asphalt were complete. The
pavers were installed except about 100 feet of the alley behind Urban Prairie homes. The detention
areas were rough constructed. After we were involved, we fine graded the detention areas, installed
the bioretention areas, and landscaping. I hope this explains the lack of documentation regarding
the pavers.
Regarding the landscaping , it has all been signed off by zoning.
Regarding the paver cleaning, I am attaching a picture during the remove & clean on south side of
Greenleaf. I am scheduling a vac and chip now on other areas.
I will be in touch regarding completion of that, and please let me know if you need further
information on anything else to complete the certification.
Thanks
Dave Phillips
dave@philgreenco.com
970-222-8989
From: Dan Mogen <dmogen@fcgov.com>
Sent: Wednesday, November 20, 2019 12:23 PM
To: Sam Eliason <sam.eliason@unitedcivil.com>; Dave Phillips <dave@philgreenco.com>
Subject: RE: Union Place Site Drainage Certification
Thanks, Sam! That does help, but more info (or justification as to why it can’t be provided) and
checklist updates are still needed.
Dan Mogen, EI, CFM
Development Review Engineer
Stormwater Engineering & Development Review Division
City of Fort Collins Utilities
(970)305-5989
dmogen@fcgov.com
From: Sam Eliason <Sam.Eliason@UnitedCivil.com>
Sent: Wednesday, November 20, 2019 12:10 PM
To: Dan Mogen <dmogen@fcgov.com>; Dave Phillips <dave@philgreenco.com>
AL
L
E
Y
B
AL
L
E
Y
A
UR
B
A
N
P
R
A
I
R
I
E
S
T
.
BLUE SUN ST.
GR
E
E
N
L
E
A
F
S
T
.
WE
S
T
W
I
L
L
O
X
L
A
N
E
CF
CF
CFCF
CF
CF
LOT 1
BLOCK 1
TR
A
C
T
A
TRACT C
TRACT D
TRACT B
TRACT G
TRACT I
TRACT L
TR
A
C
T
N
TRACT M
TR
A
C
T
M
TR
A
C
T
M
TRACT M
LOT 1
BLOCK 4
LOT 2
BLOCK 4
EXISTING
IRRIGATION
DITCH
PROPERTY
BOUNDARY
(TYP.)
CH
SC
TR
A
C
T
Q
MATCHLINE SEE SHEET GR02
84.
9
8
84.
3
7
84.
7
6 85.
2
8
LOT 2
BLOCK 2
LOT 1
BLOCK 2
LOT 1
BLOCK 5
LOT 2
BLOCK 5
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
LOT 1
BLOCK 3
LOT 2
BLOCK 3
LOT 3
BLOCK 3
LOT 4
BLOCK 3
LOT 6
BLOCK 3
LOT 7
BLOCK 3
LOT 8
BLOCK 3
LOT 1
BLOCK 1
TOF=88.10
FG=87.60
TOF=88.00
FG=87.50
TOF=88.19
FG=87.69
TOF=88.31
FG=87.81
TOF=88.30
FG=87.80
TOF=88.20
FG=87.70
TOF=88.11
FG=87.61
TOF=88.02
FG=87.52
LOT 5
BLOCK 3
TYPE 'B'
TOF=86.40
FG=85.90
TRACT M
86.
2
4
86.
0
3
85.
4
0
86.
1
2
86.
9
9
87.
1
1
87.
2
4
87.
0
1
86.
3
2
86.
3
6
87.
4
0
86.
9
2
86.
3
7
87.
9
5
87.
5
9
86.
0
4
85.
2
8
85.
1
5
85.
6
7
85.
0
7
86.
1
6
85.
7
2
85.
4
4
86.
1
5
86.
8
9
85.
6
3
SEE SHEET C400
OF FILING 2 PLANS
SEE SHEET C400
OF FILING 2 PLANSSEE SHEET C400
OF FILING 2 PLANS
SEE SHEET C400
OF FILING 2 PLANS
87.
1
0
87.
3
0
87.
2
4
87.
1
0
86.
3
8
86.
2
6
86.
7
8
87.
4
2
87.
8
4
87.
9
8
86.
0
2
86.
0
0
85.
0
6
85.
0
1
85.
0
6
84.
1
9
84.
4
5
84.
5
0
84.
5
3
84.
7
1
1.
2
%
0.
4
%
0.
4
%
0.
7
%
2.8%
5.1%
1.5%
4.1%
2.1%
3.2%
3.6%1.6%
9.1:1
5.5:1
5.1:1
6.7:1
7.5:1
6.6:1
8.1:1
7.1:1
8.
2
:
1
9.
6
:
1
13
.
1
:
1
10.6
:
1
84.
4
4
84.
6
5
NO
S
W
A
L
E
H
E
R
E
NO
S
W
A
L
E
H
E
R
E
84.
3
4
84.
3
3
83.
9
3
VERIFIED OUTLET STRUCTURE
INV = 85.07 (2 3/8" DIAM ORIFICE)
SPILL = 85.99
85.
7
2
85.
2
0
84.
8
9
85.
4
1
84.
9
0
84.
4
8
84.
1
3
83.
9
6
86.
0
8
85.
3
5
84.
7
5
84.
4
5
85.
3
5
85.
7
9
85.
5
8
86.
0
4
85.
9
2
85.
5
3
84.
8
2
84.
9
5
84.
8
2
84.
7
8
84.
7
3
84.
9
0
85.
6
3
85.
4
8
84.
9
1
86.
0
0
85.
5
9
85.
4
2
85.
6
9
85.
2
2
85.
1
5
84.
6
0
85.
2
8
85.
0
4
84.
6
7
85.
1
5
84.
9
4
84.
8
9
84.
6
3
84.
6
7
83.
9
3
83.
5
6
86.
2
8
86.
3
5
86.
4
2
84.
7
6 84.
4
7
83.
5
9
SM
E
P:
\
U
1
3
0
0
3
-
R
E
V
I
V
E
\
C
A
D
D
\
C
P
\
A
S
-
B
U
I
L
T
S
CP
G
R
0
1
-
0
4
.
D
W
G
NO
N
E
10
/
2
8
/
1
9
5:
3
5
:
2
1
P
M
RV
U
24
X
3
6
N
,
E
X
P
N
,
E
X
M
A
,
e
x
t
o
,
E
X
L
S
,
E
X
U
T
,
p
r
p
n
,
P
R
U
T
,
p
r
m
a
,
K
E
Y
M
A
P
-
G
R
,
p
r
t
o
p
t
,
T
y
p
i
c
a
l
S
e
c
t
i
o
n
s
,
p
r
t
o
-
d
e
t
a
i
l
,
P
R
T
O
-
F
U
T
U
R
E
,
P
R
T
O
,
I
M
A
G
E
S
:
1
9
.
t
i
f
,
2
0
.
t
i
f
,
2
1
.
t
i
f
,
2
2
.
t
i
f
GR
A
D
I
N
G
P
L
A
N
GR01
N/A
20'
DR
A
W
I
N
G
N
A
M
E
:
PR
O
J
.
M
G
R
:
PA
T
H
:
DA
T
E
:
SE
R
V
E
R
:
DE
S
I
G
N
E
R
:
TI
M
E
:
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
f
o
r
,
o
r
li
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
p
l
a
n
s
.
A
l
l
ch
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
m
u
s
t
b
e
a
p
p
r
o
v
e
d
b
y
th
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
RE
V
I
V
E
P
R
O
P
E
R
T
I
E
S
L
L
C
9/
7
/
2
0
1
4
UN
I
O
N
P
L
A
C
E
40
U13003
1" =
1" =VERTICAL:
HORIZONTAL:
SCALE
Civil Engineering & Consulting
1501 Academy Court, Suite 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
UNITED CIVIL
Design Group
GR01
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
PROPOSED STORM DRAIN
MANHOLE
PROPOSED STORM PIPE
4980
EXISTING OR ORIGINALLY PROPOSED
SPOT ELEVATION
EXISTING STORM PIPE
1. THE EXACT BUILDING FOOTPRINTS ARE UNKNOWN AT THIS TIME,
THEREFORE TOP OF FOUNDATION AND FINISHED FLOOR ELEVATIONS
HAVE NOT BEEN SHOWN FOR THE COMMERCIAL AND MULTI-FAMILY
LOTS. INDIVIDUAL GRADING PLANS FOR THESE LOTS SHALL BE
PREPARED AND APPROVED BY THE CITY FOR EACH INDIVIDUAL LOT
PRIOR TO RECEIVING A BUILDING PERMIT. SEE NOTES 12 AND 13 FOR
MORE INFORMATION.
2. ALL SPOT ELEVATIONS ARE TO FLOW LINE OR FINISHED GRADE
UNLESS OTHERWISE NOTED.
3. ALL SPOT ELEVATIONS ARE OF THE ELEVATION 49XX.XX.
4. HANDICAP RAMPS SHALL NOT EXCEED 8.33% SLOPE (1:12).
SIDEWALKS IN GENERAL SHALL NOT EXCEED 5.00% SLOPE (1:20)
UNLESS NECESSARY IN WHICH CASE THEY SHALL NOT EXCEED 8.33%
SLOPE (1:12). WHERE SIDEWALKS ARE OF SUCH A SLOPE THAT SPECIAL
REQUIREMENTS NEED TO BE ADDRESSED FOR HANDICAP
CONSIDERATION THE CONTRACTOR SHALL COMPLY WITH APPLICABLE
CODES.
5. (MINIMUM) THE FINISHED GRADE SHALL SLOPE AWAY FROM THE
BUILDING AT A MIN. 2% TOWARDS SWALES OR OVER CURB TO PAVED
AREAS.
