HomeMy WebLinkAboutSite Certifications - 03/06/201912/15 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet Erik Snyder PLS 38555 12/15 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc.Spillway for pond is over a sidewalk and landscape with a 2-6% slope. No scour is expected during overflow event 0.5% for about 25' Garage is 0.35' above overflow weir and 0.85' above 100-year WSEL. In an event where overflow weir is breached, stormwater may get in garage (through trench drain) if overflow weir is flowing fuller than 0.35' high Some areas have greater than +/- 0.2 ft change in grade. Grading concept and functionality is still compliant with intent of plans. 12/15 Page 3 4.Outlet Structure Certification a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) B TRMs at FES have not been installed yet. These are scheduled to be installed by the erosion control contractor. An additional hole (1/2 size) was added at bottom of plate for drainage 1.5% long. slope 12/15 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. Some small horizontal and vertical deviations from plans. Not expected to be an issue. Some small horizontal and vertical deviations from plans. Not expected to be an issue. No pans proposed with this site. Curbline meets construction plans 100-year overflow weirs in Inlet B2 and STMH C2 were modeled due to changes in weir height. 12/15 Page 5 V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All inlet covers are stenciled or stamped with the following designation: NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Vol.2, Ch.9 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. No groundwater subdrains were installed on this site. An underdrain was installed for the Stormtech system. Underdrain has positive fall to pond. Underdrain installed at approximately same elevation as Stormtech chambers (+0.5' higher than design). This should function sufficiently. 12/15 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. Culvert looks to be installed 0.5' high. Drainage grade through culvert looks to be satisfactory. Stormtech subdrain does not indicate a sock required. 12/15 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A. Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1.All fabric was installed per the details on the approved construction plans. XIII.Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV.Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. ECB does not look to be installed on Pond side slopes. This may not be an issue since no runoff will be directed over pond sideslope. Pond side slope is 4:1. Ponds show no signs of rilling or erosion on the side slope at the time of this certification. No seeding has occurred at the time of this certification. This will be escrowed. TRMs have not been installed yet. These are scheduled to be installed by the erosion control contractor. Stormtech was installed approximately 8 feet east of design location due to utility conflicts. This puts Stormtech eastern edge under garden retaining wall. Contractor was asked to contact Stormtech manufacturer to verify Stormtech will be functional next to wall. Contractor indicated that Stormtech had no concern about the relocation. 1/19 Page 1 of 2 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. • Use “Yes” for items completed as described. • Use “N/A” for items that are not applicable to the site being certified. • If any blanks are “No,” attach an explanation referencing the item number below. Project Name: Village Cooperative of Fort Collins Date: 3/6/2019 Building Permit Numbers: B1701509 I. Compaction A. Yes All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II. Storm Drain Pipe Installation Requirements A. Yes The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0 A. Riprap 1. N/A The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. 2. N/A A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. 3. N/A The riprap is the gradation shown on the approved construction plans with a D50 of . 4. N/A The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. 5. N/A The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 1. N/A All fabric was installed per manufacturer’s specifications. 1/19 Page 2 of 2 IV. Other Permanent BMPs A. N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes.) V. Extended Detention Basins A. Yes Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality control box(es). Provide date of inspection and name of inspector: December of 2018 Kurt Vanatta Included certification sheet(s): Please check the appropriate box(es) for the Low Impact Development (LID) facilities found on this site and complete the corresponding certification sheets. ☐ Permeable Interlocking Concrete Pavers ☐ Bioretention Cells (Rain Gardens) ☐ Sand Filters ☐ Vegetated Buffers ☒ Underground Infiltration ☐ Other LID – For certification of Dry Wells, Tree Filters, Constructed Wetland Channels & Ponds, etc., contact City Staff to determine requirements to exhibit the LID facility has been constructed and functions as intended per the approved