Loading...
HomeMy WebLinkAboutSite Certifications - 08/29/2023December 8, 2022 Mr. Wes Lamarque City of Fort Collins Storm Water Division 700 Wood Street Fort Collins, CO 80524 (970) 221-6700 Re: Overall Grading Certification for Waters Edge West, Fort Collins, Colorado. Dear Mr. Lamarque, The purpose of this letter is to provide the overall site grading certification for the Waters Edge West project, located west of the Morningstar Way/ Turnberry Road intersection, in Fort Collins, Colorado. The site is bounded by Hearthfire Subdivision to the west, Serramonte Highlands Subdivision to the north, Turnberry Road to the east, and Richards Lake Filing One Subdivision to the south. Aspen Engineering reviewed the multiple record surveys exhibits, prepared by Majestic Surveying, which included survey asbuilts for stormer piping and appurtenances, LID basins, ponds, swales, and LID basins and other pertinent drainage features. Aspen also visited the project site on numerous occasions throughout building and site construction, as well as during the overall site grading certification timeline from July to December of 2022. Aspen noted during its site visit on December 8, 2022, that landscaping continues for the open/green spaces within the development and is on-going at this time. Individual grading certifications are to be completed for each building and townhome building, as they are constructed and completed. For the purpose of this overall site certification, the individual building certifications are not included, and are not a part of this certification. This certification is intended to cover the overall site grading, drainage patterns, and includes the following attachments: 1)Overall Site and Drainage Certification Checklist 2)As-built survey of storm sewer piping, inlets, manholes, LID basins and Ponds, and trickle pan and swales (from Majestic Surveying) 3)As-built LID and Pond survey Information (from Majestic Surveying) with Aspen’s markups for provided as-built volumes w/ LID and Pond Volume Summary Calculations by Aspen Engineering 4)Contractor checklist for LID basins (pictures to be obtained from Connell Resources) Wes Lamarque 8/29/2023 5) As-built markups for the grading and drainage exhibit sheets/plans, including storm sewer plan and profile sheets, and associated drainage detail sheets Based on the provided record surveys (by Majestic Surveying), as well as visual observation by Aspen Engineering during numerous site visits, Aspen Engineering asserts that the proposed grading appears to meet the intent of the approved grading and drainage plans for overall site/ project. Aspen is providing the following as the assessment of the drainage within Waters Edge West project: 1) The storm sewer system record drawings are provided as an attachment to this certification. The vast majority of the pipe slopes are over the 0.40% minimum slope. A slope of less than 0.40% occurred on five storm sewer segments within the development. The following are the storm sewer segments with slopes less than 0.40%: Storm A3 (36” RCP segment @ 0.19%); Storm B (36” RCP segment @ 0.36%); Storm D (36” RCP segment @ 0.32%); Storm E (34” x 53” HERCP segment @ 0.37%; Storm R (24” RCP segment @ 0.37%). It’s important to note that the slopes that are 0.32%, 0.36%, and 0.37% are all within construction tolerance and are not expected to significantly impact the capacity of the storm sewer system. The segment that is 0.19% is lower than would be expected, but when considering the upstream 36” RCP has a slope of 1.89%, cleansing velocities will be achieved and Aspen does not anticipate any capacity issues due to the 0.19% grade. Please refer to the storm sewer plan and profile sheets/asbuilts for additional information. 2) The 4” PVC underdrain pipe at Station 23+54.20, Storm Sewer A Plan and Profile sheet C242 of the civil plans, was not installed. Connell Resources and Ownership chose not to install this pipe, as the Townhome/Condo site may change in the future and prior to building construction, with the Owners/Developers of the condo site being required to install the 4” underdrain at a later date, if required. Please refer to sheet C-242 for the notation about this item. 3) LID Basins were installed at five locations, all contained within Ponds 101, 201, 300, 301, and 501. All LID basins meet or exceed that required for the development (please see attached LID Basin exhibit and calculations). The surfaces of the basins were vegetated with a seed mix and mulched to establish cover. Erosion control fencing has also been placed around the LID Basins to protect them from being filled in with silt, while home construction is completed. 4) At the time of final observation by Aspen Engineering on December 8, 2022, the site vegetation and landscaping are on-going with home construction. At conclusion of the project, the majority of the grass areas of the site will contain sod, with other landscaped areas containing rock mulch, decorative cobble, shrubs, plants, and ornamental grasses, with LID basins hydro-seeded, as required. 5) The curb cuts, chases, and sidewalk chases were checked to confirm compliance with the grading plan. Nearly all of the curb cuts and chases have been installed throughout the site, with the exception of a few items, which have been noted on individual grading plan sheets contained in this certification. These remaining curb cuts and chases will be added once home construction in these areas is near completion. Connell Resources will install the remaining: 8 chases in the northeast corner of the site in the private drives/alleys; 2’ sidewalk culvert north of Lot 197; 4’ sidewalk culvert east of Lot 200; 2’ sidewalk culvert north of Lot 121; 4’ chase with sidewalk culvert and curb cut at the northeast corner of the City Park; curb cuts and chases around the perimeter of the Thrive Multi-family area. Please refer to markups on the grading and drainage certification sheets within this submittal for the above items, and also for the items which have been installed. Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as- built construction to the approved drainage and grading plans, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 11/19 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 11/19 Page 3 4.Outlet Structure: a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 11/19 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 11/19 Page 5 V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 11/19 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 11/19 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1.All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2.All fabric has been installed in the locations and sizes indicated on the approved construction plans. a.All fabric was installed per the details on the approved construction plans. XII.Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII.Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. B.Attached is verification of the rain garden and/or sand filter flat surface area(s) and ponding volume(s). This verification includes survey of critical elevations. C.Attached is verification of the underground infiltration required volume(s), weir elevations, orifices, inspection ports and filtering fabric. This verification includes survey of critical elevations. D.All visible LID design features were verified as part of the engineer's site visit. 11/19 1/19 Page 1 of 2 DURING CONSTRUCTION INSPECTION CHECKLIST  To be completed by Construction Superintendent    This checklist is to be completed during construction and included with the Overall Site and Drainage Certification.   Use “Yes” for items completed as described.   Use “N/A” for items that are not applicable to the site being certified.   If any blanks are “No,” attach an explanation referencing the item number below.     Project Name: Waters edge     Date:  08/30/22    Building Permit Numbers:                                                                                                                                                       I. Compaction  A. Yes All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the  City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content  and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction.  Provide testing log from contractor/engineer.    II. Storm Drain Pipe Installation Requirements  A. Yes The pipe trenches have been compacted in accordance with Section 02225‐3.07.A.1. of the Fort Collins Development Construction  Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas  are to be at 90%, both in accordance with ASTM D698).    III. Energy Dissipation and Erosion Protection ‐ FCSCM Chapter 9, Section 7.0  A. Riprap  1. Yes The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans.  2. Yes A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an  approved equal. Provide documentation for an approved equal.  3. Yes The riprap is the gradation shown on the approved construction plans with a D50 of various per plan.  4. Yes The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown.  5. Yes The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.)  B. Permanent Erosion Control Fabric ‐ FCSCM Vol.1, Ch.7  1. Yes All fabric was installed per manufacturer’s specifications.  1/19 Page 2 of 2     IV. Other Permanent BMPs  A. Yes All cut‐off walls have been installed in accordance with the approved construction plans. (Cut‐off walls are required for irrigation ditch  crossings of storm drain pipes.)    V. Extended Detention Basins   A. Yes Installation of this facility was verified via inspection by a City‐Stormwater Inspector at the point of installation of the water quality  control box(es).  Provide date of inspection and name of inspector:  Martha cruse        Included certification sheet(s):  Please check the appropriate box(es) for the Low Impact Development  (LID) facilities found on this site and complete the corresponding  certification sheets.    ☐   Permeable Interlocking Concrete Pavers  ☒   Bioretention Cells (Rain Gardens)  ☐   Sand Filters  ☐   Vegetated Buffers  ☐   Underground Infiltration  ☐   Other LID – For certification of Dry Wells, Tree Filters,  Constructed Wetland Channels & Ponds, etc., contact City Staff  to determine requirements to exhibit the LID facility has been  constructed and functions as intended per the approved  drainage report.    *Please provide photographic documentation of the installation of all  stages of all LID facilities.  **Please contact the City Stormwater Inspector at  stormwaterinspection@fcgov.com to discuss inspection requirements  for each LID facility and request inspections.  ***All facilities being certified must be “clean” – free of sediment &  construction debris – prior to certification or acceptance of the facility.    Completed by:   Name: Roland Tremble     Title: Projec manager     Email: rtremble@yahoo.com     Phone: 970) 215‐8897     Company: Connell Resources     Address: 7785 highland meadows parkway #100       Fort collins, CO 80528            1/19 Page 1 of 2 Permeable Interlocking Concrete Pavers  Item/Activity Yes No N/A Submittal Requirements Submitted?/Response  Stormwater Inspection  Pre‐construction meeting was held with City‐Stormwater  Inspector to discuss installation, inspection, checklist, and  protection from sedimentation  ☐ ☐ ☐  Record date, inspector name, meeting  location (i.e. DCP, initial erosion control  inspection, etc.)                                              Sub‐surface inspection(s): Installation of this facility was  verified via inspection by a City‐Stormwater Inspector at the  point of installation of the outlet, underdrain, geomembrane  layer, and sub‐base courses (per design in Final Plan  Documents)  ☐ ☐ ☐  Record date(s) of inspection and  inspector’s name                                              Surface inspection(s): Installation of this facility was verified via  inspection by a City‐Stormwater Inspector at the point of  installation of the pavers and joint fill material  ☐ ☐ ☐  Record date(s) of inspection and  inspector’s name                                              Excavation  Heavy equipment did not encroach into the excavated area  (prevents over‐compaction) ☐ ☐ ☐                                              Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after  “ripping”                                              Bottom surface of cell is flat and level ☐ ☐ ☐ Provide photograph                                             Impermeable Liner  Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered  material                                              Impermeable liner is attached to concrete perimeter wall ☐ ☐ ☐ Provide photograph                                             Impermeable liner is buried with no exposure  ☐ ☐ ☐                                              Any penetrations of the impermeable liner have been sealed  and checked for water‐tightness ☐ ☐ ☐ Provide photograph (if necessary)                                             Edge Restraint and Concrete Cut‐Off Wall  The required edge restraint meets design specifications ☐ ☐ ☐ Provide specification of installation                                             Concrete cut‐off wall meets design specifications for:    ☐ ☐ ☐ Provide specification of installation                                               ‐ Dimensions ☐ ☐ ☐                                                ‐ Reinforcement ☐ ☐ ☐                                                ‐ Footings ☐ ☐ ☐                                              Underdrain System  Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph                                             At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph                                             1/19 Page 2 of 2 Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph                                             Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph                                             Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph                                             Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph                                             Underdrain integrity tested after backfilling using TV and/or  water test ☐ ☐ ☐ Provide documentation of test results                                             Aggregate  Sub‐base Course(e.g., #2/4):  ‐ Has 90% fractured faces   ‐ Is thoroughly washed (virtually free of fine sediment)  ‐ Is installed to the required design depth  ☐ ☐ ☐  Provide load ticket, photographs, and  record depth installed                                              Basecourse (e.g., #57):  ‐ Has 90% fractured faces  ‐ Is thoroughly washed (virtually free of fine sediment)  ‐ Is installed to the required design depth  ☐ ☐ ☐  Provide load ticket, photographs, and  record depth installed                                              Leveling Course / Joint Fill (e.g., crushed #89):  ‐ Has 90% fractured faces  ‐ Is thoroughly washed (virtually free of fine sediment)  ‐ Is dry screened  ‐ Is installed to the required design depth and to the top  of the paver joints  ☐ ☐ ☐  Provide load ticket, photographs, and  record depth installed                                              Aggregate materials are installed and compacted according to  manufacturer’s and/or design specifications ☐ ☐ ☐ Provide photographs and documentation  of compaction                                              Protection During Construction  PICP area is protected from construction site sediment,  including runoff from the upstream catchment and  construction equipment traffic   ☐ ☐ ☐  Specify how the area was covered and/or  otherwise protected to prevent  construction runoff from entering the  pavement                                              Close Out  Cracked/broken paver units have been removed and replaced ☐ ☐ ☐                                              Paver height offsets are no more than 1/4” between adjacent  units & surface contains no deformations  (depressions/settlement) exceeding 1/2"   ☐ ☐ ☐                                               Upstream catchment is stabilized prior to diverting runoff into  PICP system ☐ ☐ ☐                                                  1/19 Page 1 of 3 Bioretention Cells (Rain Gardens)  Item/Activity Yes No N/A Submittal Requirements Submitted?/Response  Stormwater Inspection  Pre‐construction meeting was held with City‐Stormwater  Inspector to discuss installation, inspection, checklist, and  protection from sedimentation  ☒ ☐ ☐  Record date, inspector name, meeting  location (i.e. DCP, initial erosion control  inspection, etc.)  DCP and onsite with  martha  Underdrain and basecourse inspection(s): Installation of this  facility was verified via inspection by a City‐Stormwater  Inspector at the point of installation of the outlet, underdrain,  geomembrane layer, and base course (per design in Final Plan  Documents)  ☒ ☐ ☐  Record date(s) of inspection and  inspector’s name  Martha at various times  Pea gravel and BSM inspection(s): Installation of this facility  was verified via inspection by a City‐Stormwater Inspector at  the point of installation of the pea gravel and bioretention  sand media  ☒ ☐ ☐  Record date(s) of inspection and  inspector’s name  Martha at various times  Excavation  Heavy equipment did not encroach into the excavated area  (prevents over‐compaction) ☒ ☐ ☐                                              Bottom of cell was “ripped” after excavation ☒ ☐ ☐ Provide photographs before and after  “ripping”                                              Bottom surface of cell is flat and level ☒ ☐ ☐ Provide photograph                                             Excavated area is protected/surrounded by sediment/runoff  control measures during construction ☒ ☐ ☐ Provide photograph                                             Intake  Upstream catchment drains to inlet/bioretention cell per plan  and flows are fully captured ☒ ☐ ☐                                              Forebay  Forebay is installed according to design specifications ☐ ☐ ☒ Provide photograph                                             There is a minimum 3” drop at the forebay entrance ☐ ☐ ☒ Provide photograph                                             Forebay will drain fully and not hold standing water ☐ ☐ ☒                                              Outlet Structure/Overflow  Emergency overflow elevation is confirmed  ☒ ☐ ☐  Measure and record distance from  overflow to top of media filter; provide  photograph  As built survey  Overflow inlet elevation is set above bioretention media per  plan ☒ ☐ ☐ Provide photograph                                             1/19 Page 2 of 3 Overflow inlet invert elevation is at least 3 inches below  containment wall/berm (to direct overflow into inlet) ☒ ☐ ☐  Measure and record distance between  inlet and top of containment wall/berm;  provide photograph  See as built survey  Overflow path and check dams, if used, are armored to protect  from erosion and maintain elevations ☒ ☐ ☐ Provide photograph                                             Impermeable Liner  Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered  material                                              Impermeable liner is appropriately anchored ☐ ☐ ☒ Provide photograph                                             Impermeable liner is buried with no exposure  ☐ ☐ ☒                                              Any penetrations of the impermeable liner have been sealed  and checked for water‐tightness ☐ ☐ ☒ Provide photograph (if necessary)                                             Underdrain System  Underdrain pipe meets design specifications ☒ ☐ ☐ Provide photograph                                             At least one cleanout is provided per underdrain lateral ☒ ☐ ☐ Provide photograph                                             Cleanout pipe is solid (not perforated/slotted) ☒ ☐ ☐ Provide photograph                                             Cleanout covers are installed and watertight ☒ ☐ ☐ Provide photograph                                             Verify the underdrain is NOT wrapped in geotextile fabric ☒ ☐ ☐ Provide photograph                                             Verify there is no orifice plate on the underdrain outfall ☒ ☐ ☐ Provide photograph                                             Underdrain integrity tested after backfilling using TV and/or  water test ☒ ☐ ☐ Provide