6. DEVELOPER SHALL VERIFY POSITION OF BUILDING STAIRS &
OPENINGS PRIOR TO CONSTRUCTING ADJOINING SIDEWALKS.
7. REFER TO GENERAL NOTES FOR ALL OTHER APPLICABLE
INFORMATION.
8. MAXIMUM SLOPE AT HANDICAPPED PARKING STALLS IS 2% IN ANY
DIRECTION.
9. CONTRACTOR TO FIELD VERIFY EXISTING ELEVATIONS SHOWN AT TIE
IN POINTS. CONTRACTOR TO NOTIFY ENGINEER IF ELEVATIONS VARY
FROM THAT SHOWN ON PLAN.
10. CONTRACTOR TO ADJUST STORM GRATES AS NECESSARY TO
PROPOSED TOP OF GRADE.
11. IF REQUESTED ENGINEER WILL FURNISH THE CONTRACTOR
AUTOCAD COMPATIBLE FILES.
12. THE TOP OF FOUNDATION (T.O.F.) ELEVATIONS AND FINISHED FLOOR
(F.F.) ELEVATIONS SHALL BE DESIGNED TO BE AT LEAST 12" ABOVE THE
100 YEAR STORM EVENT. THE BUILDINGS ALONG WEST WILLOX LANE
SHALL HAVE THE T.O.F. AND F.F. ELEVATED AT LEAST 14" ABOVE THE
ADJACENT WEST WILLOX LANE SIDEWALK.
13. STANDARD CITY OF FORT COLLINS TYPE "B" LOT GRADING PLANS
SHOWN ON SHEET DT06 SHALL ALSO BE USED TO DETERMINE TOP OF
FOUNDATION ELEVATIONS.
14. RETAINING WALLS ON THE INDIVIDUAL LOTS MAY BE NECESSARY TO
MEET THE LOT GRADING REQUIRMENTS.
15. BASEMENTS WILL NOT BE ALLOWED ON THIS SITE DUE TO HIGH
GROUNDWATER.
OUTFALL CURB & GUTTER
CURB TRANSITION
(CATCH TO OUTFALL)
3' TRANSITION TO 0" CURB FACECF
10' TRANSITION (ROLLOVER TORVVERTICAL CURB AND GUTTER)
LEGEND
NOTES
4981
2' CURB CUT W/1' TRANSITIONCCSEE SHEET DT05 FOR DETAIL
2' CURB CHANNELCHSEE SHEET DT05 FOR DETAIL
CONCRETE SIDEWALK
SEE SHEET DT05 FOR DETAIL
SIDEWALK CHASESCSEE SHEET DT05 FOR DETAIL
FLOW LINE
FINISH SURFACE
FL
FS
MOUNTAIN GRANITE RIP RAP
PROPERTY BOUNDARY
EASEMENT LINE
CENTERLINE
LOT BOUNDARY
CONCRETE SIDEWALK CULVERTCUSEE SHEET DT05 FOR DETAIL 12B
NEWLY PROPOSED SPOT ELEVATION
FOR REVISIONS TO SITE
39.
7
6
(SEE LANDSCAPE PLANS)
NOT SHOWN FOR CLARITY
22
0 20'40'
SCALE: 1" = 20'
10'
NORTH
1
1
1
1 1
1
1
1
1
SM
E
10
/
2
2
/
1
9
RE
C
O
R
D
D
R
A
W
I
N
G
S
RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
82.
2
0
AS-BUILT SPOT ELEVATION
4980
4981 1' MINOR DESIGN CONTOUR
5' MAJOR DESIGN CONTOUR
4980
4981 1' MINOR AS-BUILT CONTOUR
5' MAJOR AS-BUILT CONTOUR
LEGEND
WE
S
T
W
I
L
L
O
X
L
A
N
E
CEDAR ST.
GR
E
E
N
L
E
A
F
S
T
.
ALLEY B
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
UR
B
A
N
P
R
A
I
R
I
E
S
T
.
AL
L
E
Y
A
CF
CF
LOT 3
BLOCK 5
TRACT E
TRACT J
LOT 1
BLOCK 4
LOT 2
BLOCK 4
TRACT O
TRACT M
TRACT M
TRACT A
LOT 2
BLOCK 5
CC
CC
CC
CC
SC
SC
SC
FOR BIORETENTION DETAIL
SEE SHEET GRO4 "GREEN
LEAF ST (EAST)"
TRACT Q
CF
MATCHLINE SEE SHEET GR03
MATCHLINE SEE SHEET GR01
82.
9
5
F
L
83.
8
6
F
S
83.
9
5
F
S
82.
9
8
F
L
83.
6
9
F
L
84.
1
9
F
S
83.
9
9
F
L
84.
5
0
F
S
83.
6
6
F
L
84.
1
6
F
S
79.
3
9
79.
5
1
79.
9
2
80.
0
4
80.
4
5
80.
5
7
81.
6
0
81.
4
8
83.
9
0
83.
7
2
82.
8
8
82.
5
0
82.
9
2
82.
9
7
83.
1
4
83.
2
3
83.
2
2
83.
2
4
84.
1
9
82.
5
5
82.
2
5
82.
5
5
83.
1
5
83.
3
0
83.
7
2
83.
7
4
84.
1
8
83.
8
1
84.
7
6
77.
7
4
77.
9
5
78.
5
5
78.
6
7
82.
6
9
F
L
84.
4
8
82.
0
6
83.
0
8
82.
7
4
82.
8
2
83.
0
7
84.
5
2
F
S
84.
0
2
F
L
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
TYPE 'B'
LOT
LOT 2
BLOCK 1
LOT 3
BLOCK 1
LOT 4
BLOCK 1
LOT 5
BLOCK 1
LOT 6
BLOCK 1
LOT 7
BLOCK 1
LOT 8
BLOCK 1
LOT 9
BLOCK 1
LOT 10
BLOCK 1
TOF=86.07
FG=85.57
TOF=85.79
FG=85.29
TOF=85.57
FG=85.07
TOF=85.37
FG=84.87
TOF=85.16
FG=84.66
TOF=85.14
FG=84.64
TOF=85.35
FG=84.85
TOF=85.55
FG=85.05
TOF=85.55
FG=85.05
FOR BIORETENTION DETAIL
SEE SHEET GR04 "GREEN
LEAF ST (WEST)"
TRACT M
TRACT H
SC
SC
CC
SCCC
TRACT M
TRACT K
78.
4
4
79.
0
3
77.
8
2
82.
6
7
SEE SHEET C400
OF FILING 2 PLANS
SEE SHEET C400
OF FILING 2 PLANS
CC
82.
5
6 82.
4
6
82.
5
9
82.
1
4
82.
5
2
83.
3
7
82.
8
1
81.
6
1
82.
1
0
82.
0
5
82.
1
5
84.
6
5
.
F
G
83.
8
6
S
W
83.
7
8
S
W
82.
5
6
F
L
83.
7
0
84.
6
6
F
G
83.
6
6
84.
3
5
1.0
4
%
82.
4
6
F
L
78.
3
0
77.
8
6
77.
4
2
77.
8
2
77.
7
5
77.
8
2
77.
8
1
78.
1
0
78.
2
0
78.
2
9
78.
1
1 78.
2
4
78.
4
1
78.
5
1
78.
6
7
79.
1
1
78.
9
3
79.
1
6
82.
1
4
82.
0
5
82.
0
0
82.
0
0
82.
1
1
82.
2
1
82.
3
5
82.
4
0
82.
3
6
82.
5
8
82.
6
1
82.
7
382.
7
2
82.
8
082.
9
1
82.
9
4
83.
0
0
82.
2
7
82.
5
2
82.
4
5
80.
4
8
81.
2
3
81.
6
6
81.
7
2
80.
9
9
80.
4
5
79.
4
5
78.
9
6
78.
7
9
4.
1
:
1
4.0
:
1
4.1
:
1
3.6
:
1
15
.
5
:
1
3.7:1
4.0:
1
3.7:1
4.9:1
4.7:1
4.3:1
0.7
%
1.2%
3.4
%
1.0
%
3.1
%
NO SWALE HERE
NO
S
W
A
L
E
H
E
R
E
NO S
W
A
L
E
H
E
R
E
NO
S
W
A
L
E
H
E
R
E
NO
S
W
A
L
E
H
E
R
E
NO
S
W
A
L
E
H
E
R
E
84.
3
5
84.
4
4
84.
6
5
82.
3
7
82.
4
4
82.
4
9
82.
3
3
82.
3
1
82.
3
0
85.
1
5
F
F
E
85.
3
6
F
F
E
NO
S
W
A
L
E
H
E
R
E
NO
S
W
A
L
E
H
E
R
E
NO S
W
A
L
E
H
E
R
E
NO
S
W
A
L
E
H
E
R
E
NO
S
W
A
L
E
H
E
R
E
NO
S
W
A
L
E
H
E
R
E
12" DIAMETER
INLET CONSTRUCTED
AT THIS LOW POINT
WITH 6" PVC PIPE
OUT TO THE EAST
AT INVERT = 80.53
16± LF 6" PVC
@ SLOPE = 9%±
APPEARS TO BE
CONNECTED TO
24" RCP PIPE
6" INVERT = 79.1±
82.
3
5
83.
5
2
83.
2
7
83.
4
6
83.
5
3
83.
2
3
83.
4
7
83.
8
0 83.
9
9
83.
6
9
83.
3
7
82.
4
1
82.
3
1
82.
5
0
82.
3
382.
3
3
82.
1
3
L
P
83.
0
0
83.
4
6
82.
6
7
82.
6
7
83.
5
4
83.
4
2
83.
1
4
84.
1
3
84.
3
8
84.
1
5
83.
6
9
84.
5
8
84.
8
0
84.
9
6
85.
3
5
83.
7
1
84.
3
6
84.
5
1
84.
8
7
84.
0
4
83.
5
8
83.
3
2
83.
8
4
84.
4
0
83.
8
4
83.
8
7
84.
2
9
84.
2
2
83.
1
7
83.
7
2
81.
8
5
83.
1
9
83.
5
9
82.
7
0
82.
5
0
83.
2
3
83.
4
8
84.
2
1
84.
2
7
84.
4
0
84.
4
1
84.
8
1
84.
9
7
84.
5
1
84.
6
8
SM
E
P:
\
U
1
3
0
0
3
-
R
E
V
I
V
E
\
C
A
D
D
\
C
P
\
A
S
-
B
U
I
L
T
S
CP
G
R
0
1
-
0
4
.
D
W
G
NO
N
E
10
/
2
8
/
1
9
5:
4
0
:
2
4
P
M
RV
U
24
X
3
6
N
,
E
X
P
N
,
E
X
M
A
,
e
x
t
o
,
E
X
L
S
,
E
X
U
T
,
p
r
p
n
,
P
R
U
T
,
p
r
m
a
,
K
E
Y
M
A
P
-
G
R
,
p
r
t
o
p
t
,
T
y
p
i
c
a
l
S
e
c
t
i
o
n
s
,
p
r
t
o
-
d
e
t
a
i
l
,
P
R
T
O
-
F
U
T
U
R
E
,
P
R
T
O
,
I
M
A
G
E
S
:
1
9
.
t
i
f
,
2
0
.
t
i
f
,
2
1
.
t
i
f
,
2
2
.
t
i
f
GR
A
D
I
N
G
P
L
A
N
GR02
N/A
20'
DR
A
W
I
N
G
N
A
M
E
:
PR
O
J
.
M
G
R
:
PA
T
H
:
DA
T
E
:
SE
R
V
E
R
:
DE
S
I
G
N
E
R
:
TI
M
E
:
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
f
o
r
,
o
r
li
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
p
l
a
n
s
.
A
l
l
ch
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
m
u
s
t
b
e
a
p
p
r
o
v
e
d
b
y
th
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
RE
V
I
V
E
P
R
O
P
E
R
T
I
E
S
L
L
C
9/
7
/
2
0
1
4
UN
I
O
N
P
L
A
C
E
40
U13003
1" =
1" =VERTICAL:
HORIZONTAL:
SCALE
Civil Engineering & Consulting
1501 Academy Court, Suite 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
UNITED CIVIL
Design Group
GR02
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
PROPOSED STORM DRAIN
MANHOLE
PROPOSED STORM PIPE
4980
EXISTING OR ORIGINALLY PROPOSED
SPOT ELEVATION
EXISTING STORM PIPE
1. THE EXACT BUILDING FOOTPRINTS ARE UNKNOWN AT THIS TIME,
THEREFORE TOP OF FOUNDATION AND FINISHED FLOOR ELEVATIONS
HAVE NOT BEEN SHOWN FOR THE COMMERCIAL AND MULTI-FAMILY
LOTS. INDIVIDUAL GRADING PLANS FOR THESE LOTS SHALL BE
PREPARED AND APPROVED BY THE CITY FOR EACH INDIVIDUAL LOT
PRIOR TO RECEIVING A BUILDING PERMIT. SEE NOTES 12 AND 13 FOR
MORE INFORMATION.
2. ALL SPOT ELEVATIONS ARE TO FLOW LINE OR FINISHED GRADE
UNLESS OTHERWISE NOTED.
3. ALL SPOT ELEVATIONS ARE OF THE ELEVATION 49XX.XX.
4. HANDICAP RAMPS SHALL NOT EXCEED 8.33% SLOPE (1:12).
SIDEWALKS IN GENERAL SHALL NOT EXCEED 5.00% SLOPE (1:20)
UNLESS NECESSARY IN WHICH CASE THEY SHALL NOT EXCEED 8.33%
SLOPE (1:12). WHERE SIDEWALKS ARE OF SUCH A SLOPE THAT SPECIAL
REQUIREMENTS NEED TO BE ADDRESSED FOR HANDICAP
CONSIDERATION THE CONTRACTOR SHALL COMPLY WITH APPLICABLE
CODES.
5. (MINIMUM) THE FINISHED GRADE SHALL SLOPE AWAY FROM THE
BUILDING AT A MIN. 2% TOWARDS SWALES OR OVER CURB TO PAVED
AREAS.
6. DEVELOPER SHALL VERIFY POSITION OF BUILDING STAIRS &
OPENINGS PRIOR TO CONSTRUCTING ADJOINING SIDEWALKS.
7. REFER TO GENERAL NOTES FOR ALL OTHER APPLICABLE
INFORMATION.
8. MAXIMUM SLOPE AT HANDICAPPED PARKING STALLS IS 2% IN ANY
DIRECTION.
9. CONTRACTOR TO FIELD VERIFY EXISTING ELEVATIONS SHOWN AT TIE
IN POINTS. CONTRACTOR TO NOTIFY ENGINEER IF ELEVATIONS VARY
FROM THAT SHOWN ON PLAN.
10. CONTRACTOR TO ADJUST STORM GRATES AS NECESSARY TO
PROPOSED TOP OF GRADE.
11. IF REQUESTED ENGINEER WILL FURNISH THE CONTRACTOR
AUTOCAD COMPATIBLE FILES.
12. THE TOP OF FOUNDATION (T.O.F.) ELEVATIONS AND FINISHED FLOOR
(F.F.) ELEVATIONS SHALL BE DESIGNED TO BE AT LEAST 12" ABOVE THE
100 YEAR STORM EVENT. THE BUILDINGS ALONG WEST WILLOX LANE
SHALL HAVE THE T.O.F. AND F.F. ELEVATED AT LEAST 14" ABOVE THE
ADJACENT WEST WILLOX LANE SIDEWALK.
13. STANDARD CITY OF FORT COLLINS TYPE "B" LOT GRADING PLANS
SHOWN ON SHEET DT06 SHALL ALSO BE USED TO DETERMINE TOP OF
FOUNDATION ELEVATIONS.
14. RETAINING WALLS ON THE INDIVIDUAL LOTS MAY BE NECESSARY TO
MEET THE LOT GRADING REQUIRMENTS.
15. BASEMENTS WILL NOT BE ALLOWED ON THIS SITE DUE TO HIGH
GROUNDWATER.
OUTFALL CURB & GUTTER
CURB TRANSITION
(CATCH TO OUTFALL)
3' TRANSITION TO 0" CURB FACECF
10' TRANSITION (ROLLOVER TORVVERTICAL CURB AND GUTTER)
LEGEND
NOTES
4981
2' CURB CUT W/1' TRANSITIONCCSEE SHEET DT05 FOR DETAIL
2' CURB CHANNELCHSEE SHEET DT05 FOR DETAIL
CONCRETE SIDEWALK
SEE SHEET DT05 FOR DETAIL
SIDEWALK CHASESCSEE SHEET DT05 FOR DETAIL
FLOW LINE
FINISH SURFACE
FL
FS
MOUNTAIN GRANITE RIP RAP
PROPERTY BOUNDARY
EASEMENT LINE
CENTERLINE
LOT BOUNDARY
CONCRETE SIDEWALK CULVERTCUSEE SHEET DT05 FOR DETAIL 12B
NEWLY PROPOSED SPOT ELEVATION
FOR REVISIONS TO SITE
39.
7
6
(SEE LANDSCAPE PLANS)
NOT SHOWN FOR CLARITY
23
0 20'40'
SCALE: 1" = 20'
10'
NORTH
SM
E
10
/
2
2
/
1
9
RE
C
O
R
D
D
R
A
W
I
N
G
S
RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
82.
2
0
AS-BUILT SPOT ELEVATION
4980
4981 1' MINOR DESIGN CONTOUR
5' MAJOR DESIGN CONTOUR
4980
4981 1' MINOR AS-BUILT CONTOUR
5' MAJOR AS-BUILT CONTOUR
LEGEND
GR
E
E
N
L
E
A
F
S
T
.
MASON STREET
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
D
D
WE
S
T
W
I
L
L
O
X
L
A
N
E
LOT 4
BLOCK 5
TRACT A
TRACT F
TRACT E
SC
(S
E
E
R
D
0
1
,
R
D
0
2
A
N
D
R
D
0
3
)
(SEE RD04)
ON-SITE
EASEMENT
28.80'29.20'
28.40'28.80'
24.80'
25.20'
SEE FUTURE
GRADING DETAIL
ON THIS SHEET
CU
MATCHLINE SEE SHEET GR02
77.
4
6
81.
8
6
77.
7
0
77.
6
6
77.
7
4
77.
2
0
76.
9
0
77.
4
6
77.
6
6
77.
9
5
77.
5
5
77.
6
2
77.
2
0
77.
2
0
81.
9
6
TRACT P
BIORETENTION
AREA = 270 SF
(SEE DETAIL SHEET GR04)
(PROPOSED GRADE 2 INCHES
BELOW ADJACENT GRADE)
BIORETENTION
AREA = 270 SF
(SEE DETAIL SHEET GR04)
(PROPOSED GRADE 2 INCHES
BELOW ADJACENT GRADE)
77.
3
3
77.
0
1
76.
8
7
77.
3
7
77.
8
2
77.
6
1
76.
8
4
77.
3
5
77.
2
9
82.
3
0
82.
3
3
78.
4
0
78.
6
0 76.
7
4
79.
2
3
81.
7
4
78.
8
2
79.
1
4
78.
7
7
78.
8
1
77.
8
6
77.
1
1
76.
