Loading...
HomeMy WebLinkAboutSite Certifications - 10/12/20161501 Academy Ct. Suite 203 | Fort Collins, CO 80524 | 970-530-4044 | www.unitedcivil.com September 30, 2016 Mr. Wes Lamarque Stormwater Department City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 RE: Site Drainage Certification – Part 3 The Square – Phase 1 Fort Collins, CO United Civil Project #U13011 This is the final part of the Site Drainage Certification for the drainage facilities shown on the Utility Plans for The Square originally prepared on 3/11/2014 and amended on 11/5/2014, 12/11/2014, and 1/22/2015. Part 1 of this site drainage certification was completed on October 1, 2014 and was completed in association with the Certificate of Occupancy (C.O.) for Sierra Trading Post (included as Appendix 3). Part 2 of this site drainage certification was completed on February 20, 2015 and was completed in association with the C.O. for Trader Joe’s (included as Appendix 4). The purpose of this final part of the Site Drainage Certification is to document the construction of the water quality pond on the east side of the site. It was decided to delay the construction of the pond until the construction around it was complete in order to keep construction sediment out of the bioretention facility. The Square Shopping Center owner posted security in the amount of $28,517.25 for the future construction of the pond with Part 1 of the Site Drainage Certification. It is understood that this certification and the City’s acceptance of the pond improvements will release those funds back to the owner. As discussed above, this portion of the site drainage certification only applies to the water quality pond on the east side of the site. The area of certification is highlighted on the original drainage plan which is attached as Exhibit A. This water quality pond was modified as part of the Phase 3 construction plans that were included with Minor Amendment #150084. These plan sheets from the Phase 3 construction plans show the water quality pond that is included with this Certification. The remainder of the Phase 3 plans and the Phase 2 plans (Minor Amendment #150045) are not part of this Site Drainage Certification. There are a few items to note about the construction of the water quality pond: The invert of the 30” outlet pipe was 0.4’ lower than expected. Since the outlet box was pre-cast, this lowered the overflow elevation at the top of the box by 0.4’. Since this was the case, we lowered all of the layers in the bioretention pond 0.4’ to maintain the effective volume in the pond. Since the top of the bioretention material was 0.4’, the 4:1 side slopes extended further into the pond. This reduced the volume slightly, but it was decided in conjunction with City staff that this would be better than having steeper side slopes. Wes Lamarque 10/12/2016 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com  The conditions at the bottom of the bioretention pond were pretty wet due to rain and other water sources. This combined with the near vertical walls on the side of the pond made it impossible to excavate the entire pond at once. The contractor excavated sections of the pond and backfilled them with gravel to limit the amount of the excavation that was open at one time.  The as-builts for the detention pond have been included in Appendix 1.  The as-built volume of the detention pond is 9,733 cf, compared to a required volume of 9,726 cf.  The original drainage certification form that was used in Part 1 and Part 2 has been updated to include the construction of the water quality pond. In addition, the city’s new “During Construction Inspection Checklist” for Bioretention Cells has been included. These are both included in Appendix 1.  United Civil Staff made 24 site visits between 5/26/16 and 9/23/16 to witness, document, and assess the progress of construction of the water quality pond. Some of the photographs have been included in Appendix 2. If you have any questions, please contact me at 970-530-4044, or sam.eliason@unitedcivil.com. Sincerely, United Civil Design Group, LLC Sam Eliason, P.E. Enclosures: Appendix 1  Drainage Certification Form (5 pages)  Bioretention Cells Checklist  Exhibit A: Drainage Plan with Site Drainage Certification Area shown  Exhibit B: As-Built Water Quality Pond Plan  Exhibit C: As-Built Water Quality Pond Section  Exhibit D: Approved Plans (Sheets C2.02, C5.00, C6.00, and C8.02) Appendix 2 – Water Quality Pond Construction Photos Appendix 3 – Site Drainage Certification – Part 1 – October 1, 2014 Appendix 4 – Site Drainage Certification – Part 2 – February 20, 2015 APPENDIX 1 •Drainage Certification Form •Bioretention Cells Checklist •Exhibit A – Drainage Plan with Site Drainage Certification Areas shown •Exhibit B – As-Built Water Quality Pond Plan •Exhibit C – As-Built Water Quality Pond Section •Exhibit D – Approved Plans (Sheets C2.02, C5.00, C6.00 and C8.02) DRAINAGE CERTIFICATION FORM Please fill out all applicable items in this certification form for single family, multi-family and commercial properties. Write “OK” for items checked or actual number checked in field. Use “N/A” for items that are not applicable to the property that is being certified. A. Drainage facilities certification 1. Pond Certification -volume verification a.topographic records and volume b.cross-sections and spot elevations -positive fall to pan -side slopes -invert elevation -spillway elevation -placement and size of riprap --- grading -orifice plate installation and size_ -compaction of berm -structural integrity of pond 2. Swales -location (are they within easement) -dimensions and cross-section verification -longitudinal slopes and side slopes -spot elevations -permanent erosion control measures (drop structures, riprap, etc....) -tie-in to pipes, pans, curbs, etc.... ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A _ ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 -weir size (elevations, size, opening, etc.) -available freeboard -landscaping infringement on swales 3. Pipes -size and type -slopes (as-built and comparison to minimum 0.4% slope) -pipe capacity calculations if slopes are significantly altered -invert elevations -installation and backfill material -cover -encasement and clearance from other utility lines close by -joints 4. Concrete Pan Channels -size -slope -super elevation -cross - section -thickness -elevations 5. Inlets -size and type -size of opening (or name of standard used) -grate elevation -invert elevation -box size ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A Okay per Sailer Construction Okay per Sailer Okay per Sailer Construction 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 6. Cross pans -size -type -grade -elevation -cross-sectional depth -tie-in to curb and gutter 7. Culverts -size -type -invert elevation -headwalls 8. Underdrains -size -type -cover -backfill -geotextiles -cleanouts 9. Curb cuts -size -tie in to swale, pipe, etc... ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 B. Certification of Grade Elevations Adjacent to Drainage Facilities: -minimum opening elevations -top of foundation elevations -comparison to 100 year WSEL’s (Freeboard requirements and floodplain issues) C. Certification of Erosion Control Measures: 1. Permanent Measures: -Permanent vegetation (6” bare spots and weeds under control) -riprap -riprap bedding -drop sections -sediment basins/water quality ponds -netting mats/blankets -mulching 2. Temporary Measures: -mulching -inlet filter installation -check bale dams -seeding and temporary vegetation -silt fence D. Site Cleanup After Construction -construction clean up -smoothing of ruts -reseeding ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 E. Statement of Compliance This certification is signed and stamped and by signing this form the engineer(s) attests that they have inspected the site and to the best of their knowledge the as-built conditions of the drainage facilities are as described in the above form and in the redlined plans enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any Stormwater Utility holds on Building Permits and/or Certificates of Occupancy. F. Signature and Stamp by a Colorado Registered Professional Engineer. Samuel M. Eliason Colorado Licensed Professional Engineer CO P.E. # 38212 12/15 Page 3 Bioretention Cells Item/Activity Yes No N/A Documentation/Submittal Requirements Excavation Heavy equipment did not travel over bioretention cell during excavation Bottom of cell was “ripped” after excavation Photograph before/after “ripping” Bottom of cell is flat and level Photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction Photograph Inlet Overflow inlet elevation is set above bioretention media per plan (typically 12 inches) Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) Measure/record