documentation of test results Water test  Filter Media and Aggregate  Reservoir aggregate layer (ASTM #57 or #67):  ‐ meets design specifications  ‐ is installed to the required design depth  ☒ ☐ ☐  Provide load ticket, photographs, and  record depth installed  Connell 1” bedding rock  12” depth  Diaphragm aggregate layer (“Pea Gravel” with gradation ASTM  #8, #89, or #9):  ‐ meets design specifications  ‐ is installed to the required design depth  ☒ ☐ ☐  Provide load ticket, photographs, and  record depth installed  Connell Pea gravel  at  6” depth  Bioretention Sand Media (BSM) composition:  ‐ meets design specifications   ‐ is installed to the required design depth  ☒ ☐ ☐  Provide load ticket, photographs, and  record depth installed  Ewing / Hagemans  earth cycle Bioswale  media 12” Depth  BSM was “machine mixed” by supplier prior to delivery ☒ ☐ ☐ Provide load ticket                                             BSM is installed flat and level ☒ ☐ ☐ Provide photograph                                             Other Structural Components  Containment wall/berm is continuous and level ☒ ☐ ☐                                              Landscaping  1/19 Page 3 of 3 Verify final landscaping is free of sod ☐ ☐ ☐ If sod is used, it must be shown to be  “sand‐grown”                                              Final landscaping (non‐floatable mulch) is flat and level ☐ ☐ ☐ Provide photograph                                             Vegetation is planted according to landscape design  specifications and final landscaping plan ☐ ☐ ☐ Provide photograph                                             Verify that weed barrier is NOT installed ☐ ☐ ☐                                              Temporary irrigation installed  ☐ ☐ ☐  If N/A, then verify that permanent  irrigation is installed to establish/maintain  vegetation                                              Close Out  Upstream catchment stabilized prior to diverting runoff into  bioretention cell ☐ ☐ ☒                                                  1/19 Page 1 of 1 Vegetated Buffers  Item/Activity Yes No N/A Submittal Requirements Submitted?/Response  Construction  Buffer area was sectioned off to eliminate site disturbance and  compaction during construction ☐ ☐ ☐ Provide photograph(s)                                             Level spreader has been installed per plan (if applicable) ☐ ☐ ☐ Provide photograph                                             Soils in the buffer area have been amended ☐ ☐ ☐ Record soil amendment certification with  Environmental & Regulatory Affairs                                              Vegetation is planted according to landscape design  specifications and final landscaping plan ☐ ☐ ☐ Provide photograph                                                 1/19 Page 1 of 3 Sand Filters  Item/Activity Yes No N/A Submittal Requirements Submitted?/Response  Stormwater Inspection  Pre‐construction meeting was held with City‐Stormwater  Inspector to discuss installation, inspection, checklist, and  protection from sedimentation  ☐ ☐ ☐  Record date, inspector name, meeting  location (i.e. DCP, initial erosion control  inspection, etc.)                                              Underdrain and basecourse inspection(s): Installation of this  facility was verified via inspection by a City‐Stormwater  Inspector at the point of installation of the outlet, underdrain,  geomembrane layer, and base course (per design in Final Plan  Documents)  ☐ ☐ ☐  Record date(s) of inspection and  inspector’s name                                              Pea gravel and filter media inspection(s): Installation of this  facility was verified via inspection by a City‐Stormwater  Inspector at the point of installation of the pea gravel and filter  media  ☐ ☐ ☐  Record date(s) of inspection and  inspector’s name                                              Excavation  Heavy equipment did not encroach into the excavated area  (prevents over‐compaction) ☐ ☐ ☐                                              Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after  “ripping”                                              Bottom surface of cell is flat and level ☐ ☐ ☐ Provide photograph                                             Excavated area is protected/surrounded by sediment/runoff  control measures during construction ☐ ☐ ☐ Provide photograph                                             Intake  Upstream catchment drains to inlet/sand filter per plan and  flows are fully captured ☐ ☐ ☐                                              Forebay (If Applicable)  Forebay is installed according to design specifications ☐ ☐ ☐ Provide photograph                                             There is a minimum 3” drop at the forebay entrance ☐ ☐ ☐ Provide photograph                                             Forebay will drain fully and not hold standing water ☐ ☐ ☐                                              Outlet Structure/Overflow  Overflow inlet elevation is set above sand filter media per plan  (typically 1 to 3 feet) ☐ ☐ ☐ Provide photograph                                             Overflow inlet invert elevation is at least 3 inches below  containment wall/berm (to direct overflow into inlet) ☐ ☐ ☐  Measure and record distance between  inlet and top of containment wall/berm;  provide photograph                                              1/19 Page 2 of 3 Overflow path and check dams, if used, are armored to protect  from erosion and maintain elevations ☐ ☐ ☐ Provide photograph                                             Impermeable Liner (If Applicable)  Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered  material                                              Impermeable liner is appropriately anchored to the perimeter  wall ☐ ☐ ☐ Provide photograph                                             Impermeable liner is buried with no exposure ☐ ☐ ☐                                              Any penetrations of the impermeable liner have been sealed  and checked for water‐tightness ☐ ☐ ☐ Provide photograph (if necessary)                                             Underdrain System  Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph                                             At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph                                             Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph                                             Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph                                             Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph                                             Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph                                             Underdrain integrity tested after backfilling using TV and/or  water test ☐ ☐ ☐ Provide documentation of test results                                             Filter Media  Filter media composition (e.g. ASTM C 33 Sand):  ‐ meets design specifications  ‐ is installed to the required design depth  ☐ ☐ ☐  Provide load ticket, photographs, and  record depth installed                                              Pea gravel layer:  ‐ meets design specifications  ‐ is installed to the required design depth  ☐ ☐ ☐  Provide load ticket, photographs, and  record depth installed                                              Filter Media is installed flat and level ☐ ☐ ☐                                              Other Structural Components  Containment wall/berm is continuous and level ☐ ☐ ☐                                              Landscaping  Verify final landscaping is free of sod ☐ ☐ ☐  If sod is used, it must be shown to be  “sand‐grown”                                              Final landscaping (non‐floatable mulch) is flat and level ☐ ☐ ☐ Provide photograph                                             Vegetation is planted according to landscape design  specifications and final landscaping plan ☐ ☐ ☐ Provide photograph                                             Verify that weed barrier is NOT installed ☐ ☐ ☐                                              1/19 Page 3 of 3 Temporary irrigation installed  ☐ ☐ ☐  If N/A, then verify that permanent  irrigation is installed to establish/maintain  vegetation                                              Close Out  Upstream catchment stabilized prior to diverting runoff into  sand filter cell ☐ ☐ ☐                                                  1/19 Page 1 of 2 Underground Infiltration  Item/Activity Yes No N/A Submittal Requirements Submitted?/Response  Stormwater Inspection  Manufacturer’s representative pre‐construction meeting: A  pre‐construction meeting was completed with the  manufacturer’s representative and installers  ☐ ☐ ☐  Record date and who was present at the  meeting                                              Pre‐construction meeting was held with City‐Stormwater  Inspector to discuss installation, inspection, checklist, and  protection from sedimentation  ☐ ☐ ☐  Record date, inspector name, meeting  location (i.e. DCP, initial erosion control  inspection, etc.)                                              Inspection(s): Installation of this facility was verified via  inspection by a City‐Stormwater Inspector at the point at which  the chambers had been laid/prior to backfilling.    Correct fabric placement was confirmed.  ☐ ☐ ☐  Record date(s) of inspection and  inspector’s name                                              Excavation  Heavy equipment did not travel across underground cell area   during excavation (prevents over‐compaction) ☐ ☐ ☐                                              Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after  “ripping”                                              Bottom of cell is flat and level, or graded per approved grading  plans ☐ ☐ ☐ Provide photograph                                             Non‐woven fabric is installed per manufacturer’s specifications  and was not damaged during construction (around system) ☐ ☐ ☐ Provide photograph                                             Woven fabric is installed per manufacturer’s specifications and  was not damaged during construction (beneath chambers) ☐ ☐ ☐ Provide photograph                                             Excavated area is protected/surrounded by sediment/runoff  control BMPs during construction ☐ ☐ ☐ Provide photograph                                             Impermeable Liner  Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered  material                                              Impermeable liner is not exposed ☐ ☐ ☐                                              Any penetrations of the impermeable liner have been sealed  and checked for water‐tightness. ☐ ☐ ☐ Provide photograph (if necessary)                                             Aggregate  Foundation and embedment materials are installed and  compacted according to design and manufacturer’s  specifications  ☐ ☐ ☐  Provide load ticket and photograph(s)                                             Underdrain System  1/19 Page 2 of 2 Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph                                             At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph                                             Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph                                             Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph                                             Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph                                             Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph                                             Underdrain integrity tested after backfilling using TV and/or  water test ☐ ☐ ☐ Provide documentation of test results                                             Manifold system  Overflow weir elevation is set at/above water quality storm  elevation ☐ ☐ ☐ Record weir elevation on survey                                             Maintenance access is provided for each Isolator Row ☐ ☐ ☐                                              At least one inspection port has been provided for each Isolator  Row (located in middle third of each row) ☐ ☐ ☐                                              Upstream catchment drains to inlet/intake properly ☐ ☐ ☐                                              Underground Detention Chambers  All chambers were installed per approved Utility Plans and  manufacturer’s specifications ☐ ☐ ☐ Photograph                                             Close Out  Upstream catchment is stabilized prior to diverting runoff into  Underground Detention system ☐ ☐ ☐                                              All Isolator Rows, chambers, and pipes are cleaned and  sediment/debris has been removed ☐ ☐ ☐                                                  SCALE 1:40 ON 24X36 SHEET LEGEND D D D D D D D 185 186 184 183 182 119 181 180 179 174 173 172 171 175 178 177 150 120 137 138 157 158 159 156 149 155 152 154 151 160 153 162 161 163 167 164 165 176 166 169 168 170 136 188187 218 217 216 215 214 223222221 220 219 259 258 257 256 262 260 261 263 264 265 S S W S MP DRAINAGE AS-BUILT SURVEY CONNELL RESOURCES WATER'S EDGE MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-27-2022 DRAWN BY: MCF/SAS NAME: WATERS EDGE FILE NAME: 2020290DRAINAGE ASB CLIENT: CONNELL CHECKED BY: JR SCALE: 1" = 60' 1 SHEET 1 OF 5 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 Feet 0 60 120 ADDED UNDER DRAIN-ADD STORM 9-19-22 UPDATED STORM ASB-ADDED SWALE 12-7-22 LEGEND MP D D D D D D DP DP DP MP DDDD D D D D D D DP DP DP MP DP DP MP DP DP MP DP DP MP DP MP MP DP 24 304 185 186 184 183 182 181 180 179 174 173 172 171 175 178 177 300 301 302 297298299 280 281 282 283 67 8 9 222327252628293031 284 295 321 296 303 324 165 176 166 169 170 319 318 317 316 315 320 322 323 121 136 230 200 199 198 202 201 236 237 238235 203204205206207208209 228 229 232231 233 234 195 196 226 194193192191190189188187 218 217 216 215 214 213 212 211 210 227 253 225 224 223222221 220 219 259 258 257 256 255 254 249 252 251 250 262 248 247 246 245 243 244 260 261 263 264 271265266267268269270 279 272 273 274 275 276 277 278 242 241 240 239 197 S W S DRAINAGE AS-BUILT SURVEY CONNELL RESOURCES WATER'S EDGE MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-27-2022 DRAWN BY: MCF/SAS NAME: WATERS EDGE FILE NAME: 2020290DRAINAGE ASB CLIENT: CONNELL CHECKED BY: JR SCALE: 1" = 60' 2 SHEET 2 OF 5 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 Feet 0 60 120 ADDED UNDER DRAIN-ADD STORM 9-19-22 UPDATED STORM ASB-ADDED SWALE 12-7-22 MP D D D D DP DP DP DP MP DP DP DP DP DP DP DP DP MP DP D DDDD D D D D D D DP MP DP DPDP DP MP DP DP DP DP DP DP DP DP DP MP MP DP DP DP MP MP MP DP DP DP DP MP DP DP DP MP MP MP MP DP DP 24 288 304 309 45 44 300 301 302 297298299 280 281 282 283 67 8 9 10 222327252628293031 11 12 13 14 5 284 285 286 287 4 289 3 290 2 1 291292295293294296 303 305 306 308 59 307 58 60 56 57 50 54 55 53 52 48 51 49 47 46 16 15 43 19 17 21 37 20 42 41 62 39 38 63 64 65 66 67 73 74 75 76 77 79 80 81 82 83 84 85 96 95 94 93 92 91 90 3635343332 253 257 256 255 254 249 252 251 250 248 247 246 245 243 244 264 271265266267268269270 279 272 273 274 275 276 277 278 242 241 240 239 W S LEGEND DRAINAGE AS-BUILT SURVEY CONNELL RESOURCES WATER'S EDGE MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-27-2022 DRAWN BY: MCF/SAS NAME: WATERS EDGE FILE NAME: 2020290DRAINAGE ASB CLIENT: CONNELL CHECKED BY: JR SCALE: 1" = 60' 3 SHEET 3 OF 5 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 Feet 0 60 120 ADDED UNDER DRAIN-ADD STORM 9-19-22 UPDATED STORM ASB-ADDED SWALE 12-7-22 D D D D D D D D D D D D 119 148 178 177 150 133 103110 111 112 113 114 115 116 117 118 120 137 138 141 140 139 142 143 144 145 146 147 157 158 159 156 149 155 152 154 151 160 153 162 161 163 164 176 128 127 126 129 132 130 125 124 123 122 121 136 135 134 131 259 258 257 256 255 262 260 261 263 264 265 S S LEGEND DRAINAGE AS-BUILT SURVEY CONNELL RESOURCES WATER'S EDGE MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-27-2022 DRAWN BY: MCF/SAS NAME: WATERS EDGE FILE NAME: 2020290DRAINAGE ASB CLIENT: CONNELL CHECKED BY: JR SCALE: 1" = 60' 4 SHEET 4 OF 5 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 Feet 0 60 120 ADDED UNDER DRAIN-ADD STORM 9-19-22 UPDATED STORM ASB-ADDED SWALE 12-7-22 LEGEND MP D D D D D D D MP DP DP DP D D D D D DP MP DP DP DP 119 148 150 79 80 81 82 83 84 85 86 87 96 95 94 93 92 91 90 89 88 9798 99 100 101 133 102 103 104 105 106 107108 109 110 111 112 113 114 115 116 117 118 120 137 138 141 140 139 142 143 144 145 146 147 157 158 159 156 149 155 152 151 128 127 126 129 132 130 125 124 123 122 121 136 135 134 131 W S DRAINAGE AS-BUILT SURVEY CONNELL RESOURCES WATER'S EDGE MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-27-2022 DRAWN BY: MCF/SAS NAME: WATERS EDGE FILE NAME: 2020290DRAINAGE ASB CLIENT: CONNELL CHECKED BY: JR SCALE: 1" = 60' 5 SHEET 5 OF 5 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 Feet 0 60 120 ADDED UNDER DRAIN-ADD STORM 9-19-22 UPDATED STORM ASB-ADDED SWALE 12-7-22 288 304 309300301302 297298299 280 281 282 283 284 285 286 287 289 290291292295293294 321 296 303 305 306 308307 324 329 319 318 317 316 315 314 313 310311312 320 322 323 328325326327 230 200 199 198 202 201 236 237 238235 203204205206207208209 228 229 232231 233 234 195 196 226 194193192191190189 214 213 212 211 210 227 253 225 224 223 256 255 254 249 252 251 250 248 247 246 245 243 244 264 271265266267268269270 279 272 273 274 275 276 277 278 242 241 240 239 197 PA R K S I D E D R . MORNINGSTAR WAY SQUIB LN. SKIFF LN. OU T R I G G E R W A Y OUTRIGGER WAY DA Y S A I L E R W A Y HE L M S M A N S T . MIDSHIP WAY COMPANION WAY MORNINGSTAR WAY LEGEND GRADING AS-BUILT SURVEY WATER'S EDGE EATS CONNELL RESOURCES MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-26-2022 DRAWN BY: MCF NAME: WATER'S EDGE FILE NAME: 2020290POND CLIENT: CONNELL CHECKED BY: SAS SCALE: 1" = 60' 1 SHEET 1 OF 4 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 ADDED EX. POND AND PANS 9-19-22 Feet 0 60 120 185 186 184 183 182 119 181 180 179 174 173 172 171 175 178 177 150 120 137 138 157 158 159 156 149 155 152 154 151 160 153 162 161 163 167 164 165 176 166 169 168 170 189188187 218 217 216 215 214 213 224 223222221 220 219 259 258 257 256 255 262 260 261 263 264 265 266 BR I G H T W A T E R D R . NA V I G A T O R W A Y NAVIGA T O R W A Y BA R N S W A L L O W C I R C L E TRAN S O M L N . BR I G H T W A T E R D R . MO R N I N G S T A R W A Y LEGEND GRADING AS-BUILT SURVEY WATER'S EDGE EATS CONNELL RESOURCES MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-26-2022 DRAWN BY: MCF NAME: WATER'S EDGE FILE NAME: 2020290POND CLIENT: CONNELL CHECKED BY: SAS SCALE: 1" = 60' 2 SHEET 2 OF 4 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 ADDED EX. POND AND PANS 9-19-22 Feet 0 60 120 1''W 119 148 9798 99 100 101 133 102 103 104 105 106 107108 109 110 111 112 113 114 115 116 117 118 141 140 139 142 143 144 145 146 147 157 149 128 127 126 129 132 130 125 124 123 122 121 136 135 134 131 BA R N S W A L L O W C I R C L E PLANK L N . GA N G W A Y D R . TRAN S O M L N . TRUNNEL LN. PA R K S I D E D R . BRIGHTWATER DR. BR I G H T W A T E R D R . LEGEND GRADING AS-BUILT SURVEY WATER'S EDGE EATS CONNELL RESOURCES MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-26-2022 DRAWN BY: MCF NAME: WATER'S EDGE FILE NAME: 2020290POND CLIENT: CONNELL CHECKED BY: SAS SCALE: 1" = 60' 3 SHEET 3 OF 4 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 ADDED EX. POND AND PANS 9-19-22 Feet 0 60 120 24 45 44 67 8 9 10 222327252628293031 11 12 13 14 5 4 3 2 1 59 58 60 56 57 50 54 55 53 52 48 51 49 47 46 16 15 43 19 17 21 37 20 42 41 62 39 38 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 79 80 81 82 83 84 85 86 87 96 95 94 93 92 91 90 89 88 9798 99 3635343332 279 PA R K S I D E D R . BRIGH T W A T E R D R . CORD A G E L N . LO N G B O A T W A Y DR O M O N D L N . MOONRAKER LN. MORNINGSTAR WAY TRUNNEL LN. PA R K S I D E D R . JIB L N . LA T E E N L N . CRUISER LN. BRIGHTWATER DR. FL E E T D R . MORNINGSTAR WAY LEGEND GRADING AS-BUILT SURVEY WATER'S EDGE EATS CONNELL RESOURCES MAJESTIC SURVEYING, LLC 1111 DIAMOND VALLEY DRIVE #104, WINDSOR, CO 80550 PROJECT NO: 2020290 DATE: 07-26-2022 DRAWN BY: MCF NAME: WATER'S EDGE FILE NAME: 2020290POND CLIENT: CONNELL CHECKED BY: SAS SCALE: 1" = 60' 4 SHEET 4 OF 4 REVISIONS:DATE: HORIZONTAL DATUM: FROM PROVIDED PLAN SET VERTICAL DATUM: NGVD 29 