MEMORANDUM
To:City of Fort Collins, Bldg Dept.
From:Tim Halopoff, PE
Date:12-22-2017
Subject:Windsong at Rock Creek – Drainage Certificate Supplement
Certification of Site Grading & Drainage - Supplement
Item:
I.Water Quality Basin Cert, B, 1, Note: Not all elevations are within 0.2’ of the approved grading plans, but
the drainage intent has been met without impacts to adjoining properties.
I. Water Quality Basin Cert, B, 3, b: There are several emergency spillways for this site. Pond spillways and
final site spillway to eastern property convey storm flow over low points at Curb & Gutter as shown on the
plans. Spillways will function as designed.
V. Storm Drain Inlets, 4: Storm inlet grates and drain pipes have constructed inverts that are not within the
+0.2’ tolerance, and elevations are not substantially different, but slopes of all pipe have been verified to be
at a minimum 0.4%, which is within industry standard and all flow capacities are met.
V. Storm Drain Inlets, 6:Due to the many small, landscape style inlets on this site, all inlet covers are not
stenciled or stamped “No Dumping-Drains to Poudre River”. Owner will be notified of the requirement and
recommend/notified that parking lot inlets should be marked as such.
Date: 01/09/2018 Subdivision: Windsong At Rock Creek
Address: SiSo Rock Creek Drive
Permit Application #:
Fort Collins, CO 80528
Larimer County Parcel #: 8604208001
Lot: 1
Block: Larimer County Reception #:
(on development agreement)
I, (print) l7I'tr Aw6 I-IA LaP&fP a Colorado registered professional engineer, verify that construction
of all stormwater faci ities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1.Certification includes attached Stormwater-approved grading plan. (NOTE: City's No _____ Yes TW
Building Department does not approve grading plans).
2.Certification includes the attached as-built survey dated 11/20/2017 (must be within 60 No _____ Yes TTI-4.
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
• Top of foundation/finished floor
• Finished grade on each side of the structure
• Quarter points along each lot line (not more than 50 feet apart)
• Break points/high points
• Swales
• Berms
• Retaining walls
• Air conditioning pads
• Window wells
• Any other appurtenance(s) within an easement
3.All elevations are within a 0.2 foot tolerance of the approved grading plan. No 1H Yes
4.The top of foundation is at least 6 inches above the highest grade surrounding the No 17U Yes
structure.
5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet No ¶H Yes
adjacent to the residence.
6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single No_____Yes TTH
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 25% (4:1).
7.All flow lines of stormwater drainage swales area minimum of 6 inches below the No _____ Yes
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8.All downspout locations and discharge directions are shown on the as-built survey. No -Yes TH
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
5/26/16 Page 1
B1602248
9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No -Yes 14
adjacent properties.
10.The grading of this lot does not adversely affect neighboring properties or City No_____Yes TIV
infrastructure.
11.Landscaping has been completed prior to survey. If not, please indicate who will be No Yes 73M
responsible for completing landscaping:
12.Final site cleanup has been completed. No Yes T34
13.I personally visited the site as part of the certification process, and in my professional No Yes T3H
opinion, the as-built survey is an accurate representation of the site conditions.
14.Based on this information, I certify that (check one):
D The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
theJ
Ty'i&r*1 \4a LP F
Email: /
:6 37953 Phone:
Company: t L.LL.
Address: 26D 3,
PE Stamp
Sign and date
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEngfcgov.com
Mailing Address
Fort Collins Utilities
ATIN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
City of
Fort Collins
- ties
fl ,..,.fl
This unofficial copy was downloaded on Aug-15-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA