HomeMy WebLinkAboutSite Certifications - 01/06/2024December 18, 2024
Mr. Wes Lamarque
City of Fort Collins Storm Water Division
700 Wood Street
Fort Collins, CO 80524
(970) 221-6700
Re: Overall Grading Certification for UCHealth-PVH Main Entrance Improvements Project, Fort
Collins, Colorado.
Dear Mr. Lamarque,
The purpose of this letter is to provide the overall site grading and drainage certification for the UCHealth-PVH
Main Entrance Improvements project, located at the PVH Lemay Campus, in Fort Collins, Colorado. The site is
bounded by Lemay Avenue to the west, to the north, and existing residences to the east and south.
Aspen Engineering reviewed the record survey exhibit, prepared by Majestic Surveying, which included survey
asbuilts for storm sewer piping and appurtenances, asbuilt spot elevations, and other pertinent drainage features.
Aspen also visited the project site on December 16, 2024, to visually observe the asbuilt conditions of the site
features in relation to the overall site grading and drainage certification.
For the purpose of this overall site certification, the existing building is not being certified and is not a part of this
certification.
This certification is intended to cover the overall site grading and drainage patterns, and includes the following
attachments:
1) Overall Site and Drainage Certification Checklist
2) As-built survey of storm sewer piping, inlets, manholes, spot elevations, and swales (from Majestic
Surveying)
3) As-built survey Information (from Majestic Surveying -
built/resultant grades of swales and roof drain locations, for grading sheets C-009 and C-010.
4) As-built markups/check-offs for the grading and drainage exhibit sheets/plans, including storm sewer
plan and profile sheets
Grading/StormwaterCertification Accepted
(Certificate of Occupancy Released)
Acceptedby:
Date:
Escrow was held for CO and is now released
weWes Lamarque
Based on the provided record survey (by Majestic Surveying), as well as visual observation by Aspen Engineering
during site visit, Aspen Engineering asserts that the proposed grading appears to meet the intent of the
approved grading and drainage plans for overall site/ project.
Aspen is providing the following as the assessment of the drainage within UCHealth-PVH Main Entrance
Improvements project:
1) The storm sewer system record drawings are provided as an attachment to this certification. The
vast majority of the pipe slopes are over the 0.40% minimum slope. A slope of less than 0.40%
occurred on one storm sewer segment. The upper segment of Storm B, which had a resultant
0.36% slope is within construction
tolerance and is not expected to impact the capacity of the storm sewer system. Please refer to
the storm sewer plan and profile sheets/asbuilts for additional information.
2) The concrete pavement near the egress door, located at the north end of the MRI trailer area, has
relatively flat grades that provide conveyance of storm runoff to the inlet grate (in the concrete
pavement area) as well as allowing overflow to be conveyed southeast and to the area inlet in the
green space area. Aspen brought this item to the attention, and they will work with the
discretion.
3) Aspen noted that minimal ponding may occur in some of the landscape beds, located north and
east of the patio area by the MRI trailer. Runoff from this area is eventually conveyed to the area
inlet in the green space, and positive fall does exist to the inlet.
4) Aspen noted that the curb and gutter on the north side of the median island, located south of the
surgery center doors and southwest of the MRI trailer area is relatively flat and grades varied
slightly from the approved design elevations. However, at time of the site walk, Aspen did not
visually observe any obstructions at the curb cuts or indications that the curb and gutter does not
drain properly to the interior cobble swale. General maintenance will likely be required at the
curb cut locations to keep these areas clear and unobstructed to allow positive conveyance of
runoff to the cobble swale and eventually to the area inlet located within the swale.
5) Aspen noted one ADA stall had flowline elevations along its east side that meet the 2.0%
maximum grade, yet the asbuilt asphalt paving for the unloading area had longitudinal and cross-
slope grades of 4.4% and 3.0%, respectively, therefore, not meeting ADA compliance. Aspen
recommends this single stall have the handicap symbol and striping removed, thus removing it
from ADA status
does not affect the required handicap parking requirements for the project, as more ADA spaces
are provided than required, as verified by BHA design. Should the owners wish to retain this
handicap/ADA space, asphalt will need to be replaced and corrected, which Aspen does not
believe is necessary and would provide for patching that could distract from the aesthetics of the
site.