ADDED EX. POND AND PANS 9-19-22 Feet 0 60 120 288 304 309300301302 297298299 280 281 282 283 284 285 286 287 289 290291292295293294 321 296 303 305 306 308307 324 329 319 318 317 316 315 314 313 310311312 320 322 323 328325326327 230 200 199 198 202 201 236 237 238235 203204205206207208209 228 229 232231 233 234 195 196 226 194193192191190189 214 213 212 211 210 227 253 225 224 223 256 255 254 249 252 251 250 248 247 246 245 243 244 264 271265266267268269270 279 272 273 274 275 276 277 278 242 241 240 239 197 Feet 0 60 120 185 186 184 183 182 119 181 180 179 174 173 172 171 175 178 177 150 120 137 138 157 158 159 156 149 155 152 154 151 160 153 162 161 163 167 164 165 176 166 169 168 170 189188187 218 217 216 215 214 213 224 223222221 220 219 259 258 257 256 255 262 260 261 263 264 265 266 Feet 0 60 120 119 148 9798 99 100 101 133 102 103 104 105 106 107108 109 110 111 112 113 114 115 116 117 118 141 140 139 142 143 144 145 146 147 157 149 128 127 126 129 132 130 125 124 123 122 121 136 135 134 131 Feet 0 60 120 24 45 44 67 8 9 10 222327252628293031 11 12 13 14 5 4 3 2 1 59 58 60 56 57 50 54 55 53 52 48 51 49 47 46 16 15 43 19 17 21 37 20 42 41 62 39 38 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 79 80 81 82 83 84 85 86 87 96 95 94 93 92 91 90 89 88 9798 99 3635343332 279 Feet 0 60 120 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' S A 10'' S A 10'' S A 10 ' ' S A 10'' SA 10 ' ' S A 8'' S A 10'' S A 8'' S A 8'' S A 8'' S A W W W W W 24 ' ' W 24 ' ' W 24 ' ' W 24 ' ' W 24 ' ' W 24 ' ' W 24 ' ' W 14 ' ' W 14 ' ' W 14 ' ' W 8'' S A ST ST GW E E E G GG E E E E E E E E E E E E E E E E G G G W W W W W W W E G G G G 14 ' ' W G 24 ' ' W 24 ' ' W 24 288 304 309 45 44 185 186 184 183 182 119 148 181 180 179 174 173 172 171 175 178 177 300 301 302 297298299 280 281 282 283 67 150 8 9 10 222327252628293031 11 12 13 14 5 284 285 286 287 4 289 3 290 2 1 291292295293294 321 296 303 305 306 308 59 307 58 60 56 57 50 54 55 53 52 48 51 324 49 329 47 46 16 15 43 19 17 21 37 20 42 41 62 39 38 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 79 80 81 82 83 84 85 86 87 96 95 94 93 92 91 90 89 88 9798 99 100 101 133 102 103 104 105 106 107108 109 110 111 112 113 114 115 116 117 118 120 137 138 141 140 139 142 143 144 145 146 147 157 158 159 156 149 155 152 154 151 160 153 162 161 163 167 164 165 176 166 169 168 170 3635343332 319 318 317 316 315 314 313 310311312 320 322 323 328325326327 128 127 126 129 132 130 125 124 123 122 121 136 135 134 131 230 200 199 198 202 201 236 237 238235 203204205206207208209 228 229 232231 233 234 195 196 226 194193192191190189188187 218 217 216 215 214 213 212 211 210 227 253 225 224 223222221 220 219 259 258 257 256 255 254 249 252 251 250 262 248 247 246 245 243 244 260 261 263 264 271265266267268269270 279 272 273 274 275 276 277 278 242 241 240 239 197 D D D D D D D D D D D D D 1''W W D DDDD D D D D D D D D D D D D BR I GHTWATER DR IVE BRIGHTWATER DR IVE 3 3.55 4 3.60 23 1.32 26 1.07 33 2.21 28 2.31 25 2.06 31 1.46 21 2.01 14 1.96 12 2.65 10 5.69 9 0.75 7 0.98 46 1.14 6 0.94 5 2.001 0.64 44 6.94 50 2.65 51 2.69 43 1.33 45 1.38 47 1.16 8 1.24 48 3.10 49 1.99 59 0.90 53 1.10 54 4.05 15 2.80 16 0.78 19 2.90 36 1.65 55 2.02 58 5.97 42 1.09 35 2.91 39 4.68 38 3.72 40 3.50 22 1.36 13 0.63 32 0.78 29 1.78 24 0.79 27 0.99 57 0.45 56 0.91 37 0.52 18 0.35 41 1.86 1 2 3 4 5 6 7 9 8 25 31 14 10 12 13 15 16 18 19 21 22 26 27 28 36 37 35 38 39 40 41 42 43 44 45 46 47 48 49 50 51 53 54 55 5756 58 59 9A 13A 13B 13C 13D 13E 60 OS1 14.17 OS1 52 30 1.99 32 33 11 1.27 11 29 30 34 2.30 34 20 0.59 20 17 17 1.90 61 1.70 61 52 2.61 60 3.04 62 1.96 62 23 242 0.44 MOR N I N G S T A R W A Y NA V I G A T O R W A Y MORNINGSTAR WAY SKIFF LANE MIDSHIP WAY MOR N I N G S T A R W A Y MORNINGSTAR WAY BRIGHTWATER DRIVE SQUIB LANE COMPANION WAY NAVIGA T O R W A Y BAR N S W A L L O W C I R C L E PA R K S I D E D R I V E FL E E T D R I V E CRUISER LANE JI B L A N E LA T E E N L A N E BRIGH T W A T E R D R I V E LO N G B O A T W A Y TU R N B E R R Y R O A D ( C R 1 1 ) DA Y S A I L E R W A Y OU T R I G G E R W A Y TU R N B E R R Y R O A D ( C R 1 1 ) HE L M S M A N S T R E E T BR I G H T W A T E R D R I V E TRANS O M L A N E GA N G W A Y D R I V E PLAN K L A N E COMPANION WAY JETTY LANE ROWING LANE TACK LANE DR O M O N D L A N E CORD A G E L A N E MOONRAKER LANETRUNNEL LANE NOTES . Is s u e d Re v i s i o n Is s u e d Re v i s i o n DR A I N A G E B A S I N E X H I B I T C-155 0 14 UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of PRE L I M I N A R Y NOT F O R C O N S T R U C T I O N LEGEND .LEGEND BASIN ID ACRES DRAINAGE DESIGN POINT DRAINAGE BASIN BOUNDARY LINE HYDROLOGY TABLE (AC-FT) REQUIRED VOLUME (FT)(AC-FT) WSELPONDDESC100 YR PROVIDED VOLUME EXISTING SWALE ASPEN E E G G W W 24 280 281 282 283 67 8 9 10 222327252628293031 5 284 285 21 37 20 3635343332 271269270 279 272 273 274 275 276 277 278 D 8' ' W 12'' W 12'' W 12'' W12'' W12'' W 12'' W 8'' SA 8'' SA 8' ' S A 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' W 8' ' W 8' ' W S S S S S E E G G E E G G G S W S W S W S W S W E E ESSS EE SSS WW G GG W G W W W W WGGGG G W W W W WGGGG GGGGGWWWWW G W G W W S S S S S SSSSS S S S E EE E E E EE EE E E E EE E E E G G G G G EE EE E E E E 8'' SA SSS S S S W W W E G S E E E E E E E E E W W W W W W W W S S S S S S S SG G G G G G G G8'' SA 8'' SA 8'' W DP MP DP DP DP DDDD D D W 8' ' W E E E E G G G SWSW S W 8'' SA 8'' W MP DP DP DP DP G MP DP DP MP W S MP T MAT C H L I N E S T A 2 1 + 0 0 MA T C H L I N E S T A 2 1 + 0 0 LO N G B O A T W A Y FL E E T D R I V E SQUIB LANE HE L M S M A N S T R E E T DA Y S A I L E R W A Y MORNINGSTAR WAY ST M H - A - 6 ST A 2 0 + 2 5 . 5 8 RI M 5 0 7 9 . 4 9 IN V I N 5 0 7 1 . 7 9 IN V I N 5 0 7 2 . 7 9 IN V I N 5 0 7 2 . 7 9 IN V O U T 5 0 7 1 . 7 9 ST M H - A - 5 ST A 1 8 + 1 9 . 6 8 RI M 5 0 7 7 . 3 1 IN V I N 5 0 6 8 . 0 8 IN V I N 5 0 6 8 . 0 8 IN V O U T 5 0 6 8 . 0 8 ST M H - A - 4 ST A 1 5 + 3 4 . 7 2 RI M 5 0 7 4 . 5 9 IN V I N 5 0 6 5 . 8 0 ( 4 2 " R C P ) IN V I N 5 0 6 6 . 0 0 ( 2 4 " R C P ) IN V O U T 5 0 6 5 . 8 0 ST M H - A - 3 ST A 1 3 + 4 8 . 1 3 RI M 5 0 7 1 . 6 1 IN V I N 5 0 6 4 . 3 1 ( 4 2 " R C P ) IN V I N 5 0 6 4 . 5 1 ( 2 4 " R C P ) IN V I N 5 0 6 7 . 5 0 ( 4 " P V C ) 205.94 LF @ 1.80% 36in RCP 284.97 LF @ 0.80% 42in RCP 186.59 LF @ 0.80%42in RCP 158.94 L F @ 2.50% 42in RC P 28.87 LF @ 2.36% 42in RCP ST M H - A - 2 ST A 1 1 + 8 9 . 2 4 RI M 5 0 6 8 . 9 7 IN V I N 5 0 6 0 . 3 3 ( 4 2 " R C P ) EN D F E S ST A 1 0 + 0 0 . 4 4 IN V I N 5 0 5 3 . 3 7 BE G I N F E S ST A 9 + 9 3 . 1 6 IN V O U T 5 0 5 3 . 2 0 154.8 0 L F @ 3.97 % 42in R C P ST I N - A - 1 ( I F O B ) ST A 1 1 + 7 9 . 2 3 FL 5 0 6 8 . 5 6 IN V I N 5 0 6 0 . 0 8 10.01 @ 2.50% 42in RCP ST I N - A - 1 ( I F O B ) ST A 1 1 + 7 6 . 7 3 RI M 5 0 6 9 . 0 8 IN V I N 5 0 6 0 . 0 2 IN V O U T 5 0 6 0 . 0 2 ST M H - A - 1 ST A 1 0 + 2 2 . 0 3 RI M 5 0 6 0 . 0 0 IN V I N 5 0 5 3 . 8 8 IN V O U T 5 0 5 3 . 8 8 IN V I N 5 0 6 5 . 8 0 ( 4 " P V C ) IN V I N 5 0 6 3 . 5 0 ( 4 " P V C ) IN V O U T 5 0 6 0 . 3 3 IN V O U T 5 0 6 4 . 3 1 50 6 9 . 0 2 50 5 9 . 8 7 50 5 9 . 8 1 50 5 3 . 3 2 50 5 9 . 3 6 50 5 3 . 7 8 50 5 3 . 7 7 RI M : 5 0 6 8 . 7 1 50 5 9 . 8 7 50 6 8 . 8 7 50 6 0 . 3 4 ( W ) 50 6 3 . 2 2 ( N ) 50 6 0 . 1 7 ( S ) 50 7 1 . 6 7 50 6 4 . 2 6 ( W ) 50 6 4 . 3 6 ( N ) 50 6 7 . 3 6 ( N W ) 50 6 4 . 0 7 ( E ) 50 7 4 . 6 6 50 6 5 . 7 2 ( W ) 50 6 5 . 6 7 ( N W ) 50 6 5 . 9 8 ( N ) 50 6 5 . 7 2 ( E ) 50 7 9 . 5 1 50 7 2 . 5 1 ( S ) 50 7 2 . 5 0 ( N ) 50 7 1 . 8 0 ( W ) 50 7 1 . 7 8 ( E ) 50 7 7 . 3 9 50 6 8 . 0 5 ( W ) 50 6 7 . 9 7 ( S ) (D U P L I C A T E I N V : N / A ) 50 6 7 . 9 2 ( E ) 1.81% 0.77% 0.78% 2.35% 3.89% 1.56% 3.00% STORM SEWER 'A' PLAN 10+0011+0012+0013+0014+0021+00 20+00 19+00 18+00 15+0016+0017+00 STORM SEWER 'A' PROFILE Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. NOTES . 5090 5095 5045 5050 5055 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-241 0 60 12 5090 5095 5045 5050 5055 5060 5065 5070 5075 5080 5085 MA T C H L I N E S E E S H E E T C - 2 4 2 LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) ASPEN 1 2 1 2 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022, and December 7, 2022. E E E E E G G GG G E E E W W W W W W G G G G G 119 178 177 164 136 253 259 258 257 256 255 254 252 262 260 261 263 264 265 266 267 268 269 D D D D 8'' W 12'' W 12'' W 12'' W 12'' W 8'' W 8'' SA 8' ' W 8'' SA 8'' S A 12 ' ' W 8'' W 8'' S A 8'' W G G EE G G G G E G S W S W S W S W S W SW SW S G G E W W S E E E G G G W SWSWS 8'' SA G GGG G G G GG W W W WWW W W S S S S S S S S S E E E E E E E EE S E E E E SSSS S S S S GG G 8'' W 8'' W 12'' W MPMP MP G MP W E E G G G W T W S MP MP T T PA R K S I D E D R I V E MOR N I N G S T A R W A Y NA V I G A T O R W A Y TRAN S O M L A N E BR I G H T W A T E R D R I V E POND 101 MA T C H L I N E S T A 2 1 + 0 0 38.15 LF @ 0.50% 24in RCP ST A 3 0 + 2 2 . 4 3 IN V O U T 5 0 8 3 . 6 6 ST I N - A - 3 ( I F O B ) ST A 2 9 + 9 8 . 2 5 RI M 5 0 8 8 . 7 5 IN V O U T 5 0 8 1 . 8 9 21.18 LF @ 5.90% 24in RCP 44.81 LF @ 0.50% 24in RCP ST M H - A - 8 ST A 2 7 + 5 5 . 3 9 RI M 5 0 9 4 . 4 6 IN V I N 5 0 8 0 . 6 8 ( 2 4 " R C P W ) IN V I N 5 0 8 1 . 8 5 ( 2 4 " R C P S ) IN V O U T 5 0 8 0 . 6 8 156.90 LF @ 0.50%24in RCP 253.78 LF @ 0.50%36in RCP ST M H - A - 7 ST A 2 5 + 0 1 . 6 1 RI M 5 0 8 8 . 4 5 IN V I N 5 0 7 9 . 4 1 ( 3 6 " R C P ) IN V O U T 5 0 7 9 . 4 1 476.08 LF @ 1.60% 36in RCP ST I N - A - 2 ( I F O B ) ST A 2 9 + 5 3 . 4 4 RI M 5 0 9 3 . 9 7 IN V I N 5 0 8 1 . 6 7 EN D F E S ST A 3 0 + 2 8 . 1 8 IN V I N 5 0 8 4 . 0 0 ST I N - A - 3 ( I F O B ) ST A 3 0 + 0 1 . 2 5 RI M 5 0 8 8 . 1 6 IN V I N 5 0 8 2 . 4 1 ST M H - A - 9 ST A 2 9 + 1 2 . 2 8 RI M 5 0 9 3 . 7 8 IN V I N 5 0 8 1 . 4 6 ( 2 4 " R C P ) IN V I N 5 0 8 2 . 9 4 ( 1 8 " R C P ) IN V O U T 5 0 8 1 . 4 6 ST I N - A - 2 ( I F O B ) ST A 2 9 + 5 0 . 4 4 FL 5 0 9 3 . 4 0 IN V O U T 5 0 8 1 . 6 5 BE G I N F E S IN V I N 5 0 7 9 . 5 7 ( 4 " P V C S ) UN D E R D R A I N C O N N E C T I O N ST A 2 3 + 5 4 . 2 0 IN V 5 0 7 7 . 0 5 ( 3 6 " R C P ) IN V I N 5 0 7 9 . 7 2 ( 4 " P V C ) IN V I N 5 0 7 9 . 5 7 ( 4 " P V C N ) (S E E D E T A I L S H E E T C - 6 0 6 ) IN S T A L L O R I F I C E P L A T E 50 8 8 . 4 9 50 7 9 . 5 0 ( W ) 50 7 9 . 6 3 ( N ) 50 7 9 . 4 6 ( N ) 50 7 9 . 