Loading...
HomeMy WebLinkAboutLot Certifications - 05/27/2022 (2)2 4 3 1 2 1 3 312 2 2 12 4 3 2 3 2 1 1 21 1 2 3 1 1 2 2 1 2 2 112 2 3 1 1 2 1 231 1 223223 GM W 3 2 2 2 2 2 1 1 2 2 1 2 1 2 1 WS WS WS WS WS 2 311 13 4908 490 7 49 0 6 49 0 4 SP R I N G C R E E K CR O S S S E C T I O N 1 3 3 5 GM 2330 E PROSPECT RD OWNER: MOUNTAIN VIEW COMMUNITY CHURCH 2290 E PROSPECT ROAD OWNER: DDNH COMMERCIAL INC 2310 E PROSPECT RD OWNER: C AND C HOLDINGS LLC OWNER: GATEWAY MEDICAL SERVICES LLC 24' EMERGENCY ACCESS EASEMENT 30' UTILITY EASEMENT 15' TRAIL EASEMENT EXISTING 10' CONCRETE TRAIL EXISTING POND LIMITS OF 100-YEAR FLOODPLAIN EXISTING EDGE OF POND EXISTING LIMITS OF WETLANDS EXISTING BUILDING EXISTING 12" CMP EXISTING 8" ADS ROOF DRAIN 6" VERTICAL CURB 4905 49 0 7 49 0 8 49 0 6 49 0 6 4906 4907 4908 4906 4907 2' CURB CUT 2. 0 % 2' SIDEWALK CHASE 4907 PHASE 2 GRADING DETAIL (SEE SHEET C4.02) 4908 LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE SHOWN FOR PHASE 2 SANCTUARY ADDITION STORM DRAIN AND GRADING IN THIS AREA FOR PHASE 1 CONSTRUCTION TURF AREAS NORTH AND WEST OF BUILDING TO BE CONVERTED TO NATIVE GRASS (SEE LANDSCAPE PLANS FOR DETAILS) 10' WIDE SPRING CREEK TRAIL (SEE NOTES ON THIS SHEET CONCERNING CONSTRUCTION NEAR THE TRAIL) OWNER: SEVEN LAKES BUSINESS PARK ASSN FLUSH CURB PROPOSED RAILING (TYP) PHASE 1 GRADING DETAIL C (SEE SHEET C4.01) 4906 490 7 49 0 8 PHASE 1 GRADING DETAIL B (SEE SHEET C4.01) FFE=4908.7 8.5 3 5.54 8.5 3 8.7 0 PHASE 1 GRADING DETAIL A (SEE SHEET C4.01) CONSTRUCTION ACCES FROM PROSPECT ROAD. CONTRACTOR TO ENSURE MUD AND DEBRIS IS NOT TRACKED OFF OF SITE 24' EMERGENCY ACCESS EASEMENT 100-YEAR FLOODPLAIN (BUILDING REMOVED FROM FLOODPLAIN PER LOMA CASE NO. 19-08-0473A DATED 3/27/2019) TURF AREAS NORTH AND WEST OF BUILDING TO BE CONVERTED TO NATIVE GRASS (SEE LANDSCAPE PLANS FOR DETAILS) LIMITS OF FLOODWAY (NO GRADING WITHIN FLOODWAY) CONSTRUCTION FENCE SHOULD BE SET ON FLOODWAY LINE (SEE FLOODPLAIN NOTES) LEVEL SPREADER (SEE DETAIL ON SHEET C4.01) LEVEL SPREADER GRADING DETAIL (SEE SHEET C4.01) 5' x 8' TRM (SEE EROSION CONTROL NOTE 10) CONSTRUCTION FENCE SHOULD ONLY BE IN PLACE FOR A LIMITED TIME DURING THE ACTIVE CONSTRUCTION. CONSTRUCTION FENCING SHALL BE BREAK AWAY AND TETHERED. MODERATE RISK FLOODPLAIN PROVIDE INLET PROTECTION ON EXISTING AREA INLET APPROXIMATELY 100' EAST OF SITE 3' EXISTING ROCK MULCH TO REMAIN 1.5'x3' COBBLE (SEE E.C. NOTE 13) 1.5'x3' COBBLE (SEE E.C. NOTE 13) 2'x5' COBBLE (SEE E.C. NOTE 13) 2'x5' COBBLE (SEE E.C. NOTE 13) 1'x1' COBBLE (SEE E.C. NOTE 13) 1'x1' COBBLE (SEE E.C. NOTE 13) 2'x5' COBBLE (SEE