Loading...
HomeMy WebLinkAboutLot Certifications - 06/13/20175/26/16 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2. Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for:  Top of foundation/finished floor  Finished grade on each side of the structure  Quarter points along each lot line (not more than 50 feet apart)  Break points/high points  Swales  Berms  Retaining walls  Air conditioning pads  Window wells  Any other appurtenance(s) within an easement 3. All elevations are within a 0.2 foot tolerance of the approved grading plan. 4. The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 25% (4:1). 7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8. All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes 4-21-17 The Flats at Rigden Farm 2715 Iowa Drive B1600845 Fort Collins, CO 80525 8343000000 Building 5 N/A Ryan Banning 4-21-17 Note: All calculations are based upon surveyed spots locations shown on elevation certification only No adverse impacts are expected. Grading meets slope requirements x x x x x x x x 6/9/2017 RB RB RB RB Isolation requirements appear to have been met through elimination of porous materials at ground level. No adverse impacts are expected RB RB RB RB All areas where possible are 5% to swales. No adverse impacts are anticipated. Some swales are 1% but convey adequately. No adverse impacts are anticipated 5/26/16 Page 2 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12. Final site cleanup has been completed. 13. I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14. Based on this information, I certify that (check one): □ The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □ The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date 4 Ryan Banning Ryan@northernengineering.com 970.221.4158 Northern Engineering 310 N. Howes Street, Suite 100 Fort Collins, CO 80521 Site remains under construction x x x x x 04/21/17 RB RB RB RB RB 06.09.17 301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com June 9, 2017 Dan Mogen, EI Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Grading Certifications 2715 Iowa Drive (The Flats at Rigden Farm) Dear Mr. Mogen: I have visited building 5 of The Flats at Rigden Farm at 2715 Iowa and we have performed asbuilt survey of the grading and drainage structures shown on the attached asbuilt elevation certification. The building grading generally conforms to the approved grading and drainage. This certification is for the elevations and grading of the building envelope to the front walkway and the elevations of the drive aisle directly adjacent to the attached garage bays. The elevation of the ground surrounding the building is roughly 2 inches below the finished floor and top of foundation. Level of cold joint waterproofing per the plan is unknown. The building fascia is entirely masonry so no isolation issues exist requiring additional separation from porous materials. Landscaping grade where adjacent to the building is above 5% in all pervious areas surrounding the building. No adverse impacts are anticipated from minor areas that remain below 5%. The rim elevation of the inlets are general lower than design except in the northeast corner however no drainage issues are anticipated due to this change. All swales have sufficient slope and overflow locations are at appropriate elevations to provide adequate flood protection. Overall site certification has been provided. Thank you and please let me know if you have any questions or concerns. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Ryan O. Banning, P.E. Project Manager