Loading...
HomeMy WebLinkAboutLot Certifications - 01/06/2023 (2)2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date Fl a t i r o n s , I n c . La n d S u r v e y i n g S e r v i c e s ww w . F l a t i r o n s I n c . c o m 12/14/22 Fl a t i r o n s , I n c . La n d S u r v e y i n g S e r v i c e s ww w . F l a t i r o n s I n c . c o m 12/14/22 Fl a t i r o n s , I n c . La n d S u r v e y i n g S e r v i c e s ww w . F l a t i r o n s I n c . c o m 12/14/22 Fl a t i r o n s , I n c . La n d S u r v e y i n g S e r v i c e s ww w . F l a t i r o n s I n c . c o m 12/14/22 Fl a t i r o n s , I n c . La n d S u r v e y i n g S e r v i c e s ww w . F l a t i r o n s I n c . c o m 12/14/22 ONLY MU L B E R R Y C O N N E C T I O N CI T Y O F F O R T C O L L I N S UT I L I T Y P L A N S A N D C O N S T R U C T I O N D O C U M E N T S OF 44 R Know what's below. Call before you dig. 46391 REENIGN ORP ENOISSEF COLORAD D O LICENSE LA L .SLEKEEHI AN D AN 05/14/21 096501004_PDP_GD LEGEND 17 NORTHNORTH DocuSign Envelope ID: 616EAD35-076D-4E0E-880A-BB80D1285C30 7/14/2021 NA NA NA NA 7/30/2021 BUILDING 2 FFE: 4956.10'DETENTION POND WSE = 4952.00' MU L B E R R Y C O N N E C T I O N CI T Y O F F O R T C O L L I N S UT I L I T Y P L A N S A N D C O N S T R U C T I O N D O C U M E N T S OF 44 R Know what's below. Call before you dig. 46391 REENIGN ORP ENOISSEF COLORAD D O LICENSE LA L .SLEKEEHI AN D AN 05/14/21 NORTH GR A D I N G D E T A I L S 096501004_CD_GD_DTLS 18 LEGEND DocuSign Envelope ID: 616EAD35-076D-4E0E-880A-BB80D1285C30 7/14/2021 NA NA NA NA 7/30/2021 DETENTION POND WSE = 4952.00' BUILDING 2 FFE: 4956.10' MU L B E R R Y C O N N E C T I O N CI T Y O F F O R T C O L L I N S UT I L I T Y P L A N S A N D C O N S T R U C T I O N D O C U M E N T S OF 44 R Know what's below. Call before you dig. 46391 REENIGN ORP ENOISSEF COLORAD D O LICENSE LA L .SLEKEEHI AN D AN 05/14/21 NORTH GR A D I N G D E T A I L S 096501004_CD_GD_DTLS 19 LEGEND DocuSign Envelope ID: 616EAD35-076D-4E0E-880A-BB80D1285C30 7/14/2021 NA NA NA NA 7/30/2021 ONLY BUILDING 1 FFE: 4956.50' MU L B E R R Y C O N N E C T I O N CI T Y O F F O R T C O L L I N S UT I L I T Y P L A N S A N D C O N S T R U C T I O N D O C U M E N T S OF 44 R Know what's below. Call before you dig. 46391 REENIGN ORP ENOISSEF COLORAD D O LICENSE LA L .SLEKEEHI AN D AN 05/14/21 NORTH GR A D I N G D E T A I L S 096501004_CD_GD_DTLS 20 LEGEND DocuSign Envelope ID: 616EAD35-076D-4E0E-880A-BB80D1285C30 7/14/2021 NA NA NA NA 7/30/2021 BUILDING 1 FFE: 4956.50' MU L B E R R Y C O N N E C T I O N CI T Y O F F O R T C O L L I N S UT I L I T Y P L A N S A N D C O N S T R U C T I O N D O C U M E N T S OF 44 R Know what's below. Call before you dig. 46391 REENIGN ORP ENOISSEF COLORAD D O LICENSE LA L .SLEKEEHI AN D AN 05/14/21 NORTH GR A D I N G D E T A I L S 096501004_CD_GD_DTLS 21 LEGEND DocuSign Envelope ID: 616EAD35-076D-4E0E-880A-BB80D1285C30 7/14/2021 NA NA NA NA 7/30/2021 1 Matt Simpson From:Shane Cassidy <scassidy@comunaleproperties.com> Sent:Wednesday, January 4, 2023 2:54 PM To:Matt Simpson Cc:Josh Heiney; Brian Reilly Subject:[EXTERNAL] RE: Mulberry Connection - Site Certification Attachments:Mulberry Connection - Cert of Lot Grading - 4036 Redman.pdf; Mulberry Connection - Cert of Lot Grading - 3874 Redman.pdf Follow Up Flag:Follow up Flag Status:Flagged Matt,     No problem, see attached for the documents. Note, some of the grading questions about the slab being 6” above grade,  minimum grades around the building over 5%, and all slopes being over a 2% grade are not met due to ADA  requirements and site constraints, but we are in conformance with he approved plans.     Let me know if you need anything else.     Thanks,     Shane Cassidy, PE | Construction Manager    1855 South Pearl St., Suite 20, Denver, CO 80210  P: 720.441.4811 | C: 609.501.3500 | F: 888.367.0295  scassidy@sprinkconstruction.com | www.sprinkconstruction.com    PLEASE KINDLY NOTE:  This email and any files transmitted with it (including this email, collectively, “Email Contents”) are confidential and may  also be privileged. If you are not the intended recipient of Email Contents: (i) please advise the sender immediately and  destroy such Email Contents; and (ii) you are prohibited from viewing, retaining, disclosing, copying, printing, forwarding  or disseminating such Email Contents.    From: Matt Simpson <masimpson@fcgov.com>   Sent: Wednesday, January 4, 2023 2:21 PM  To: Shane Cassidy <scassidy@comunaleproperties.com>  Cc: Josh Heiney <jheiney@comunaleproperties.com>; Brian Reilly <Brian@alcornci.com>  Subject: RE: Mulberry Connection ‐ Site Certification    Hi Shane,  I just looked closer at the files and you will also need to submit a Lot Grading certification, stamped by a PE, for each  building.  I have attached the standard form.  I will needed this for 4036 before I can release the stormwater hold.      Also, just for your information, there are holds remaining for “Bldg Dept Required Docs” and “WWW Irrigation Final”  (see Eric Olson EOlson@fcgov.com).