distance between inlet and top of containment wall/berm Upstream catchment drains to inlet Forebay Forebay is installed according to design specifications Forebay has flat, concrete bottom Outlet Structure/Overflow Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media filter Impermeable Liner Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Underdrain System Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test (Approximately 14.5") (Approximately 8") 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 12/15 Page 4 Filter Media Filter media composition is per design specifications Filter media was “machine mixed” by supplier prior to delivery Filter media installed flat and level Other Structural Components Containment wall/berm is continuous and level Landscaping Final landscaping does NOT include sod Final landscaping (wood/rock mulch) is flat and level Vegetation is planted according to landscape design specifications Verify that weed barrier is not installed Temporary irrigation installed If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell Signature: Name: Title: Email: Phone: Company: Address: 4 4 4 4 4 4 4 4 4 4 Samuel M.Eliason Principal sam.eliason@unitedcivil.com 970-530-4044 United Civil Design Group 1501 Academy Ct.Ste 203 Fort Collins,CO 80524 EXHIBIT A PART 2 PART 1 PART 3 POROUS BIORETENTION (SEE DETAILS) PROPOSED OUTLET STRUCTURE AT 11.90 FOREBAY 12" CONCRETE STRIP W/ 4" PEA GRAVEL BOTTOM OF POND (MIN ELEV = 10.64, (MAX ELEV = 10.75) LIMITS OF BIORETENTION SECTION AT THE HDPE MEMBRANE (2713 SF) CLEANOUT (TYP.) (1 OF 4) 6" PVC UNDERDRAIN PIPE 6" PVC UNDERDRAIN PIPE AS PROPOSED CONTOUR AS-BUILT CONTOUR AS PROPOSED SPOT ELEVATION AS-BUILT SPOT ELEVATION AS-BUILT SLOPE 0 10'20' SCALE: 1" = 10' 5' LEGEND NOTES 1.AS-BUILT SPOT ELEVATIONS AND CONTOURS PER SURVEY PERFORMED BY PLS GROUP, INC. ON 9/26/2016. 2.AS-PROPOSED SPOT ELEVATIONS AND CONTOURS PER THE SQUARE SHOPPING CENTER UTILITY PLANS FOR MINOR AMENDMENT #150084 (PHASE 3) SHEET C5.0 AS PREPARED BY UNITED CIVIL DESIGN GROUP ON 6/17/2016 THE SQUARE 9/30/2016 EXHIBIT B - AS-BUILT WATER QUALITY POND PLAN EXISTING GROUND PROPOSED GROUND 14.5" PONDING MINIMUM 30-MIL HDPE IMPERVIOUS MEMBRANE MINIMUM 12" THICK BIORETENTION SAND MEDIA LAYER (SEE NOTES 1-2) MINIMUM 6" THICK PEA GRAVEL LAYER CDOT AGGREGATE NO. 4 STORAGE/ FILTRATION LAYER PIPE P2 & P3 4" PERFORATED UNDERDRAIN INV. 5004.10 (N&S- MATCH EXISTING) PIPE E1 EXISTING 30" RCP STORM DRAIN OUTLET STRUCTURE (SEE DETAIL) MINIMUM 30-MIL HDPE IMPERVIOUS MEMBRANE UNDISTURBED EARTH UT I L I T Y E A S E M E N T PR O P E R T Y L I N E INV. 5004.00 (EXISTING) GRATE 5011.90 TO P O F B E R M 5 0 1 2 . 7 5 PHASE 3 CURB AND GUTTER 12" WIDE BY 4" DEEP CONCRETE 4" PEA GRAVEL FOREBAY TO CAPTURE INITIAL SEDIMENT ELEV. 5003.80 ELEV. 5009.70 ELEV. 5009.20 ELEV. 5010.70 EXISTING MANHOLE PIPE P4 & P5 6" PERFORATED UNDERDRAIN INV. OUT 5007.5 (N&S) PIPE E3 EXISTING 8" PVC INV. 5007.99 INV. 5004.42 (EXISTING) PLUG EXISTING 30" RCP (SEE NOTE 3) PIPE P1 18" HDPE INV. 5006.23 PIPE E2 18" HDPE INV. 5005.75 12" CDOT NO. 4 AT BASE OF INLET DRILL 12 1" HOLES IN INLET. (6 ON NORTH SIDE AND 6 ON SOUTH SIDE. 3 AT 4" AND 3 AT 18" ABOVE BOTTOM) EXISTING INLET TO REMAIN 1 C8.02 NOT TO SCALE NOTES: 1.REFER TO THE CITY OF FORT COLLINS BIORETENTION SAND MEDIA SPECIFICATION FOR MORE INFORMATION ON THE SOIL MIX. 2.BIORETENTION SAND MEDIA SHALL BE PROVIDED BY HAGEMAN EARTH CYCLE OR APPROVED EQUAL. 3.PIPE TO BE PLUGGED WITH PRE-MANUFACTURED CAST-ALUMINUM EXPANSION PLUG OR METAL PLATE ATTACHED TO THE OPENING. IN THIS PARTICULAR CASE, THE PLUG DOES NOT NEED TO BE WATER TIGHT, BUT SHOULD BE SOIL TIGHT. 4.REFER TO SHEET C2.02 FOR A PLAN VIEW OF STORM INFRASTRUCTURE. Water Quality Storage (cf) Detention Storage (cf) Total Volume (cf) Top Elevation Outfall Elevation Total Provided 9,733 9,733 9,733 5011.90 5004.00 Total Required 9,193 9,726 9,726 * POND VOLUME PROVIDED INCLUDES 1,312 CF OF SURFACE STORAGE AND 8,421 CF OF SUBSURFACE STORAGE. **SUBSURFACE VOLUME BASED ON 2,625 SQUARE FEET OF BIORETENTION AREA AND A 45% VOID RATIO. THE SQUARE 9/30/2016 EXHIBIT C - AS-BUILT WATER QUALITY POND POND SECTION APPENDIX 2 Water Quality Pond Construction Photos 1501 Academy Ct. Suite 203 | Fort Collins, CO 80524 | 970-530-4044 | www.unitedcivil.com Water Quality Pond Construction Photos – 5/26/2016 to 9/23/2016 Picture 1: Excavation of Bioretention Pond with Erosion Control in place Picture 2: More Excavation of Bioretention Pond 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Picture 3: CDOT #4 in place with first underdrain and cleanout Picture 4: Second underdrain in place 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Picture 5: Placement of CDOT #4 and underdrain Picture 6: Placement of CDOT #4 and underdrain cleanout 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Picture 7: Level CDOT #4 and addition of 6” of pea gravel Picture 8: 6” of Pea Gravel over CDOT #4 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Picture 9: Level Pea Gravel Picture 10: 12” of Bioretention material added 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Picture 11: 12” of bioretention throughout pond. Side slope added (too steep) Picture 12: 12” of Bioretention material added throughout pond. 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Picture 13: Side slope flattened. Picture 14: Final landscaping of pond 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Picture 15: Final landscaping of pond Picture 16: Final landscaping of pond and outlet structure 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Picture 17: Final landscaping of pond Picture 18: Final landscaping of pond APPENDIX 3 Site Drainage Certification – Part 1 October 1, 2014 1501 Academy Ct. Suite 203 | Fort Collins, CO 80524 | 970-530-4044 | www.unitedcivil.com October 1, 2014 Mr. Wes Lamarque Stormwater Department City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 RE: Site Drainage Certification – Part 1 The Square Fort Collins, CO United Civil Project #U13011 On September 29th, United Civil Design Group, LLC personnel conducted a site visit at the The Square redevelopment project, located in Fort Collins, CO. The purpose of the site visit was to verify and document the drainage facilities shown on the Utility Plans for The Square prepared by United Civil Design Group on 3/11/2014. This site drainage certification only applies to the south half of the site that is usable to Sierra Trading Post. The owner is only requesting a CO for Sierra Trading Post at this time. The northern portion of the site, which includes the construction of Trader Joe’s, is still under construction. The area of certification is highlighted on the original drainage plan which is attached as Exhibit A. In addition, the site drainage certification does not include the water quality pond on the east side of the site. It was decided to delay construction on that pond until the end of construction in order to keep construction sediment out of the bioretention facility. A cost estimate for the construction of this facility is attached as Exhibit B. The owner will put up security for the future construction of the pond. There are a couple of minor items that the developer has been made aware of and will be fixing this week. These items include: • Construction of curb cut on the southeast corner of the southern parking lot. • Final landscaping and site construction cleanup There were a few drainage related items that changed during the construction that should be noted. • All of the existing parking lots were overlaid so most of the grades shown in the parking lot were changed up to 2” to reflect the overlay. This did not affect the sites ability to drain effectively. • There were a number of roof drains that were added to tie into the existing storm sewer on the south side of the building. The water from these roofs drained to the existing storm system via overland flow previously so there was no change to the existing drainage patterns on the site. 1501 Academy Ct. Suite 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com Please note that United Civil personnel were not on site to witness the actual construction of the infrastructure while it was being installed. However, the contractor has verified that construction of the storm sewer and concrete pans throughout the site were in conformance to the plans. If you have any questions, please contact me at 970-530-4044, or sam.eliason@unitedcivil.com. Sincerely, United Civil Design Group, LLC Sam Eliason, P.E. Enclosures: • Drainage Certification Form (5 pages) • Exhibit A: Drainage Plan with Site Drainage Certification Area shown • Exhibit B: Water Quality Pond Cost Estimate for Escrow DRAINAGE CERTIFICATION FORM Please fill out all applicable items in this certification form for single family, multi-family and commercial properties. Write “OK” for items checked or actual number checked in field. Use “N/A” for items that are not applicable to the property that is being certified. A. Drainage facilities certification 1. Pond Certification -volume verification a.topographic records and volume b.cross-sections and spot elevations -positive fall to pan -side slopes -invert elevation -spillway elevation -placement and size of riprap --- grading -orifice plate installation and size_ -compaction of berm -structural integrity of pond 2. Swales -location (are they within easement) -dimensions and cross-section verification -longitudinal slopes and side slopes -spot elevations -permanent erosion control measures (drop structures, riprap, etc....) -tie-in to pipes, pans, curbs, etc.... 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A _ ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A The water quality pond has not been completed with this initial phase of the project. We are proposing to delay the construction of this facility until after all the construction is completed to make sure we aren't introducing construction sediment to the bioretention pond. The owner is going to pay an escrow amount so the City can be assured it will be constructed in the future. -weir size (elevations, size, opening, etc.) -available freeboard -landscaping infringement on swales 3. Pipes -size and type -slopes (as-built and comparison to minimum 0.4% slope) -pipe capacity calculations if slopes are significantly altered -invert elevations -installation and backfill material -cover -encasement and clearance from other utility lines close by -joints 4. Concrete Pan Channels -size -slope -super elevation -cross - section -thickness -elevations 5. Inlets -size and type -size of opening (or name of standard used) -grate elevation -invert elevation -box size Okay per Sailer Construction Okay per Sailer Okay per Sailer Construction 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A 6. Cross pans -size -type -grade -elevation -cross-sectional depth -tie-in to curb and gutter 7. Culverts -size -type -invert elevation -headwalls 8. Underdrains -size -type -cover -backfill -geotextiles -cleanouts 9. Curb cuts -size -tie in to swale, pipe, etc... The contractor was made aware of one missing curb cut on the southeast corner of the south 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A parking lot. They will be adding it this week. B. Certification of Grade Elevations Adjacent to Drainage Facilities: -minimum opening elevations -top of foundation elevations -comparison to 100 year WSEL’s (Freeboard requirements and floodplain issues) C. Certification of Erosion Control Measures: 1. Permanent Measures: -Permanent vegetation (6” bare spots and weeds under control) -riprap -riprap bedding -drop sections -sediment basins/water quality ponds -netting mats/blankets -mulching 2. Temporary Measures: -mulching -inlet filter installation -check bale dams -seeding and temporary vegetation -silt fence D. Site Cleanup After Construction -construction clean up -smoothing of ruts -reseeding 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A Construction is still continuing on the northwest and north side site and some work was continuing on the building on the Sierra Trading Post building on the south side. There is still some cleanup that will need to be done before opening. The contractor is aware of it and will finish as soon as construction is complete. E. Statement of Compliance This certification is signed and stamped and by signing this form the engineer(s) attests that they have inspected the site and to the best of their knowledge the as-built conditions of the drainage facilities are as described in the above form and in the redlined plans enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any Stormwater Utility holds on Building Permits and/or Certificates of Occupancy. F. Signature and Stamp by a Colorado Registered Professional Engineer. Samuel M. Eliason Colorado Licensed Professional Engineer CO P.E. # 38212 EX H I B I T A AR E A OF SI T E DR A I N A G E CE R T I F I C A T I O N Project Number:U13011 Location:Fort Collins, CO Date:September 30, 2014 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price LF 100 $2.50 $610.00 Remove 3" Asphalt SY 244 $5.00 $705.00 Remove Curb & Gutter LF 141 $4.00 $600.00 CY 150 $10.00 $1,500.00 CY 78 $44.00 $3,432.00 CY 