6) The curb cuts, chases, and sidewalk chases were observed and installation confirmed, with these
items appearing to meet the intent of the approved grading and drainage plans.
7) Aspen noted that the drainage swale along the south side of the property does convey runoff east
and into the existing pond, but that the cobble swale is slightly lower than the new concrete pan
possible that very minimal/slight
ponding may occur at the downstream end of the swale, prior to flows being conveyed east and
into the existing detention pond. This minimal ponding will have little to no impact on the
drainage system, and therefore is not anticipated to cause any issues.
Based on the recorded survey elevations by Majestic Surveying, visual observation, and the above-mentioned
variances/ modifications from the original plans, Aspen Engineering certifies that the grading for UCHealth-PVH
Main Entrance Improvements project, Fort Collins, Colorado, appears to meet the intent of the approved grading
and drainage plan, accepted by the City of Fort Collins.
Please refer to the referenced attachments above for additional details and information relating to the overall site
certification for this project. If you
Sincerely,
John Gooch, PE
Aspen Engineering
Page 1
OVERALL SITE and DRAINAGE CERTIFICATION
Commercial, Multi-Family and Subdivision Certification Form and Checklist
Project Name:
Date:
Building Permit Numbers:
(Commercial or multi-family)
Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as-
built construction to the approved drainage and grading plans, please fill in all applicable items in this
Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be
verified during construction.A copy of the approved grading plan must be submitted with the as-built grading
plan. (As-built elevations must be written in red next to the approved elevations.)
Use “Yes” for items completed as described.
Use “N/A” for items that are not applicable to the site being certified.
If any blanks are “No,” attach an explanation referencing the item number below.
Attach an explanation or description of the as-built condition for any items listed or for anything not listed but
shown on the approved construction plans.
Provide an as-built redline or Mylar drawing with the following:
I. Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7
For multiple detention basins on a site, provide the following for each basin separately:
A.Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and
volume verification calculations for the water quality capture volume and the 100-year detention storage
volume.
1. Detention basin topography was prepared by a professional land surveyor registered in the state
of Colorado.
2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for
proposed and solid lines for as-built).
3. All critical spot elevations as shown on the approved construction plans have been verified and
the as-built elevations are shown on the plan sheet.
4. Stage-storage-discharge tables are provided on a separate document.
5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92-
602(8) is attached and has been uploaded to the Statewide Compliance Portal
(tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include:
a. The cover sheet from the approved drainage report
b. The stamped certification page from the approved drainage report
c. As-built topographic survey
d. Stamped certification page from the Overall Site & Drainage Certification
e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet
1 /19
Page 2
B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is
a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of
the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2%
grade requirement.
1.Low Flow: Choose one of the following detention basin low flow options as applicable:
a. Turf swale for low flow path in detention basin.
There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade
is .
b. Concrete pan for low flow in detention basin.
There is a concrete pan installed that meets the grades as shown on the approved construction
plans. (Show as-built spot elevations.)
c. Soft pan for low flow in detention basin.
Verify and document the soft pan material gradation, trench width and depth - to be verified
during construction by engineer. Picture documentation is preferred or engineer’s statement of
visual inspection and compliance. (Choose one below.)
o There is a soft pan with an underdrain installed that meets the design on the approved
construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations,
bends, cleanouts, etc.)
o There is soft pan installed without an underdrain but there is a type A or B soil. The soil
type must be documented by supplying verification from a registered professional geotechnical
engineer.
NOTE: Spot elevations are to be within 0.2 ft. +/-.
2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown.
Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed
is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re-
graded. Provide documentation if a variance was granted for steeper slopes during the design process.
3.Spillway: The following items must be field verified:
a. The location of the spillway is indicated on the as-built plan.
b. The width of the spillway is indicated on the as-built plan.
c. The elevation(s) of the spillway is shown on the as-built plan.
d. A concrete ribbon defines the location and grade of the spillway.
e. There is downstream scour protection in the spillway as per the construction plans. Indicate
type: (riprap size “D50” gradation and bedding type, geotextile, buried
riprap with inches of bury, etc.).
f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape
features, rocks, etc.