3 6 ( E ) RI M 5 0 9 3 . 8 1 IN V I N 5 0 8 1 . 4 4 ( N ) IN V I N 5 0 8 2 . 6 6 ( S ) IN V O U T 5 0 8 1 . 4 3 ( E ) 50 9 4 . 6 5 50 8 0 . 6 0 ( W ) 50 8 1 . 6 0 ( S ) 50 8 0 . 5 4 ( E ) 50 9 3 . 9 4 50 8 1 . 6 6 RI M : 5 0 9 3 . 9 4 IN V O U T 5 0 8 1 . 6 4 50 8 8 . 7 7 50 8 1 . 8 7 50 8 8 . 2 4 50 8 2 . 4 9 50 8 3 . 7 8 6.09% 0.47% 0.52% 0.41%0.53% 1.59% (4 " N O T I N S T A L L E D , PE R C O N N E L L ) STORM SEWER 'A' PLAN 21+0022+0023+0024+0025+0031+00 30+00 29+00 26+0027+0028+00 STORM SEWER 'A' PROFILE Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-242 0 61 12 5090 5095 5060 5065 5070 5075 5080 5085 MA T C H L I N E S E E S H E E T C - 2 4 1 5105 5110 5100 5105 5110 5100 NOTES . ASPEN LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 2 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022, and December 7, 2022. 2 24 30 0 29 9 28 0 22 23 27 25 26 28 29 30 31 19 21 37 20 38 36 35 34 33 32 31 9 32 0 20 0 19 9 20 2 20 1 23 6 23 7 23 8 23 5 20 3 20 4 23 3 23 4 24 6 24 5 24 3 24 4 27 9 27 5 27 6 27 7 27 8 24 2 24 1 24 0 23 9 8'' W 12 ' ' W 12 ' ' W 8' ' S A 8' ' S A 8'' SA 8'' SA 8'' SA 8'' SA 8' ' S A 8' ' S A 8' ' S A 8'' W 8'' W 8'' W S S S S S EE E E GG GG GG GGEEE E E E GG G S W SWSW S WSWSW SW SW SW S S S S WW W G W W G G W W W W G G G G G W W W W W G G G G G G G G G W W W W W G G W W G W W S S S S S S S S S S S S S E E EE E E E E EE EE E E E EE E E E 8' ' S A 8' ' W E G G EE EE EEGSWGGGG GSWSWSWSWSW GG ESWESWSW S W S W S W G G E W S W S E E G W S W S E E E W W W S S S G G G G 8' ' S A MP DP DP DP D D D D DD W MP DP DP DP DP E G LONGBOAT W A Y HELMSMAN STREET MO R N I N G S T A R W A Y POND 501 POND 201 POND 301 ST M H - A 2 - 1 ST A 1 2 + 4 7 . 9 9 RI M 5 0 7 6 . 3 3 IN V I N 5 0 6 8 . 2 5 IN V I N 5 0 6 8 . 2 5 IN V O U T 5 0 6 8 . 2 5 ST M H - A - 4 ST A 1 0 + 0 0 RI M 5 0 7 4 . 5 9 IN V I N 5 0 6 5 . 8 0 ( 4 2 " R C P ) IN V I N 5 0 6 6 . 0 0 ( 2 4 " R C P ) 336.23 LF @ 0.57% 24in RCP 248.00 LF @ 0.91% 24in RCP ST M H - A 2 - 2 ST A 1 5 + 8 4 . 2 2 RI M 5 0 8 0 . 8 3 IN V I N 5 0 7 0 . 1 8 IN V O U T 5 0 7 0 . 1 8 17.51 LF @ 4.47% 24in RCP 115.73 LF @ 0.57%24in RCP EN D F E S ST A 1 7 + 2 6 . 2 0 IN V I N 5 0 7 2 . 0 0 ST I N - A 2 - 1 ( I F O B ) ST A 1 6 + 9 9 . 9 4 RI M 5 0 7 5 . 9 2 IN V O U T 5 0 7 0 . 8 4 ST A 1 7 + 2 0 . 4 5 IN V O U T 5 0 7 1 . 7 4 BE G I N F E S IN V I N 5 0 6 5 . 8 0 ( 4 " P V C ) IN V O U T 5 0 6 5 . 8 0 ST I N - A 2 - 1 ( I F O B ) ST A 1 7 + 0 2 . 9 4 RI M 5 0 7 5 . 5 6 IN V I N 5 0 7 0 . 9 6 IN S T A L L O R I F I C E P L A T E (S E E D E T A I L S H E E T C - 6 0 6 ) 50 7 4 . 6 6 50 6 5 . 7 2 ( W ) 50 6 5 . 9 8 ( N ) 50 6 5 . 6 7 ( N W ) 50 6 5 . 7 2 ( E ) 50 7 6 . 4 0 50 6 8 . 1 4 ( W ) 50 6 8 . 1 0 ( N ) 50 6 8 . 0 9 ( S ) 50 8 0 . 9 0 50 7 0 . 1 0 50 7 0 . 0 5 50 7 5 . 7 1 50 7 0 . 6 6 50 7 5 . 4 4 50 7 0 . 8 1 50 7 1 . 6 0 3.40% 0.48% 0.58% 0.85% RI M 5 0 7 1 . 2 0 IN V O U T 5 0 6 5 . 0 4 (S E E D E T A I L S H E E T C - 6 0 6 ) ST A 1 1 + 0 6 . 6 1 IN V O U T 5 0 6 5 . 4 5 ST I N - A 1 - 2 ( I F O B ) ST A 1 0 + 7 1 . 6 1 RI M 5 0 7 1 . 2 7 IN V O U T 5 0 6 5 . 1 4 ST M H - A - 3 ST A 1 0 + 0 0 RI M 5 0 7 1 . 6 1 IN V I N 5 0 6 4 . 3 1 ( 4 2 " R C P ) IN V I N 5 0 6 4 . 5 1 ( 2 4 " R C P ) IN V I N 5 0 6 7 . 5 0 ( 4 " P V C ) 32.01 LF @ 0.88% 24in RCP 17.11 LF @ 0.88% 24in RCP 52.00 LF @ 0.88% 24in RCP EN D F E S ST A 1 1 + 1 2 . 3 6 IN V I N 5 0 6 5 . 5 0 ST I N A - 1 - 1 ( I F O B ) ST A 1 0 + 5 2 FL 5 0 7 1 . 2 0 IN V O U T 5 0 6 4 . 9 7 ST I N - A 1 - 2 ( I F O B ) ST A 1 0 + 7 4 . 6 1 RI M 5 0 7 0 . 8 7 IN V I N 5 0 6 5 . 1 7 ST I N A - 1 - 1 ( I F O B ) ST A 1 0 + 5 4 . 5 0 RI M 5 0 7 1 . 7 2 IN V I N 5 0 6 4 . 9 9 OR I F I C E P L A T E BE G I N F E S & I N S T A L L IN V O U T 5 0 6 4 . 3 1 RI M 5 0 7 1 . 2 3 IN V O U T 5 0 6 4 . 8 6 RI M 5 0 7 1 . 5 0 IN V I N 5 0 6 4 . 9 3 RI M 5 0 7 0 . 8 2 IN V I N 5 0 6 5 . 0 7 IN V I N 5 0 6 5 . 3 5 RI M 5 0 7 1 . 6 7 IN V I N 5 0 6 4 . 2 6 ( W ) IN V I N 5 0 6 4 . 3 6 ( N ) IN V I N 5 0 6 7 . 3 6 ( N W ) IN V O U T 5 0 6 4 . 0 7 ( E ) 0.74% 0.64% 0.96% STORM SEWER 'A1' PLAN 18+0017+0016+0015+0014+0010+00 11+00 10+00 13+0012+0011+00 STORM SEWER 'A1' PROFILE Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5045 5050 5055 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-243 0 62 12 5090 5095 5045 5050 5055 5060 5065 5070 5075 5080 5085 STORM SEWER 'A2' PLAN STORM SEWER 'A2' PROFILE NOTES . AS P E N LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 2 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022, and December 7, 2022. 2 247 246 245 243 244 279 273 274 275 276 277 278 242 241 240 8' ' S A 8' ' S A 8' ' W 8' ' W E E G G G E S W W E E G S W G G S W S W E S W S W E E E EGG GWSWSWSS E E E EWWW WSSS S S G G G G8'' SA 8'' W D DPOND 301 ST A 1 1 + 4 4 . 3 5 IN V O U T 5 0 6 9 . 8 2 ST I N - A 2 - 1 - 1 ( I F O B ) ST A 1 1 + 1 7 . 3 5 RI M 5 0 7 4 . 4 9 IN V I N 5 0 6 8 . 9 7 ST M H - A 2 - 1 ST A 1 0 + 0 0 RI M 5 0 7 6 . 3 3 IN V I N 5 0 6 8 . 2 5 IN V I N 5 0 6 8 . 2 5 IN V O U T 5 0 6 8 . 2 5 27.01 LF @ 3.15% 24in RCP 114.35 LF @ 0.50%24in RCP EN D F E S ST A 1 1 + 5 0 . 1 0 IN V I N 5 0 7 0 . 0 0 ST I N - A 2 - 1 - 1 ( I F O B ) ST A 1 1 + 1 4 . 3 5 RI M 5 0 7 4 . 6 8 IN V O U T 5 0 6 8 . 8 2 BE G I N F E S (S E E D E T A I L S H E E T C - 6 0 6 ) IN S T A L L O R I F I C E P L A T E 50 7 6 . 4 0 50 6 8 . 1 4 ( W ) 50 6 8 . 1 0 ( N ) 50 6 8 . 0 9 ( S ) 50 6 9 . 5 2 50 7 4 . 5 4 50 6 8 . 6 7 50 7 4 . 3 3 50 6 8 . 7 4 2.38% 0.46% 29 30 31 62 63 76 77 34 33 32 27 1 27 0 27 2 27 3 27 4 27 5 D D D D 8'' W 12 ' ' W 12 ' ' W 8' ' S A 8' ' S A 8'' W 8'' W G W W W G G W W G G G W W W GGW S S S S S S S SS E E EE E E EE 8' ' W E E E E E E E W W W W W W S S S S S S G G G G G G 8' ' S A 8' ' S A 8' ' W DP DP D D DP DP DP DP DP DP W DPMP MP DP DP DP ST I N - A 3 - 1 ( I F O B ) ST A 1 4 + 4 1 . 5 7 FL 5 0 7 6 . 3 2 IN V O U T 5 0 7 1 . 3 5 ST M H - A 3 - 4 ST A 1 4 + 1 6 . 4 9 RI M 5 0 7 6 . 5 6 IN V I N 5 0 7 0 . 8 4 ( 3 0 " R C P ) IN V I N 5 0 7 1 . 0 4 ( 1 8 " R C P ) IN V O U T 5 0 7 0 . 8 4 ST M H - A 3 - 3 ST A 1 3 + 4 7 . 8 4 RI M 5 0 7 7 . 0 0 IN V I N 5 0 6 9 . 4 7 ( 3 0 " R C P ) IN V I N 5 0 6 9 . 4 7 ( 2 4 " R C P ) IN V O U T 5 0 6 9 . 4 7 ST M H - A 3 - 2 ST A 1 2 + 8 8 . 6 1 RI M 5 0 7 7 . 3 7 IN V I N 5 0 6 9 . 2 3 IN V O U T 5 0 6 9 . 2 3 ST M H - A 3 - 1 ST A 1 1 + 4 0 . 2 3 RI M 5 0 7 8 . 4 6 IN V I N 5 0 6 8 . 6 4 IN V O U T 5 0 6 8 . 6 4 ST M H - A - 5 ST A 1 0 + 0 0 RI M 5 0 7 7 . 3 1 IN V I N 5 0 6 8 . 0 8 IN V I N 5 0 6 8 . 0 8 IN V O U T 5 0 6 8 . 0 8 25.08 LF @ 2.00% 30in RCP 68.66 LF @ 2.00% 30in RCP 59.23 LF @ 0.40% 36in RCP 148.39 LF @ 0.40%36in RCP 140.23 LF @ 0.40%36in RCP 50 7 7 . 3 9 50 6 8 . 0 5 ( W ) 50 6 7 . 9 7 ( S ) 50 6 7 . 9 2 ( E ) 50 7 8 . 5 9 50 6 8 . 5 8 50 6 8 . 5 3 50 7 7 . 4 3 50 6 9 . 2 3 50 6 9 . 1 8 50 7 7 . 1 0 50 6 9 . 3 6 ( W ) 50 6 9 . 4 3 ( E ) 50 6 9 . 3 4 ( N ) 50 7 6 . 5 4 50 7 0 . 7 2 ( S ) 50 7 0 . 7 2 ( N ) 50 7 0 . 6 6 ( E ) 50 7 6 . 7 6 ( R I M ) 50 7 1 . 2 9 0.40%0.40%0.19% 1.89% 2.27%23.19 LF @ 0.40% 18in RCP 32.15 LF @ 0.40% 24in RCP ST M H - A 3 - 3 ST A 1 0 + 0 0 RI M 5 0 7 7 . 0 0 IN V I N 5 0 6 9 . 4 7 ( 3 0 " R C P ) IN V I N 5 0 6 9 . 4 7 ( 2 4 " R C P ) IN V O U T 5 0 6 9 . 4 7 ST I N - A 3 - 1 - 2 ( I F O B ) ST A 1 0 + 5 8 . 3 4 RI M 5 0 7 2 . 0 8 IN V O U T 5 0 6 9 . 6 9 ST I N - A 3 - 1 - 1 ( I F O B ) ST A 1 0 + 3 5 . 1 5 RI M 5 0 7 7 . 0 0 IN V I N 5 0 6 9 . 6 0 ST I N - A 3 - 1 - 1 ( I F O B ) ST A 1 0 + 3 2 . 1 5 FL 5 0 7 6 . 2 9 IN V O U T 5 0 6 9 . 6 0 50 7 7 . 1 0 50 6 9 . 3 6 ( W ) 50 6 9 . 4 3 ( E ) 50 6 9 . 3 4 ( N ) 50 7 6 . 9 5 ( R I M ) 50 6 9 . 5 5 ( W ) 50 7 6 . 9 5 ( R I M ) 50 6 9 . 5 5 ( E ) 50 7 2 . 0 0 50 6 9 . 6 8 (....%) ST M H - A 3 - 4 ST A 1 0 + 0 0 RI M 5 0 7 6 . 5 6 IN V I N 5 0 7 0 . 8 4 ( 3 0 " R C P ) IN V I N 5 0 7 1 . 0 4 ( 1 8 " R C P ) IN V O U T 5 0 7 0 . 8 4 12.26 LF @ 2.00% 18in RCP ST I N - A 3 - 2 - 1 ( I F O B ) ST A 1 0 + 1 2 . 2 6 FL 5 0 7 6 . 2 5 IN V O U T 5 0 7 1 . 2 9 50 7 6 . 5 4 50 7 0 . 7 2 ( S ) 50 7 0 . 7 2 ( N ) 50 7 0 . 6 6 ( E ) 50 7 6 . 7 6 ( R I M ) 50 7 1 . 0 8 2.94% STORM SEWER 'A2-1' PLAN 10+0011+0012+0013+0014+0011+00 10+00 10+00 11+00 STORM SEWER 'A2-1' PROFILE Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5050 5055 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-244 0 63 12 5090 5095 5050 5055 5060 5065 5070 5075 5080 5085 STORM SEWER 'A3' & 'A3-2' PLAN STORM SEWER 'A3' PROFILESTORM SEWER 'A3-1' PROFILESTORM SEWER 'A3-2' PROFILE 10+00 STORM SEWER 'A3-1' PLAN 51005100 NOTES . ASPEN AS P E N LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 1 2 2 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022, and December 7, 2022. E E E W W G G G 17 817 7 12 1 13 6 26 2 26 1 D D D 8' ' W 12 ' ' W 8'' W 8' ' S A 12'' W 12'' W EE G SSW S W S W E G G W W SE S EE S SS S G 12 ' ' W MP MP E E G G G T MP MO R N I N G S T A R W A Y TR A N S O M L A N E BRIGHTWATE R D R I V E POND 101 ST M H - A - 6 ST A 1 0 + 0 0 RI M 5 0 7 9 . 4 9 IN V I N 5 0 7 1 . 7 9 ( 3 6 " R C P ) IN V I N 5 0 7 2 . 7 9 ( 2 4 " R C P ) IN V I N 5 0 7 2 . 7 9 ( 1 8 " R C P ) IN V O U T 5 0 7 1 . 7 9 10.00 LF @ 2.00% 18in RCP ST I N - A 4 - 1 ( I F O B ) ST A 1 0 + 1 0 FL 5 0 7 9 . 1 2 IN V O U T 5 0 7 2 . 9 9 50 7 9 . 5 1 50 7 2 . 5 1 ( S ) 50 7 2 . 5 0 ( N ) 50 7 1 . 8 0 ( W ) 50 7 1 . 7 8 ( E ) RI M 5 0 7 9 . 4 3 50 7 3 . 1 3 6.27% EEG G W W 27 1 26 9 27 0 27 2 27 3 12 ' ' W 12 ' ' W 8' ' S A 8' ' S A E E E W W W S S S G G G G 8' ' S A D W S MP T MO R N I N G S T A R W A Y ST M H - A - 6 ST A 1 0 + 0 0 RI M 5 0 7 9 . 4 9 IN V I N 5 0 7 1 . 7 9 ( 3 6 " R C P ) IN V I N 5 0 7 2 . 7 9 ( 2 4 " R C P ) IN V I N 5 0 7 2 . 7 9 ( 1 8 " R C P ) IN V O U T 5 0 7 1 . 7 9 ST I N - A 5 - 1 ( I F O B ) ST A 1 0 + 5 2 FL 5 0 7 9 . 1 0 IN V O U T 5 0 7 4 . 9 2 24in R C P 52.07 L F @ 4.0 9 % 50 7 9 . 5 1 50 7 2 . 5 1 ( S ) 50 7 2 . 5 0 ( N ) 50 7 1 . 8 0 ( W ) 50 7 1 . 7 8 ( E ) RI M 5 0 7 9 . 2 6 50 7 4 . 4 6 3.76% ST I N - A 6 - 1 - 1 ( I F O B ) ST A 1 0 + 3 4 . 9 2 FL 5 0 9 2 . 1 0 IN V O U T 5 0 8 6 . 7 5 ST M H - A 6 - 1 ST A 1 0 + 0 0 RI M 5 0 9 2 . 6 6 IN V I N 5 0 8 5 . 5 0 ( 1 8 " R C P E ) IN V I N 5 0 8 5 . 7 0 ( 1 8 " R C P W ) IN V O U T 5 0 8 5 . 5 0 34.93 LF @ 3.00% 18in RCP IN V I N 5 0 8 8 . 2 5 ( 1 2 " H D P E W ) IN V I N 5 0 8 8 . 2 5 ( 4 " P V C S ) RI M 5 0 9 2 . 