6 $40.00 $240.00 CY 13 $46.50 $604.50 LF 106 $20.00 $2,120.00 EA 1 $6,000.00 $6,000.00 Nyoplast Drain Inlet EA 1 $1,500.00 $1,500.00 6" PVC Underdrain Pipe LF 90 $10.00 $900.00 4" PVC Underdrain Pipe LF 100 $8.00 $800.00 TOTAL = $19,011.50 TOTAL = $28,517.25 REQUIRED AMOUNT OF SECURITY =$28,517.25 The Square - Phase 1 Water Quality Pond Cost Estimate Bioretention Sand Media AMOUNT OF SECURITY = 1.5 x $19,011.50 Excavation Sawcut Asphalt CDOT Aggregate #4 Concrete Pan Concrete Outlet Structure Pea Gravel = C:\United Civil\Dropbox\Projects\U13011-Square\Docs\Estimates\U13011_Detention Pond-Escrow-Estimate.xls EXHIBIT B APPENDIX 4 Site Drainage Certification – Part 2 February 20, 2015 1501 Academy Ct. Suite 203 |Fort Collins, CO 80524 |970-530-4044 |www.unitedcivil.com February 20, 2015 Mr. Wes Lamarque Stormwater Department City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 RE: Site Drainage Certification – Part 2 The Square Fort Collins, CO United Civil Project #U13011 On February 12th and 20th, 2015, United Civil Design Group, LLC personnel conducted a site visit at The Square redevelopment project, located in Fort Collins, CO. The purpose of the site visit was to verify and document the drainage facilities shown on the Utility Plans for The Square originally prepared on 3/11/2014 and amended on 11/5/2014, 12/11/2014, and 1/22/2015. This site drainage certification only applies to the north half of the site that is usable to Trader Joe’s. The south half of the site for Sierra Trading Post was previously certified on October 1, 2015. The area of certification is highlighted on the original drainage plan which is attached as Exhibit A. In addition, the site drainage certification does not include the water quality pond on the east side of the site. It was decided to delay construction on that pond until the end of construction in order to keep construction sediment out of the bioretention facility. The owner already put up security for the future construction of the pond when the Site Drainage Certification was prepared for Sierra Trading Post. There were a few drainage related items that changed during the construction that should be noted. •All of the existing parking lots were overlaid so most of the grades shown in the parking lot were changed up to 2” to reflect the overlay. This did not affect the sites ability to drain effectively. •There were a couple of canopy roof drains and a small drainage inlet that were added on the west side of Trader Joe’s. These storm flows will tie into the existing storm sewer on the west side of the building as shown on the revised Sheet C2.02. •There were a few canopy roof drains and two small drainage inlets that were added on the north side of Trader Joe’s. These storm flows will tie into the proposed storm sewer on the north side of the building as shown on the revised Sheet C2.02. This system will temporarily end with a sump drain and pump that will discharge to the adjacent parking lot on the north side of the building. In the next 6 months, the storm sewer will be extended to the bioretention facility on the east side of the building. 1501 Academy Ct. Suite 203 |FORT COLLINS, CO 80524 |970-530-4044 |www.unitedcivil.com Please note that United Civil personnel were not on site to witness the actual construction of the infrastructure while it was being installed. However, the contractor has verified that construction of the storm sewer and concrete pans throughout the site were in conformance to the plans. If you have any questions, please contact me at 970-530-4044, or sam.eliason@unitedcivil.com. Sincerely, United Civil Design Group, LLC Sam Eliason, P.E. Enclosures: •Drainage Certification Form (5 pages) •Exhibit A: Drainage Plan with Site Drainage Certification Area shown •Exhibit B: Sheet C2.02 – Storm Drainage Revisions DRAINAGE CERTIFICATION FORM Please fill out all applicable items in this certification form for single family, multi-family and commercial properties. Write “OK” for items checked or actual number checked in field. Use “N/A” for items that are not applicable to the property that is being certified. A. Drainage facilities certification 1. Pond Certification -volume verification a.topographic records and volume b.cross-sections and spot elevations -positive fall to pan -side slopes -invert elevation -spillway elevation -placement and size of riprap --- grading -orifice plate installation and size_ -compaction of berm -structural integrity of pond 2. Swales -location (are they within easement) -dimensions and cross-section verification -longitudinal slopes and side slopes -spot elevations -permanent erosion control measures (drop structures, riprap, etc....) -tie-in to pipes, pans, curbs, etc.... 