1 /19
Page 3
4.Outlet Structure:
a. The orifice plate for the approved release rate is installed with the correct size and location of
the orifice.
b. The orifice plate for the water quality outlet is installed with the correct hole size, number of
rows and columns of holes.
c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate
so no water ponds in front of the plate.
d. The well screen is the correct material and is installed as shown on the construction plans.
e. 100-year overflow grate elevation is . (Elev. A on detail D-46)
f. The top elevation of the water quality capture volume is . (Elev. B on detail
D-46)
g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the
top and bolted at the bottom.
h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain
runoff water and is sloped at 2% towards outlet.
II. Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0
A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet
or exceed capacity requirements shown in the approved drainage study for this project.
1. All swales are located within the drainage easements as shown on the construction plans.
2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires
longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these
criteria are not met, the certification engineer will write a justification and propose mitigation for each
instance or have the issues corrected. If variances to these criteria have previously been approved and
are shown on the construction plans, no justification is needed.
3. As-built spot elevations on channels/swales are shown that correspond to spot elevations
shown on the approved construction plans.
4. All permanent erosion control measures are installed as shown on the approved construction
plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used
as part of this verification.)
5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the
system. (Pictures at tie-in points suggested.)
6. The minimum freeboard is provided for all channels and swales as shown on the approved
construction plans or as identified in the approved drainage study. (Show the freeboard provided on
the cross-sections as on the construction plan set or attached as separate documentation.)
7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees,
shrubs, sod, etc. infringe on the low flow portion of channels or swales.)
1 /19
Page 4
III. Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0
A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been
verified and meets or exceeds the capacity requirements shown in the approved drainage study for this
project.
1. All storm drain pipe sizes and materials have been verified and are in conformance with the
approved construction plans. (Indicate on the plan and profile sheets that they have been verified.)
Material and size substitutions must be approved prior to installation. If a pipe size or material was
changed during construction, the certification engineer must attach the approval documents or supply
them with this certification. Approval documents must include a calculation documenting the capacity
equivalency (equal or greater) of the substituted size.
2. The longitudinal slope of the pipe is as shown on the approved construction plans. The
acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans
must be justified with capacity calculations on an attached sheet.
3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of
the approved construction plans.
B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the
approved construction plans and construction specifications.
1. The minimum cover requirements for all pipes have been met as shown on the approved
construction plans. These will be called out in critical locations.
2. All encasements and clearances as specified on the approved construction plans have been met.
3. Any specific joint types or construction methods specified on the approved construction plans
have been met. (List on a separate sheet and attach to this certification.)
IV. Concrete Pans - FCSCM Ch. 8, Sec. 2.0
A. Construction/Installation: All concrete pans have been constructed in accordance with the
approved construction plans.
1. The concrete pans are the correct size/width as shown on the approved construction plans.
2. The longitudinal slopes of the pans are as shown on the approved construction plans. The
certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless
a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or
justification by separate document.
3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross-
section is “V” shaped and meets the side slope shown on the detail.)
4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4
inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide
documentation of the reinforcement used if different than shown on the details or on the approved
construction plans.)
5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as-
built drawings.
1 /19
(see letter)
Page 5
V.Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0
A. Construction/Installation: All storm drain inlets have been constructed in accordance with the
approved construction plans and construction specifications.
1. The size and type of inlets are consistent with the inlets shown on the approved construction
plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the
inlet number(s), type and size (length). If the inlet installed is other than the one on the approved
construction plan detail sheet, provide the name and source of the detail with justification for equal or
better capacity.
2. The size of the inlet opening is consistent with the approved detail. (Check height and width.)
3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as
indicated by a spot elevation on the construction plans.
4. The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan
and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide
justification and capacity calculations to show the capacity is not affected or propose mitigation.
5. The as-built size of the inlet box is as shown on the construction plans or an explanation or
justification is attached.
6. All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or
an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER.
VI. Culverts - FCSCM Ch. 9, Sec. 4.0
A. Construction/Installation: All culverts have been constructed and/or installed in accordance with
the approved construction plans and construction specifications.
1. All culvert sizes have been verified as indicated on the as-built construction plans as correct.
2. The culvert material type for all culverts installed is as on the approved construction plans and is
indicated on the as-built plans.
3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built
construction plans.