9
8
76.
9
4 77.
2
2 77.
3
1
78.
1
877.
5
1
77.
5
3
77.
0
1
77.
8
878.
5
1
81.
3
0
82.
2
4
82.
3
4
80.
0
5
79.
8
2
79.
8
4
79.
7
4
77.
7
3
77.
7
8
77.
8
5
77.
7
6
77.
8
9
77.
9
0
77.
6
4
77.
5
9
77.
5
5
82.
3
3
77.
8
6
77.
4
2
77.
0
9
77.
0
7
77.
1
4
77.
2
3
76.
9
5
77.
0
4
77.
5
7
77.
8
4
78.
0
3
77.
6
0
77.
9
4
78.
0
7
77.
9
4
77.
9
0
78.
2
2
77.
8
2
77.
7
5
78.
7
6
78.
3
0
78.
0
0
78.
3
6
77.
9
0
77.
8
1
77.
8
977.
4
8
82.
5
1
82.
3
7
82.
6
6
82.
7
4
82.
7
7
82.
8
7
82.
8
5
82.
1
6
81.
9
5
81.
8
1
81.
6
2
81.
4
8
81.
6
9
81.
8
0
81.
9
7
82.
2
0
82.
3
6
82.
5
3
82.
6
8
82.
7
4
82.
7
8
82.
8
8
81.
6
3
F
L
81.
5
2
F
L
79.
6
2
79.
2
7
81.
0
8
80.
8
3
4.
8
:
1
5.
2
:
1
4.5:1
4.1:1
4.
1
:
1
3.
9
:
1
3.
9
:
1
3.
8
:
1
3.
3
:
1
3.8:1
4.
2
:
1
5.
0
:
1
5.
0
:
1
5.1:1
3.
6
:
1
3.
8
:
1
3.3
:
1
5.7:1
7.9:1
4.
7
:
1
4.
5
:
1
4.
1
:
1
4.
2
:
1
5.5:1
3.3:1
3.9:1
4.0:1
4.3:1
4.3:1
4.
8
:
1
3.9:1
6.
0
:
1
4.8
:
1
0.3%
0.1
%
0.5
%
0.2
%
0.5
%
1.2%
0.3%
1.2%
1.
0
%
77.
0
9
77.
0
9
76.
9
3
77.
1
9
77.
2
3
0.8
%
0.6%
2.4%
0.5%
0.7%
0.
7
%
84.
5
4
84.
3
8
84.
2
0
83.
5
8
82.
3
0
82.
3
0
82.
3
3
82.
4
2
82.
3
1
82.
4
0
82.
8
2
82.
4
7
82.
3
2
82.
5
0
82.
3
5
VERIFIED PROPOSED OUTLET STRUCTURE
SEE REVISED DETAIL SHEET DT04
INV = 78.76 (7.75" DIAM ORIFICE BUILT INSTEAD OF 7")
SPILL AS-BUILT = 80.05 (DESIGN = 80.10)
EXISTING OUTLET STRUCTURE
CLEANED OUT AND LEFT IN PLACE
6" DIAM ORIFICE = 78.76
SPILL = 80.80
82.
4
1
82.
3
1
83.
0
7
82.
4
9
82.
4
5
82.
6
4
82.
7
4
82.
6
3
81.
8
1
82.
3
5
82.
4
1
81.
4
0LP
82.
0
2
81.
8
5
x
x
x
x
x
x
PROPOSED INTERIM
CONTOURS (TYP.)
FUTURE
CONTOURS (TYP.)
INTERIM END OF
MASON STREET
PROPERTY LINE
FUTURE EXTENSION
OF MASON STREET
DETENTION POND
DETENTION POND
82.
3
3
77.
3
1
77.
7
8
78.
0
0
78.
3
6
77.
9
0
81.
9
5
81.
8
1
81.
6
2
81.
4
8
81.
6
9
81.
8
0
81.
9
7
4.
1
:
1
4.
7
:
1
4.3:1
4.
8
:
1
6.
0
:
1
82.
3
3
82.
4
2
SM
E
P:
\
U
1
3
0
0
3
-
R
E
V
I
V
E
\
C
A
D
D
\
C
P
\
A
S
-
B
U
I
L
T
S
CP
G
R
0
1
-
0
4
.
D
W
G
NO
N
E
10
/
2
8
/
1
9
5:
4
0
:
4
7
P
M
RV
U
24
X
3
6
N
,
E
X
P
N
,
E
X
M
A
,
e
x
t
o
,
E
X
L
S
,
E
X
U
T
,
p
r
p
n
,
P
R
U
T
,
p
r
m
a
,
K
E
Y
M
A
P
-
G
R
,
p
r
t
o
p
t
,
T
y
p
i
c
a
l
S
e
c
t
i
o
n
s
,
p
r
t
o
-
d
e
t
a
i
l
,
P
R
T
O
-
F
U
T
U
R
E
,
P
R
T
O
,
I
M
A
G
E
S
:
1
9
.
t
i
f
,
2
0
.
t
i
f
,
2
1
.
t
i
f
,
2
2
.
t
i
f
GR
A
D
I
N
G
P
L
A
N
GR03
N/A
20'
DR
A
W
I
N
G
N
A
M
E
:
PR
O
J
.
M
G
R
:
PA
T
H
:
DA
T
E
:
SE
R
V
E
R
:
DE
S
I
G
N
E
R
:
TI
M
E
:
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
f
o
r
,
o
r
li
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
p
l
a
n
s
.
A
l
l
ch
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
m
u
s
t
b
e
a
p
p
r
o
v
e
d
b
y
th
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
RE
V
I
V
E
P
R
O
P
E
R
T
I
E
S
L
L
C
9/
7
/
2
0
1
4
UN
I
O
N
P
L
A
C
E
40
U13003
1" =
1" =VERTICAL:
HORIZONTAL:
SCALE
Civil Engineering & Consulting
1501 Academy Court, Suite 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
UNITED CIVIL
Design Group
GR03
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
PROPOSED STORM DRAIN
MANHOLE
PROPOSED STORM PIPE
4980
EXISTING OR ORIGINALLY PROPOSED
SPOT ELEVATION
EXISTING STORM PIPE
1. THE EXACT BUILDING FOOTPRINTS ARE UNKNOWN AT THIS TIME,
THEREFORE TOP OF FOUNDATION AND FINISHED FLOOR ELEVATIONS
HAVE NOT BEEN SHOWN FOR THE COMMERCIAL AND MULTI-FAMILY
LOTS. INDIVIDUAL GRADING PLANS FOR THESE LOTS SHALL BE
PREPARED AND APPROVED BY THE CITY FOR EACH INDIVIDUAL LOT
PRIOR TO RECEIVING A BUILDING PERMIT. SEE NOTES 12 AND 13 FOR
MORE INFORMATION.
2. ALL SPOT ELEVATIONS ARE TO FLOW LINE OR FINISHED GRADE
UNLESS OTHERWISE NOTED.
3. ALL SPOT ELEVATIONS ARE OF THE ELEVATION 49XX.XX.
4. HANDICAP RAMPS SHALL NOT EXCEED 8.33% SLOPE (1:12).
SIDEWALKS IN GENERAL SHALL NOT EXCEED 5.00% SLOPE (1:20)
UNLESS NECESSARY IN WHICH CASE THEY SHALL NOT EXCEED 8.33%
SLOPE (1:12). WHERE SIDEWALKS ARE OF SUCH A SLOPE THAT SPECIAL
REQUIREMENTS NEED TO BE ADDRESSED FOR HANDICAP
CONSIDERATION THE CONTRACTOR SHALL COMPLY WITH APPLICABLE
CODES.
5. (MINIMUM) THE FINISHED GRADE SHALL SLOPE AWAY FROM THE
BUILDING AT A MIN. 2% TOWARDS SWALES OR OVER CURB TO PAVED
AREAS.
6. DEVELOPER SHALL VERIFY POSITION OF BUILDING STAIRS &
OPENINGS PRIOR TO CONSTRUCTING ADJOINING SIDEWALKS.
7. REFER TO GENERAL NOTES FOR ALL OTHER APPLICABLE
INFORMATION.
8. MAXIMUM SLOPE AT HANDICAPPED PARKING STALLS IS 2% IN ANY
DIRECTION.
9. CONTRACTOR TO FIELD VERIFY EXISTING ELEVATIONS SHOWN AT TIE
IN POINTS. CONTRACTOR TO NOTIFY ENGINEER IF ELEVATIONS VARY
FROM THAT SHOWN ON PLAN.
10. CONTRACTOR TO ADJUST STORM GRATES AS NECESSARY TO
PROPOSED TOP OF GRADE.
11. IF REQUESTED ENGINEER WILL FURNISH THE CONTRACTOR
AUTOCAD COMPATIBLE FILES.
12. THE TOP OF FOUNDATION (T.O.F.) ELEVATIONS AND FINISHED FLOOR
(F.F.) ELEVATIONS SHALL BE DESIGNED TO BE AT LEAST 12" ABOVE THE
100 YEAR STORM EVENT. THE BUILDINGS ALONG WEST WILLOX LANE
SHALL HAVE THE T.O.F. AND F.F. ELEVATED AT LEAST 14" ABOVE THE
ADJACENT WEST WILLOX LANE SIDEWALK.
13. STANDARD CITY OF FORT COLLINS TYPE "B" LOT GRADING PLANS
SHOWN ON SHEET DT06 SHALL ALSO BE USED TO DETERMINE TOP OF
FOUNDATION ELEVATIONS.
14. RETAINING WALLS ON THE INDIVIDUAL LOTS MAY BE NECESSARY TO
MEET THE LOT GRADING REQUIRMENTS.