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A _ ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A The water quality pond has not been completed with this initial phase of the project. We are proposing to delay the construction of this facility until after all the construction is completed to make sure we aren't introducing construction sediment to the bioretention pond. The owner is going to pay an escrow amount so the City can be assured it will be constructed in the future. -weir size (elevations, size, opening, etc.) -available freeboard -landscaping infringement on swales 3. Pipes -size and type -slopes (as-built and comparison to minimum 0.4% slope) -pipe capacity calculations if slopes are significantly altered -invert elevations -installation and backfill material -cover -encasement and clearance from other utility lines close by -joints 4. Concrete Pan Channels -size -slope -super elevation -cross - section -thickness -elevations 5. Inlets -size and type -size of opening (or name of standard used) -grate elevation -invert elevation -box size Okay per Sailer Construction Okay per Sailer Okay per Sailer Construction 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A 6. Cross pans -size -type -grade -elevation -cross-sectional depth -tie-in to curb and gutter 7. Culverts -size -type -invert elevation -headwalls 8. Underdrains -size -type -cover -backfill -geotextiles -cleanouts 9. Curb cuts -size -tie in to swale, pipe, etc... 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A B. Certification of Grade Elevations Adjacent to Drainage Facilities: -minimum opening elevations -top of foundation elevations -comparison to 100 year WSEL’s (Freeboard requirements and floodplain issues) C. Certification of Erosion Control Measures: 1. Permanent Measures: -Permanent vegetation (6” bare spots and weeds under control) -riprap -riprap bedding -drop sections -sediment basins/water quality ponds -netting mats/blankets -mulching 2. Temporary Measures: -mulching -inlet filter installation -check bale dams -seeding and temporary vegetation -silt fence D. Site Cleanup After Construction -construction clean up -smoothing of ruts -reseeding 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A ___OK ___N/A E. Statement of Compliance This certification is signed and stamped and by signing this form the engineer(s) attests that they have inspected the site and to the best of their knowledge the as-built conditions of the drainage facilities are as described in the above form and in the redlined plans enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any Stormwater Utility holds on Building Permits and/or Certificates of Occupancy. F. Signature and Stamp by a Colorado Registered Professional Engineer. Samuel M. Eliason Colorado Licensed Professional Engineer CO P.E. # 38212 EX H I B I T A AR E A OF SI T E DR A I N A G E CE R T I F I C A T I O N PROPOSED SAWCUT PROPOSED CURB AND GUTTER PROPOSED CONCRETE PAN PROPOSED STORM PIPE PROPOSED SWALE PROPOSED NYLOPLAST INLET PROPOSED DROP INLET PROPOSED POROUS LANDSCAPE DETENTION POND PROPOSED ITEMS 6" F 6" F 6" F 6" F 6" F 18+50 11 + 0 0 12 + 0 0 13 + 0 0 14+0015+0016+0017+00 18+00 8 X 24 TEE 1 STA 14+38.33 N: 1440155.55 E: 3119047.02 75.48 LF 24" HDPE @ 0.80% 8 X 24 TEE 2 STA 15+13.81 N: 1440155.44 E: 3118971.54 17.44 LF 18" HDPE @ 0.80% 11.25 BEND 1 STA 15+31.25 N: 1440155.41 E: 3118954.10 28.63 LF 18" HDPE @ 0.80% 22.25 BEND 2 STA 15+59.87 N: 1440160.97 E: 3118926.02 23.50 LF 18" HDPE @ 0.80% 11.25 BEND 3 STA 15+83.37 N: 1440156.34 E: 3118902.98 10.00 LF 18" HDPE @ 0.80% INLET 1-2 STA 15+93.37 N: 1440156.32 E: 3118892.98 90.59 LF 18" HDPE @ 0.80% REDUCER STA 16+83.96 N: 1440156.19 E: 3118802.39 8 x8 TEE 4 STA 17+62.46 N: 1440156.07 E: 3118723.89 INLET 1-3 STA 18+10.21 N: 1440159.32 E: 3118676.79 8.68 LF 8" HDPE @ 0.80%39.07 LF 8" HDPE @ 0.80% SE E S H E E T C 2 . 