5 8 IN V I N 5 0 8 5 . 3 0 ( N W ) IN V I N 5 0 8 5 . 3 8 ( S E ) IN V O U T 5 0 8 5 . 2 9 ( N E ) RI M 5 0 9 2 . 5 8 50 8 6 . 3 5 3.01% ST M H - A 6 - 1 ST A 1 1 + 2 1 . 8 2 RI M 5 0 9 2 . 6 6 IN V I N 5 0 8 5 . 5 0 ( 1 8 " R C P E ) IN V I N 5 0 8 5 . 7 0 ( 1 8 " R C P W ) IN V O U T 5 0 8 5 . 5 0 16.42 LF @ 3.00% 18in RCP 121.88 L F @ 3.00% 24in RC P ST I N - A 6 - 1 ( I F O B ) ST A 1 1 + 3 8 . 2 4 FL 5 0 9 2 . 1 1 IN V O U T 5 0 8 6 . 0 0 ST M H - A - 8 ST A 1 0 + 0 0 RI M 5 0 9 4 . 4 6 IN V I N 5 0 8 0 . 6 8 ( 2 4 " R C P W ) IN V I N 5 0 8 1 . 8 5 ( 2 4 " R C P S ) IN V O U T 5 0 8 0 . 6 8 RI M 5 0 9 4 . 6 5 IN V I N 5 0 8 0 . 6 0 ( N W ) IN V I N 5 0 8 1 . 6 0 ( S W ) IN V O U T 5 0 8 0 . 5 4 ( S E ) RI M 5 0 9 2 . 5 8 IN V I N 5 0 8 5 . 3 0 ( N W ) IN V I N 5 0 8 5 . 3 8 ( S E ) IN V O U T 5 0 8 5 . 2 9 ( N E ) RI M 5 0 9 2 . 6 1 50 8 5 . 7 3 2.13%3.03% 13.19 LF @ 3.00% 18in RCP ST I N - A 7 - 1 ( I F O B ) ST A 1 0 + 1 3 . 1 8 FL 5 0 9 3 . 3 7 IN V O U T 5 0 8 3 . 3 4 ST M H - A - 9 ST A 1 0 + 0 0 RI M 5 0 9 3 . 7 8 IN V I N 5 0 8 1 . 4 6 ( 2 4 " R C P ) IN V I N 5 0 8 2 . 9 4 ( 1 8 " R C P ) IN V O U T 5 0 8 1 . 4 6 IN V I N 5 0 8 9 . 0 0 RI M 5 0 9 3 . 8 1 IN V I N 5 0 8 1 . 4 4 ( N ) IN V I N 5 0 8 2 . 6 6 ( S ) IN V O U T 5 0 8 1 . 4 3 ( E ) RI M 5 0 9 3 . 9 0 50 8 3 . 0 6 3.03% STORM SEWER 'A4' & 'A5' PLAN 10+0011+0010+0011+0010+00 10+00 11+00 12+0010+00 STORM SEWER 'A4' PROFILE Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-245 0 64 123 5090 5095 5055 5060 5065 5070 5075 5080 5085 STORM SEWER 'A7' PLAN STORM SEWER 'A7' PROFILESTORM SEWER 'A6-1' PROFILESTORM SEWER 'A5' PROFILE STORM SEWER 'A6' & 'A6-1' PLAN 11+00 STORM SEWER 'A6' PROFILE 5100 51055100 5105 5110 5090 5095 5055 5060 5065 5070 5075 5080 5085 5100 5105 5090 5095 5060 5065 5070 5075 5080 5085 5100 5105 5110 NOTES . AS P E N AS P E N LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 1 2 22 2 3 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022, and December 7, 2022. 3 3 50 6 1 . 6 1 50 5 4 . 2 6 RI M 5 0 6 1 . 5 4 IN V I N 5 0 5 3 . 8 8 RI M 5 0 6 1 . 5 4 IN V O U T 5 0 5 3 . 7 9 50 5 0 . 9 9 0.56% 0.47% 0.71% 0.63% 0.36% 50 5 9 . 9 9 50 5 3 . 0 2 50 5 1 . 1 7 RI M 5 0 6 4 . 9 1 IN V I N 5 0 5 3 . 7 0 IN V O U T 5 0 5 3 . 6 3 24''W 24''W 24''W 24''W14'' W 14'' W G 24''W 28 8 28 7 28 9 3 2 1 12 ' ' W 12 ' ' W S S S E E E G G G W W WE G S W 8' ' S A 8'' SA8'' SA E E G G G S W S W D 8'' W 8'' W D DP DPMP SQ U I B L A N E OUTRIGGER WAY MO R N I N G S T A R W A Y TURNBERRY ROAD (CR 11) POND 110 8'' SA 8'' SA 8'' S A W W W ST 12 13 14 59 58 60 57 8'' W 8'' SA E EE G G S W S W W W W G GG S S S E E EE DP D S W DP BRI G H T W A T E R D R I V E LO N G B O A T W A Y POND 110 50 7 0 . 4 5 50 5 8 . 8 3 3.42% 2.64% 50 6 8 . 1 2 50 5 5 . 0 3 50 5 4 . 9 1 50 5 1 . 8 3 3.42% STORM SEWER 'B' PLAN 10+0011+0010+00 11+00 12+00 Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5045 5050 5055 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-246 0 65 1 5045 5050 5055 5060 5065 5070 5075 5080 5085 STORM SEWER 'B' PROFILE 12+00 STORM SEWER 'C' PLAN STORM SEWER 'C' PROFILE 13+00 5035 5040 5035 5040 Street Cut Note NOTES . AS P E N ASP E N LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022. ST I N - D - 2 ( I F O B ) ST A 1 5 + 5 2 . 1 4 FL 5 0 9 4 . 0 4 IN V O U T 5 0 8 5 . 3 5 ST I N - D - 1 ( I F O B ) ST A 1 5 + 1 7 . 9 8 FL 5 0 9 4 . 0 4 IN V I N 5 0 8 5 . 1 8 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 7 9 . 7 0 34.17 LF @ 0.50% 30in RCP ST I N - D - 1 ( I F O B ) ST A 1 5 + 1 4 . 9 7 RI M 5 0 9 4 . 5 7 IN V O U T 5 0 8 5 . 1 7 EN D F E S ST A 1 0 + 0 7 . 6 9 IN V I N 5 0 7 9 . 7 2 36in RCP ST M H - D - 2 ST A 1 3 + 9 2 . 5 6 RI M 5 0 8 6 . 5 0 IN V I N 5 0 8 1 . 2 7 IN V O U T 5 0 8 1 . 2 7 ST M H - D - 1 ST A 1 2 + 6 8 . 7 8 RI M 5 0 9 0 . 3 8 IN V I N 5 0 8 0 . 7 8 IN V O U T 5 0 8 0 . 7 8 122.41 L F @ 3.19% 30in RC P 123.78 LF @ 0.40%36in RCP 262.70 LF @ 0.40% 0.32% 1.34% 2.26% 0.70% RI M : 5 0 9 4 . 4 4 IN V O U T 5 0 8 5 . 0 9 RI M : 5 0 9 4 . 5 1 IN V O U T 5 0 8 5 . 4 7 RI M : 5 0 8 6 . 3 2 50 8 2 . 3 2 50 8 2 . 2 7 RI M : 5 0 8 9 . 9 0 50 8 0 . 6 1 50 8 0 . 5 4 50 7 9 . 7 0 RI M : 5 0 9 4 . 4 4 IN V I N 5 0 8 5 . 2 3 10'' S A 10'' SA E E 11 9 13 3 11 0 11 1 11 2 11 3 11 4 11 5 11 6 11 7 11 8 13 8 14 1 14 2 14 3 12 8 12 9 13 2 13 0 13 6 13 5 13 4 13 1 D D D 8'' SA 8'' SA 8'' W 8'' W EE G G E E G G G GEEE E E G G G EE E GG EG E G G EE E W S W S W S S S W S W SWSWSWS S SW S W S W S S S W WS W S W SW W E E G W S W G EWG W G G E G G S W E E TR A N S O M L A N E GANGWAY DRIVE BAR N S W A L L O W C I R C L E POND 300 STORM SEWER 'D' PLAN 12+00 11+00 Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-247 0 66 1 5090 5095 5060 5065 5070 5075 5080 5085 STORM SEWER 'D' PROFILE 10+0013+0014+0015+0016+00 5105 5110 5100 5105 5110 5100 NOTES . STORM SEWER 'D' STORM SEWER NOTES THE DEVELOPER OR HOA SHALL BE RESPONSIBLE FOR ANY DISTURBED LANDSCAPING OR FENCING DUE TO MAINTENANCE ACTIVITIES, UNDERTAKEN BY THE CITY OF FORT COLLINS, FOR STORM SEWER PIPE 'D' . AS P E N LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022. ST I N - E 1 - 1 ( I F O B ) ST A 1 2 + 4 6 . 6 5 FL 5 0 8 7 . 0 3 IN V O U T 5 0 8 1 . 4 9 EN D F E S ST A 1 0 + 0 7 . 6 1 IN V I N 5 0 8 0 . 5 2 163.35 LF @ 0.40%24in RCP BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 8 0 . 5 0 ST M H - E 1 - 1 ST A 1 0 + 8 3 . 3 0 RI M 5 0 8 5 . 6 4 IN V I N 5 0 8 0 . 8 3 IN V I N 5 0 8 0 . 8 3 IN V O U T 5 0 8 0 . 8 3 77.22 LF @ 0.40% 34in X 53in HERCP RI M : 5 0 8 7 . 4 0 50 8 1 . 5 9 RI M : 5 0 8 6 . 0 7 50 8 0 . 9 3 50 8 0 . 9 3 50 8 0 . 8 8 50 8 0 . 5 9 0.40%0.37% 8'' S A 8'' S A 8'' S A 8'' S A 8'' S A E E 148 116 117 118 120 137 138 141 140 139 145 146 147 157 158 159 156 149 155 154 160 161 D D 8'' W 8'' W 8'' S A 8'' S A 8'' S A 8'' W 8' ' S A 8'' SA 8'' W EE EE EE GG G G GG GG G EE EE G G EE GG E EE E E G G G G G G S W W S WS WS W S W S W S S W S W S W W S S W W W S S W W S W S E E S W G W S G D D D D W S S T NAVIGA T O R W A Y BAR N S W A L L O W C I R C L E POND 300 ST M H - E 1 - 1 ST A 1 0 + 0 0 RI M 5 0 8 5 . 6 4 IN V I N 5 0 8 0 . 8 3 IN V I N 5 0 8 0 . 8 3 IN V O U T 5 0 8 0 . 8 3 7.38 LF @ 0.40% 30in RCP ST I N - E 1 - 1 - 1 ( I F O B ) ST A 1 0 + 0 7 . 3 8 RI M 5 0 8 4 . 2 6 IN V O U T 5 0 8 0 . 8 6 RI M : 5 0 8 6 . 0 7 50 8 0 . 9 3 50 8 0 . 9 3 50 8 0 . 8 8 RI M : 5 0 8 4 . 3 1 50 8 0 . 9 6 0.41% ST I N - E - 1 ( I F O B ) ST A 1 0 + 3 9 . 8 7 FL 5 0 8 5 . 3 9 IN V O U T 5 0 8 0 . 6 6 EN D F E S ST A 1 0 + 0 5 . 7 3 IN V I N 5 0 8 0 . 5 2 34.17 LF @ 0.40% 24in RCP 33.78 LF @ 0.40% 30in RCP BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 8 0 . 5 0 ST I N - E - 1 ( I F O B ) ST A 1 0 + 4 2 . 8 7 FL 5 0 8 5 . 3 4 IN V I N 5 0 8 0 . 6 7 ST I N - E - 2 ( I F O B ) ST A 1 0 + 7 7 . 0 4 FL 5 0 8 5 . 3 5 IN V O U T 5 0 8 0 . 8 1 IN V O U T 5 0 8 0 . 5 8 RI M : 5 0 8 5 . 8 4 50 8 0 . 8 2 RI M : 5 0 8 5 . 8 6 50 8 1 . 0 5 RI M : 5 0 8 5 . 8 4 50 8 0 . 9 0 0.70% 0.44% STORM SEWER 'E' & 'E1' PLAN 10+00 Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-248 0 67 1 5090 5095 5060 5065 5070 5075 5080 5085 STORM SEWER 'E1' PROFILE 11+0012+0013+00 11+00 STORM SEWER 'E' PROFILE 10+00 5100 5105 5100 5105 51105110 11+00 STORM SEWER 'E1-1' PROFILE 10+00 NOTES . ASPEN LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022. ST M H - F - 1 ST A 1 1 + 3 1 . 8 3 RI M 5 0 7 9 . 4 0 IN V I N 5 0 7 1 . 3 2 IN V O U T 5 0 7 1 . 3 2 ST I N - F - 1 ( I F O B ) ST A 1 0 + 6 8 . 6 3 RI M 5 0 7 5 . 0 0 IN V O U T 5 0 7 0 . 6 9 EN D F E S ST A 1 0 + 0 7 . 6 9 IN V I N 5 0 7 0 . 0 6 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 7 0 . 0 0 34.60 LF @ 0.50% 36in RCP 60.20 LF @ 1.00% 36in RCP 62.53 LF @ 1.00% 36in RCP ST I N - F - 1 ( I F O B ) ST A 1 0 + 7 1 . 6 3 RI M 5 0 7 5 . 0 0 IN V I N 5 0 7 0 . 7 2 ST M H - F - 5 ST A 1 5 + 7 4 . 7 6 RI M 5 0 8 6 . 1 4 IN V I N 5 0 7 6 . 8 5 IN V O U T 5 0 7 6 . 8 5 153.04 LF 36in RCP ST M H - F - 4 ST A 1 4 + 2 1 . 7 2 RI M 5 0 8 5 . 9 8 IN V I N 5 0 7 6 . 0 8 IN V O U T 5 0 7 6 . 0 8 ST M H - F - 3 ST A 1 3 + 0 3 . 1 8 RI M 5 0 8 7 . 2 8 IN V I N 5 0 7 5 . 4 9 IN V O U T 5 0 7 5 . 4 9 ST M H - F - 2 ST A 1 2 + 4 8 . 2 2 RI M 5 0 8 8 . 1 5 IN V I N 5 0 7 5 . 2 2 IN V O U T 5 0 7 5 . 2 2 118.54 LF @ 0.50%36in RCP 54.96 @ 0.50% 36in RCP 116.45 L F @ 3.35% 36in R C P @ 0.50% OU T L E T S T R U C T U R E ( I F O B ) ST A 1 6 + 0 9 . 3 6 IN V O U T 5 0 7 7 . 0 0 IN V I N 5 0 7 7 . 0 0 ( 4 " P V C ) 0.40% 0.47% 0.40% 3.11% 0.95% 0.97% 0.52% 50 7 0 . 0 5 50 7 4 . 9 9 50 7 0 . 6 6 50 7 8 . 9 2 50 7 1 . 4 1 50 7 1 . 2 9 50 7 4 . 9 9 50 7 0 . 7 2 50 8 7 . 9 3 50 7 5 . 1 4 50 7 5 . 0 3 50 8 7 . 3 9 50 7 5 . 4 6 50 7 5 . 3 6 50 8 6 . 1 1 50 7 6 . 1 2 50 7 6 . 0 2 RI M 5 0 8 3 . 1 8 IN V I N 5 0 7 6 . 8 3 IN V O U T 5 0 7 6 . 7 3 RI M 5 0 8 2 . 9 6 IN V I N 5 0 7 7 . 0 1 10 ' ' S A 8' ' S A 10 ' ' S A 8'' SA 8'' SA 8'' SA E E E 119 148 137 138 141 140 139 144 145 146 147 157 158 159 156 149 155 160 D D 8' ' W 8'' W 8' ' S A 8'' SA 8' ' S A 8'' W 8'' SA 8' ' W E E E E E E G G G G G G G G G E E G E E G G E E E EE G G G S W WS WS W S W S S W S W W S S WW W S S W S W S W S EE S W G WSG D D D D W S T NAVIGATOR WAY BA R N S W A L L O W C I R C L E POND 300 RICHARD'S LAKE STORM SEWER 'F' PLAN 13+00 14+00 Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5050 5055 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-249 0 68 1 5090 5095 5050 5055 5060 5065 5070 5075 5080 5085 STORM SEWER 'F' PROFILE 15+0012+0011+0010+00 16+00 17+00 51005100 NOTES . ASP E N LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022. ST I N - G - 2 ( I F O B ) ST A 1 1 + 1 5 . 1 5 FL 5 0 9 5 . 7 3 IN V O U T 5 0 9 2 . 7 0 ST I N - G - 1 ( I F O B ) ST A 1 0 + 6 3 . 8 1 FL 5 0 9 5 . 7 3 IN V I N 5 0 9 2 . 4 5 ST I N - G - 1 ( I F O B ) ST A 1 0 + 6 0 . 8 1 RI M 5 0 9 6 . 2 9 IN V O U T 5 0 9 2 . 4 3 EN D F E S ST A 1 0 + 0 6 . 1 0 IN V I N 5 0 9 0 . 2 4 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 9 0 . 0 0 51.33 LF @ 0.50% 18in RCP 54.75 L F@ 4.00 %18in R C P 50 9 0 . 0 2 RI M 5 0 9 6 . 2 7 50 9 2 . 5 3 3.98% 0.47% 50 9 6 . 2 7 50 9 2 . 4 3 RI M 5 0 9 6 . 2 7 IN V O U T 5 0 9 2 . 7 7 8'' S A 12''W W 8'' S A E G 185 184 183 182 181174 173 172 171 167 166 169 168 170 D 8' ' W 8' ' S A 12' ' W G G E E G G EE GG EE GG E E S S S S S W W W W W S W S W S W S W 12'' W W S MP E MOR N I N G S T A R W A Y NA V I G A T O R W A Y BE G I N F E S ST A 1 3 + 0 1 . 