Loading...
HomeMy WebLinkAboutSite Certifications - 01/24/2019 (2)January 17, 2019 Mr. Wes Lamarque City of Fort Collins 700 Wood Street Fort Collins, Colorado 80521 RE: Site Certification for South College Storage Fort Collins, Colorado Dear Wes: This drainage certification letter is provided to verify as-constructed conditions for South College Storage. Northern Engineering completed survey work December 12, 2018, to verify general compliance with the Final Utility Plans for Stadium Apartments, dated September 28, 2017. Included in this drainage certification submittal are the following: Appendix A - City of Fort Collins Overall Site and Drainage Certification Form. Appendix B - City of Fort Collins During Construction Inspection Checklist and photographs provided by contractor. Appendix C - As-constructed Rain Garden M calculations. Appendix D - As-constructed record drawings for Grading and Storm Drain Plan and Profile Sheets. Appendix E – State Portal Documents. Rain Garden M has been over sized by a significant amount (677 ). This additional sizing will increase the amount of infiltrated runoff and further enhance downstream conditions. We have concluded, based on the attached information and personal site inspection, that the drainage features for the project site have been constructed in substantial compliance with the above referenced Final Utility Plans, with the following exceptions: ·ITEM V.A.3: Inlet A2, within Storm Line A, has a rim elevation of 5037.88 (the design is 5037.36) therefore this is not within the City of Fort Collins tolerance of 0.20’. However, this difference in height was not enough of a discrepancy to alter the flow capacity. Additionally, the flow line slope in this area is at 0.60% which is still above Pond Design Water Quality Vol. (ft3) As-built Water Quality Vol. (ft3) Rain Garden M 2496.3 3174.0 Pond M 38627.0 38637.7 Table 1: Drainage Amenity Volumes Accepted 1/24/2019 WL the minimum of 0.50%. therefore, we conclude that this defect will not impact the design. · ITEM V.A.3: Inlet A3, within Storm Line A, has a rim elevation of 5037.82 (the design is 5037.36) therefore this is not within the City of Fort Collins tolerance of 0.20’. However, this difference in height was not enough of a discrepancy to alter the flow capacity. Additionally, the flow line slope in this area is at 0.60% which is still above the minimum of 0.50%. Therefore, we conclude that this defect will not impact the design. · Item V.A.4: Inlet C2, within Storm Line C, has an invert of 5003.29 (the design is 5003.01) therefore this is not within the City of Fort Collins tolerance of 0.20’. However, due to the increased height of the invert a steeper slope within the 15” RCP has increased which will not hinder the flow. Therefore, we conclude that this defect will not impact the design. · Item V.A.4: The invert of Pond M is slightly higher than the approved design drawings. Headwall E2 Connection has an invert of 5020.08 (the design is 5019.70) and is greater than the City’s 0.20’ tolerance. However, the flow through the 12” HDPE pipe will be controlled by the pond’s outlet structure. · Item XIII.A: At the time of Northern Engineering’s site investigation, construction debris was not removed throughout the project site. · Item XIII.A.1: At the time of Northern Engineering’s site investigation, construction debris was not removed throughout the project site. Northern Engineering did a site visit on January 11th, 2019 to verify that as-built information was accurate. After the investigation Northern Engineering concluded that this site met all the required volumes, slopes, erosion protection, landscaping, and location of infrastructure coincided with the approved Mylars and Drainage Report. Please feel free to contact me with any questions you may have. NORTHERN ENGINEERING SERVICES, INC. Blaine Mathisen, EI Frederick S. Wegert, PE Project Engineer Project Engineer 1/17/19 APPENDIX A OVERALL SITE AND DRAINAGE CERTIFICATION FORM 8/16 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet South College Storage 1/8/2019 Yes Yes Yes Yes Yes Yes B1704440 8/16 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes Yes N/A N/A Yes Yes Yes Yes N/A Yes Yes 1.76 Scour Stop N/A 8/16 Page 3 4.Outlet Structure Certification a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) Yes N/A Yes N/A Yes N/A N/A N/A Yes Yes Yes Yes Yes Yes Yes Yes 8/16 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. Yes Yes Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A 8/16 Page 5 V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following (or an equivalent) designation: NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Vol.2, Ch.9 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. Yes Yes Yes No No Yes Yes N/A N/A N/A N/A N/A Yes Yes Yes 8/16 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 8/16 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A. Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1.All fabric was installed per the details on the approved construction plans. XIII.Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV.Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. Yes Yes N/A N/A Yes Yes Yes No No Yes Yes APPENDIX B DURING CONSTRUCTION INSPECTION CHECKLIST 12/15 Page 1 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. I.Compaction A.All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II.Storm Drain Pipe Installation Requirements A.The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A.The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. B.A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. C.The riprap is the gradation shown on the approved construction plans with a D50 of . D.The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. E.The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) IV. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A.All fabric was installed per manufacturer’s specifications. V. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes and at the end of flared end sections.) See final summary report from EEC attached below. See final summary report from EEC attached below. Yes Yes Yes N/A N/A Yes Yes Yes N/A 12/15 Page 2 Permeable Interlocking Concrete Pavers Post-excavation infiltration rates are consistent with design infiltration capacity (for “full or partial infiltration” designs) Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Any penetrations of the impermeable liner have been sealed and checked for water-tightness. Meets specifications for: -Dimensions -Reinforcement -Footings Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test Base coarse (e.g., #2/4) has 90% fractured faces Bedding coarse (e.g., #89) is thoroughly washed Sub-base materials are installed and compacted according to manufacturer’s specifications PICP area is protected from construction site sediment, including runoff from the upstream catchment and Close Out 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 12/15 Page 3 Bioretention Cells Heavy equipment did not travel over bioretention cell during excavation Bottom of cell was “ripped” after excavation Photograph before/after “ripping” Bottom of cell is flat and level Photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction Photograph Overflow inlet elevation is set above bioretention media per plan (typically 12 inches) Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) Measure/record distance between inlet and top of containment wall/berm Upstream catchment drains to inlet Forebay is installed according to design specifications Forebay has flat, concrete bottom Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media filter Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 12/15 Page 4 Filter Media Filter media composition is per design specifications Filter media was “machine mixed” by supplier prior to delivery Filter media installed flat and level Other Structural Components Containment wall/berm is continuous and level Landscaping Final landscaping does NOT include sod Final landscaping (wood/rock mulch) is flat and level Vegetation is planted according to landscape design specifications Verify that weed barrier is not installed Temporary irrigation installed If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell Signature: Name: Title: Email: Phone: Company: Address: 4 4 4 4 4 4 4 4 4 4 David Harvey Operations Manager david@growyourstorage.com 719-510-4202 GYS General Contracting 791 Copper Center Pkwy Colorado Springs, CO 80921 4396 G REENFIELD D RIVE W INDSOR , C OLORADO 80550 (970) 545-3908 FAX (970) 663-0282 December 10, 2018 GYS Development 791 Copper Center Parkway Colorado Springs, Colorado 80921 Attn: Mr. Brandon Grebe (brandon@growyourstorage.com) Mr. David Harvey (david@growyourstorage.com) Re: Construction Observation and Testing Report – Final Summary Letter South College Executive Self-Storage - 6020 S. College Avenue Fort Collins, Colorado EEC Project No. 1174160 Mr. Grebe and Harvey: As you are aware, during various construction phases for the South College Avenue Executive Self-Storage facility located at 6020 South College Avenue in Fort Collins, Colorado, Earth Engineering Consultants, LLC (EEC) personnel, provided observations and testing services of requested items on a part-time, as-needed/on-call basis as requested. Reports concerning the construction observation and testing services provided by EEC personnel were submitted to GYS Development, and to the project design team members’ attention during the appropriate time periods as the test results became available. We have recently been asked by Mr. David Harvey, Operations Manager with GYS General Contracting, to provide a summary letter addressing the services performed by EEC personnel, primarily, but not limited to the following items: foundation observations including over- excavation and replacement of on-site subsoils with approved imported structural fill material, conventional spread footings reinforcement observations, reinforcement observations of exterior perimeter and interior foundation walls, interior columns, stair and elevators cores, periodic observations and testing services associated with the concrete masonry units (CMU) wall construction, perimeter drainage system observations, non-destructive testing (NDT) and observations of structural framing/steel erection components, slab-on-metal deck (SOMD) and light gauge steel framing elements, earthwork related elements associated with the proposed development including utility trench backfill and site improvements, along with testing of cast- in-place concrete Earth Engineering Consultants, LLC EEC Project No. 1174160 December 10, 2018 Page 2 During the foundation construction phase for the referenced project, EEC personnel provided part-time site observations and testing services for the preparation of foundation bearing stratum either on undisturbed sandstone bedrock and/or on an approved zone of imported structural fill material to support the conventional spread footing foundation system as recommended in the project-specific subsurface exploration report, (please refer to EEC’s “Subsurface Exploration Report” dated February 27, 2017, Project No. 1172005), and observation and testing services for the cast-in-place concrete foundation walls and structural related elements. EEC personnel provided site observations and field density testing of either on-site and/or imported fill material placed and compacted as engineered fill material within the interior floor slab areas for the building and associated site-work, backfill of foundation walls, and within on- site utility trenches. EEC personnel provided reinforcement observations of the foundation system, (conventional spread footings), foundation walls, columns, and elevator cores, and floor slabs (slab on grade and slab on metal deck). During the concrete masonry unit (CMU) wall construction phases for the elevator shaft and stair cores, EEC personnel provided, on a periodic/special-inspection basis, reinforcement observations and observation/testing services of the CMU components, (i.e., mortar, grout and CMU block strength characteristics). EEC personnel provided testing of cast-in-place concrete for the elevated SOMD and associated exterior concrete flatwork. Based on our review of the outlined testing, as directed by the general contractor and completed by EEC personnel on an as-needed basis, the final field density test results at the locations as described within each bi-monthly construction materials testing (CMT) / quality control (QC) report for the project, met the project compaction requirements for fill materials placed and compacted to redevelop interior floor slab elevations, backfill placed adjacent to foundation walls and on-site utility installation trenches. Laboratory compressive strength tests completed on the cast-in-place concrete for the foundation related elements and floor slabs (both interior and exterior), along with the grout, and CMU prisms for the CMU walls, conformed to the project specified minimum 28-day compressive strengths requirements. Observations of reinforcement within the foundation system for the project, (i.e., the conventional spread footings, concrete cast-in-place foundation walls, columns, etc.) and the CMU stair and elevator walls, were completed by EEC personnel and bi-monthly CMT/QC reports were submitted to your attention during the appropriate periods as the results became Earth Engineering Consultants, LLC EEC Project No. 1174160 December 10, 2018 Page 3 available. Based on our review of the outlined observations, we believe the reinforcement within the foundation system(s) for the project, and the structural related elements were placed, and constructed in general compliance with the project plans and specifications. EEC personnel also conducted various site visits during the installation phase of the exterior perimeter drainage system for general conformance purposes. In general, the perimeter drain system along the north, west and south boundaries consisted of a 6-inch flex perforated PVC pipe encased with gravel wrapped in filter fabric material which appeared to exhibit a positive slope towards the daylight drain at the east side of the building. Based on visual observations, the perimeter drain system appeared to be constructed in general accordance with the details on sheets C3.00, A0.4, and A4.2 of the Civil and Architectural plans dated September 28, 2017 and August 25, 2017, respectively. Observations for the structural steel erection, slab on metal deck, and light gauge framing elements, were completed by EEC’s in-house ICC certified *inspector and reports were submitted to your attention during the appropriate periods as the results became available. Based on the observations performed in the areas referenced in our CMT/QC bi-monthly reports it appeared the work completed was in general accordance with the project plans and specifications. Additional copies of our fifteen (15) periodic/bi-monthly construction materials testing (CMT)/quality control (QC) test reports dated January 1, 2018 – Submittal No. 1, February 12, 2018 - Submittal No. 2, February 14, 2018– Submittal No. 3, March 21, 2018 - Submittal No. 4, April 11, 2018 - Submittal No. 5, April 20, 2018 – Submittal No. 6, May 25, 2018 – Submittal No. 7, June 22, 2018 - Submittal No. 8, July 25, 2018 - Submittal No. 9, August 14, 2018 - Submittal No. 10, August 17, 2018 – Submittal No. 11, September 24, 2018 – Submittal No. 12, October 4, 2018 – Submittal No. 13, October 30, 2018 – Submittal No. 14, and November 8, 2018 – Submittal No. 15 are available upon request. APPENDIX C CAPTURE VOLUME Project Title Date: Project Number Calcs By: Client Pond Designation Invert Elevation Water Quality Volume 100-yr Detention Volume Total Pond Volume Min Sc D = Depth between contours (ft.) A1 = Surface Area lower contour (ft2)t A2 = Surface Area upper contour (ft2)Area/Row No. of Rows 5023.40 2681.16 0.00 0.00 0.00 0.0000 5023.60 2873.88 0.20 555.39 555.39 0.0128 5023.80 3063.06 0.20 593.59 1148.99 0.0264 5024.00 3252.16 0.20 631.43 1780.41 0.0409 5024.20 3444.26 0.20 669.55 2449.96 0.0562 WQCV 5024.40 3799.03 0.20 724.04 3174.00 0.0729 Total Vol Elevation Depth Volume WQCV 5024.21 0.81 0.0567 Overall Detention 5024.40 1.00 0.0729 Circular Perforation Sizing Dia (in.) 1 Rain Garden M 0.05 #REF! 0.0567 ac-ft 5023.40 ft Rain Garden M Volume Elevation (ft) n 1/4 #REF! Surface Area (ft2)Total Outlet Area #REF! South College 1/17/2019 1269-002 B. Mathisen Branon Grebe 0.0567 ac-ft 0.0000 ac-ft Required Area Per Row Total Vol. (ac-ft) Total Vol. (ft3) Incremental Vol. (ft3) Incremental Depth (ft) Calc. Depths () 3 **2121AAAADV++= Project Title Date: Project Number Calcs By: Client Pond Designation Invert Elevation Water Quality Volume 100-yr Detention Volume Total Pond Volume Min Sc D = Depth between contours (ft.) A1 = Surface Area lower contour (ft2)t A2 = Surface Area upper contour (ft2)Area/Row No. of Rows 5019.60 189.61 0.00 0.00 0.00 0.0000 5019.80 789.93 0.20 91.10 91.10 0.0021 5020.00 1423.91 0.20 218.29 309.40 0.0071 5020.20 1996.76 0.20 340.46 649.85 0.0149 5020.40 2774.65 0.20 475.01 1124.87 0.0258 5020.60 6480.72 0.20 899.72 2024.59 0.0465 5020.80 7458.78 0.20 1392.80 3417.40 0.0785 5021.00 8160.24 0.20 1561.38 4978.77 0.1143 5021.20 8595.80 0.20 1675.42 6654.19 0.1528 5021.40 8960.21 0.20 1755.47 8409.66 0.1931 5021.60 9325.78 0.20 1828.48 10238.14 0.2350 5021.80 9692.45 0.20 1901.71 12139.84 0.2787 5022.00 10059.51 0.20 1975.08 14114.93 0.3240 5022.20 10425.89 0.20 2048.43 16163.36 0.3711 5022.40 10791.81 0.20 2121.66 18285.02 0.4198 5022.60 11154.03 0.20 2194.48 20479.51 0.4701 5022.80 11512.55 0.20 2266.56 22746.07 0.5222 5023.00 11875.82 0.20 2338.74 25084.81 0.5759 5023.20 12243.14 0.20 2411.80 27496.62 0.6312 5023.40 12615.86 0.20 2485.81 29982.42 0.6883 5023.60 12995.53 0.20 2561.05 32543.47 0.7471 5023.80 13385.20 0.20 2637.98 35181.45 0.8077 5024.00 13784.93 0.20 2716.91 37898.36 0.8700 5024.20 14263.13 0.20 2804.67 40703.03 0.9344 Total Vol 5024.40 14777.75 0.20 2903.94 43606.97 1.0011 Elevation Depth Volume 100-yr Detention 5024.05 4.45 0.8870 Overall Detention 5024.05 4.45 0.8870 Required Area Per Row Total Vol. (ac-ft) Total Vol. (ft3) Incremental Vol. (ft3) Incremental Depth (ft) Surface Area (ft2)Total Outlet Area #REF! South College 1/4/2019 1269-002 B. Mathisen Branon Grebe 0.8870 ac-ft 0.8870 ac-ft Pond M 0.05 #REF! 0.0000 ac-ft 5019.60 ft Pond M Volume Elevation (ft) n 1/4 #REF! Circular Perforation Sizing Dia (in.) 1 Calc. Depths () 3 **2121AAAADV++= APPENDIX D RECORD DRAWINGS LOD LOD LO D LO D LO D LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LO D LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD SS SS SSS G G G G G G G G G G G G W W W W W W W UD E E E E E EE A.V. S S VAULT ELECELEC T SB M CABLE D VAULT ELEC C V.P.V.P. V.P. V.P. V.P.V.P. FES S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS ST HYD X X X X X X X X X X X X X X X X X X X X X X X X X E E E E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X X X X X X X CTVCTV G OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U X X X X X X X X X X X X S ELECE E E E E E E E E E E E E E E 24.3% SKYWAY DRIVE (80' R.O.W.) (SEE SHEET C4.03) 9' UTILITY EASEMENT 5' SIDEWALK 31' -BLDG SAWCUT 4:1 4:1 5:1 4: 1 5:1 5: 1 12:1 5:1 4:1 4:1 6:17:1 6:1 16:1 7.9% 5.4% 4.6% 3.4% 1.9% 8.4% 1.2 % 8.1% 2.2% 3.2% 4.2% 4.7% 3.3 % 7.6% MA R S D R I V E (S E E S H E E T C4 . 0 1 ) 18" VERTICAL CURB AND GUTTER 30" VERTICAL CURB AND GUTTER RAMP 5' SIDEWALK SO U T H C O L L E G E A V E N U E OWNER: TRILBY HOLDINGS GROUP LLC OW N E R : T R I L B Y H O L D I N G S GR O U P L L C 9' UTILITY EASEMENT 5:1 6:1 6.6% 5.1% 1.7% 5.1% 2.1% 3.5% 4.8% 7:1 6:1 4:1 4:1 3:1 4:1 1.5% 0.0% 7.3% 4.1% 4.0 % 41' -BLDG R50' TEMPORARY CUL-DE-SAC 4:1 4:1 4:1 4.5% 3.0% ABANDONED IRRIGATION DITCH (SEE NOTE 12) ADDITIONAL ROW (WIDTH VARIES) ADDITIONAL ROW (WIDTH VARIES) HEADWALL MODIFIED CURB SECTION (SEE SHEET C2.00) (1.8 2 ) 4.78 4.73 4.5' 12' 35.4 7 33.0 4 27.0 3 29.2 5 24.7 6 26.33 27.03 36.27 35.1 0 36. 5 1 37 . 7 0 38.6 0 36.44 35.6 8 20.68 20.3 1 19.70 20.0 6 20.2 9 25.4 0 20.8 8 25.3 8 24.75 24.7 5 24.15 25.38 25.3 8 38 . 5 0 38. 5 9 38.6 6 30.0 6 35.33 35. 4 4 35.6 2 35.3 9 35.21 24.9 0 24.90 25.1 0 24.90 24.9 0 24.90 23 . 2 5 24.17 23.2 5 23.2 5 23.25 23 . 2 5 38.45 LOWER LEVEL FFE=27.03 35.58 29. 6 2 35.9 8 36.76 36.73 36.71 37.4 6 37.5 3 36.94 37.9 1 39.17 39.23 39.42 40.07 38.58 37.79 37.8 0 25.3 8 25.3 8 25.3 8 25.4 0 25.38 25.3 8 21.2 1 21.5 3 20.9 8 20. 9 2 20.55 20. 1 4 25.3 8 24.9 1 24.7 1 25.20 25.2 0 24.15 23.75 (23.17) (23.36) 24.15 30. 0 6 35. 1 0 28.87 25.31 19.00 25.37 25.00 25.00 25.00 25.00 25.2 0 25.20 25.20 35.3 035. 3 3 35.83 36.7 0 36.64 35. 9 8 34. 8 3 34.4 8 35.0 5 20.47 20.4 7 19. 7 0 19.70 25. 5 5 25.5 8 25.3 0 25.3 0 21.70 21.7 0 38 . 3 8 38.3 0 38.9 9 39.0 6 36. 8 3 36.96 36.51 36.41 36.37 36. 4 5 37 . 7 0 37 . 7 0 SAWCUT SAWCUT 5:1 (A s - B u i l t ) 4:1 (As-Built) 4:1 (A s - B u i l t ) 3:1 (As-B u i l t ) 4:1 (As-Built) 4:1 22' SPILLWAY 20' CURB CUT W W W W W W W W W W W W FDC 37. 0 6 36. 7 2 36.6 5 36.5 9 37.7 0 37.04 37.2 2 37 . 2 2 36.7 2 37.6 2 1.9% RAISED CROSS WALK 37. 1 0 37 . 0 4 37.51 37.45 37.5 5 37 . 5 5 37.45 37.3 8 37.34 37.69 5:1 37.08 36.8 0 36.68 37.54 37 . 4 9 36.9 4 37.4 6 37. 0 9 37. 1 1 37. 4 5 37.65 37 . 2 3 36.84 36.92 37. 1 9 37. 1 1 37. 2 1 37. 0 0 36.9 3 37.5 8 37. 6 6 37.6 4 38. 1 4 38. 2 4 37. 0 0 2' PANCURB CHASE SIDEWALK CHASE BIKE RACK RAMP OUTFALL CURB AND GUTTER 37.3 0 37.2 3 37.02 37.4 6 RAMP 37 . 7 0 37. 7 0 No . Re v i s i o n s : By : Da t e : RE V I E W E D B Y : C. S n o w d o n DE S I G N E D B Y : DR A W N B Y : SC A L E : DA T E : 09 . 2 8 . 2 0 1 7 PR O J E C T : 12 6 9 - 0 0 2 Sheet of 21 SO U T H C O L L E G E S T O R A G E 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m 09.28.17 C4.00 GR A D I N G P L A N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 ---- LEGEND: PROPOSED CONTOUR PROPOSED UNDERDRAIN PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR LIMITS OF DISTURBANCE PROPOSED SPOT ELEVATION PROPOSED SLOPES PROPOSED STORM INLET EXISTING SPOT ELEVATION PROPOSED LOT LINE EXISTING RIGHT OF WAY LOD 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION BOTH HORIZONTAL AND VERTICAL OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL CONTROL NETWORK DATUM: NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.CONTRACTOR SHALL OBTAIN THE MOST CURRENT SOILS AND SUBSURFACE EXPLORATION REPORT FOR MORE INFORMATION REGARDING PAVEMENT DESIGN, SUBSURFACE TREATMENT AND COMPACTION. 8.CONTRACTOR SHALL CONFIRM DOORWAY, FOUNDATION WALLS, AND SLOPED SLABS WITH STAMPED ARCHITECTURAL AND STRUCTURAL DRAWINGS PRIOR TO STAKING. 9.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS 10.REFER TO SHEET C2.00 FOR CURB TYPES AND LOCATIONS 11.LARIMER COUNTY URBAN AREA STREET STANDARDS (LCUASS) REQUIRE THAT A MINIMUM OF 3-FEET SEPARATION EXISTS BETWEEN THE BOTTOM OF A PAVEMENT SECTION AND UNDISTURBED BEDROCK WITHIN THE ROADWAY THAT WOULD BE CONSIDERED CITY OF FORT COLLINS ROADWAY. A. LCUASS REQUIRES AN OVER-EXCAVATION AND REPLACEMENT APPROACH IN AREAS THAT DO NOT HAVE 3 FEET OF SEPARATION. B. DURING THE ROADWAY UTILITY INSTALLATION A BETTER UNDERSTANDING OF THE BEDROCK PROFILE WITHIN THE ROADWAY ALIGNMENT SHOULD BE DETERMINED BY THE GENERAL CONTRACTOR. C. ALL BEDROCK FOUND TO BE WITHIN 3 FEET OF THE BOTTOM OF THE PAVEMENT SHOULD BE REMOVED/OVER EXCAVATED AND STOCKPILED OR WASTED FROM THE SITE. D. IF REUSE IS DESIRED THE SANDSTONE NEEDS TO BE PULVERIZED/BROKEN DOWN TO LESS THAN 2-INCH DIAMETER PARTICLE SIZE. E. THE OVER-EXCAVATED ZONE SHOULD BE REPLACED WITH APPROVED NON-EXPANSIVE MATERIAL AND PLACED IN UNIFORM 9 INCH LIFTS, MOISTURE CONDITIONED TO NEAR OPTIMUM MOISTURE CONTENT AND COMPACTED TO AT LEAST 95% OF THE MATERIAL'S STANDARD PROCTOR DENSITY (ASTM D698). F. MONITORING OF THE OVER EXCAVATION AND REPLACEMENT WITH APPROVED FILL MATERIAL SHOULD BE PERFORMED BY THE GEOTECHNICAL ENGINEER TO VERIFY SEPARATION TO THE UNDISTURBED HAS BEEN ACHIEVED. 12.MODIFICATION TO THESE PLANS SHALL BE REQUIRED SHOULD THE ABANDONED IRRIGATION LATERAL BECOME ACTIVE AND PRIOR TO ANY RUNNING IRRIGATION WATER. NOTES: UD FUTURE CURB AND GUTTER PROPERTY BOUNDARY EXISTING STORM SEWER ST OVER-EXCAVATION AND REPLACEMENT AREA PROPOSED CURB AND GUTTER EXISTING SLOPES RAIN GARDEN SAND MEDIA ( IN FEET ) 1 inch = ft. Feet01010 10 REC O R D D R A W I N G LOD LOD LO D LO D LO D LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LO D LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD SS SS SSS G G G G G G G G G G G G W W W W W W W F FDC UD E E E E E EE A.V. S S S VAULT ELECELEC T SB M CABLE D VAULT ELEC V.P.V.P. V.P. V.P. V.P.V.P. FES S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS ST HYD E E E E E E E E E E E X X X X X X X X X X CTV OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U X X X X X X X X X X X X S W W W W W W W W W W W W W W W W W W W W W W W W E E E E E E E E E E E E EXISTING 20' SOUTH FORT COLLINS SANITATION DISTRICT SANITARY SEWER EASEMENT REMOVE EXISTING 6" TEE AND INSTALL 6" x 6" CROSS w/ 8" TO 6" REDUCTION 8" G.V. (S) (SEE NOTE 17) N:100067.77 E:193987.85 CONNECT TO EXISTING GAS LINE (APPROXIMATE LOCATION) N:100044.94 E:193724.62 RELOCATED SWITCHING CABINET WITHIN UNDERGROUND VAULT N:100029.42 E:194274.23 9'' UTILITY EASEMENT 20' DRAINAGE EASEMENT 9' UTILITY EASEMENT 20' DRAINAGE EASEMENT 3/4" SERVICE CONNECTION N:99929.59 E:193985.69 OWNER: TRILBY HOLDINGS GROUP LLC OW N E R : T R I L B Y H O L D I N G S GR O U P L L C ±126 L.F. OF 4" PVC @ 4.00% S89°06'11"E 8"x6" TEE 6"- G.V.(E) & T.B. N:99939.59 E:193985.84 ±127.95 S89°06'11"E ±144.33 L.F. OF 6" FIRE LINE S89°06'11"E 8" x 6" SWIVEL TEE 1 - 6" G.V.(E) 1 - 8" G.V. (S) (MECHANICALLY RESTRAINED) 8" PLUG W/ T.B. (S) N:99917.06 E:193985.49 6" F.H. ASSEMBLY N:99916.44 E:194024.85 9' UTILITY EASEMENT DRAINAGE EASEMENT 80' PUBLIC RIGHT-OF-WAY 76' PUBLIC RIGHT-OF-WAY 15' UTILITY EASEMENT ADDITIONAL ROW (WIDTH VARIES) CO L L E G E A V E N U E (E X I S T I N G R O W V A R I E S ) MA R S D R I V E (7 6 ' R O W ) SKYWAY DRIVE (80' ROW) 70.5' HALF PUBLIC RIGHT-OF-WAY 20 ' E M E R G E N C Y AC C E S S E A S E M E N T 20' EMERGENCY ACCESS EASEMENT 30 ' E M E R G E N C Y AC C E S S E A S E M E N T 30' EMERGENCY ACCESS EASEMENT ±39 L.F. OF 6" FIRE LINE N89°06'11"W 35 8 . 3 9 L F 8 " P V C @ 0 . 4 0 % 287 . 9 5 L F 8 " P V C @ 0 . 4 0 % 19 0 . 0 0 L F 8 " P V C @ 0 . 4 3 % 20' UTILITY EASEMENT EX. SAN MH 3 RIM=5016.40 INV IN=5003.30 (S) INV OUT=5003.19 (E) EX. SAN MH 2 RIM=5008.08 INV IN=5002.50 (W) INV OUT=5002.26 (N) OVERHEAD UTILITY EXISTING FIRE HYDRANT EX. SAN MH 4 RIM=5014.90 INV. IN=5005.29 (SE) INV. OUT=5004.73 (N) EX. SAN MH 5 RIM=5012.38 INV. IN=5006.54 (S) INV. OUT=5006.44 (NW) EX SAN MH 6 RIM=5016.24 INV. IN=5007.45 (SW) INV. OUT=5007.26 (N) CONNECT TO EXISTING 8" SANITARY SEWER APPROXIMATE INV: 5003.97' (CONTRACTOR TO FIELD VERIFY) 3/4" METER PIT EXISTING 30" FES FL ELEV: 4997.75 15.00 LF 30" RCP @ 7.67% EX. STORM INLET RIM=5005.55 INV IN=4997.99 (N) INV IN=4996.60 (W) INV OUT=4996.35 (E) DRAINAGE EASEMENT MECHANICAL WATERLINE LOWERING W/ RESTRAINTS (SEE DETAIL) ELECTRIC TRANSFORMER ELECTRIC METER GAS METER RIPRAP TEMPORARY ACCESS EASEMENT EXISTING ELECTRIC LINE GAS SERVICE LINE FIRE DEPARTMENT CONNECTION 6" FIRE SERVICE 3 4" WATER SERVICE STORM LINE A (SEE SHEET C3.01) STORM LINE D (SEE SHEET C3.02) STORM LINE E (SEE SHEET C3.02) STORM LINE C (SEE SHEET C3.02) STORM LINE B (SEE SHEET C3.01) EXISTING ELECTRIC LINE 45° BEND W/ TB 45° BEND W/ TB APPROXIMATE LOCATION OF EXISTING 6" WATER LINE (SEE NOTE 17) 4" UNDER DRAIN ELECTRIC VAULT AIR RELEASE VALVE (SEE DETAIL) DAYLIGHT DRAIN INV. IN=5022.34 (W) FG=5022.23 53.77 LF 6" HDPE @ 1.00% PERIMETER DRAIN CONNECTION INV. IN=5022.88 (N) INV. IN=5022.88 (W) INV. OUT=5022.88 (E) FG=5026.83 4" SANITARY SERVICE APPROXIMATE INV. IN=5009.01 (E) AS-BUILT AIR RELEASE VALVE AS-BUILT 8"x6" TEE AS-BUILT ELECTRIC TRANSFORMER AS-BUILT ELECTRIC METER AS-BUILT 3 4" WATER SERVICE AS-BUILT 6" FIRE SERVICEAS-BUILT FIRE HYDRANT AS-BUILT 8"x6" SWIVEL TEE AS-BUILT DAYLIGHT DRAIN INV = 5022.27 AS-BUILT METER PIT ELEC ELEC BRKR ARV H2O HYD D D W W D D FES FES FES ST ST ST ST ST ST ST ST ST ST ST ST ST ST SSSSSS 124 L.F. 140 L.F. 129 L.F. 38 L.F. No . Re v i s i o n s : By : Da t e : RE V I E W E D B Y : C. S n o w d o n DE S I G N E D B Y : DR A W N B Y : SC A L E : DA T E : 09 . 2 8 . 2 0 1 7 PR O J E C T : 12 6 9 - 0 0 2 Sheet of 21 SO U T H C O L L E G E S T O R A G E 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m 09.28.17 C3.00 UT I L I T Y P L A N NORTH CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER CONSTRUCTION SHALL BE PER THE FORT COLLINS-LOVELAND WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3.ALL SANITARY CONSTRUCTION SHALL BE PER THE SOUTH FORT COLLINS SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 4.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 8.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 10.REFER TO PLUMBING PLANS FOR ALL WATER SERVICE AND SANITARY SEWER SERVICE LOCATIONS. IF CONFLICT OCCURS, BOTH THE PLUMBING ENGINEER AND CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO INSTALLATION OR ORDERING OF MATERIALS. 11.ALL STORM SEWER IS TO BE OWNED AND MAINTAINED BY PROPERTY MANAGER. 12.ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 13.CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC METERS WITH ARCHITECT AND UTILITY PROVIDERS. 14.CONTRACTOR TO COORDINATE FINAL LOCATION OF IRRIGATION SHUT-OFF VALVE AND BACKFLOW DEVICE WITH LANDSCAPE ARCHITECT AND SPRINKLER CONTRACTOR. 15.CONTRACTOR TO COORDINATE SITE LIGHTING (LANDSCAPE) TO ENSURE NO CONFLICTS WITH OTHER UTILITIES. 16.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 17.THE EXISTING 6" WATER MAIN SHOWN IN THE PLANS WAS NOT PROVIDED FROM FIELD LOCATES OR VERIFIED IN THE FIELD BY SURVEYORS. THE CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING THE EXISTING WATER LINE AND THE EXISTING TEE FOR THE CROSS CONNECTION. LOCATING THIS WATER LINE SHALL OCCUR PRIOR TO ANY CONSTRUCTION, ORDERING OF MATERIAL OR MOBILIZATION. IF CONFLICT FROM THE PLANS OCCUR, THE PROJECT ENGINEER SHALL BE NOTIFIED PRIOR TO PROCEEDING AND REVISIONS MAY BE REQUIRED AND SHALL BE PROCESSED AND APPROVED BY THE FORT COLLINS - LOVELAND WATER DISTRICT W G T EXISTING STORM SEWER ST EXISTING TELEPHONE EXISTING GAS EXISTING ELECTRIC METER EXISTING WATER METER EXISTING IRRIGATION BOX EXISTING POWER POLE EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING SANITARY SEWER SS PROPOSED STORM INLET EXISTING LIGHT POLE PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE CONTROL IRR PROPERTY BOUNDARY SS SPROPOSED SEWER SERVICE PROPOSED CURB STOP & METER PIT PROPOSED AIR RELEASE VALVE W ---- PROPOSED CURB & GUTTER UNDERDRAIN UD PROPOSED ELECTRIC TRANSFORMER A.V. REC O R D D R A W I N G UD INLET A3 STA 12+17.50 N: 99606.67 E: 193964.11 INLET A2 STA 11+64.46 N: 99605.84 E: 194017.14 FES A1 STA 10+00.00 N: 99569.22 E: 194177.47 164.46 LF 1 5 " H D P E @ 5 . 0 0 % 53.04 LF 15" RCP @ 4.80% MA R S D R I V E . D D FES ST ST ST ST ST ST ST 56.0 LF 15" RCP @ 4.48% 158.1 LF 15" HDPE @ 5.16%65 . 9 L F 4 " P E R F P I P E @ 0 . 2 7 % W W W W W W W W W W E E E E E E W W W W W W W W W W F FDC E E E E E E EE A.V. INLET B2 STA 11+93.09 N: 99986.30 E: 193943.21 FES B1 STA 10+00.00 N: 100003.61 E: 194135.52 193.09 LF 18" RCP @ 1 . 7 5 % SKYWAY DRIVE. MA R S D R I V E . WATER LINE LOWERING STA.=11+49.49 PROPOSED 8" WATER LINE ELEC ELEC BRKR ARV H2O HYD W W ST ST ST ST ST ST 5020 5025 5030 5035 5040 5045 5020 5025 5030 5035 5040 5045 9+5010+0011+0012+0012+50 FE S A 1 ST A 1 0 + 0 0 . 0 0 IN V . 5 0 2 3 . 2 5 ( W ) 164.46 LF 15" HDPE @ 5.00% IN L E T A 2 ST A 1 1 + 6 4 . 4 6 FL . E L 5 0 3 7 . 3 6 IN V . I N 5 0 3 1 . 4 7 ( W ) IN V . O U T 5 0 3 1 . 4 7 ( E ) 53.04 LF 15" RCP @ 4.80% IN L E T A 3 ST A 1 2 + 1 7 . 5 0 FL . E L 5 0 3 7 . 3 6 IN V . O U T 5 0 3 4 . 0 2 ( E ) 100-YR HGL EXISTING GROUND PROPOSED GRADE 50 3 7 . 8 2 50 3 3 . 9 4 ( E ) 50 3 7 . 8 8 50 3 1 . 4 3 ( E ) 50 3 1 . 4 3 ( W ) 50 2 3 . 2 7 ( W ) 56.0 LF 15" RCP @ 4.48% 158.1 LF 15" HDPE @ 5.16% 5020 5025 5030 5035 5040 5045 5050 5020 5025 5030 5035 5040 5045 5050 9+5010+0011+0012+0012+25 IN L E T B 2 ST A 1 1 + 9 3 . 0 9 FL . E L 5 0 3 6 . 2 ± IN V . O U T 5 0 3 2 . 2 5 ( E ) 193.09 LF 18" RCP @ 1 . 7 5 % FE S B 1 ST A 1 0 + 0 0 . 0 0 IN V . 5 0 2 8 . 8 7 ( W ) MECHNICAL LOWERING STA:11+49.49 T.O.P. ELEV: 5029.78 18" MIN. 100-YR HGL PROPOSED GRADE EXISTING GROUND 50 3 6 . 3 3 50 2 8 . 9 7 No . Re v i s i o n s : By : Da t e : RE V I E W E D B Y : C. S n o w d o n DE S I G N E D B Y : DR A W N B Y : SC A L E : DA T E : 09 . 2 8 . 2 0 1 7 PR O J E C T : 12 6 9 - 0 0 2 Sheet of 21 SO U T H C O L L E G E S T O R A G E 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m 09.28.17 NORTH PROFILE SCALE: C3.01 PL A N A N D P R O F I L E ST O R M L I N E A A N D B CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R ---- PROFILE SCALE: NORTH ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 STORM LINE A STORM LINE B PROPOSED RIGHT-OF-WAY W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE FOR INLET TYPE AND SIZE. 8.CONTRACTOR TO ENSURE THAT ALL FLARED-END SECTIONS ARE BURIED AND FLUSH WITH SURROUNDING GRADE PRIOR TO LANDSCAPING. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 10.INLETS WITHIN PUBLIC RIGHT-OF-WAY ARE PUBLICLY OWNED AND MAINTAINED. 11.REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE STORMTECH CHAMBER DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION W G TEXISTING TELEPHONE EXISTING GAS EXISTING SANITARY SEWER SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY EEXISTING ELECTRIC PROPOSED STORM INLET INLET SCHEDULE: INLET SCHEDULE INLET ID INLET TYPE A2 5' TYPE R A3 5' TYPE R B2 TYPE C (DEPRESSED) C2 10' TYPE R MONITORING WELL D2 NYLOPLAST 30" BASIN (DOME GRATE) CLEAN OUT D3 NYLOPLAST 12" BASIN (CLOSED LID) REC O R D D R A W I N G VA U L T EL E C EL E C T S B M CA B L E VA U L T EL E C V. P . V. P . S SS SS SS SS E E E E E E E E E E E OHUOHU OHUOHUXX INLET C2 STA 11+18.60 N: 100024.89 E: 194531.35 FES C1 STA 10+00.00 N: 99906.30 E: 194531.25 118.60 LF 15" RCP @ 1.00% SK Y W A Y D R I V E . 6.73 6.47D D FES ST ST ST 113.4 LF 15" RCP @ 1.38% SS SS UD UD FES E1 STA 10+00.00 N: 99541.51 E: 194351.57 142.9 3 L F 1 2 " H D P E @ 0 . 2 0 % STORM LINE D (SEE THIS SHEET) HEADWALL E2 CONNECTION STA 11+42.93 N: 99475.34 E: 194224.88 LO T L I N E FES ST ST ST ST ST ST ST 140.5 L F 1 2 " H D P E @ 0 . 4 6 % 4990 4995 5000 5005 5010 5015 5020 4990 4995 5000 5005 5010 5015 5020 9+50 10+00 11+00 11+50 118.60 LF 15" RCP @ 1.00% FE S C 1 ST A 1 0 + 0 0 . 0 0 IN V . 5 0 0 1 . 8 3 ( N ) IN L E T C 2 ST A 1 1 + 1 8 . 6 0 FL . E L 5 0 0 6 . 6 ± IN V . O U T 5 0 0 3 . 0 1 ( S ) 100-YR HGL EXISTING GROUND PROPOSED GRADE 50 0 7 . 4 6 50 0 3 . 2 9 ( S ) 113.4 LF 15" RCP @ 1.38% 50 0 1 . 7 2 ( N ) 5010 5015 5020 5025 5030 5035 5040 5010 5015 5020 5025 5030 5035 5040 9+5010+0011+0011+61 142.93 LF 12" HDPE @ 0.20% FE S E 1 ST A 1 0 + 0 0 . 0 0 IN V . 5 0 1 9 . 4 1 ( S W ) HE A D W A L L E 2 C O N N E C T I O N ST A 1 1 + 4 2 . 9 3 IN V . 5 0 1 9 . 7 0 ( N E ) 100-YR HGL EXISTING GROUND PROPOSED GRADE HEADWALL w/ ORIFICE PLATE (SEE DETAIL) 140.5 LF 12" HDPE @ 0.46% 50 2 0 . 0 8 ( N E ) 50 1 9 . 4 4 ( N E ) UD UD MONITORING WELL D2 STA 10+37.07 N: 99517.15 E: 194217.14 37.07 LF 15" HDPE @ 2.50% 65.54 L F 4" PE R F O R A T E D H D P E @ 0.2 0 % STORM LINE A (SEE SHEET C3.01) STORM LINE E (SEE THIS SHEET) CONCRETE COLLAR D1 STA 10+00.00 N: 99480.15 E: 194214.82 LOT LINE FES ST ST ST ST ST ST ST ST 65.9 L F 4 " P E R F P I P E @ 0 . 2 7 % 39.2 LF 15" HDPE @ 2.19% 5010 5015 5020 5025 5030 5035 5040 5010 5015 5020 5025 5030 5035 5040 9+5010+0011+0011+25 65.54 LF 4" PEFORATED HDPE @ 0.20% MO N I T O R I N G W E L L D 2 ST A 1 0 + 3 7 . 0 7 FL . E L 5 0 2 4 . 2 ± IN V . I N 5 0 2 0 . 7 7 ( N W ) IN V . O U T 5 0 2 0 . 7 7 ( S ) 37.07 LF 15" HDPE @ 2.50% CO N C R E T E C O L L A R D 1 ST A 1 0 + 0 0 . 0 0 IN V . 5 0 1 9 . 8 5 ( N ) CL E A N O U T D 3 ST A 1 1 + 0 2 . 6 1 RI M 5 0 2 4 . 0 ± IN V . O U T 5 0 2 0 . 9 0 ( S E ) EXISTING GROUND PROPOSED GRADE RAIN GARDEN 10-YR HGL 50 2 0 . 9 8 ( S E ) 50 2 4 . 4 6 50 2 0 . 8 0 50 2 0 . 8 0 50 1 9 . 9 4 No . Re v i s i o n s : By : Da t e : RE V I E W E D B Y : C. S n o w d o n DE S I G N E D B Y : DR A W N B Y : SC A L E : DA T E : 09 . 2 8 . 2 0 1 7 PR O J E C T : 12 6 9 - 0 0 2 Sheet of 21 SO U T H C O L L E G E S T O R A G E 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m 09.28.17 NORTH PROFILE SCALE: NORTH C3.02 PL A N A N D P R O F I L E ST O R M L I N E C , D , A N D E CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 ---- PROFILE SCALE: NORTH PROFILE SCALE: STORM LINE C STORM LINE D STORM LINE E PROPOSED RIGHT-OF-WAY W EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE FOR INLET TYPE AND SIZE. 8.CONTRACTOR TO ENSURE THAT ALL FLARED-END SECTIONS ARE BURIED AND FLUSH WITH SURROUNDING GRADE PRIOR TO LANDSCAPING. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 10.INLETS WITHIN PUBLIC RIGHT-OF-WAY ARE PUBLICLY OWNED AND MAINTAINED. 11.REFER TO THE EROSION CONTROL PLAN SHEETS AND REPORT FOR TEMPORARY CONTROL MEASURES AND CONSTRUCTION SEQUENCING THAT SHALL BE USED TO PREVENT LOADING OF THE STORMTECH CHAMBER DRAINAGE FACILITIES WITH SEDIMENT DURING CONSTRUCTION W G TEXISTING TELEPHONE EXISTING GAS EXISTING SANITARY SEWER SS PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY EEXISTING ELECTRIC PROPOSED STORM INLET INLET SCHEDULE: INLET SCHEDULE INLET ID INLET TYPE A2 5' TYPE R A3 5' TYPE R B2 TYPE C (DEPRESSED) C2 10' TYPE R MONITORING WELL D2 NYLOPLAST 30" BASIN (DOME GRATE) CLEAN OUT D3 NYLOPLAST 12" BASIN (CLOSED LID) REC O R D D R A W I N G APPENDIX E STATE PORTAL DOCUMENTS This unofficial copy was downloaded on Jan-17-2019 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Jan-17-2019 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.020 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] Watershed Length-to-Width Ratio =1.00 L:W 0.00 190 0.00 0.00 Watershed Area = 3.64 acres 0.20 790 0.20 0.13 Watershed Imperviousness = 60.0%percent 0.40 1,424 0.40 0.19 Percentage Hydrologic Soil Group A = 0.0%percent 0.60 1,997 0.60 0.23 Percentage Hydrologic Soil Group B = 88.1%percent 0.80 2,775 0.80 0.27 Percentage Hydrologic Soil Groups C/D = 11.9%percent 1.00 6,481 1.00 0.30 1.20 7,459 1.20 0.33 1.40 8,160 1.40 0.35 1.60 8,596 1.60 0.38 1.80 8,960 1.80 0.40 User Input: Detention Basin Characteristics 2.00 9,326 2.00 0.42 WQCV Design Drain Time = 40.00 hours 2.20 9,692 2.20 0.44 2.40 10,060 2.40 0.46 2.60 10,426 2.60 0.48 2.80 10,792 2.80 0.50 3.00 11,154 3.00 0.52 3.20 11,513 3.20 0.54 3.40 11,876 3.40 0.55 3.60 12,243 3.60 0.57 3.80 12,616 3.80 0.58 4.00 12,996 4.00 0.60 4.20 13,385 4.20 0.61 4.40 13,785 4.40 0.63 4.60 14,263 4.60 0.63 After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two-Hour Rainfall Depth =0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume =0.071 0.165 0.265 0.360 0.541 0.716 0.949 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.070 0.165 0.265 0.359 0.540 0.716 0.948 acre-ft Time to Drain 97% of Inflow Volume =3 6 9 12 16 19 23 hours Time to Drain 99% of Inflow Volume =4 7 10 12 16 20 24 hours Maximum Ponding Depth =1.00 1.48 1.93 2.33 3.03 3.66 4.41 ft Maximum Ponded Area =0.147 0.191 0.211 0.228 0.257 0.283 0.317 acres Maximum Volume Stored =0.047 0.130 0.220 0.308 0.479 0.648 0.873 acre-ft Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet South College Storage Fort Collins, Colorado SDI_Design_Data_FC_Rainfall - Pond M.xlsm, Design Data 1/17/2019, 12:36 PM Doing_Clear_Formatting =Yes CountA=1 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 5 10 15 20 25 30 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV SDI_Design_Data_FC_Rainfall - Pond M.xlsm, Design Data 1/17/2019, 12:36 PM