drainage report. *Please provide photographic documentation of the installation of all stages of all LID facilities. **Please contact the City Stormwater Inspector at stormwaterinspection@fcgov.com to discuss inspection requirements for each LID facility and request inspections. ***All facilities being certified must be “clean” – free of sediment & construction debris – prior to certification or acceptance of the facility. Completed by: Name: Thom Dobeck Title: Superintendent Email: Thom@halcyonconstruction.org Phone: 970-652-0731 Company: Halcyon Construction Inc. Address: 4627 W. 20th St Rd, Ste B, Greeley, CO. 80634 1/19 Page 1 of 2 Underground Infiltration Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Manufacturer’s representative pre-construction meeting: A pre-construction meeting was completed with the manufacturer’s representative and installers ☒ ☐ ☐ Record date and who was present at the meeting Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☒ ☐ ☐ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point at which the chambers had been laid/prior to backfilling. Correct fabric placement was confirmed. ☒ ☐ ☐ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not travel across underground cell area during excavation (prevents over-compaction) ☒ ☐ ☐ Bottom of cell was “ripped” after excavation ☒ ☐ ☐ Provide photographs before and after “ripping” Photos provided to Northern Engineering Bottom of cell is flat and level, or graded per approved grading plans ☒ ☐ ☐ Provide photograph Photos provided to Northern Engineering Non-woven fabric is installed per manufacturer’s specifications and was not damaged during construction (around system) ☒ ☐ ☐ Provide photograph Photos provided to Northern Engineering Woven fabric is installed per manufacturer’s specifications and was not damaged during construction (beneath chambers) ☒ ☐ ☐ Provide photograph Photos provided to Northern Engineering Excavated area is protected/surrounded by sediment/runoff control BMPs during construction ☒ ☐ ☐ Provide photograph Photos provided to Northern Engineering Impermeable Liner Impermeable liner meets design specifications ☒ ☐ ☐ Provide specifications of delivered material Impermeable liner is not exposed ☒ ☐ ☐ Any penetrations of the impermeable liner have been sealed and checked for water-tightness. ☒ ☐ ☐ Provide photograph (if necessary) Aggregate Foundation and embedment materials are installed and compacted according to design and manufacturer’s specifications ☒ ☐ ☐ Provide load ticket and photograph(s) Underdrain System 1/19 Page 2 of 2 Underdrain pipe meets design specifications ☒ ☐ ☐ Provide photograph At least one cleanout is provided per underdrain lateral ☒ ☐ ☐ Provide photograph Cleanout pipe is solid (not perforated/slotted) ☒ ☐ ☐ Provide photograph Cleanout covers are installed and watertight ☒ ☐ ☐ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☒ ☐ ☐ Provide photograph Verify there is no orifice plate on the underdrain outfall ☒ ☐ ☐ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☒ ☐ ☐ Provide documentation of test results Manifold system Overflow weir elevation is set at/above water quality storm elevation ☒ ☐ ☐ Record weir elevation on survey Maintenance access is provided for each Isolator Row ☒ ☐ ☐ At least one inspection port has been provided for each Isolator Row (located in middle third of each row) ☒ ☐ ☐ Upstream catchment drains to inlet/intake properly ☒ ☐ ☐ Underground Detention Chambers All chambers were installed per approved Utility Plans and manufacturer’s specifications ☒ ☐ ☐ Photograph Close Out Upstream catchment is stabilized prior to diverting runoff into Underground Detention system ☒ ☐ ☐ All Isolator Rows, chambers, and pipes are cleaned and sediment/debris has been removed ☒ ☐ ☐ FO FO FO FO FO FO FO FO FO FO FO FO GGGGGGGGGGGG SS SS SS SS SS SS SS SS SS SS SS SSS T T T T T UD UD TF HORSETOOTH ROAD VILLAGE COOPERATIVE OF FORT COLLINS DETENTION POND PROPOSED100-YR WSEL: 5006.31 INSTALLED 100-YR WSEL: 5006.40 VILLAGE COOPERATIVE OF F.C. SHEET NO: D: \ P R O J E C T S \ 1 2 8 4 - 0 0 1 \ D R A I N A G E \ D R N G C E R T \ 1 2 8 4 - 0 0 1 _ S T A G E S T O R A G E . D W G ISSUED:DRAWING REFERENCE: RECORD DRAWING POND STORAGE DRAINAGE CERTIFICATION S. THOMAS 1in=30ft MARCH 1, 2019 N/A DRAWN BY: SCALE: ISSUED: ( IN FEET ) 0 1 INCH = 30 FEET 30 30 FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 E N G I N E E R N GI EHTRON R N 970.221.4158 northernengineering.com Detention Pond Contour Elevation (Y-values) Contour Area Incremental Volume Total Volume ft2 ft3 ft3 5,000.80 15 0 0 5,001.00 284 30 30 5,001.20 475 86 116 5,001.40 651 135 251 5,001.60 842 185 437 5,001.80 1,079 238 675 5,002.00 1,421 290 965 5,002.20 1,713 339 1,304 5,002.40 1,930 383 1,687 5,002.60 2,135 423 2,110 5,002.80 2,354 465 2,575 5,003.00 2,579 509 3,084 5,003.20 2,825 555 3,639 5,003.40 3,083 605 4,244 5,003.60 3,351 657 4,901 5,003.80 3,635 712 5,612 5,004.00 3,931 769 6,381 5,004.20 4,241 829 7,210 5,004.40 4,567 892 8,102 5,004.60 4,911 958 9,061 5,004.80 5,275 1,029 