15. BASEMENTS WILL NOT BE ALLOWED ON THIS SITE DUE TO HIGH
GROUNDWATER.
OUTFALL CURB & GUTTER
CURB TRANSITION
(CATCH TO OUTFALL)
3' TRANSITION TO 0" CURB FACECF
10' TRANSITION (ROLLOVER TORVVERTICAL CURB AND GUTTER)
LEGEND
NOTES
4981
2' CURB CUT W/1' TRANSITIONCCSEE SHEET DT05 FOR DETAIL
2' CURB CHANNELCHSEE SHEET DT05 FOR DETAIL
CONCRETE SIDEWALK
SEE SHEET DT05 FOR DETAIL
SIDEWALK CHASESCSEE SHEET DT05 FOR DETAIL
FLOW LINE
FINISH SURFACE
FL
FS
MOUNTAIN GRANITE RIP RAP
PROPERTY BOUNDARY
EASEMENT LINE
CENTERLINE
LOT BOUNDARY
CONCRETE SIDEWALK CULVERTCUSEE SHEET DT05 FOR DETAIL 12B
NEWLY PROPOSED SPOT ELEVATION
FOR REVISIONS TO SITE
39.
7
6
(SEE LANDSCAPE PLANS)
NOT SHOWN FOR CLARITY
FUTURE GRADING DETAIL
SCALE: 1" =20'
24
0 20'40'
SCALE: 1" = 20'
10'
NORTH
RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
SM
E
10
/
2
2
/
1
9
RE
C
O
R
D
D
R
A
W
I
N
G
S
82.
2
0
AS-BUILT SPOT ELEVATION
4980
4981 1' MINOR DESIGN CONTOUR
5' MAJOR DESIGN CONTOUR
4980
4981 1' MINOR AS-BUILT CONTOUR
5' MAJOR AS-BUILT CONTOUR
LEGEND
GREEN LEAF ST.
UR
B
A
N
P
R
A
I
R
I
E
S
T
.
(PRIVATE DRIVE)
(P
R
I
V
A
T
E
D
R
I
V
E
)
83.
8
0
83.
8
9
83.
8
8
83.
8
0
83.
6
2
83.
5
5
83.
4
2
83.
3
6
83.
3
0
83.
8
0
83.
8
9
83.
3
1
L
P
2' C
U
R
B
C
U
T
83.
1
5
BIORETENTION
AREA = 180 SF
ELEVATION = 4983.15
83.
4
9
1' C
U
R
B
C
U
T
83.
4
1
83.
3
9
83.
4
7
84.
0
3
84.
4
3
84.
5
2
84.
5
2
84.
4
3
83.
0
9
83.
2
1 83.
1
5
83.
1
1
83.
1
1
84.
0
3
84.
4
8
84.
5
4
84.
1
3
L
P
84.
1
8
84.
4
8
84.
2
4
84.
5
2
F
S
84.
0
2
F
L
84.
5
0
F
S
83.
9
9
F
L
84.
5
2
84.
6
2
84.
5
7
2' C
U
R
B
C
U
T
BIORETENTION
AREA = 70 SF
ELEVATION = 4983.93
GREEN LEAF ST.
(PRIVATE DRIVE)
84.
1
0
84.
0
3
84.
0
5
83.
9
584.
8
7
84.
4
4
84.
6
5
85.
1
2
85.
1
7
84.
9
2
84.
3
6
L
P
84.
3
8
1' C
U
R
B
C
U
T
84.
6
9
84.
7
6
SM
E
P:
\
U
1
3
0
0
3
-
R
E
V
I
V
E
\
C
A
D
D
\
C
P
\
A
S
-
B
U
I
L
T
S
CP
G
R
0
1
-
0
4
.
D
W
G
NO
N
E
10
/
2
8
/
1
9
5:
4
2
:
4
6
P
M
RV
U
24
X
3
6
N
,
E
X
P
N
,
E
X
M
A
,
e
x
t
o
,
E
X
L
S
,
E
X
U
T
,
p
r
p
n
,
P
R
U
T
,
p
r
m
a
,
K
E
Y
M
A
P
-
G
R
,
p
r
t
o
p
t
,
T
y
p
i
c
a
l
S
e
c
t
i
o
n
s
,
p
r
t
o
-
d
e
t
a
i
l
,
P
R
T
O
-
F
U
T
U
R
E
,
P
R
T
O
,
I
M
A
G
E
S
:
1
9
.
t
i
f
,
2
0
.
t
i
f
,
2
1
.
t
i
f
,
2
2
.
t
i
f
GR
A
D
I
N
G
D
E
T
A
I
L
S
F
O
R
B
I
O
R
E
T
E
N
T
I
O
N
A
R
E
A
S
GR04
N/A
20'
DR
A
W
I
N
G
N
A
M
E
:
PR
O
J
.
M
G
R
:
PA
T
H
:
DA
T
E
:
SE
R
V
E
R
:
DE
S
I
G
N
E
R
:
TI
M
E
:
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
f
o
r
,
o
r
li
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
p
l
a
n
s
.
A
l
l
ch
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
m
u
s
t
b
e
a
p
p
r
o
v
e
d
b
y
th
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
RE
V
I
V
E
P
R
O
P
E
R
T
I
E
S
L
L
C
9/
7
/
2
0
1
4
UN
I
O
N
P
L
A
C
E
40
U13003
1" =
1" =VERTICAL:
HORIZONTAL:
SCALE
Civil Engineering & Consulting
1501 Academy Court, Suite 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
UNITED CIVIL
Design Group
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
PROPOSED STORM DRAIN
MANHOLE
PROPOSED STORM PIPE
4980
EXISTING OR ORIGINALLY PROPOSED
SPOT ELEVATION
EXISTING STORM PIPE
1. THE EXACT BUILDING FOOTPRINTS ARE UNKNOWN AT THIS TIME,
THEREFORE TOP OF FOUNDATION AND FINISHED FLOOR ELEVATIONS
HAVE NOT BEEN SHOWN FOR THE COMMERCIAL AND MULTI-FAMILY
LOTS. INDIVIDUAL GRADING PLANS FOR THESE LOTS SHALL BE
PREPARED AND APPROVED BY THE CITY FOR EACH INDIVIDUAL LOT
PRIOR TO RECEIVING A BUILDING PERMIT. SEE NOTES 12 AND 13 FOR
MORE INFORMATION.
2. ALL SPOT ELEVATIONS ARE TO FLOW LINE OR FINISHED GRADE
UNLESS OTHERWISE NOTED.
3. ALL SPOT ELEVATIONS ARE OF THE ELEVATION 49XX.XX.
4. HANDICAP RAMPS SHALL NOT EXCEED 8.33% SLOPE (1:12).
SIDEWALKS IN GENERAL SHALL NOT EXCEED 5.00% SLOPE (1:20)
UNLESS NECESSARY IN WHICH CASE THEY SHALL NOT EXCEED 8.33%
SLOPE (1:12). WHERE SIDEWALKS ARE OF SUCH A SLOPE THAT SPECIAL
REQUIREMENTS NEED TO BE ADDRESSED FOR HANDICAP
CONSIDERATION THE CONTRACTOR SHALL COMPLY WITH APPLICABLE
CODES.
5. (MINIMUM) THE FINISHED GRADE SHALL SLOPE AWAY FROM THE
BUILDING AT A MIN. 2% TOWARDS SWALES OR OVER CURB TO PAVED
AREAS.
6. DEVELOPER SHALL VERIFY POSITION OF BUILDING STAIRS &
OPENINGS PRIOR TO CONSTRUCTING ADJOINING SIDEWALKS.
7. REFER TO GENERAL NOTES FOR ALL OTHER APPLICABLE
INFORMATION.
8. MAXIMUM SLOPE AT HANDICAPPED PARKING STALLS IS 2% IN ANY
DIRECTION.
9. CONTRACTOR TO FIELD VERIFY EXISTING ELEVATIONS SHOWN AT TIE
IN POINTS. CONTRACTOR TO NOTIFY ENGINEER IF ELEVATIONS VARY
FROM THAT SHOWN ON PLAN.
10. CONTRACTOR TO ADJUST STORM GRATES AS NECESSARY TO
PROPOSED TOP OF GRADE.
11. IF REQUESTED ENGINEER WILL FURNISH THE CONTRACTOR
AUTOCAD COMPATIBLE FILES.
12. THE TOP OF FOUNDATION (T.O.F.) ELEVATIONS AND FINISHED FLOOR
(F.F.) ELEVATIONS SHALL BE DESIGNED TO BE AT LEAST 12" ABOVE THE
100 YEAR STORM EVENT. THE BUILDINGS ALONG WEST WILLOX LANE
SHALL HAVE THE T.O.F. AND F.F. ELEVATED AT LEAST 14" ABOVE THE
ADJACENT WEST WILLOX LANE SIDEWALK.
13. STANDARD CITY OF FORT COLLINS TYPE "B" LOT GRADING PLANS
SHOWN ON SHEET DT06 SHALL ALSO BE USED TO DETERMINE TOP OF
FOUNDATION ELEVATIONS.
14. RETAINING WALLS ON THE INDIVIDUAL LOTS MAY BE NECESSARY TO
MEET THE LOT GRADING REQUIRMENTS.
15. BASEMENTS WILL NOT BE ALLOWED ON THIS SITE DUE TO HIGH
GROUNDWATER.