E.C. NOTE 13) NATURAL HABITAT BUFFER ZONE 3' STRIP OF EXISTING GRASS TO REMAIN IN PLACE EROSION CONTROL BLANKET ON BOTH FILL SLOPES ON EITHER SIDE OF LEVEL SPREADER. SEDIMENT CONTROL LOG ENDS 5' INTO EROSION CONTROL BLANKET (TYPICAL) SEDIMENT CONTROL LOG ENDS 5' INTO EROSION CONTROL BLANKET (TYPICAL) OUTER CRITICAL ROOT ZONE FOR EXISTING TREE (TYP.) (SEE SHEET TR01 FOR MORE INFORMATION ON EXISTING TREES AND PROTECTING THEM DURING CONSTRUCTION) INNER CRITICAL ROOT ZONE FOR EXISTING TREE (TYP.) MO U N T A I N V I E W C O M M U N I T Y C H U R C H 12 / 1 8 / 2 0 2 0 U20004 1" = 20' 1" = N/A MO U N T A I N V I E W C O M M U N I T Y C H U R C H NO R T H 2/ 1 / 2 0 2 1 9: 2 4 : 5 4 A M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 0 0 0 4 - M O U N T A I N V I E W C O M M U N I T Y C H U R C H \ C A D D \ C P \ C 4 . 0 0 - O V E R A L L G R A D I N G A N D E R O S I O N C O N T R O L P L A N . D W G C4 . 0 0 - O V E R A L L G R A D I N G A N D E R O S I O N C O N T R O L P L A N SM E JR S C4.00 16 OV E R A L L G R A D I N G & E R O S I O N C O N T R O L P L A N 0 20'40' SCALE: 1" = 20' 10' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , u n a u t h o r i z e d ch a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d m u s t be a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : 2/1/2021 9 INLET PROTECTION ROCK SOCK CONCRETE WASHOUT AREA CONSTRUCTION FENCE 90. 3 0 PROPOSED SPOT ELEVATION 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE GRADE BREAK PROPOSED 5' MAJOR CONTOUR PROPOSED 1' MINOR CONTOUR LEGEND PERMANENT SEEDING SEDIMENT CONTROL LOG EROSION CONTROL BLANKET (SEE E.C. NOTE 12) CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: NOTES 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK UNLESS OTHERWISE NOTED. 3.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 4.NOTE THAT THE FINISHED FLOOR ELEVATION AS SHOWN ON THIS DRAWING CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE ARCHITECTURAL PLANS. 5.THERE SHALL BE NO EQUIPMENT, MATERIALS, OR ITEMS STORED ON THE SPRING CREEK TRAIL OR WITHIN THE TRAIL EASEMENT. IF THERE IS A NEED TO CLOSE A SECTION OF THE TRAIL FOR ANY REASON, A TRAFFIC CONTROL PLAN IS REQUIRED TO BE SUBMITTED AND APPROVED THROUGH TRAFFIC CONTROL. THE PARKS DEPARTMENT WILL SIGN OFF ON IT ONCE SUBMITTED. PLEASE KEEP THE CLOSURES TO THE SHORTEST AMOUNT OF TIME DEPENDING ON WORK SCHEDULING AND FLOW. PARKS DEPARTMENT PLANNING STAFF CAN HELP WITH ANY QUESTIONS YOU MAY HAVE REGARDING THESE STANDARDS. PLEASE CONTACT JILL WUERTZ (JWUERTZ@FCGOV.COM), 970_416_2062, OR PARKS PLANNING TECHNICIAN, AARON WAGNER (AAWAGNER@FCGOV.COM) 970_416_8083, 413 S. BRYAN AVE, FORT COLLINS, CO 80521 REGARDING THE PARKS' DEPARTMENT'S INTEREST. 6.THERE SHALL BE NO ENCROACHMENTS INTO THE TRAIL EASEMENT DURING THE CONSTRUCTION PROCESS. IF IT IS DETERMINED THAT AN ENCROACHMENT IS REQUIRED, FOR ANY REASON, A TRAFFIC CONTROL PLAN SHALL BE SUBMITTED AS NOTED ABOVE. FLOODPLAIN NOTES 1.PORTIONS OF THIS PROJECT ARE LOCATED WITHIN THE FEMA REGULATED 100-YEAR SPRING CREEK FLOODPLAIN AND FLOODWAY. THIS PROPERTY IS ALSO LOCATED IN THE SPRING CREEK MODERATE RISK FLOODPLAIN AND IS SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE CITY CODE. 2.ALL DEVELOPMENT (CURB & GUTTER, PAVEMENT, GRADING, FILL, PARKING LOTS, UTILITIES, LANDSCAPING, ETC.) WITHIN THE FEMA REGULATORY FLOODPLAIN MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT AND APPLICABLE FEES. 3.A NO RISE CERTIFICATION IS REQUIRED PRIOR TO PERFORMING ANY WORK WITHIN THE FLOODWAY (I.E. CURB CUT, CURB & GUTTER, UTILITY WORK, LANDSCAPING, ETC.) 4.ALL SPOT ELEVATIONS AND BASE FLOOD ELEVATIONS AS SHOWN ON THIS DRAWING ARE PER VERTICAL CONTROL DATUM NAVD 88. 5.NO STORAGE OF MATERIAL OR EQUIPMENT MAY OCCUR AT ANY TIME IN THE FLOODWAY BEFORE, DURING OR AFTER CONSTRUCTION. 6.ANY ITEMS LOCATED IN THE FLOODWAY THAT CAN FLOAT (E.G. PICNIC TABLE, BIKE RACKS, ETC.) MUST BE ANCHORED. 7.FLOODWAY MUST BE SURVEYED AND STAKED IN THE FIELD PRIOR TO COMMENCING ANY SITE WORK. 8.ALL FENCING IN THE FLOODWAY SHALL BE BREAK-AWAY AND TETHERED INCLUDING ANY CONSTRUCTION FENCING. CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: EROSION CONTROL NOTES 1.TOTAL DISTURBED AREA FOR COMBINED PHASE 1 WORK AND PHASE 2 SANCTUARY BUILDING ADDITION = 40,550 SF (0.93 ACRES). TOTAL DISTURBED AREA FOR JUST PHASE 1 CONSTRUCTION WITHOUT PHASE 2 SANCTUARY BUILDING ADDITION IS 32,700 SF (0.75 ACRES). TOTAL DISTURBED AREA FOR PHASE 2 SANCTUARY BUILDING ADDITION IS 10,500 SF (0.24 ACRES) 2.THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS. 3.REFER TO SHEET C0.02 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 4.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 5.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 6.SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 7.TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED LANDSACPE PLANS. 8.A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: 9.DOWNSPOUTS DESIGNED TO DISCHARGE RUNOFF AT GROUND SURFACE ARE TO BE PROVIDED WITH A SPLASH GUARD. 10.TURF REINFORCEMENT MAT (TRM) SHALL BE NORTH AMERICAN GREEN VMAX SC250 OR APPROVED EQUAL. SEE MANUFACTURER'S SPECIFICATIONS FOR INSTALLATION. 11.NO MUD AND DEBRIS SHALL BE TRACKED ONTO NEIGHBORING STREETS OR PROPERTIES. IN THE EVENT THAT TRACK OUT DOES OCCUR, THE CONTRACTOR SHALL CLEAN MUD/DEBRIS IMMEDIATELY. 12.TEMPORARY EROSION CONTROL BLANKETS (ECB) SHALL BE NORTH AMERICAN GREEN ERONET S75 OR APPROVED EQUAL. 13.2" TO 6" COBBLE ROCK SHALL BE PLACED AT THE END OF PIPES AND DOWNSPOUTS PER MINIMUM DIMENSION SHOWN ON PLANS. 14.SEE EROSION CONTROL DETAILS ON SHEET C6.02 INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE NITROGEN 13 65 POTASSIUM 16 80 POTASSIUM M 120 PROJECT:MOUNTAIN VIEW COMMUNITY CHURCH BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION SILT FENCE VEHICLE TRACKING CONTROL STAGING AREAS (if applicable) CONSTRUCTION FENCE (if applicable) ROCK SOCKS CONCRETE WASHOUT AREA (if applicable) TEMPORARY SEEDING INLET PROTECTION (EXIST. & PROP.) 1.COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2.CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs. MOBILIZATIONDEMOLITION UTILITY INSTALLATION BUILDING CONSTRUCTION SITE GRADING & PAVING FINAL LANDSCAPING & STABILIZATIONPHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING C- 3 1 7 8 8 C-3 1788 On behalf of: n/a Environmental Planner n/a n/a 3/8/2021 3/9/2021 3/9/2021 4.71 7.70 7.87 LEVEL SPREADER TOP ELEVATION 4905.10 (SEE DETAIL ON THIS SHEET) 4.62 5.1 0 5.1 0 5.1 0 4905 4.6 4.8 3.0% 18. 4 % 12. 7 % 15. 8 % 9.4 % 20 . 8 % 15. 5 % 6.5 % (16 . 1 % ) (14 . 2 % ) (16.2%) (9. 7 % ) 5.2 0 5.2 0 4.4 7 4.45 4.4 1 4.5 3 4.5 9 4.4 2 4.3 9 4.7 6 4.7 8 4.7 7 5.0 9 5.2 9 5.1 2 4.8 5 4.8 1 4.7 0 4.5 4 4.6 3 4.5 6 4.5 7 5.2 9 4.92 EXISTING ELEVATION AT TOE OF SLOPE (TYP.) 4.98 MODIFIED IMPACT STILLING BASIN/FOREBAY (SEE DETAIL ON SHEET C6.01) 16.0 % 4.6 4.8 490 5 4.6 4.8 LIMITS OF DISTURBANCE/ TOE OF BERM SLOPE (TYP.) 1' WIDE TOP OF BERM AT ELEV = 4905.20 TO TIE INTO LEVEL SPREADER AND EXISTING GROUND TO THE SOUTH INNER CRITICAL ROOT ZONE FOR EXISTING TREE (TYP.) OUTER CRITICAL ROOT ZONE FOR EXISTING TREE (TYP.) 2 4 3 1 2 1 3 312 2 2 12 4 3 2 3 2 1 1 21 1 2 3 1 1 2 2 1 2 112 2 3 1 1 2 1 2 1 223223 GM W 3 2 2 2 2 2 1 1 2 2 1 2 1 2 1 WS WS WS WS WS WS WS WS WS WS WS WS WS WS 2 311 13 GM 2.0 % 1.9 % 2.2 % 2. 0 % 2. 1 % 0. 9 % 5.0 % 5.1% 2. 3 % 2. 4 % 2.2 % 2. 1 % 2.4% 2.8% 2.0 % 2. 0 % 2. 1 % 3. 1 % 2. 2 % 17 . 6 % 18 . 6 % 9.7% 9.9% 4.3 % 2. 9 % 1.8 % 2. 3 % 1.8% 2. 1 % 1.3% 3.8 % FFE=4908.7 4906 4907 4908 49 0 8 4906 490 7 4907 4907 4908 4908 490 6 490 7 6.7 6 8.4 4 6.8 5 8.4 4 8. 1 7 8.2 7 6. 2 6 6.1 8 6.2 2 6.0 2 5.8 8 5.1 8 5.1 7 5.1 7 5.9 2 7.67 5.8 2 5.3 2 5.3 0 5.7 8 6.1 0 6.3 9 6.7 1 6.4 1 6.9 0 8.2 7 8.2 0 8.3 5 6.9 4 7.1 1 5.7 5 7.1 4 7.7 9 6.2 8 6.6 6 7.9 7 8.6 4 T B C 8.0 7 8.7 0 8.7 0 8.6 8 8.4 7 8.7 0 8.7 0 6.8 8 7.1 9 7.9 5 7.3 1 6.6 8 6.7 9 8.2 2 8.7 0 8.3 5 7.4 7 7.5 6 6.7 5 5.9 1 6.8 7 7.0 6 8.0 8 5.9 3 8. 2 6 8. 4 9 7.0 2 6.8 5 6.6 7 6.4 2 6.4 8 6.5 7 5.8 5 6.4 2 6.4 4 6.8 75.8 7 6.2 8 6.2 6 5.6 7 7.7 9 8.0 4 EXISTING WATER METER TO REMAIN AT EXISTING GRADE IN PHASE 1 8.1 98.1 98.1 7 8.1 6 8.2 7 8.7 0 8.6 6 8.5 9 8.6 6 8.4 4 EXISTING SEWER CLEANOUT TO REMAIN AT EXISTING GRADE IN PHASE 1 7.1 9 7.1 0 7.4 2 7.8 5 7.9 2 7.6 4 7.9 7 7.8 9 8.3 0 7.5 9 8.1 9 8.1 5 8.1 3 8.1 4 8.3 9 8.3 9 8.4 8 8.5 5 6.9 7 7.5 3 7.0 4 8.9 0 T O B 8.7 9 T O B 8.7 0 T O B 8. 7 0 T O B 8.4 8 8.3 5 6.5 2 6.7 2 6.6 8 7.2 6 7.8 3 7.4 5 7.5 7 6.9 4 5.2 6 5.2 0 5.7 1 5.2 1 5.6 7 5.1 9 2. 0 % 8.2%8.6% 5.5 6 5.2 3 5.0 5 5.1 2 5.7 7 6.0 9 6.9 5 6.1 6 6.87 6.4 2 6.0 6 5.6 7 6.7 3 6.7 0 6.9 4 7.3 7 6.3 3 6.5 1 6.5 4 6.5 0 6.4 0 6.2 5 6.1 0 6.0 6 6.1 1 5.9 15.8 7 5.8 4 8.3 4 8.7 0 8.5 2 8.4 6 8.3 7 6.2 4 6.6 6 7.1 2 7.7 9 6.1 8 5.6 8 6.1 6 6.0 9 6.0 0 5.8 9 5.8 2 5.5 9 5.5 0 5.3 9 5.3 2 6.1 8 8.7 0 T O B 8.7 0 T O B 8.7 0 T O B 8.5 0 T O B 8.5 0 T O B 8.5 0 T O B 8.5 0 T O B 8.5 0 T O B 8.5 0 T O B 8.5 0 T O B 8.5 0 T O B 8.5 0 T O B 8.5 7 T O B 8.5 7 T O B 8.7 4 T O B 8.8 4 T O B 8.7 0 T O B 8.5 0 T O B OUTLET C DETAIL (SEE SHEET C6.00) 4. 2 % 8.6%2.7%2.0% RETAINING WALL, TYP. DO NOT OVEREXCAVATE NEAR DRIP LINE OF TREES. CUT AND PULL AWAY FROM TREE, NOT TOWARD TREE 7.8 2 8.5 9 7.9 3 8.6 3 8.5 2 7.8 2 7.9 3 6.1 1 5.9 9 5.7 4 5.6 2 5.7 1 5.71 4906 490 7 49 0 8 FFE=4908.7 8.7 0 1.8% 1.9% 4.0% 2.0% 2.2% 4.8% 4.8% 5.4% 2.6% 3.0 % 2.0% 2.1% 2.0% 8.3 0 7.7 9 8.48 8.37 8.21 8. 9 6 T B C 8.23 7.9 7 8.6 4 T B C 8.0 7 8.70 8.70 8.0 8 8.49 7.85 7.3 0 7.3 0 7.2 7 7.9 8 8.1 8 7.21 6.43 7.88 7.61 7.2 9 8.0 4 8.8 0 6.17 8.69 6.4 5 6.65 7.70 490 7 49 0 8 49 0 7 49 0 8 8.0 7 8. 0 3 8.6 4 8.0 % 2.1% 7. 2 1 1' CURB CHANNEL 6. 4 9 6.4 8 7.02 6.99 TBC 6. 5 8 6.53 7.05 8.3% 6.5 2 6.4 9 7. 0 0 7.26 7.20 7.30 7.6 9 T B C 7.0 2 T B C 7.7 9 T B C 2.5% 2.4%7.2 4 T B C 6.74 6.8 4 6.7 0 6.7 0 6.4 9 6. 6 2 7.10 TBC 6.77 6.85 6.69 6.7 9 6.8 0 6.6 9 6.8 0 7.41 7.7 4 3.4 % 3.4 % 6.5 % 2.3 % 6.3 % 10 . 4 % 7. 7 1 T B C 7.80 8.44 8.6 2 9.4% 8.53 7. 8 5 8.35 THICKENED EDGE SIDEWALK 8.1 6 8.1 8 8.2 1 8.3 3 8.6 4 8.4 7 7.41 7.65 7.70 7.80 4' CONCRETE PAN 8.2 7 LEVEL SPREADER DETAILS NOT TO SCALE 4" MAXIMUM FILL 2" 4:1 MAX (TYP.)2" NOTES: 1.CONTRACTOR SHALL TAKE CARE NOT TO OVEREXCAVATE WHEN REMOVING THE TURF IN VICINITY OF THE EXISTING TREE ROOT ZONES. 2.NO TRUCKS OR HEAVY EQUIPMENT SHALL BE USED FOR CONSTRUCTION OF THE LEVEL SPREADER. MATERIALS SHALL BE REMOVED AND PLACED BY MANUAL LABOR SO AS NOT TO DISTURB EXISTING TREES. 3.CONTACT DESIGN ENGINEER FOR FIELD REVIEW ONCE LEVEL SPREADER IS STAKED FOR CONTRUCTION. 4.CONTACT MATT SIMPSON IN THE STORMWATER DEPARTMENT AT 970-416-2754 AND NILS SAHA IN THE FORESTRY DEPARTMENT AT 301-204-7852 PRIOR TO CONSTRUCTION SO THEY CAN BE PRESENT TO OBSERVE AND INSPECT INSTALLATION. 5.EROSION CONTROL BLANKET REQUIRED ON BOTH SIDE SLOPES ON EITHER SIDE OF THE STRIP STRIP STONE. SIDE SLOPES TO BE SEEDED PER LANDSCAPE PLANS. APRROXIMATELY 4" x 4" STRIP STONE EXISTING TURF TO BE STRIPPED PRIOR TO CONSTRUCTION OF THE LEVEL SPREADER (SEE NOTE 1) STRIP STONE SUPPORTED ON BACKSIDE WITH ONE 18" STEEL J HOOK REBAR GROUND STAKE FOR EVERY STONE FLOW MO U N T A I N V I E W C O M M U N I T Y C H U R C H 12 / 1 8 / 2 0 2 0 U20004 1" = ##' 1" = N/A MO U N T A I N V I E W C O M M U N I T Y C H U R C H NO R T H 2/ 1 / 2 0 2 1 9: 2 5 : 0 3 A M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 0 0 0 4 - M O U N T A I N V I E W C O M M U N I T Y C H U R C H \ C A D D \ C P \ C 4 . 0 0 - O V E R A L L G R A D I N G A N D E R O S I O N C O N T R O L P L A N . D W G C4 . 0 0 - O V E R A L L G R A D I N G A N D E R O S I O N C O N T R O L P L A N SM E JR S C4.01 16 PH A S E 1 D E T A I L E D G R A D I N G P L A N 0 ##'##' SCALE: 1" = ##' ##' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , u n a u t h o r i z e d ch a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d m u s t be a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : 2/1/2021 10 NOTES 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK UNLESS OTHERWISE NOTED. 3.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 4.NOTE THAT THE FINISHED FLOOR ELEVATION AS SHOWN ON THIS DRAWING CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE ARCHITECTURAL PLANS. CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: 90. 3 0 PROPOSED SPOT ELEVATION FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL TOB = TOP OF BOULDER 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE GRADE BREAK PROPOSED 1' MAJOR CONTOUR PROPOSED 0.2' MINOR CONTOUR 4905 LEGEND 4.8 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: LEVEL SPREADER GRADING DETAIL SCALE: 1" = 10' FLOODPLAIN NOTES 1.PORTIONS OF THIS PROJECT ARE LOCATED WITHIN THE FEMA REGULATED 100-YEAR SPRING CREEK FLOODPLAIN AND FLOODWAY. THIS PROPERTY IS ALSO IN THE SPRING CREEK MODERATE RISK FLOODPLAIN AND IS SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE CITY CODE. 2.ALL DEVELOPMENT (CURB & GUTTER, PAVEMENT, GRADING, FILL, PARKING LOTS, UTILITIES, LANDSCAPING, ETC.) WITHIN THE FEMA REGULATORY FLOODPLAIN MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT AND APPLICABLE FEES. 3.A NO RISE CERTIFICATION IS REQUIRED PRIOR TO PERFORMING ANY WORK WITHIN THE FLOODWAY (I.E. CURB CUT, CURB & GUTTER, UTILITY WORK, LANDSCAPING, ETC.) 4.ALL SPOT ELEVATIONS AND BASE FLOOD ELEVATIONS AS SHOWN ON THIS DRAWING ARE PER VERTICAL CONTROL DATUM NAVD 88. 5.NO STORAGE OF MATERIAL OR EQUIPMENT MAY OCCUR AT ANY TIME IN THE FLOODWAY BEFORE, DURING OR AFTER CONSTRUCTION. 6.ANY ITEMS LOCATED IN THE FLOODWAY THAT CAN FLOAT (E.G. PICNIC TABLE, BIKE RACKS, ETC.) MUST BE ANCHORED. 7.FLOODWAY MUST BE SURVEYED AND STAKED IN THE FIELD PRIOR TO COMMENCING ANY SITE WORK. 8.ALL FENCING IN THE FLOODWAY SHALL BE BREAK-AWAY AND TETHERED INCLUDING ANY CONSTRUCTION FENCING. PHASE 1 GRADING DETAIL C SCALE: 1" = 10' PHASE 1 GRADING DETAIL B SCALE: 1" = 10' PHASE 1 GRADING DETAIL A SCALE: 1" = 10' C- 3 1 7 8 8 C-3 1788 On behalf of: n/a Environmental Planner n/a n/a n/a 3/8/2021 3/9/2021 1 2 23 1 2 1 231 223223 3 2 2 2 1 2 PHASE 2 SANCTUARY BUILDING EXPANSION GM MATCH GRADE AT REMOVAL LIMITS PER PHASE 1 GRADING 8.4 3 2. 8 % 4. 3 % 2. 5 % 2.5 % 3.4% 2.2% 5. 9 % (2 . 0 % ) (2 . 0 % ) (2 . 1 % ) (2 . 1 % ) (2 . 2 % ) (2 . 3 % ) (0 . 9 % ) (1 . 2 % ) (1 . 0 % ) (1 . 1 % ) 8.43 8.43 8.70 FG 8.62 FG 8.66 FG 8.66 FG 8.64 FG 8.70 4907490849074907490749084908490849084909 4907 490 8 490 7 490 7 490 8 490 8 490 8 490 8 490 8 490 9 490 9 6.7 2 F G 6.7 4 F G 6.07 FG 6.7 9 F G 6. 8 2 F G 9.2 8 9.2 8 7.8 3 7.9 3 7.89 7.73 7.7 4 2.0% 3.1% 18 . 3 % (2.8 % ) (2.8 % ) (2.6 % ) 7.42 9.1 9 T O W 7.7 4 T O W 9.1 9 9.18 TOW FFE=4908.7 490 7 4907 49074908 4908 49 0 8 MATCH EXISTING GRADE AT BACK OF WALK PER PHASE 1 GRADING 7.2 6 F G LIMITS OF EXISTING BUILDING LIMITS OF PHASE 2 SANCTUARY BUILDING ADDITION 6.8 7 F G 7.0 9 F G 7.4 4 F G 7.8 5 F G 6.9 4 F G 6. 1 3 F G 6.4 2 6.6 8 6.7 5 6.4 8 6.4 2 8.9 0 8.7 0 F G 8.70 8.54 8.6 0 8.6 2 8.6 2 8.6 2 8.4 78.5 0 8.6 78.4 1 8.6 98.6 8 8.3 0 8.4 7 8.5 1 8.3 3 8.4 8 8.0 5 16.2% 11.5% 3. 4 % 2.8% 2.8% 3. 2 % 2.4% 3. 2 % 5.1 % EXISTING WATER METER TO BE LOWERED 1.2' IN PHASE 2 EXISTING SEWER CLEANOUT TO TO BE LOWERED 1.2' IN PHASE 2 7.0 1 7.0 6 8.7 0 T O B 8.4 68.4 8 8.5 3 8.7 9 T O B 6.8 5 F G 6.7 2 F G 5. 0 % 6. 2 % 6.2 % FFE = 4909.28 (7" HIGHER AT BACK OF SANCTUARY THAN REST OF THE BUILDING) 8.67 FG 6.4 2 6.4 4 6.4 3 5.8 5 MO U N T A I N V I E W C O M M U N I T Y C H U R C H 12 / 1 8 / 2 0 2 0 U20004 1" = ##' 1" = N/A MO U N T A I N V I E W C O M M U N I T Y C H U R C H NO R T H 2/ 1 / 2 0 2 1 9: 2 5 : 0 9 A M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 0 0 0 4 - M O U N T A I N V I E W C O M M U N I T Y C H U R C H \ C A D D \ C P \ C 4 . 0 0 - O V E R A L L G R A D I N G A N D E R O S I O N C O N T R O L P L A N . D W G C4 . 0 0 - O V E R A L L G R A D I N G A N D E R O S I O N C O N T R O L P L A N SM E JR S C4.02 16 PH A S E 2 D E T A I L E D G R A D I N G P L A N 0 ##'##' SCALE: 1" = ##' ##' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , u n a u t h o r i z e d ch a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d m u s t be a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : 2/1/2021 11 NOTES 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK UNLESS OTHERWISE NOTED. 3.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 4.NOTE THAT THE FINISHED FLOOR ELEVATION AS SHOWN ON THIS DRAWING CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE ARCHITECTURAL PLANS. PHASE 2 GRADING DETAIL SCALE: 1" = 10' CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: 90. 3 0 PROPOSED SPOT ELEVATION FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL TOB = TOP OF BOULDER 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE GRADE BREAK PROPOSED 1' MAJOR CONTOUR PROPOSED 0.2' MINOR CONTOUR 4905 LEGEND 4.8 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: FLOODPLAIN NOTES 1.PORTIONS OF THIS PROJECT ARE LOCATED WITHIN THE FEMA REGULATED 100-YEAR SPRING CREEK FLOODPLAIN AND FLOODWAY. THIS PROPERTY IS ALSO LOCATED WITHIN THE SPRING CREEK MODERATE RISK FLOODPLAIN AND IS SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE CITY CODE. 2.ALL DEVELOPMENT (CURB & GUTTER, PAVEMENT, GRADING, FILL, PARKING LOTS, UTILITIES, LANDSCAPING, ETC.) WITHIN THE FEMA REGULATORY FLOODPLAIN MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT AND APPLICABLE FEES. 3.A NO RISE CERTIFICATION IS REQUIRED PRIOR TO PERFORMING ANY WORK WITHIN THE FLOODWAY (I.E. CURB CUT, CURB & GUTTER, UTILITY WORK, LANDSCAPING, ETC.) 4.ALL SPOT ELEVATIONS AND BASE FLOOD ELEVATIONS AS SHOWN ON THIS DRAWING ARE PER VERTICAL CONTROL DATUM NAVD 88. 5.NO STORAGE OF MATERIAL OR EQUIPMENT MAY OCCUR AT ANY TIME IN THE FLOODWAY BEFORE, DURING OR AFTER CONSTRUCTION. 6.ANY ITEMS LOCATED IN THE FLOODWAY THAT CAN FLOAT (E.G. PICNIC TABLE, BIKE RACKS, ETC.) MUST BE ANCHORED. 7.FLOODWAY MUST BE SURVEYED AND STAKED IN THE FIELD PRIOR TO COMMENCING ANY SITE WORK. 8.ALL FENCING IN THE FLOODWAY SHALL BE BREAK-AWAY AND TETHERED INCLUDING ANY CONSTRUCTION FENCING. C- 3 1 7 8 8 C-3 1788 On behalf of: n/a Environmental Planner n/a n/a n/a 3/8/2021 3/9/2021 Southeast Entrance: South Entrance