2 9 IN V I N 5 0 8 6 . 9 7 ST M H - H - 1 ST A 1 1 + 6 3 . 5 0 RI M 5 0 9 8 . 2 6 IN V I N 5 0 8 6 . 3 1 IN V O U T 5 0 8 6 . 3 1 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 8 5 . 5 2 131.69 LF @ 0.50%24in RCP 157.40 LF @ 0.50%24in RCP EN D F E S ST A 1 0 + 0 5 . 7 5 IN V I N 5 0 8 5 . 5 5 EN D F E S ST A 1 2 + 9 5 . 5 4 IN V O U T 5 0 8 6 . 9 4 0.52% 0.43% 50 9 8 . 2 2 50 8 6 . 2 5 50 8 6 . 2 5 50 8 6 . 9 3 (H E A D W A L L IN S T A L L E D ; NO F E S ) (H E A D W A L L ) (H E A D W A L L IN S T A L L E D ; NO F E S ) (H E A D W A L L ) 50 8 5 . 5 8 STORM SEWER 'G' PLAN 13+00 Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-250 0 69 12 5090 5095 5070 5075 5080 5085 STORM SEWER 'G' PROFILE 12+0010+0011+0012+00 11+00 10+00 STORM SEWER 'H' PLAN 14+00 STORM SEWER 'H' PROFILE 5115 5120 5100 5105 5110 5115 5120 5100 5105 5110 NOTES . ASPEN LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 2 2 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022. EN D F E S ST A 1 2 + 9 3 . 9 5 IN V I N 5 0 7 5 . 0 0 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 7 3 . 0 0 281.78 LF @ 0.68% 18in RCP EN D F E S ST A 1 0 + 0 5 . 7 5 IN V I N 5 0 7 3 . 0 4 BE G I N F E S ST A 1 2 + 8 8 . 2 0 IN V O U T 5 0 7 4 . 9 6 50 7 4 . 9 2 50 7 2 . 9 9 0.67% 230 228 229 232231 226 227 253 225 224 223222221 258 257 256 255 254 249 252 251 250 248 247 8'' W 8'' SA 8'' SA 8'' SA 8'' SA 8'' W 8'' W 8'' W G G E E G G G G G G G G G G E E E E E E E E W S W S W S W S W S W S W S WS WS W S W WS E E E E E E E E E E E E G G G G G G G G G G S W WWSW S W SWSWSWSWS W SWSWS MIDSHIP WAY POND 201 POND 201 POND 301 POND 301 POND 301 BE G I N F E S ST A 1 0 + 7 6 . 4 6 IN V O U T 5 0 7 3 . 9 3 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 7 3 . 0 0 70.04 LF @ 1.22% 18in RCP EN D F E S ST A 1 0 + 0 5 . 7 5 IN V I N 5 0 7 3 . 0 7 EN D F E S ST A 1 0 + 8 2 . 2 1 IN V I N 5 0 7 4 . 0 0 1.16% 50 7 3 . 7 9 50 7 2 . 8 4 EN D F E S ST A 1 0 + 5 1 . 6 9 IN V O U T 5 0 7 2 . 9 0 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 7 2 . 0 0 45.28 LF @ 1.75% 18in RCP BE G I N F E S ST A 1 0 + 5 7 . 4 4 IN V I N 5 0 7 3 . 0 0 EN D F E S ST A 1 0 + 0 5 . 7 5 IN V I N 5 0 7 2 . 1 1 50 7 2 . 9 2 1.79% 50 7 1 . 8 9 STORM SEWER 'J' PLAN 11+00 Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5090 5095 5050 5055 5060 5065 5070 5075 5080 5085 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-251 0 70 12 5090 5095 5050 5055 5060 5065 5070 5075 5080 5085 STORM SEWER 'I' PROFILE 10+0011+0012+0013+00 STORM SEWER 'K' PLAN STORM SEWER 'J' PROFILE 10+00 11+00 10+00 STORM SEWER 'K' PROFILE STORM SEWER 'I' PLAN 50955095 NOTES . ASPEN LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 2 2 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022. BE G I N F E S ST A 1 0 + 2 1 . 7 0 IN V O U T 5 0 7 0 . 1 7 EN D F E S ST A 1 0 + 0 5 . 7 5 IN V I N 5 0 6 9 . 6 1 39.66 LF @ 2.00% 18in RCP EN D F E S ST A 1 0 + 2 7 . 4 5 IN V I N 5 0 7 0 . 2 9 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 6 9 . 5 0 0.47% 50 9 2 . 4 3 50 9 2 . 4 3 50 9 2 . 4 3 30 0 30 1 29 8 29 9 31 9 31 8 20 0 23 7 23 8 24 2 24 1 24 0 23 9 E E S S E E S E E S W WW W G G G G W W G G S POND 501 SK I F F L A N E SQ U I B L A N E 8'' SA 24 ' ' W 14 ' ' W G G 24 ' ' W 24 ' ' W 24 ' ' W 8' ' S A 8' ' S A TU R N B E R R Y R O A D ( C R 1 1 ) POND 110 10 ' ' S A 10 ' ' S A G 109 RICHARD'S LAKE ST I N - N - 1 ( I F O B ) ST A 1 0 + 5 7 . 5 4 FL 5 0 5 9 . 7 4 IN V O U T 5 0 5 2 . 8 8 EN D F E S ST A 1 0 + 0 5 . 7 5 IN V I N 5 0 5 0 . 3 0 51.52 L F @ 5.0 0 % 18in R C P BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 5 0 . 0 0 5.45% RI M 5 0 6 0 . 2 3 50 5 2 . 7 8 50 4 9 . 9 7 ST I N - O - 1 ( I F O B ) ST A 1 0 + 5 2 . 3 1 RI M 5 0 7 5 . 0 0 IN V O U T 5 0 7 2 . 2 6 BE G I N P I P E ST A 1 0 + 0 0 IN V O U T 5 0 7 2 . 0 0 52.31 LF @ 0.50% 12in ADS 50 7 4 . 9 8 50 7 2 . 2 5 50 7 2 . 0 1 0.46% STORM SEWER 'L' PLAN 10+00 Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 5045 5050 5055 5060 5065 5070 5075 5080 SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-252 0 71 12 5090 5095 5050 5055 5060 5065 5070 5075 5080 5085 STORM SEWER 'L' PROFILE 11+0010+0011+0010+00 STORM SEWER 'M' PROFILE 11+00 10+00 11+00 STORM SEWER 'N' PROFILESTORM SEWER '0' PROFILE STORM SEWER 'O' PLAN STORM SEWER 'N' PLAN 5030 5035 5040 5045 5050 5055 5060 5065 5070 5075 5080 5030 5035 5040 5100 5090 5095 5050 5055 5060 5065 5070 5075 5080 5085 5100 NOTES . ASPEN AS P E N ASPEN (STORM SEWER 'M' REMOVED) LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 2 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022. 20 0 19 9 19 8 20 2 20 1 23 6 23 7 23 8 23 5 20 3 20 4 20 5 23 2 23 3 23 4 19 5 19 6 24 7 24 6 24 5 24 3 24 4 24 2 24 1 24 0 23 9 19 7 8' ' S A 8' ' S A 8'' SA 8'' SA 8'' SA 8'' W 8'' W 8'' W E EE G GG GG GGEEE E E E G G W S S W W S S W SWSW S W 8' ' S A 8' ' S A 8' ' W 8' ' W E E E G G G G G E EE EE EEGSWGGGG GSWSWSWSWSW GG ESWESWSW W S S W S W S W S W G G G E E E W S W S W S E E G G G W S W S W S D D DD POND 201POND 301 CO M P A N I O N W A Y MI D S H I P W A Y HELMSMAN STREET IN V I N 5 0 6 9 . 9 6 ST I N - R - 2 ( I F O B ) ST A 1 2 + 0 0 . 7 2 FL 5 0 7 9 . 6 8 IN V O U T 5 0 7 5 . 1 8 ST I N - R - 1 ( I F O B ) ST A 1 1 + 7 2 . 8 8 RI M 5 0 7 9 . 6 8 IN V I N 5 0 7 4 . 6 2 ST M H - R - 1 ST A 1 0 + 6 2 . 0 3 RI M 5 0 7 6 . 2 8 IN V I N 5 0 7 0 . 2 4 IN V O U T 5 0 7 0 . 2 4 EN D F E S ST A 1 0 + 0 5 . 7 5 27.85 LF @ 2.00% 18in RCP 108.4 3 L F @ 4.00 % 24in R C P 55.96 LF @ 0.50% 24in RCP ST I N - R - 1 ( I F O B ) ST A 1 1 + 7 0 . 3 8 RI M 5 0 8 0 . 0 9 IN V O U T 5 0 7 4 . 5 7 BE G I N F E S ST A 1 0 + 0 0 IN V O U T 5 0 6 9 . 9 3 50 6 9 . 8 5 50 7 5 . 6 2 50 7 0 . 0 6 50 7 0 . 0 6 50 7 9 . 3 4 50 7 3 . 6 8 RI M 5 0 7 9 . 6 6 50 7 5 . 1 0 50 7 9 . 6 6 50 7 4 . 5 2 2.08% 3.49% 0.37% 50 7 1 . 5 5 50 7 7 . 7 4 50 7 2 . 1 2 50 7 2 . 1 2 RI M 5 0 8 3 . 8 5 50 7 7 . 8 9 RI M 5 0 8 3 . 7 7 50 7 7 . 1 0 RI M 5 0 8 4 . 1 7 50 7 7 . 0 7 2.84% 5.11% 0.95% 10+00 11+00 10+00 13+0012+0011+00 STORM SEWER 'R' PROFILE Is s u e d Re v i s i o n 0 KEY MAP - 1" = 700' UTILITY PLAN APPROVAL City of Fort Collins, Colorado CALL UTILITY NOTIFICATION CENTER OF COLORADO1-800-922-1987 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. SK Y L A N D M E A D O W S D E V E L O P M E N T S , L T D . WA T E R S E D G E S E C O N D F I L I N G Fo r t C o l l i n s , C O 187010190 147 Permit-Seal Drawing No. Ti t l e Cl i e n t / P r o j e c t SheetRevision of Is s u e d Re v i s i o n ST O R M S E W E R P L A N & P R O F I L E C-253 0 72 12 5090 5095 5055 5060 5065 5070 5075 5080 5085 STORM SEWER 'Q' PLANSTORM SEWER 'R' PLAN STORM SEWER 'Q' PROFILE 5100 5105 STORM SEWER 'Q' & 'R' STORM SEWER NOTES THE DEVELOPER OR HOA SHALL BE RESPONSIBLE FOR ANY DISTURBED LANDSCAPING OR FENCING DUE TO MAINTENANCE ACTIVITIES, UNDERTAKEN BY THE CITY OF FORT COLLINS, FOR STORM SEWER PIPES 'Q' & 'R' . NOTES . AS P E N 5090 5095 5055 5060 5065 5070 5075 5080 5085 5100 5105 LEGEND - EXISTING __" SA SANITARY SEWER WITH MANHOLE STORM SEWER __" W WATER LINE SWALE ELECTRIC - UNDERGROUNDUGE LEGEND - PROPOSED WATER LINE SANITARY SEWER WITH MANHOLE STORM SEWER STORM SEWER CURB INLET STORM SEWER FLARED END SECTION RESTRAINED JOINT WITH PLUG FIRE HYDRANT 8" SA ELECTRIC SERVICE WATER SERVICE WITH METER PIT SANITARY SEWER SERVICE GAS SERVICE E W S G MP _" W THRUST BLOCK (SEE WATERLINE NOTE 21, SHEET C-002) 1 2 These Drawings of Record have been prepared based upon a survey by Majestic Surveying dated July 27, 2022. Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User Defined Selected BMP Type =EDB Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Area =107.50 acres 0.00 11 0.00 0.00 Watershed Length =2,900 ft 1.00 5,357 1.00 4.42 Watershed Length to Centroid =1,500 ft 2.00 34,982 2.00 8.84 Watershed Slope =0.015 ft/ft 3.00 85,493 3.00 13.26 Watershed Imperviousness =38.5%percent 4.00 125,710 4.00 17.68 Percentage Hydrologic Soil Group A =11.3%percent 5.00 135,985 5.00 22.10 Percentage Hydrologic Soil Group B =29.5%percent 6.00 142,935 6.00 26.52 Percentage Hydrologic Soil Groups C/D =59.2%percent 7.00 149,599 7.00 30.94 Target WQCV Drain Time =40.0 hours 8.00 156,379 8.00 35.36 9.00 163,573 9.00 39.78 User Input 10.00 172,233 10.00 44.20 11.00 184,711 11.00 44.20 After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif Create a new stormwater facility, and attach the PDF of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year One-Hour Rainfall Depth =N/A 0.98 1.36 2.31 2.91 3.67 in CUHP Runoff Volume =1.575 3.038 5.496 13.745 19.752 27.355 acre-ft Inflow Hydrograph Volume =N/A 3.038 5.496 13.745 19.752 27.355 acre-ft Time to Drain 97% of Inflow Volume =2.0 3.8 5.4 9.1 11.0 12.8 hours Time to Drain 99% of Inflow Volume =2.2 4.0 5.7 9.5 11.6 13.6 hours Maximum Ponding Depth =2.83 2.75 3.64 5.87 7.46 9.30 ft Maximum Ponded Area =1.77 1.66 2.54 3.26 3.50 3.81 acres Maximum Volume Stored =1.588 1.427 3.319 10.081 15.445 22.163 acre-ft Once CUHP has been run and the Stage-Area-Discharge information has been provided, click 'Process Data' to interpolate the Stage-Area-Volume-Discharge data and generate summary results in the table below. Once this is complete, click 'Print to PDF'. Stormwater Detention and Infiltration Design Data Sheet Waters Edge West (Combined volumes and outflows for Pond 110 and Pond 300) Fort Collins, Colorado (40.62983°, -105.04528°) SDI-Design Data v2.00, Released January 2020 Location for 1-hr Rainfall Depths (use dropdown): After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Waters Edge West State ComplianceXcel.xlsm, Design Data 10/3/2022, 3:14 PM Booleans for Message Booleans for CUHP Watershed L:W 1 CUHP Inputs Complete Watershed Lc:L 1 CUHP Results Calculated Watershed Slope FALSE Time Interval RunOnce 1 CountA 1 Draintime Coeff 1.0 User Precip 1 Equal SA Inputs 1 Equal SD Inputs 1 Stormwater Detention and Infiltration Design Data Sheet 0 50 100 150 200 250 300 350 400 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 8 9 10 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV Waters Edge West State ComplianceXcel.xlsm, Design Data 10/3/2022, 3:14 PM