OUTFALL CURB & GUTTER
CURB TRANSITION
(CATCH TO OUTFALL)
3' TRANSITION TO 0" CURB FACECF
10' TRANSITION (ROLLOVER TORVVERTICAL CURB AND GUTTER)
LEGEND
NOTES
4981
2' CURB CUT W/1' TRANSITIONCCSEE SHEET DT05 FOR DETAIL
2' CURB CHANNELCHSEE SHEET DT05 FOR DETAIL
CONCRETE SIDEWALK
SEE SHEET DT05 FOR DETAIL
SIDEWALK CHASESCSEE SHEET DT05 FOR DETAIL
FLOW LINE
FINISH SURFACE
FL
FS
MOUNTAIN GRANITE RIP RAP
PROPERTY BOUNDARY
EASEMENT LINE
CENTERLINE
LOT BOUNDARY
CONCRETE SIDEWALK CULVERTCUSEE SHEET DT05 FOR DETAIL 12B
NEWLY PROPOSED SPOT ELEVATION
FOR REVISIONS TO SITE
39.
7
6
(SEE LANDSCAPE PLANS)
NOT SHOWN FOR CLARITY
GREEN LEAF ST (EAST)
BIORETENTION AREA
GREEN LEAF ST (WEST)
BIORETENTION AREA
(ON-SITE PRIVATE DETAIL)(ON-SITE PRIVATE DETAIL)
25
0 10'20'
SCALE: 1" = 10'
5'
NO
R
T
H
NOTES:
1.CONTRACTOR SHALL PLACE HDPE IMPERVIOUS MEMBRANE ON BOTH SIDES OF BIORETENTION
AREA ADJACENT TO GREENLEAF STREET. BIORETENTION AREAS WITHIN THE DETENTION POND
WILL NOT REQUIRE THE HDPE MEMBRANE.
2. PERFORATED PVC UNDERDRAIN PIPES ARE NOT NEEDED FOR THIS PROJECT.
ELEVATION AS SHOWN
ON PLANS
1
1
1
1
1
SM
E
10
/
2
2
/
1
9
RE
C
O
R
D
D
R
A
W
I
N
G
S
RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
82.
2
0
AS-BUILT SPOT ELEVATION
4980
4981 1' MINOR DESIGN CONTOUR
5' MAJOR DESIGN CONTOUR
4980
4981 1' MINOR AS-BUILT CONTOUR
5' MAJOR AS-BUILT CONTOUR
LEGEND
49
8
2
.
1
8
49
8
0
.
1
7
49
8
2
.
4
6
49
7
8
.
9
2
49
7
8
.
5
7
49
7
7
.
8
2
0.90%
1.15%
49
7
6
.
8
4
49
7
6
.
7
4
0.10%
(V
E
R
I
F
I
E
D
)
(V
E
R
I
F
I
E
D
)
RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
SM
E
10
/
2
2
/
1
9
RE
C
O
R
D
D
R
A
W
I
N
G
S
49
8
1
.
6
8
49
7
9
.
1
0
0.21%
49
7
7
.
6
1
2.22%
49
7
9
.
0
3
49
8
1
.
4
0
49
7
8
.
2
5
49
7
8
.
2
5
49
8
1
.
6
7
49
7
9
.
6
5
49
7
8
.
4
0
49
7
8
.
6
0
0.42%
49
8
2
.
6
8
49
7
9
.
3
5
49
7
9
.
3
5
1.59%
0.32%
(V
E
R
I
F
I
E
D
)
(S
I
N
G
L
E
C
O
M
B
O
IN
L
E
T
I
N
S
T
A
L
L
E
D
)
(V
E
R
I
F
I
E
D
)
RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
SM
E
10
/
2
2
/
1
9
RE
C
O
R
D
D
R
A
W
I
N
G
S
URBAN PRAIRIE ST. (PRIVATE DRIVE)
(P
R
I
V
A
T
E
D
R
I
V
E
)
GREEN LEAF ST. (PRIVATE DRIVE)
PR
I
V
A
T
E
D
R
I
V
E
BL
U
E
S
U
N
S
T
.
PRIVATE DRIVE
CE
D
A
R
S
T
.
PR
I
V
A
T
E
D
R
I
V
E
TRACT B
TR
A
C
T
G
TR
A
C
T
I
TRACT J
TR
A
C
T
H
LO
T
1
A
*
BL
O
C
K
5
LO
T
1
B
BL
O
C
K
5
LO
T
1
C
*
BL
O
C
K
5
LO
T
1
D
BL
O
C
K
5
LO
T
1
E
BL
O
C
K
5
LO
T
1
F
*
BL
O
C
K
5
LO
T
1
G
BL
O
C
K
5
LO
T
1
H
*
BL
O
C
K
5
LO
T
1
A
*
BL
O
C
K
4
LO
T
1
B
BL
O
C
K
4
LO
T
1
C
*
BL
O
C
K
4
LO
T
1
D
BL
O
C
K
4
LO
T
1
E
*
BL
O
C
K
4
LO
T
1
F
BL
O
C
K
4
LO
T
1
G
BL
O
C
K
4
LO
T
1
H
*
BL
O
C
K
4
LO
T
1
I
BL
O
C
K
4
LO
T
1
J
*
BL
O
C
K
4
LO
T
1
K
BL
O
C
K
4
LO
T
1
L
*
BL
O
C
K
4
LO
T
2
A
*
BL
O
C
K
4
LO
T
2
B
BL
O
C
K
4
LO
T
2
C
*
BL
O
C
K
4
LO
T
2
D
BL
O
C
K
4
LO
T
2
E
*
BL
O
C
K
4
LO
T
2
F
BL
O
C
K
4
LO
T
2
G
*
BL
O
C
K
4
LOT 2A*
BLOCK 2
LOT 2B
BLOCK 2
LOT 2C*
BLOCK 2
LOT 2D
BLOCK 2
LOT 2E*
BLOCK 2
LOT 1A*
BLOCK 2
LOT 1B
BLOCK 2
LOT 1C*
BLOCK 2
LOT 1D
BLOCK 2
LOT 1E*
BLOCK 2
85.
0
8
85.
1
1
85.
0
0
84.
8
9
84.
7
8
84.
6
8
84.
5
7
84.
4
6
84.
3
5
84.
2
4
84.
1
4
84.
0
3
83.
9
2
83.
8
9
84
.
8
7
84
.
7
0
84
.
6
0
84
.
4
9
84
.
3
8
84
.
2
7
84
.
1
6
84
.
0
6
83
.
9
5
83
.
8
7
83
.
9
8
84
.
2
1
84
.
4
5
84.8
7
84.6
9
84.5
7
84
.
4
5
84.3
3
84.2
1
84.0
9
83.8
7
85.
5
5
85.
6
1
85.
5
1
85.
4
1
85.
2
8
85.
1
5
85.
0
2
84.
7
8
85.7
9
85.7
0
85.6
0
85.5
1
85.4
2
85.3
3
85.2
4
85.1
4
85.0
5
86
.
4
8
86
.
3
8
86
.
2
8
86
.
1
8
86
.
0
8
85
.
9
8
85
.
8
8
85
.
7
8
85
.
6
7
LOCATION OF
FFE STEP
LOCATION OF
FFE STEP
LOCATION OF
FFE STEP
RA
M
P
RA
M
P
RA
M
P
RA
M
P
RA
M
P
RA
M
P
RA
M
P
RA
M
P
RAMP
85.
1
8
85.
2
0
85.
2
6
85.
1
4
84.
7
7
86.
2
4
86.
0
3
85.
8
2
86.
0
4
85.
8
4
85.
5
1
85.
6
4
85.
5
8
85.
5
5
85.
5
1
85.
9
6
85.
8
9
85.
8
0
85.
7
1
85.
6
0
LOT 3
BLOCK 5
LOT 2
BLOCK 5
LOT 1
BLOCK 3
LOT 2
BLOCK 3
LOT 3
BLOCK 3
LOT 4
BLOCK 3
LOT 5
BLOCK 3
LOT 6
BLOCK 3
LOT 7
BLOCK 3
LOT 8
BLOCK 3
LOT 1
BLOCK 1
LOT 2
BLOCK 1
LOT 3
BLOCK 1
LOT 4
BLOCK
1
LOT
5
BLOC
K
1
LOT
6
BLO
C
K
1
LO
T
7
BL
O
C
K
1
TRACT A
TRACT D
TRA
C
T
K
TRACT N
TRACT O
TRACT M
TRACT M
TRACT M
TRACT M
TR
A
C
T
M
TRACT Q
TR
A
C
T
Q
TRACT C
NOT INCLUDED
NOT
INCLUDED
NOT INCLUDED
TRACT M
TRACT M
NOT INCLUDED
TRACT Q NOT INCLUDED
TR
A
C
T
C
TR
A
C
T
C
NO
T
I
N
C
L
U
D
E
D
TR
A
C
T
L
2' CURB CUT
84.4
7
84
.
4
7
85.
2
3
2' CURB CUT
2' CURB CUT
85
.
7
2
84
.
1
4
83.
8
9
85.
0
9
86.
0
9
85.
0
8
BIORETENTION AREA PER MINOR
AMENDMENT PLANS DATED 3/12/14
BIORETENTION AREA PER MINOR
AMENDMENT PLANS DATED 3/12/14
PRIVATE DRIVE
EXISTING POROUS PAVERS (TYP.)
BIORETENTION AREA
(SEE DETAIL SHEET C800)
82.
8
1
82.
2
4
82.
2
4
82.
2
4
83.2
5
83.6
7
83.3
6
82.
9
8
82.
9
3
82.
8
1
82.
8
4
CONCRETE SIDEWALK
CULVERT (SEE DETAIL
SHEET C800)
FOREBAY (SEE
DETAIL SHEET C800)
81.
7
0
1.0%
82.
7
5
83.46
83.45
82.
4
5
82.
4
5
82.
4
5
83.69
83.69
83.66
83.66
EXISTING POROUS PAVERS (TYP.)
FOREBAY (SEE DETAIL SHEET C800)
MOUNTAIN GRANITE
RIP RAP SWALE (TYP.)
FOREBAY DRAIN PIPE:
10 LF 4" PVC PERFORATED
PIPE 12" BELOW GRADE
FOREBAY DRAIN PIPE:
10 LF 4" PVC PERFORATED
PIPE 12" BELOW GRADE
SEE DETAIL 4
ON SHEET C800
FOR DRAINAGE
SWALE SECTION
83.
2
8
83.
2
4
83.
0
6
83.
2
3
83.3
1
83.3
2
82.
6
0
82.
9
3
83.3
7
82.
5
7
82.
3
8
83.
4
2
82.
3
4
82.
7
2
82.
9
5
81.7
0
85.
9
7
86.
0
8
86.
1
0
86.
0
5
85.
5
4
85.
8
3
86.
2
8
86.
5
3
86.
3
1
85.
9
2
85.
0
8
85.
1
1
85.
4
1
85.
7
0
85.
7
4
85.
5
4
85.
6
5
85.
3
7
85.
7
7
86.
0
7
84.
8
3
84.
9
5
85.
1
6
86.
0
5
85.
9
5
86.
1
9
1.4
%
1.
7
%
3.
2
%
85.
6
8
85.
7
5
85.
5
0
85.
0
4
85.
2
9
85.
3
4
85.
7
3
85.
7
5
85.
7
5
85.
5
0
85.
0
1
85.
2
1
85.
3
3
83.
9
3
84.
4
5
85.
0
3
85.
4
5
85.
4
5
84.
5
3
84.
5
4
4.6%
5.4%
2.1%
3.4%
2.9%
2.4%
2.
5
%
85.
0
4
85.
0
7
86.
8
2
86.
1
7
86.
4
3
86.
6
9
86.
5
5
86.
8
6
86.
5
2
85.
7
9 85.
6
8
86.
5
7
2.
4
%
1.
0
%
4.
9
%
7.3%
3.9%
1.6%
3.8%
4.6
%
5.7%
15.8%
85.
2
2
84.
8
0
85.
3
0
85.
1
7
84.
2
3
84.
0
8
83.
8
8
83.
7
2
83.
5
6
82.
9
7
82.
4
5 82.
5
0
82.
5
1
84.
1
8
84.
3
5
83.
5
8
82.
5
1
DR
A
W
I
N
G
N
A
M
E
:
PR
O
J
.
M
G
R
:
PA
T
H
:
DA
T
E
:
SE
R
V
E
R
:
DE
S
I
G
N
E
R
:
TI
M
E
:
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
f
o
r
,
o
r
li
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
p
l
a
n
s
.
A
l
l
ch
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
m
u
s
t
b
e
a
p
p
r
o
v
e
d
b
y
th
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
RE
V
I
V
E
P
R
O
P
E
R
T
I
E
S
L
L
C
6/
2
/
2
0
1
5
UN
I
O
N
P
L
A
C
E
S
U
B
D
I
V
I
S
I
O
N
S
E
C
O
N
D
F
I
L
I
N
G
8
U13003
1" =
1" =VERTICAL:
HORIZONTAL:
SCALE
Civil Engineering & Consulting
1501 Academy Court, Suite 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
UNITED CIVIL
Design Group
SM
E
NO
N
E
P:
\
U
1
3
0
0
3
-
R
E
V
I
V
E
\
C
A
D
D
\
C
P
\
A
S
-
B
U
I
L
T
S
C4
0
0
_
G
R
A
D
I
N
G
P
L
A
N
.
D
W
G
10
/
2
9
/
2
0
1
9
12
:
3
9
:
4
1
P
M
SM
E
G
R
A
D
I
N
G
P
L
A
N
C400
N/A
20'
1.EXISTING UNDERGROUND AND OVERHEAD
PUBLIC AND PRIVATE UTILITIES AS SHOWN
ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE
ENGINEER.
2.THE EXACT BUILDING FOOTPRINTS ARE
UNKNOWN AT THIS TIME, THEREFORE TOP
OF FOUNDATION AND FINISHED FLOOR
ELEVATIONS HAVE NOT BEEN SHOWN FOR
THE COMMERCIAL AND MULTI-FAMILY LOTS.
INDIVIDUAL GRADING PLANS FOR THESE
LOTS SHALL BE PREPARED AND APPROVED
BY THE CITY FOR EACH INDIVIDUAL LOT
PRIOR TO RECEIVING A BUILDING PERMIT.
SEE NOTES 12 AND 13 FOR MORE
INFORMATION.
3.ALL SPOT ELEVATIONS ARE TO FLOW LINE
OR FINISHED GRADE UNLESS OTHERWISE
NOTED.
4.ALL SPOT ELEVATIONS ARE OF THE
ELEVATION 49XX.XX.
5.HANDICAP RAMPS SHALL NOT EXCEED
8.33% SLOPE (1:12). SIDEWALKS IN
GENERAL SHALL NOT EXCEED 5.00%
SLOPE (1:20) UNLESS NECESSARY IN WHICH
CASE THEY SHALL NOT EXCEED 8.33%
SLOPE (1:12). WHERE SIDEWALKS ARE OF
SUCH A SLOPE THAT SPECIAL
REQUIREMENTS NEED TO BE ADDRESSED
FOR HANDICAP CONSIDERATION THE
CONTRACTOR SHALL COMPLY WITH
APPLICABLE CODES.
6.(MINIMUM) THE FINISHED GRADE SHALL
SLOPE AWAY FROM THE BUILDING AT A MIN.
2% TOWARDS SWALES OR OVER CURB TO
PAVED AREAS.
7.DEVELOPER SHALL VERIFY POSITION OF
BUILDING STAIRS & OPENINGS PRIOR TO
CONSTRUCTING ADJOINING SIDEWALKS.
8.REFER TO GENERAL NOTES FOR ALL
OTHER APPLICABLE INFORMATION.
9.CONTRACTOR TO FIELD VERIFY EXISTING
ELEVATIONS SHOWN AT TIE IN POINTS.
CONTRACTOR TO NOTIFY ENGINEER IF
ELEVATIONS VARY FROM THAT SHOWN ON
PLAN.
10.IF REQUESTED ENGINEER WILL FURNISH
THE CONTRACTOR AUTOCAD COMPATIBLE
FILES.
11. THE TOP OF FOUNDATION (T.O.F.)
ELEVATIONS AND FINISHED FLOOR (F.F.)
ELEVATIONS SHALL BE DESIGNED TO BE AT
LEAST 12" ABOVE THE 100 YEAR STORM
EVENT. THE BUILDINGS ALONG WEST
WILLOX LANE SHALL HAVE THE T.O.F. AND
F.F. ELEVATED AT LEAST 14" ABOVE THE
ADJACENT WEST WILLOX LANE SIDEWALK.
12.BASEMENTS WILL NOT BE ALLOWED ON
THIS SITE DUE TO HIGH GROUNDWATER.
13.LOTS DESIGNATED WITH AN "*" ARE
DESIGNATED AS ACCESSIBLE UNITS.
REFER TO THE ARCHITECTURAL PLANS FOR
ADDITIONAL INFORMATION.
NOTES
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
CALL 2 BUSINESS DAYS IN ADVANCE
BEFORE YOU DIG, GRADE OR EXCAVATE
FOR THE MARKING OF UNDERGROUND
MEMBER UTILITIES.
0 20'40'
SCALE: 1" = 20'
10'
NO
R
T
H
LOT LINES / R.O.W.
EASEMENT LINES
CENTERLINE
EXISTING CURB & GUTTER
LEGEND
5124
5124
PROPOSED 1' CONTOUR
EXISTING 1' CONTOUR
SIDEWALK CHASE
90.
3
0
PROPOSED SPOT
ELEVATION
FF=FINISHED FLOOR
FG=FINISHED GRADE AT
EXTERIOR WALL
TOW=TOP OF WALL
LP=LOW POINT
HP=HIGH POINT
5
90
.
3
0
EXISTING SPOT
ELEVATION
MOUNTAIN GRANITE RIP RAP
(SEE LANDSCAPE PLANS)
85.
