Loading...
HomeMy WebLinkAboutLot Certifications - 06/09/2017 (3). . " : .;: . . CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code§ 26-544 & City Land Use Code§ 3.3.2 (e) · Date: June 9, 2017 Subdivision: WEST SIDE ------------ Address: 417 North Grant Avenue Fort Collins, CO Permit Application#: _B_1_6_05_1_9_7 ________ _ Larimer County Parcel#: _9_7_11_2_-_20_-_00_9 _______ _ Larimer County Reception #:_n_la __________ _ Lot: 9 & 10 Block: 294 ------ {on development agreement) I, (print) Lester Crawford a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response . For each question initialed "No," attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots . 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City's No Building Department does not approve grading plans). 2. Certification includes the attached as-built survey dated 5/25/17 (must be within 60 No days of the date the certification is submitted) accurately and truthfully depicting elevations for: • Top of foundation/finished floor • Finished grade on each side of the structure • Quarter points along each lot line (not more than 50 feet apart) • Break points/high points • Swales • Berms • Retaining walls • Air conditioning pads • Window wells • Any other appurtenance(s) within an easement 3. All elevations are within a 0.2 foot tolerance of the approved grading plan. 4. The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. No No No No No Yes~ Yes ..LQ__ Yes.!&__ Yes~ Yes.!&__ Yes.!&_ 8. All downspout locations and discharge directions are shown on the as-built survey. No __ Yes ..LQ_ 2/14/1 7 Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. Page I 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No Yes~ adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City No Yes~ infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: Northern Landscape Services No.1Q_ Yes 12 . Final site cleanup has been completed. No Yes.!&._ Yes LC 13. I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions. No 14. Based on this information, I certify that (check one): D The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). 0 The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading ofthe lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. PE Stamp Sign and date Name: Les Crawford PE Email: Les@LesCrawfordPE.com Phone: 970 .773 .0610 Company: Les Crawford PE Address: 242 Linden St Fort Collins, CO NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com 2/14/17 Mailing Address Fort Collins Utilities ATIN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 City of k !S~t~~!s~ Page 2 S89°40'41"E 139.95' (M) PROPERTY LINE/LIMITS OF CONSTRUCTION RIGHT-OF-WAY RIGHT-OF-WAY/LIMITS OF CONSTRUCTION PRESERVE & PROTECT EXISTING TREE (TYP.) EXISTING SHED PRESERVE & PROTECT EXISTING TREE (TYP.) PRESERVE & PROTECT EXISTING POWER POLE (TYP.) MATCH INTO EXISTING AT TOE OF SLOPE MATCH INTO EXISTING S89°40'37"E 140.05' (M) MATCH INTO EXISTING PRESERVE & PROTECT EXISTING TREE (TYP.) STAIRS TO DECK (RE: ARCHITECT) PROPOSED WINDOW WELL PROPOSED WINDOW WELL BUILDING COLUMN - TYP. (RE: ARCHITECT) MATCH INTO EX. SIDEWALK GRAVEL DRIVEWAY LANDSCAPE PAVERS - (TYP. ) EDGE OF UPPER DECK (RE: ARCHITECT) PROPOSED CONCRETE STOOP PROPOSED CONCRETE STEPS WITH 2 (TWO) 6" RISERS AND 1 (ONE) 12" TREAD. PROPOSED STEPS WITH 2 (TWO) 6" RISERS AND 1 (ONE) 13" TREAD. PROPOSED WINDOW WELL MATCH INTO EXISTING 10' (±) WIDE CONCRETE DRIVEWAY CONCRETE PATIO MATCH INTO EX. SIDEWALK N89°40'42"W 140.16' (M) MATCH INTO EXISTING PROPERTY LINE/LIMITS OF CONSTRUCTION MATCH INTO EXISTING 2' WIDE VALLEY PAN WITH FLOWLINE @ 0.6% MATCH INTO EXISTING 36.9'MATCH INTO EXISTING MATCH INTO EXISTING DECK (RE: ARCHITECT) 5' WIDE CONCRETE WALK MATCH INTO EX. SIDEWALK DESIGN NOTES:LEGEND: 2. SPOT ELEVATIONS SHOWN ARE FLOWLINE, EDGE OF PAVEMENT, OR EDGE OF WALK UNLESS NOTED OTHERWISE. 1 . EXISTING IMPERVIOUS AREA = 1,524 SQ. FT. PROPOSED IMPERVIOUS AREA = 2,928 SQ. FT. PROJECT BENCHMARKS: PROJECT DATUM: NAVD88 BENCHMARK #1: City of Fort Collins Benchmark 1-00 on a catch basin at the southeast corner of Vine Drive and College Avenue ELEVATION: 4968.74 PLEASE NOTE: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted for their vertical datums. If NGVD29 Unadjusted Datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.17' BASIS OF BEARINGS Basis of Bearings is the West Right-of-Way Line of Grant Avenue as bearing S00°08'41" W (assumed bearing). CALL UTILITY NOTIFICATION CENTER OF COLORADO RORIGINAL FIELD SURVEY BY: NORTHERN ENGINEERING SERVICES, INC NE PROJECT NO. 376-006 DATE: OCTOBER 2016 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 6 0 6 ( IN FEET ) 1 INCH = 6 FEET 12 18 1 DI R T A L L E Y OH U N0 0 ° 1 8 ' 5 8 " E 3 5 . 0 3 ' ( M ) OH U N0 0 ° 1 8 ' 5 8 " E 3 5 . 0 3 ' ( M ) OH U OH U OH U OH U S0 0 ° 0 8 ' 4 1 W 3 5 . 0 3 ' ( M ) S0 0 ° 0 8 ' 4 1 W 3 5 . 0 4 ' ( M ) EX . S I D E W A L K EX . C U R B & G U T T E R N. G R A N T A V E N U E 0.6% 0.6% ASBUILT BENCHMARK: ASBUILT BENCHMARK: SOUTHEAST LOT CORNER, ELEVATION (4.97) ASBUILT INFORMATION BY: LES CRAWFORD P.E. 242 LINDEN STREET FORT COLLINS, CO 80524 DATE: MAY 25, 2017 FIELD CHANGE NOTES: 2. DECK AND GRAVEL ASSUMED IMPERVIOUS. 1 . CIRCLED SPOTS ARE +/- 0.2 FEET CH A N G E T O W O O D D E C K CHA N G E T O C O N C R E T E CHA N G E T O A S P H A L T NEW GRADE RIDGELINE NEW SWAL E F L O W L I N E DELE T E D F L O W L I N E FL UNDER DECK 1 (ONE) 2.8% 2.8% TO P O F D E C K 5 . 8 5 5.3 5 6% 6% 10 % UNCHANGED 3. ADDITION OF RIDGELINE WILL DIVERT FLOWS UNDER THE RAISED WOODEN DECK. TO THE CONCRET PAN. DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS 5.4 55.3 5 5.7 5 FLAT @ 5.35 2% FIELD CHANGED SPOT ELEVATION FIELD CHANGED GRADE FIELD CONFIRMED ELEV (=/- 0.2 FT) DOWN SPOUT ALL ARE DIRECTED AWAY FROM FOUNDATION) BASE DRAWING INFO FROM: NORTHERN ENGINEERING SERVICES, INC NE PROJECT NO. 376-006 DATE: OCTOBER 7, 2016 GRADING PLAN C1 BY: