Loading...
HomeMy WebLinkAboutSite Certifications - 10/03/2022Wes Lamarque 10/3/2022 WQ Pond - Stage/Storage LOCATION:900 STUART PROJECT NO: 1223-131-00 COMPUTATIONS BY: MO DATE: 2/20/2015 V = 1/3 d ( A + B + sqrt(A*B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Surface Incremental Detention Total Stage Area Storage Storage Storage (Elev)(Ft^2)(Ac-ft)(Ac-ft)(Ac-ft) 4951.5 0 4952.0 185 0.00 0.00 4952.5 783 0.01 0.01 4953.0 1527 0.01 0.02 4953.5 2505 0.02 0.04 WQCV-4954.0 3515 0.03 0.08 SPILLWAY-4954.5 4718 0.05 0.12 Top Berm 4955.0 6066 0.06 0.18 REQUIRED WQCV=0.08 AC-FT PROVIDED WQCV=0.08 AC-FT AB-POND 1/17/2017 Surface Incremental Detention Total Stage Area Storage Storage Storage (Elev)(Ft^2)(Ac-ft)(Ac-ft)(Ac-ft) 4951.5 0 4952.0 501 0.00 0.00 4953.0 2375 0.03 0.03 WQCV-4954.0 4014 0.07 0.10 SPILLWAY-4954.5 4861 0.05 0.16 Top Berm 4955.0 6052 0.06 0.22 REQUIRED WQCV=0.08 AC-FT PROVIDED WQCV=0.10 AC-FT 1-17-17 AB POND.xls 4-24-17 SITE VISIT PHOTOS 9-9-17 SITE VISIT PHOTOS