Loading...
HomeMy WebLinkAboutLot Certifications - 05/10/2021 (4)2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes May 3, 2021 Ridgewood Hills Fourth Filing 7363 Avondale Rd, Bldg 3 B1916097 Fort Collins, CO 80525 9614422001 MA 180030 Larry C. Owen 4-22-21 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date Bath Landscaping Larry C. Owen larrycowen@comcast.net (303) 913-5382 Owen Consulting Group, Inc. 6614 E. Brilliant Sky Dr. Scottsdale, AZ 85266 6614 E. Brilliant Sky Dr., Scottsdale, AZ 85266 • Phone (303) 913-5382 • larrycowen@comcast.net May 6, 2021 City of Fort Collins Stormwater Engineering and Development Review Division 700 N. Wood St. Fort Collins, CO 80522 Attention: Mr. Wes Lamarque RE: Ridgewood Hills Fourth Filing – Tract A Building #3 - Certification of Lot Grading Dear Wes, The attached Certification of Lot Grading form and Exhibit 1 document the as-built grading and drainage improvements in the immediate vicinity of Building 3 of the Ridgewood Hills Apartments south of Avondale Rd. and east of Triangle Dr. in Ridgewood Hills. During the course of construction and final grading of the portion of the site immediately adjacent to this building, it was deemed necessary to make a number of minor modifications to the approved grading plan for the project, mostly to better accommodate ADA access requirements, bicycle parking, and increased size of HVAC units, however, none of the modifications compromised the overall concept or integrity of the approved grading plan, but which did result in a few “No” responses on the Certification form. Explanatory comments have been added to the form for each “No” response. I trust that the attached documentation will be acceptable, and that the escrow monies submitted to the City as security for the finalization of the certification of this particular building, may be released and reapplied as security for the certification of Building #1 of the same project, which is the next building for which a TCO will be sought. A copy of the “Escrow Submittal, Certificate of Occupancy Sheet” for Building 1 is also attached. Thank you for your consideration of the attached documentation. If you have any questions or comments, please contact me immediately. Yours truly, Owen Consulting Group, Inc. Larry C. Owen, P.E. cc: Mr. Bill Timm, M. Timm Development, Inc. Sheet: Of: Date: Job No: Drawn: Design: Scale: Checked: NO DA T E BY CH K RE V I S I O N S DE S C R I P T I O N 123456 70 4 7 E . B a l a n c i n g R o c k R d Sc o t t s d a l e , A Z 8 5 2 6 6 Ph o n e : ( 3 0 3 ) 9 1 3 - 5 3 8 2 la r r y c o w e n @ c o m c a s t . n e t OW E N CO N S U L T I N G GR O U P , I N C . DR A W N B Y : da v i d C: \ U s e r s \ d a v i d \ D e s k t o p \ B u i l d i n g 3 G r a d e C e r t i f i c a t i o n w i t h T i t l e b l o c k . d w g FI L E L O C A T I O N : 5/ 6 / 2 0 2 1 1 0 : 2 9 A M PL O T D A T E : EX1.0 MAY 5, 2021 RI D G E W O O D H I L L S T R A C T A ( S O U T H ) BU I L D I N G # 3 G R A D E C E R T I F I C A T I O N - E X H I B I T FO R T C O L L I N S , CO L O R A D O NORTH 0 SCALE:1" = 10' 5'10'20'30' 11 LO LO LO 1" = 10' Date Received _______________ From _______________________ ESCROW SUBMITTAL CERTIFICATE OF OCCUPANCY SHEET TO BE SUBMITTED WITH PAYMENT at 281 North College prior to TCO/CO issuance. Name __________________________________________________________________ Company ______________________________________________________________ Address ________________________________________________________________ City/State/Zip _________________________ Phone Number __________________________________________________________ Project Information Project Name / Subdivision / Blk / Lot ________________________________________________________________________________ Project Physical Address __________________________________________________________________________________________ Permit and/or Development Review # ________________________________________ The following escrows are collected prior to Temporary or Full Certificate of Occupancy (C.O.). Grading Amount $ _______________________ Non-refundable admin fee (must be paid separately if escrow will be placed with bond/LOC) $ 200.00 An escrow amount, along with a non-refundable $200.00 administrative fee, is required to guarantee certification and proper installation and maintenance of storm drainage facilities as shown on the approved plan. Escrow used to release C.O. / SW Engineering Final Hold if conditions cannot be met prior to needing a release. This escrow is retained until the final grading certification can be produced and accepted by the water utilities engineers. Floodplain Amount $ _______________________ A security deposit that that is infrequently used to guarantee performance when working in floodplains to ensure proper installation and maintenance or to ensure a LOMR is submitted and approved. This escrow is returned when proper functioning of the improvements can be shown and/or fulfilment of the LOMR responsibilities to FEMA have been completed. Zoning Amount $ _______________________ An escrow in lieu of work completed is required to guarantee that all plants, irrigation, and landscaping elements are installed in accordance with the approved landscape plan. When submitting an escrow please provide the following: 1) Highlighted copy of approved landscape plan, illustrating the areas covered under the escrow 2) Itemized estimate of materials, labor, and irrigation 3) Check, bond or letter of credit in the amount of 125% of the estimated cost of the landscaping improvements. Please note: escrows are retained until a zoning inspector has completed a final landscape inspection verifying that the approved landscape plan requirements have been met in full. To request a zoning inspection for full or partial escrow refund or reduction contact us at 970-416-2745 or zoning @fcgov.com. Grand Total Please circle appropriate method of escrow: CHECK /BOND/LOC # _________________________________ $___________________ Upon escrow release, Bond/LOC to be returned to: ___________________________________________________________________ Any inquires on escrows should be directed to DRCoord@fcgov.com Building permit status may be accessed through Citizen Portal fcgov.com/citizenaccess City Staff Internal Process Grading Please scan everything that was supplied then deposit any checks or cash in ACCT # 504.211610 and any LOC or Bonds be given to engineering. All admin fees for grading should be deposited into ACCT # 5040.475999. Please send scanned copies of the supplied escrows and fee to both WaterUtilitiesEng@fcgov.com and utilityfees@fcgov.com Floodplain Please scan everything that was supplied then deposit any checks or cash in ACCT # 504.422060 and any LOC or Bonds be given to engineering. Please send scanned copies of the supplied escrows to mhilmesrobinson@fcgov.com Zoning Please scan everything that was supplied then deposit any checks or cash in ACCT # 100.211610 and any LOC or Bonds be given to engineering. Please send scanned copies of the supplied escrows to zoning@fcgov.com NOTE: There will be a 1 business day processing period before sign off. Auxiliary aids and services are available for persons with disabilities. V/TDD 711.