4. The culvert headwalls or wing walls have been installed as shown on the approved construction
plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to
the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative.
An alternative to consider is a turf reinforcement mat (TRM).
VII. Sub-Drains
A. Construction/Installation: All sub-drains shown on the construction plans have been installed in
accordance with those plans and the construction specifications. Sub-drains installed with the sanitary
sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE:
Indicate any sub-drains installed after the plans were approved on the as-built plans.)
1. The size of the sub-drains are as approved on the construction plans and are indicated on the as-
built plans.
2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are
as indicated on the approved construction plans.
1 /19
Page 6
3. The cover requirements per the construction plans are provided.
4. The cleanouts have been installed at the locations shown on the construction plans and are
accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations
marked.)
5. The backfill materials for sub-drains are as shown on the approved construction plans. (This
includes the type, depth and width.)
6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless
shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material
is accepted only if approved prior to installation.)
VIII. Curb Cuts
A. Construction: All curb cut openings are constructed in accordance with the approved construction
plans and construction specifications.
1. The size (width) of the curb cut opening is as shown on the approved construction plans.
2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth
transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb
cut.
IX. Sidewalk Culverts & Chases
A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the
approved construction plans.
1. The size (width and length) of the culverts are as shown on the approved construction plans.
2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the
detail shown on the approved construction plans or per the City’s detail.
3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the
as-built plans.
4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s
detail.
5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no
obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert.
X. Site Grading - FCSCM Ch. 8
A. Construction: All common open spaces have been graded in accordance with the approved
construction plans.
1. The grading on all common open spaces bordering private lots has been verified as correct and
the as-built rear lot corner elevations have been shown on the as-built plans.
1 /19
Page 7
2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all
common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the
situation for noncompliance and when it may be corrected. An escrow for overlot grading may be
required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site
Certification. It is understood that residential lots will be brought to final grade once the foundation is
backfilled so they may be lower than the plan shows at this Overall Site Certification stage.)
3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction
plans and the slopes are stabilized.
XI. Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0
A. Construction: All permanent erosion control BMPs have been installed per the approved
construction plans.
1. All riprap has been installed in the locations and sizes indicated on the approved construction
plans.
2. All fabric has been installed in the locations and sizes indicated on the approved construction
plans.
a. All fabric was installed per the details on the approved construction plans.
XII. Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0
A. Construction: All construction debris and obstructions of any kind have been removed from
drainage paths.
1. All construction debris has been removed except in staging area(s).
2. All ruts have been smoothed out in all construction areas.
3. All areas needing reseeding have been identified and future stabilization goals have been
coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note
the area needing stabilization in the narrative.
XIII. Certification of LID and Water Quality Facilities - FCSCM Ch. 7
A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and
other items to be verified during construction, along with pictures and other required documentation.
B. Attached is verification of the rain garden and/or sand filter flat surface area(s) and ponding
volume(s). This verification includes survey of critical elevations.
C. Attached is verification of the underground infiltration required volume(s), weir elevations,
orifices, inspection ports and filtering fabric. This verification includes survey of critical elevations.
D. All visible LID design features were verified as part of the engineer's site visit.
1 /19
1 /19 Page 8
XIV. Certification of Other Permanent BMPs
A. The construction of other permanent BMPs not specifically addressed in this certification is in
accordance with the approved plan. This may include grade control structures, rundowns, bridges, stream
access/improvements, etc.
Please specify other permanent BMPs included on this site:
XV. Certification and Erosion Control Measures - FCSCM Ch. 3
A.All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing
this certification there are any erosion control measures still remaining on the site, please note them in
the narrative and verify that they need to remain at this time. If in doubt as to the need for any control
measure, please consult with the Erosion Control Inspector at erosion@fcgov.com.
XVI. Statement of Compliance - FCSCM Ch. 3
A.This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has
visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage
facilities are as described in the above form and in the enclosed as-built plans.
B. Failure to properly disclose all known information could result in the rejection of this certification and
prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates
of Occupancy within this development.
XVII.Signature and Stamp by a Colorado-Registered Professional Engineer
Engineer’s contact information:
Name:
Email:
Phone:
Company:
Address:
PE Stamp
Sign and date over stamp