9
2
AS-BUILT SPOT
ELEVATION
AS-BUILT LEGEND
5124 AS-BUILT 1' CONTOUR
DESIGN 1' CONTOUR5124
SM
E
10
/
2
2
/
1
9
RE
C
O
R
D
D
R
A
W
I
N
G
S
RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
PROJECT NAME Union Place
PROJECT NUMBER U13003
CALCULATED BY SME
Delta Volume = (d/3)(A1+A2+(A1*A2)0.5)
Basin P1 Basin P2 Basin P3 Total
Elevation d Delta Volume
ft ft ft 2 ft 2 ft 2 ft 2 ft 3 ft 3 acre-ft
4976.8
4978.76 0 41,100 17,777 32 58,909 0 0 0.00
4979.00 0.24 43,557 18,539 508 62,604 14579 14,579 0.33
4980.00 1.00 49,283 22,088 2,983 74,354 68395 82,974 1.90
4980.05 0.05 49,536 22,088 2,983 74,607 3724 86,698 1.99 spill
4981.00 1.00 54,350 30,813 85,163 79697 162,672 3.73
4981.30 0.30 55,866 32,727 88,593 26062 188,733 4.33
4982.30
Delta Volume = (d/3)(A1+A2+(A1*A2)0.5)
Scenario #1 - Does not include basin P3
Basin P1 Basin P2 Basin P3 Total
Elevation d Delta Volume
ft ft ft 2 ft 2 ft 2 ft 2 ft 3 ft 3 acre-ft
4976.8 0 1 1 0 0 0.00
4977.0 0.2 15 882 897 62 62 0.00
4978.0 1 30,216 15,327 45,543 17611 17,672 0.41
4978.76 0.76 41,100 17,777 58,877 39571 57,244 1.31
4979.0 0.24 43,557 18,539 62,096 14515 71,759 1.65
4980.0 1 49,283 22,088 71,371 66680 138,438 3.18
4981.0 1 54,350 30,813 85,163 78166 216,604 4.97
4981.3 0.3 55,866 32,727 88,593 26062 242,666 5.57
Scenario #2 - Does include basin P3
Basin P1 Basin P2 Basin P3 Total
Elevation d Delta Volume
ft ft ft 2 ft 2 ft 2 ft 2 ft 3 ft 3 acre-ft
4976.8 0 0 0 0 0.00
4977.0 0.2 15 882 897 60 60 0.00
4978.0 1 30,216 15,327 0 45,543 17611 17,670 0.41
4978.76 0.76 41,100 17,777 32 58,909 39583 57,253 1.31
4979.0 0.24 43,557 18,539 508 62,604 14579 71,833 1.65
4980.0 1 49,283 22,088 2,983 74,354 68395 140,227 3.22
4981.0 1 54,350 30,813 85,163 79697 219,925 5.05
4981.3 0.3 55,866 32,727 88,593 26062 245,986 5.65
Detention Pond Volume and Depth (provided above elevation 4978.76)
Elevation Area Cumulative Volume
Bottom of Regional Pond
Top of Berm
Detention Pond As-Built Volume Calculations - POND P
Elevation Area Cumulative Volume
Regional Detention Pond Volume and Depth (provided above elevation 4976.8)
Elevation Area Cumulative Volume
Note: The initial elevation 4978.76 was based on the invert of the existing outlet pipe. This would have been bottom elevation for Pond P1
if temporary retention was not present. The volumes shown above have been revised from the original report and are based off of as-built
survey information.
Pond As-built Volumes.xls, pond p - asbuilt
10/29/2019,7:54 AM
P:
\
U
1
3
0
0
3
-
R
E
V
I
V
E
\
C
A
D
D
\
E
T
\
D
E
T
E
N
T
I
O
N
P
O
N
D
E
X
H
I
B
I
T
.
D
W
G
DE
T
E
N
T
I
O
N
P
O
N
D
E
X
H
I
B
I
T
PA
T
H
:
DR
A
W
I
N
G
N
A
M
E
:
SH
E
E
T
S
I
Z
E
:
8
.
5
x
1
1
UNION PLACE
DETENTION POND EXHIBIT
JOB NUMBER:U13003DATE:December 10, 2018 PREPARED FOR:REVIVE PROPERTIES, LLC NO
T
E
:
TH
I
S
E
X
H
I
B
I
T
W
A
S
P
R
E
P
A
R
E
D
F
O
R
I
N
F
O
R
M
A
T
I
O
N
O
N
L
Y
A
N
D
T
H
E
E
N
G
I
N
E
E
R
P
R
E
P
A
R
I
N
G
T
H
E
S
E
P
L
A
N
S
W
I
L
L
N
O
T
B
E
R
E
S
P
O
N
S
I
B
L
E
F
O
R
U
N
A
U
T
H
O
R
I
Z
E
D
U
S
E
O
F
T
H
E
M
.
1501 ACADEMY COURT, SUITE 203 FORT COLLINS, CO 80524
(970) 530-4044 WWW.UNITEDCIVIL.COM
SHEET OF1 1
UNITED CIVIL
Design Group LLC
18" OUTLET PIPE
ELEV = 76.80
FUTURE OUTLET PIPE
MC'D'S
OUTLET
STRUCTURE
INCREMENTAL VOLUME = 1.31 AC-FT
INCREMENTAL VOLUME = 2.09 AC-FT
INCREMENTAL VOLUME = 1.28 AC-FT
INCREMENTAL VOLUME = 0.97 AC-FT
ELEV = 82.30
TOP OF BERM
ELEV = 80.10
TOTAL VOLUME = 3.40
ELEV = 80.80
TOTAL VOLUME = 4.68
ELEV = 81.30
TOTAL VOLUME = 5.65
MAXIMUM REGIONAL 100-YEAR WATER SURFACE
ELEV = 78.76
TOTAL VOLUME = 1.31
PROPOSED OUTLET WALL
1.99 AC-FT
1.38 AC-FT
80.05 3.30
UPDATED FOR AS-BUILT CONDITIONS - 10/28/2019
PROJECT NAME Union Place
PROJECT NUMBER U13003
CALCULATED BY SME
Delta Volume = (d/3)(A1+A2+(A1*A2)0.5)
d = depth between elevations
A1 = Area of Previous Elevation, ft2
A2 = Area of Current Elevation, ft2
Elevation d Elevation Area Delta Volume
ft ft ft 2 ft 3 ft 3 acre-ft
4985.07 0 0 0 0 0.00
4985.20 0.13 120 5 5 0.00
4985.40 0.20 810 83 88 0.00
4985.60 0.20 1,830 257 345 0.01
4985.80 0.20 2,970 475 821 0.02
4985.99 0.19 4,210 679 1,499 0.03
Detention Pond Volume and Depth
Cumulative Volume
Detention Pond As-built Calculations - POND C1
Pond As-built Volumes.xls, pond C1-asbuilt
10/29/2019,7:51 AM
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Oct 22 2019
Culvert Report: SD-03
Invert Elev Dn (ft)= 4979.03
Pipe Length (ft)= 34.00
Slope (%)= 0.21
Invert Elev Up (ft)= 4979.10
Rise (in)= 18.0
Shape = Circular
Span (in)= 18.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Concrete
Culvert Entrance = Square edge w/headwall (C)
Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5
Embankment
Top Elevation (ft)= 4982.00
Top Width (ft)= 20.00
Crest Width (ft)= 0.00
Calculations
Qmin (cfs)= 1.98
Qmax (cfs)= 1.98
Tailwater Elev (ft)= Critical
Highlighted
Qtotal (cfs)= 1.98
Qpipe (cfs)= 1.98
Qovertop (cfs)= 0.00
Veloc Dn (ft/s)= 3.55
Veloc Up (ft/s)= 3.55
HGL Dn (ft)= 4979.56
HGL Up (ft)= 4979.63
Hw Elev (ft)= 4979.84
Hw/D (ft)= 0.49
Flow Regime = Inlet Control
Project:
Inlet ID:
Gutter Geometry (Enter data in the blue cells)
Maximum Allowable Width for Spread Behind Curb TBACK =0.0 ft
Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =ft/ft
Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.013
Height of Curb at Gutter Flow Line HCURB =6.00 inches
Distance from Curb Face to Street Crown TCROWN =25.0 ft
Gutter Width W =2.00 ft
Street Transverse Slope SX =0.007 ft/ft
Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft
Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft
Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013
Minor Storm Major Storm
Max. Allowable Spread for Minor & Major Storm TMAX =21.0 ft
Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 inches
Check boxes are not applicable in SUMP conditions
MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm
MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP cfs
Version 4.05 Released March 2017
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)
(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
Union Place - Revive
Inlet SDI-G1
Inlet Calcs_SDI-G1, Inlet SDI-G1 10/21/2019, 12:18 PM
Design Information (Input)MINOR MAJOR
Type of Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches
Number of Unit Inlets (Grate or Curb Opening)No =1 1
Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo (G) =3.00 3.00 feet
Width of a Unit Grate Wo =1.73 1.73 feet
Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43
Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50
Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30
Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet
Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches
Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches
Angle of Throat (see USDCM Figure ST-5)Theta =0.00 0.00 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet
Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66
Low Head Performance Reduction (Calculated)MINOR MAJOR
Depth for Grate Midwidth dGrate =0.523 0.523 ft
Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft
Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.94 0.94
Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00
Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.94 0.94
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition)Qa =3.58 3.58 cfs
Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.00 2.08 cfs
CDOT/Denver 13 Combination
INLET IN A SUMP OR SAG LOCATION
Version 4.05 Released March 2017
H-VertH-Curb
W
Lo (C)
Lo (G)
Wo
WP
CDOT/Denver 13 Combination
Override Depths
Inlet Calcs_SDI-G1, Inlet SDI-G1 10/21/2019, 12:18 PM
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Oct 24 2019
Tract K Swale
User-defined
Invert Elev (ft)= 82.56
Slope (%)= 1.04
N-Value = 0.035
Calculations
Compute by:Known Q
Known Q (cfs)= 14.10
(Sta, El, n)-(Sta, El, n)...
( 0.00, 85.36)-(0.01, 84.65, 0.035)-(2.60, 83.86, 0.035)-(6.60, 83.78, 0.035)-(8.60, 83.66, 0.035)-(9.70, 82.56, 0.035)-(10.95, 82.56, 0.035)
-(12.20, 82.56, 0.035)-(13.30, 83.70, 0.035)-(20.00, 84.35, 0.035)-(26.00, 84.66, 0.035)-(26.01, 85.15, 0.035)
Highlighted
Depth (ft)= 1.33
Q (cfs)= 14.10
Area (sqft)= 5.83
Velocity (ft/s)= 2.42
Wetted Perim (ft)= 13.71
Crit Depth, Yc (ft)= 0.89
Top Width (ft)= 12.76
EGL (ft)= 1.42
-5 0 5 10 15 20 25 30 35
Elev (ft)Depth (ft)Section
81.00 -1.56
82.00 -0.56
83.00 0.44
84.00 1.44
85.00 2.44
86.00 3.44
Sta (ft)
Lot 6
FFE = 85.36 Lot 7
FFE =85.15
100-YR WS = 83.89
Section cut looking northwest near the beginning
of swale at the front of the homes.