0 1 MA T C H L I N E 63.20 LF 24" HDPE @ 0.80% EXISTING ROOF DRAIN (SEE NOTE 6-7) EXISTING ROOF DRAIN (SEE NOTE 6-7) EXISTING WALLS AND LANDSCAPING TO BE REMOVED CURB INLET N:1440163.99 E:3118719.19 FL 5020.53 INV. OUT 5017.19 ƒ%(1' STA 18+01.53 N: 1440156.01 E: 3118684.82 11.3 LF 8" HDPE @ 2.00% 78.50 LF 8" HDPE @ 0.80% 3" ROOF DRAIN FROM CANOPY 3" ROOF DRAIN FROM CANOPY 189.22 LF 8" PVC @ 1.0% 3" ROOF DRAIN FROM CANOPY TIE 8" STORM DRAIN INTO EXISTING MANHOLE ,19,1 “ 8" INLINE DRAIN WITH ;*5$7(#“ INV = 5019.0 4" DRAINS 4" UNDERDRAIN BEHIND WALL 4" INLINE DRAIN W/ DOMED GRATE 4" INLINE DRAIN W/ DOMED GRATE 4" UNDERDRAIN BEHIND WALL 4" STORM DRAINS PROPERTY CORNER N:1440276.89 E:3119169.42 PROPERTY CORNER N:1440276.29 E:3118949.74 PROPERTY CORNER N:1440209.08 E:3118592.94 TEMPORARY SUMP DRAIN WITH PUMP TO DISCHARGE TO THE ADJACENT PARKING LOT 5005 5010 5015 5020 5025 5030 5005 5010 5015 5020 5025 5030 14+0014+5015+0015+5016+0016+5017+0017+5018+0018+50 8 X 2 4 T E E 1 ST A : 1 4 + 3 8 . 3 3 IN V . = 5 0 1 4 . 1 6 8 X 2 4 T E E 2 ST A : 1 5 + 1 3 . 8 1 IN V . = 5 0 1 4 . 7 6 11 . 2 5 B E N D 1 ST A : 1 5 + 3 1 . 2 5 IN V . = 5 0 1 4 . 9 0 22 . 2 5 B E N D 2 ST A : 1 5 + 5 9 . 8 7 IN V . = 5 0 1 5 . 1 3 11 . 2 5 B E N D 3 ST A : 1 5 + 8 3 . 3 7 IN V . = 5 0 1 5 . 3 2 IN L E T 1 - 2 ST A : 1 5 + 9 3 . 3 7 5, 0         “ IN V . I N = 5 0 1 5 . 6 1 ' ( W ) IN V . O U T = 5 0 1 5 . 4 0 ' ( E ) RE D U C E R ST A : 1 6 + 8 3 . 9 6 IN V . = 5 0 1 6 . 3 4 8 x 8 T E E 4 ST A : 1 7 + 6 2 . 4 6 IN V . = 5 0 1 6 . 9 7 IN L E T 1 - 3 ST A : 1 8 + 1 0 . 2 1 5, 0        “ IN V . O U T = 5 0 1 7 . 3 5 ( E ) 63.20 LF 24" HDPE @ 0.80% 75.48 LF 24" HDPE @ 0 . 8 0 % 17.44 LF 18" HDPE @ 0.80% 28.63 LF 18" HDPE @ 0.80% 23.50 LF 18" HDPE @ 0.80% 10.00 LF 18" HDPE @ 0.80% 90.59 LF 18" HDPE @ 0 . 8 0 % 39.07 LF 8" HDPE @ 0.80% PROPOSED GRADE EXISTING GROUND 8.68 LF 8" HDPE @ 0.80% 100-YEAR HGL ST A : 1 6 + 9 8 . 3 8 IN V . = 5 0 1 4 . 8 2 TO B E L O W E R E D U N D E R S T O R M 6" F I R E S E R V I C E 18" MIN. 78.50 LF 8" HDPE @ 0 . 8 0 % TEMPORARY SUMP DRAIN WITH PUMP TO DISCHARGE STORMWATER FLOWS TO THE ADJACENT PARKING LOT PR E P A R E D F O R : DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r li a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e p l a n s . A l l ch a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d m u s t b e a p p r o v e d b y th e p r e p a r e r o f t h e s e p l a n s . CAUTION SQ U A R E S H O P P I N G C E N T E R L L C 3/ 1 1 / 2 0 1 4 TH E S Q U A R E 15 U13011 Civil Engineering & Consulting 1501 Academy Court, Suite 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com LA P T O P - 0 4 NO N E C: \ U N I T E D C I V I L \ D R O P B O X \ P R O J E C T S \ U 1 3 0 1 1 - S Q U A R E \ C A D D \ C P C2 . 0 1 _ S T O R M P & P . D W G 1/ 2 2 / 2 0 1 5 4: 5 0 : 5 3 P M SM E ST O R M S E W E R P L A N & P R O F I L E ST A 1 4 + 0 0 - S T A 1 8 + 5 0 C2.02 3' 30' LEGEND 0 30'60' SCALE: 1" = 30' 15' CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: NOTES 5B 1 SM E 1/ 2 2 / 2 0 1 5 ST O R M D R A I N F O R R O O F D R A I N S A D D E D 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. 2.ALL STORM SEWER CONSTRUCTION SHALL BE PER CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3.ALL PIPE LENGTHS ARE FROM CENTER TO CENTER OF ADJACENT STRUCTURES UNLESS OTHERWISE NOTED. 4.STORM SEWER MAINS AND ROOF LEADERS SHOWN ON THESE DRAWINGS AS HIGH DENSITY POLYETHYLENE (HDPE) SHALL BE WATERTIGHT ADS-N12 OR APPROVED EQUAL. 5.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES. 6.ROOF DRAINS TO BE CONNECTED DIRECTLY TO PROPOSED HDPE STORM SEWER SHALL BE CONNECTED USING MANUFACTURED TEES. 7.CONTRACTOR SHALL FIELD VERIFY LOCATION OF EXISTING ROOF DRAINS AS SHOWN PRIOR TO CONSTRUCTION. 8.ALL SITE STORM SEWER AS SHOWN ON THESE DRAWINGS IS PRIVATE. INLET SCHEDULE INLET ID TYPE 1-3 8" INLINE DRAIN WITH 12"X12" GRATE (OR APPROVED EQUAL) 1-2 24" NYLOPLAST DRAIN BASIN (OR APPROVED EQUAL) CURB INLET 2'x3' CONCRETE CURB INLET (OR APPROVED EQUAL) PRELIMIARY STORM SEWER DESIGN NOT FOR CONSTRUCTION NOTE: THE STORM SEWER SHOWN FROM STATION 10+00 TO STATION 16+83.96 IS A PRELIMINARY DESIGN ONLY AND NOT FOR CONSTRUCTION. THE FINAL DESIGN AND LAYOUT OF THIS STORM SEWER WILL BE DETAILED WITH A FUTURE PHASE OF CONSTRUCTION AND IS NOT TO BE CONSTRUCTED WITH THIS PHASE. NO MAJOR BUILDING ROOF DRAINS WILL BE CONNECTED TO THIS STORM SYSTEM UNTIL THE NEXT PHASE. STORMWATER FLOWS THAT ACCUMULATE IN THE PIPE WILL BE PUMPED OUT OF A SUMP AT INLET 1-2 TO THE ADJACENT DRIVE LANE TO THE NORTH. THIS TEMPORARY DRAINAGE SITUATION WILL BE IN PLACE NO LONGER THAN AUGUST 1, 2015.