HomeMy WebLinkAboutSite Certifications - 04/14/2021Elevation Area (SF)
Ave. Area
(SF)
Incremental
Capacity (CF)
Total
Capacity
(CF)
4942 0 0
1,040.0
4942.1 2,080 104.0 104.0
2,460
4943 2,840 2,214.0 2,318.0
Elevation Area (SF)
Ave. Area
(SF)
Incremental
Capacity (CF)
Total
Capacity
(CF)
4942 0 0
979.7
4942.1 1,959 98.0 98.0
2,197
4943.25 2,434 2,526.1 2,624.1
APPROVED GRADING PLAN
RAIN GARDEN CAPACITY
AS‐BUILT GRADING PLAN
St. Elizabeth Ann Seton Catholic Parish
1/19 Page 1 of 2
DURING CONSTRUCTION INSPECTION CHECKLIST
To be completed by Construction Superintendent
This checklist is to be completed during construction and included with the Overall Site and Drainage Certification.
• Use “Yes” for items completed as described.
• Use “N/A” for items that are not applicable to the site being certified.
• If any blanks are “No,” attach an explanation referencing the item number below.
Project Name: St. Elizabeth Ann Seton Date: 8.15.2020
Building Permit Numbers: B1805979
I. Compaction
A. Yes All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the
City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content
and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction.
Provide testing log from contractor/engineer.
II. Storm Drain Pipe Installation Requirements
A. Yes The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction
Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas
are to be at 90%, both in accordance with ASTM D698).
III. Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0
A. Riprap
1. N/A The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans.
2. N/A A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an
approved equal. Provide documentation for an approved equal.
3. N/A The riprap is the gradation shown on the approved construction plans with a D50 of .
4. N/A The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown.
5. N/A The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.)
B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7
1. N/A All fabric was installed per manufacturer’s specifications.
1/19 Page 2 of 2
IV. Other Permanent BMPs
A. N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch
crossings of storm drain pipes.)
V. Extended Detention Basins
A. Yes Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality
control box(es). Provide date of inspection and name of inspector: Chandler Arrellano inspected multiple times daily during install
Included certification sheet(s):
Please check the appropriate box(es) for the Low Impact Development
(LID) facilities found on this site and complete the corresponding
certification sheets.
☐ Permeable Interlocking Concrete Pavers
☒ Bioretention Cells (Rain Gardens)
☐ Sand Filters
☐ Vegetated Buffers
☐ Underground Infiltration
☐ Other LID – For certification of Dry Wells, Tree Filters,
Constructed Wetland Channels & Ponds, etc., contact City Staff
to determine requirements to exhibit the LID facility has been
constructed and functions as intended per the approved
drainage report.
*Please provide photographic documentation of the installation of all
stages of all LID facilities.
**Please contact the City Stormwater Inspector at
stormwaterinspection@fcgov.com to discuss inspection requirements
for each LID facility and request inspections.
***All facilities being certified must be “clean” – free of sediment &
construction debris – prior to certification or acceptance of the facility.
Completed by:
Name: Brian Welch
Title: President
Email: LambornLTC@comcast.net
Phone: 7204419595
Company: Lamborn Landscape & Tree Care
Address: 356 Tynan Dr. Erie, CO 80516
1/19 Page 1 of 3
Bioretention Cells (Rain Gardens)
was held with City-Stormwater
Inspector to discuss installation, inspection, checklist, and ☒ ☐ ☐ location (i.e. DCP, initial erosion control
Underdrain and basecourse inspection(s):
facility was verified via inspection by a City-Stormwater
Inspector at the point of installation of the outlet, underdrain,
geomembrane layer, and base course (per design in Final Plan
☒ ☐ ☐
inspector’s name
Pea gravel and BSM inspection(s):
was verified via inspection by a City-Stormwater Inspector at
the point of installation of the pea gravel and bioretention ☒ ☐ ☐ inspector’s name
Excavation
☒ ☐ ☐
☒ ☐ ☐
☒ ☐ ☐ Provide photograph
Excavated area is protected/surrounded by sediment/runoff
control measures during construction ☒ ☐ ☐
Intake
☒ ☐ ☐
Forebay
☒ ☐ ☐ Provide photograph
There is a minimum 3” drop at the forebay entrance ☒ ☐ ☐ Provide photograph
Forebay will drain fully and not hold standing water ☒ ☐ ☐
Outlet Structure/Overflow
Emergency overflow elevation is confirmed
☒ ☐ ☐ overflow to top of media filter; provide
☒ ☐ ☐
1/19 Page 2 of 3
Overflow inlet invert elevation is at least 3 inches below
containment wall/berm (to direct overflow into inlet) ☒ ☐ ☐ inlet and top of containment wall/berm;
☐ ☐ ☒
Impermeable Liner
☐ ☐ ☒
☐ ☐ ☒ Provide photograph
Impermeable liner is buried with no exposure ☐ ☐ ☒
Any penetrations of the impermeable liner have been sealed
and checked for water-tightness ☐ ☐ ☒
Underdrain System
☒ ☐ ☐ Provide photograph
At least one cleanout is provided per underdrain lateral ☐ ☐ ☒ Provide photograph
Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☒ Provide photograph
Cleanout covers are installed and watertight ☐ ☐ ☒ Provide photograph
Verify the underdrain is NOT wrapped in geotextile fabric ☒ ☐ ☐ Provide photograph
Verify there is no orifice plate on the underdrain outfall ☒ ☐ ☐ Provide photograph
Underdrain integrity tested after backfilling using TV and/or
water test ☐ ☐ ☒
Filter Media and Aggregate
- meets design specifications
☒ ☐ ☐ record depth installed Arrellano
#8, #89, or #9):
- meets design specifications
☒ ☐ ☐ record depth installed Arrellano
- meets design specifications
☒ ☐ ☐ record depth installed Arrellano
☒ ☐ ☐
☒ ☐ ☐
Other Structural Components
☒ ☐ ☐
1/19 Page 3 of 3
Landscaping
Verify final landscaping is free of sod ☒ ☐ ☐
☒ ☐ ☐ Provide photograph
Vegetation is planted according to landscape design
specifications and final landscaping plan ☒ ☐ ☐
☒ ☐ ☐
Temporary irrigation installed
☐ ☐ ☒ irrigation is installed to establish/maintain