HomeMy WebLinkAboutLot Certifications - 06/06/2022 (4)Date: May 26, 2022
Address: 639 Smith Street
Subdivision: _FTC__________ _
Permit Application#: _8_21_0_39_7_1 ________ _
Larimer County Parcel#: _9_71_3_21_40_0 _ 2 ________ _
Lot: 2 Block: 166 ------------Larimer County Reception#: ___________ _
(on development agreement)
I, (print) Megan L Keefe a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1.Certification includes attached Storm water-approved grading plan. (NOTE: City's No __ Yes-ML
Building Department does not approve grading plans).
2.Certification includes the attached as-built survey dated 0511912022 (must be within 60 No __ Yes*
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
•Top of foundation/finished floor
•Finished grade on each side of the structure
•Quarter points along each lot line (not more than SO feet apart)
•Break points/high points
•Swales
•Berms
•Retaining walls
•Air conditioning pads
•Window wells
•Any other appurtenance(s) within an easement
3.All elevations are within a 0.2 foot tolerance of the approved grading plan.
4.The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 33% {3:1).
7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan_
8.All downspout locations and discharge directions are shown on the as-built survey.
2/14/17
Runoff is directed Into an appropriate drainage system or lot line swale, and it is not
directed onto neiehboring properties.
No �Yes __
No __ Yes�
No __ Yes�
No __ Yes�
No __ Yes�
No __ Yes�
Page. I
STEPH EN AG ENBROAD
6/6/2022