HomeMy WebLinkAboutLot Certifications - 03/24/2017CERTIFICATION OF LOT GRADING
Pursuant to Fort CoiJins City Code § 26-544 & City Land Use Code § 33.2 (e)
Date: March 21 , 2017 Subdivision: Registry Ridge 6th Filing
Address: 6739 Snowdon Dr. Permit Application #: B1604397
Fort Collins, CO 80526 Larimer County Parcel #: 9615125007
Lot: ]_ Block: Larimer County Reception #: 20110028778
(on development agreement)
I, (print) Dennis R. Messner _, a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1 . Certification includes attached Stormwater-approved grading plan. (NOTE: City's No _
Building Department does not approve grading plans).
2. Certification includes the attached as-built survey dated 3-21-17 (must be within 60 No.
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
• Top of foundation/finished floor
• Finished grade on each side of the structure
• Quarter points along each lot line (not more than 50 feet apart)
• Break points/high points
• Swales
• Berms
• Retaining walls
• Air conditioning pads
• Window wells
• Any other appurtenance(s) within an easement
3. All elevations are within a 0.2 foot tolerance of the approved grading plan. No
4. The top of foundation is at least 6 inches above the highest grade surrounding the No.
structure.
5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet No.
adjacent to the residence.
6. All slopes meet or exceed the minimum requirement of 2% (1 % is acceptable on single No.
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 33% (3:1).
7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the No _
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8. All downspout locations and discharge directions are shown on the as-built survey. No.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
2/14/17
Yes 1^
Yes
Yes
.Yes.
.Yes.
.Yes.
.Yes.
Yes
A'
Page 1
9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No.
adjacent properties.
10. The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11 . Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping: Insignia Homes, Ltd.
12. Final site cleanup has been completed.
13. I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions.
14. Based on this information, I certify that (check one):
Yes
No
No
No
No
.Yes
Yes
fX Y
'i/v
Yes
Yes
• The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
PE Stamp
Sign and date
Name: Dennis R. Messner
Email: dennismessner45@gmail.com
Phone: 970^02-4360
Company: Dennis R. Messner, P. E.
Address: 2015 Buena Vista PI.
Loveland, CO 80538
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to , drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, writte n information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng(S)fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
Fort Collins
2/J4/17 Page 2
co
n
c
r
e
t
e
p
a
n
ww ww
wwwwww
Sn
o
w
d
o
n
D
r
(
5
3
'
R
O
W
)
Leahy Dr
(53' ROW)
Lot 7, REGISTRY RIDGE
SIXTH FILING
Finish Floor = 5088.16
DS
DS
DS
DS
DS
DS
center line
swale
swale high
point
op
e
n
s
p
a
c
e
op
e
n
s
p
a
c
e
Survey Tech
Party Chief
Date#R e v i s i o n s
Scale
Proj. Manager
Field Date Project#:Prepared for:
Office 970.669.2100 - Fax 970.669.3652
Loveland, Colorado 80538
6843 North Franklin Avenue
1" = 20'
MBS
MDG
NM
2-16-2017
Insignia Homes
14071.024
Grading Certificate
NOTICE: According to Colorado law you must
commence any legal action based upon any defect in
this survey within three years after you first discover
such defect. In no event, may any action based upon
any defect in this survey be commenced more than ten
years from the date of the certification shown hereon.
Notes:
-Street address is 6739 Snowdon Drive, Fort Collins, CO
-This is not a monumented land survey.
-Lot dimensions shown are per plat and not measured.
-All spots are shown to finished grade elevation.
AC
ww
DS
LEGEND:
air conditioning unit
window well
downspout
downspout discharge direction
gas meter
2 3/14/2017 added down spouts discharge dir. & swales
1 3/9/2017 added down spouts, AC pad and Patio's
3 3/21/2017 added open space label and pan flow dir.
Certification of Lot Grading March 21, 2017
Lot 7, Registry Ridge 6th Filing, City of Fort Collins, Larimer County, Colorado
6739 Snowdon Dr., Fort Collins, CO 80526
Building Permit No.: B1604397
The following “explanations” have been revised to address physical changes made since original
submission on March 3, 2015.
Explanation for Certification Item No. 3: The constructed spot elevations vary more and less than 0.2
foot of those depicted on the approved grading plan but the intended drainage pattern is retained.
Explanation for Certification Item No. 11: The landscaping has not been completed. An escrow
account has been established to assure landscape completion.
Explanation for Certification Item No. 12: The final clean up will be performed following
establishment of landscaping.