Loading...
HomeMy WebLinkAboutSite Certifications - 10/26/201812/15 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet Nix Farm Natural Areas New Garage Facility 10/9/18 B1801283 Yes Yes Yes Yes No No Accepted 10/26/2018 WL 12/15 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes N/A N/A Yes No Yes Yes N/A N/A N/A N/A N/A N/A The existing spillway remains as is and was not disturbed during construction. 12/15 Page 3 4.Outlet Structure Certification a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) N/A Yes Yes N/A N/A N/A N/A N/A Yes Yes Yes Yes Yes N/A Yes Yes The only adjustment to the outlet structure was modification to the existing water quality control plate. The hole configuration was adjusted to reuse the existing plate and the calculations are attached for reference. 12/15 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes 12/15 Page 5 V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All inlet covers are stenciled or stamped with the following designation: NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Vol.2, Ch.9 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. Yes Yes Yes Yes No No No N/A Yes Yes Yes 12/15 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. Yes Yes Yes Yes N/A N/A Yes N/A 12/15 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A. Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1.All fabric was installed per the details on the approved construction plans. XIII.Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV.Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. N/A Yes N/A N/A Yes Yes Yes Yes Yes Yes Yes 12/15 Page 8 XVI. Certification and Erosion Control Measures A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing this certification there are any erosion control measures still remaining on the site, please note them in the narrative and verify that they need to remain at this time. If in doubt as to the need for any control measure, please consult with the Erosion Control Inspector at 970-221-6700. XVII.Statement of Compliance A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage facilities are as described in the above form and in the enclosed as-built plans. B.Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. XVIII.Signature and Stamp by a Colorado-Registered Professional Engineer Engineer’s contact information: Name: Email: Phone: Company: Address: PE Stamp Jason Claeys jclaeys@interwestgrp.com 970-347-8917 Interwest Consulting Group 1218 W. Ash Street, Suite A Windsor, CO 80550 12/15 Page 1 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. I.Compaction A.All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II.Storm Drain Pipe Installation Requirements A.The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A.The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. B.A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. C.The riprap is the gradation shown on the approved construction plans with a D50 of . D.The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. E.The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) IV. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A.All fabric was installed per manufacturer’s specifications. V. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes and at the end of flared end sections.) Yes Yes N/A The Tested areas is the Parking lot The Tested areas is the Parking lot 12/15 Page 2 Permeable Interlocking Concrete Pavers Post-excavation infiltration rates are consistent with design infiltration capacity (for “full or partial infiltration” designs) Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Any penetrations of the impermeable liner have been sealed and checked for water-tightness. Meets specifications for: -Dimensions -Reinforcement -Footings Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test Base coarse (e.g., #2/4) has 90% fractured faces Bedding coarse (e.g., #89) is thoroughly washed Sub-base materials are installed and compacted according to manufacturer’s specifications PICP area is protected from construction site sediment, including runoff from the upstream catchment and Close Out 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 12/15 Page 3 Bioretention Cells Heavy equipment did not travel over bioretention cell during excavation Bottom of cell was “ripped” after excavation Photograph before/after “ripping” Bottom of cell is flat and level Photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction Photograph Overflow inlet elevation is set above bioretention media per plan (typically 12 inches) Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) Measure/record distance between inlet and top of containment wall/berm Upstream catchment drains to inlet Forebay is installed according to design specifications Forebay has flat, concrete bottom Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media filter Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 12/15 Page 4 Filter Media Filter media composition is per design specifications Filter media was “machine mixed” by supplier prior to delivery Filter media installed flat and level Other Structural Components Containment wall/berm is continuous and level Landscaping Final landscaping does NOT include sod Final landscaping (wood/rock mulch) is flat and level Vegetation is planted according to landscape design specifications Verify that weed barrier is not installed Temporary irrigation installed If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell Signature: Name: Title: Email: Phone: Company: Address: 4 4 4 4 4 Dale Wellmon Superintendent dale/wellmon@elderconstructioninc.com 970-290-9831 Elder Construction Inc. 7380 Greendale Rd Windsor Co 80550 Nix Farm Natural Areas Facility Water Quality Pond and Outlet Sizing Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 6.628 acres Composite. Imperviousness, I 32.3% WQCV (watershed inches)0.158 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.105 acre-feet Including 20% for Sedimentation WATER QUALITY OUTLET SIZING (Per USDCM, Volume 3): Design Water Quality Depth, DWQ 2.21 ft Determine K40 K40 = 0.013DWQ 2 + 0.22DWQ - 0.10 0.450 Maximum Area per Row, a a = WQCV / K40 0.234 square inches Number of Rows, nr 6 rows Number of Columns, nc (See Table 6a-1 for Max.)3 columns Choose Hole Diameter 5/16 inches Use USDCM Volume 3, Figure 5 0.313 inches Total Area per Row, Ao 0.23 square inches Total Outlet Area, Aot 1.39 square inches Does design work?Yes Minimum Steel Plate Thickness 3/8 inch (Not Used) Number of Rows, nr 3 rows Choose Rectangular Hole Width (w/ 2" Height)0 inches Use USDCM Volume 3, Figure 5 0.000 inches Total Outlet Area, Aot 0.00 square inches Does design work?Yes Minimum Steel Plate Thickness 1/4 inch Urban Storm Drainage Criteria Manual (USDCM) Volume III, Urban Drainage and Flood Control District, June 2001 (Updated November 2010) Circular Perforation Sizing Rectangular Perforation Sizing J.Claeys Interwest Consulting Group 1276-095-00 December 22, 2016 2.1** 12 AreaWQCVVolume  = 1276-095-00 PondCalcs (2018-10-01 Modified).xls - W QCV & Outlet StructurePage 1 of 2 Interwest Consulting Group SH O P EX P A N S I O N 'G ' EXISTING MAINTENANCE BLDG 'E' FFE = 4934.9± VEHICLE STORAGE 'F' FFE = 4933.6 EXISTING FUEL STORAGE PROPOSED MODULAR PRIVATE D R I V E EXISTING OFFICE BLDG 'B' FFE = 4936.7 EXISTING OFFICE BLDG 'A' WATER QUALITY POND CH E M I C A L ST O R A G E 0 30' 60301530 SCALE: 1" = LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR SPILL GUTTER ASBUILT MAJOR CONTOUR ASBUILT MINOR CONTOUR 12 1 8 W . A s h , S u i t e C Wi n d s o r , C o l o r a d o 8 0 5 5 0 Ph o n e : ( 9 7 0 ) 6 7 4 - 3 3 0 0 Fa x : ( 9 7 0 ) 6 7 4 - 3 3 0 3 C O N S U L T I N G G R O U P I N T E R W E S T PR E P A R E D F O R PROJ. NO. DA T E : SC A L E ( H ) : SC A L E ( V ) : CH E C K E D B Y : DE S I G N E D B Y : PR O J E C T N A M E NI X F A R M N A T U R A L A R E A S F A C I L I T Y MA J O R A M E N D M E N T 2 0 1 6 GR A D I N G P L A N 04 / 0 4 / 1 8 1" = 3 0 ' N/ A JT C RA 1276-195-00 7 of 10 CI T Y O F F O R T C O L L I N S NA T U R A L A R E A S D E P A R T M E N T 17 4 5 H O F F M A N M I L L R O A D FO R T C O L L I N S , C O 8 0 5 2 4 PH : 9 7 0 . 4 1 6 . 2 8 1 5 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date NOTES: 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 2.ALL MANHOLE RIM AND STORM DRAIN INLET GRATES SHALL BE ADJUSTED TO FINAL GRADES CONFIRMED IN THE FIELD. 3.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, INTERWEST CONSULTING GROUP AND THE CERTIFYING ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING DUE TO ANY ERRORS OR OMISSIONS THAT MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT OF INCORRECT INFORMATION PROVIDED TO INTERWEST CONSULTING GROUP AND THE CERTIFYING ENGINEER. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY. DATE: DENOTES RECORDED DATA PER 10/24/18 NORTHERN ENGINEERING SHOP EXPANSION 'G' EXISTING MAINTENANCE BLDG 'E' VEHICLE STORAGE 'F' EXISTING FUEL STORAGE EXISTING OFFICE BLDG 'B' EXISTING OFFICE BLDG 'A' CH E M I C A L ST O R A G E PRIVATE D R I V E WATER QUALITY POND PROPOSED MODULAR SD-01 PROFILE HORIZ. SCALE: 1"=30' VERT. SCALE: 1"=3' 4925 4930 4935 4925 4930 4935 9+75 10+00 10+50 11+00 11+50 12+00 0 30' 60301530 SCALE: 1" = 12 1 8 W . A s h , S u i t e C Wi n d s o r , C o l o r a d o 8 0 5 5 0 Ph o n e : ( 9 7 0 ) 6 7 4 - 3 3 0 0 Fa x : ( 9 7 0 ) 6 7 4 - 3 3 0 3 C O N S U L T I N G G R O U P I N T E R W E S T PR E P A R E D F O R PROJ. NO. DA T E : SC A L E ( H ) : SC A L E ( V ) : CH E C K E D B Y : DE S I G N E D B Y : PR O J E C T N A M E NI X F A R M N A T U R A L A R E A S F A C I L I T Y MA J O R A M E N D M E N T 2 0 1 6 UT I L I T Y P L A N 04 / 0 4 / 1 8 1" = 3 0 ' 1" = 3 ' JT C RA 1276-195-00 8 of 10 CI T Y O F F O R T C O L L I N S NA T U R A L A R E A S D E P A R T M E N T 17 4 5 H O F F M A N M I L L R O A D FO R T C O L L I N S , C O 8 0 5 2 4 PH : 9 7 0 . 4 1 6 . 2 8 1 5 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date NOTES: 1.ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DEVELOPMENT STANDARDS. 2.FIRE HYDRANT WATER MAINS SHALL BE DUCTILE IRON PIPE. ALL FITTINGS SHALL BE FULLY RESTRAINED JOINTS PER CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL). 3.ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER. 4.ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE NOTED. 5.ALL SANITARY SEWER SERVICES SHALL BE SDR 35 PVC. 6.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 7.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 8.STORM PIPES SHALL BE REINFORCED CONCRETE PIPE (RCP) BEDDED PER STANDARDS. RCP SHALL HAVE FLEXIBLE GASKET MATERIAL (WATER TIGHT RUBBER GASKETS) CONFORMING TO ASTM C443 AND TYPE 4-G BELL SPIGOT JOINTS. 9.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 10.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 11.ADJUST ALL EXISTING UTILITY MANHOLES, VALVE COVERS, ETC TO WITHIN LIMITS OF NEW WORK TO FINISHED GRADE. 12.TRENCH DRAIN SHALL BE 8" WIDE SLOPED CHANNEL ACO POWERDRAIN S200K WITH LOAD CLASS F (4-BOLT SLOTTED) GRATE. GRATE TO BE SECURED USING '4-BOLT' LOCKING MECHANISM. PROVIDE IN-LINE CATCH BASIN (SK2-902D) AT DOWNSTREAM END OF TRENCH DRAIN WITH REMOVABLE TRASH BUCKET. TRENCH DRAIN INVERTS ARE ESTIMATED AND TO BE VERIFIED IN THE FIELD. RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, INTERWEST CONSULTING GROUP AND THE CERTIFYING ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS RECORD DRAWING DUE TO ANY ERRORS OR OMISSIONS THAT MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT OF INCORRECT INFORMATION PROVIDED TO INTERWEST CONSULTING GROUP AND THE CERTIFYING ENGINEER. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY. DATE: DENOTES RECORDED DATA PER 10/24/18 NORTHERN ENGINEERING & ELDER CONSTRUCTION City of Fort Colins Bio Retention Pond Mix BSM Material Mixing Spreadsheet Material % of CY Cedar 10% SAND 65% Compost 15% Topsoil 10% Total Material /CY 100% 1. Not necessary for site certification 2. Rain Garden - sediment was removed and growing media was replaced 10/16/2018 (Martin and Sons) See pictures below. 3. Soft Bottom Pan Installation - Water service was lowered and pan completed. As built shots were taken the morning of 10/23/2018. See pictures below. 4. ScourStops in Soft Bottom Trench - ScourStops were installed 10/19/2018. See pictures below. 5. Sediment in Storm Piping - Sediment was removed from storm pipes 10/24/2018. See pictures below. 6. Cobble Riprap at Headwall - Outfall of trench drain at headwall was dug down approximately eight inches and filled with cobble of various sizes 10/24/2018. See pictures below: 7. Fine Grading - Fine grading under way. See pictures below. 8. Debris in Outlet Structure - Debris was cleaned from structure 10/18/2018. See pictures below. 9. Splash Blocks at New Garage - Splash blocks were installed directing water outside of landscape edging 10/22/2018. See pictures below. 10. Perforated Landscape Edging - Not necessary for site certification. 11. Outlet Protection at Existing Culvert - ScourStop was installed at FES outlet 10/24/2018. See pictures below. 12. Sanitary Sewer Cleanouts - Cleanouts were lowered and re-capped 10/24/2018. See pictures below. 13. Cleaned out 10/18/2018