10,090 5,005.00 5,665 1,104 11,193 5,005.20 6,103 1,186 12,379 5,005.40 6,591 1,278 13,657 5,005.60 7,153 1,383 15,040 5,005.80 7,875 1,511 16,551 5,006.00 8,999 1,695 18,246 5,006.20 10,506 1,957 20,203 5,006.40 11,046 2,164 22,366 5,006.60 11,626 2,276 24,642 5,006.80 12,257 2,397 27,039 100-year Volume Required (cf)22,329 100-year WSEL Proposed 5006.31 100-year WSEL Installed 5006.40 WQ Volume Required (cf)740 WQ WSEL Proposed 5001.71 WQ WSEL Installed 5001.84 Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Feb 21 2019 100-yr Overflow Weir in Inlet B2 Rectangular Weir Crest = Sharp Bottom Length (ft) = 3.00 Total Depth (ft) = 2.00 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 16.00 Highlighted Depth (ft) = 1.37 Q (cfs) = 16.00 Area (sqft) = 4.11 Velocity (ft/s) = 3.90 Top Width (ft) = 3.00 0 .5 1 1.5 2 2.5 3 3.5 4 Depth (ft) Depth (ft)100-yr Overflow Weir in Inlet B2 -1.00 -1.00 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Length (ft)Weir W.S. Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Feb 21 2019 100-yr Overflow Weir in STMH C2 Rectangular Weir Crest = Sharp Bottom Length (ft) = 1.50 Total Depth (ft) = 2.00 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 3.82 Highlighted Depth (ft) = 0.84 Q (cfs) = 3.820 Area (sqft) = 1.25 Velocity (ft/s) = 3.05 Top Width (ft) = 1.50 0 .5 1 1.5 2 2.5 Depth (ft) Depth (ft)100-yr Overflow Weir in STMH C2 -1.00 -1.00 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Length (ft)Weir W.S. Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Feb 21 2019 Allowable Flow Over Weir before Trench Drain Pools and Water goes to Parking Structure Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 20.00 Total Depth (ft) = 0.60 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 12.00 Highlighted Depth (ft) = 0.33 Q (cfs) = 12.00 Area (sqft) = 7.04 Velocity (ft/s) = 1.71 Top Width (ft) = 22.64 0 5 10 15 20 25 30 35 Depth (ft) Depth (ft)Allowable Flow Over Weir before Trench Drain Pools and Water goes to Parking Structure -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. FINAL DRAINAGE AND EROSION CONTROL REPORT May 30, 2017 The Village Cooperative of Fort Collins Fort Collins, Colorado Prepared for: Village Cooperative of Fort Collins Shane Wright 1400 Corporate Center Circle, Suite 100 Eagan, Minnesota 55121 651-760-8306 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 1284-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. RE: Final Drainage and Erosion Control Report for The Village Cooperative of Fort Collins Dear Staff: Northern Engineering is pleased to submit this Final Drainage and Erosion Control Report for your review. This report accompanies Final Development Plan submittal for the proposed The Village Cooperative of Fort Collins development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.020 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Length-to-Width Ratio =2.00 L:W 0.00 15 0.00 0.00 Watershed Area =2.73 acres 0.20 284 0.20 0.21 Watershed Imperviousness =58.0%percent 0.40 475 0.40 0.29 Percentage Hydrologic Soil Group A =percent 0.60 651 0.60 0.36 Percentage Hydrologic Soil Group B =25.0%percent 0.80 842 0.80 0.42 Percentage Hydrologic Soil Groups C/D =75.0%percent 1.00 1,079 1.00 0.46 1.20 1,421 1.20 0.51 1.40 1,713 1.40 0.55 1.60 1,930 1.60 0.59 1.80 2,135 1.80 0.62 User Input: Detention Basin Characteristics 2.00 2,354 2.00 0.66 WQCV Design Drain Time =12.00 hours 2.20 2,579 2.20 0.69 2.40 2,825 2.40 0.72 2.60 3,083 2.60 0.75 2.80 3,351 2.80 0.78 3.00 3,635 3.00 0.81 3.20 3,931 3.20 0.83 3.40 4,241 3.40 0.86 3.60 4,567 3.60 0.88 3.80 4,911 3.80 0.91 4.00 5,275 4.00 0.93 4.20 5,665 4.20 0.95 4.40 6,103 4.40 0.98 4.60 6,591 4.60 1.00 4.80 7,153 4.80 1.02 5.00 7,875 5.00 1.04 5.20 8,999 5.20 1.06 5.40 10,506 5.40 1.08 5.60 11,046 5.60 1.10 5.80 11,626 5.80 1.12 After completing and printing this worksheet to a pdf, go to:6.00 12,257 6.00 1.14 https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two-Hour Rainfall Depth =0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume =0.041 0.123 0.200 0.273 0.411 0.540 0.717 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.041 0.122 0.200 0.273 0.410 0.540 0.716 acre-ft Time to Drain 97% of Inflow Volume =1 3 4 5 6 7 9 hours Time to Drain 99% of Inflow Volume =2 3 4 5 6 8 9 hours Maximum Ponding Depth =0.98 2.21 3.06 3.68 4.61 5.25 5.89 ft Maximum Ponded Area =0.024 0.059 0.085 0.108 0.151 0.215 0.273 acres Maximum Volume Stored =0.012 0.066 0.126 0.187 0.305 0.419 0.579 acre-ft Stormwater Detention and Infiltration Design Data Sheet Village Cooperative of Fort collins Fort Collins, CO Workbook Protected Worksheet Protected Village Cooperative - State Statute Compliance .xlsm, Design Data 3/1/2019, 11:04 AM Doing_Clear_Formatting =Yes CountA=1 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Stormwater Detention and Infiltration Design Data Sheet Area Discharge 0 2 4 6 8 10 12 14 16 18 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV Village Cooperative - State Statute Compliance .xlsm, Design Data 3/1/2019, 11:04 AM