HomeMy WebLinkAboutSite Certifications - 05/28/20201/19 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as- built construction to the approved drainage and grading plans, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) • Use “Yes” for items completed as described. • Use “N/A” for items that are not applicable to the site being certified. • If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I. Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3. All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4. Stage-storage-discharge tables are provided on a separate document. 5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a. The cover sheet from the approved drainage report b. The stamped certification page from the approved drainage report c. As-built topographic survey d. Stamped certification page from the Overall Site & Drainage Certification e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet Lot 18 - Midpoint Drive 11-19-2019 B1607516 Yes Yes Yes Yes Yes Yes 1/19 Page 2 B. Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1. Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b. Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c. Soft pan for low flow in detention basin. • Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3. Spillway: The following items must be field verified: a. The location of the spillway is indicated on the as-built plan. b. The width of the spillway is indicated on the as-built plan. c. The elevation(s) of the spillway is shown on the as-built plan. d. A concrete ribbon defines the location and grade of the spillway. e. There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes Yes Yes Yes Yes Yes Yes Concrete Yes 1/19 Page 3 4. Outlet Structure: a. The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. The well screen is the correct material and is installed as shown on the construction plans. e. 100-year overflow grate elevation is . (Elev. A on detail D-46) f. The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II. Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. All swales are located within the drainage easements as shown on the construction plans. 2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) Yes N/A N/A N/A N/A Yes 4897.50 Yes N/A Yes Yes Yes Yes Yes Yes Yes Yes 1/19 Page 4 III. Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1. All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2. The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B. Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1. The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2. All encasements and clearances as specified on the approved construction plans have been met. 3. Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV. Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1. The concrete pans are the correct size/width as shown on the approved construction plans. 2. The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. N/A N/A N/A N/A N/A N/A N/A N/A Yes Yes Yes Yes Yes Yes 1/19 Page 5 V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1. The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2. The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4. The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5. The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6. All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI. Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1. All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2. The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4. The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII. Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1. The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1/19 Page 6 3. The cover requirements per the construction plans are provided. 4. The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5. The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII. Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1. The size (width) of the curb cut opening is as shown on the approved construction plans. 2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX. Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1. The size (width and length) of the culverts are as shown on the approved construction plans. 2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1. The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. N/A N/A N/A N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 1/19 Page 7 2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI. Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1. All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2. All fabric has been installed in the locations and sizes indicated on the approved construction plans. a. All fabric was installed per the details on the approved construction plans. XII. Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1. All construction debris has been removed except in staging area(s). 2. All ruts have been smoothed out in all construction areas. 3. All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII. Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. XIV. Certification of Other Permanent BMPs A. The construction of other permanent BMPs not specifically addressed in this certification is in accordance with the approved plan. This may include grade control structures, rundowns, bridges, stream access/improvements, etc. Please specify other permanent BMPs included on this site: Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes N/A //1 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2. Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: z Top of foundation/finished floor z Finished grade on each side of the structure z Quarter points along each lot line (not more than 50 feet apart) z Break points/high points z Swales z Berms z Retaining walls z Air conditioning pads z Window wells z Any other appurtenance(s) within an easement ϯ͘All elevations are within a 0.2 foot tolerance of the approved grading plan. ϰ͘The top of foundation is at least 6 inches above the highest grade surrounding the structure. ϱ͘There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. ϲ͘All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than ϯϯ% (ϯ:1). ϳ͘All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. ϴ͘All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes DZ ^ƵƌǀĞLJǁĂƐĐŽŶĚƵĐƚĞĚĂƚĂƚŝŵĞ ǁŚĞŶ&ŽƌƚŽůůŝŶƐǁĂƐ ƌĞƋƵĞƐƚŝŶŐĂĚĚŝƚŝŽŶĂů ŝŶĨŽƌŵĂƚŝŽŶ͘EŽ^ƵƌǀĞLJŚĂƐ ďĞĞŶĐŽŶĚƵĐƚĞĚƐŝŶĐĞƚŚĂƚƚŝŵĞ͘ dŚĞĞŶƚŝƌĞƚLJŽĨƚŚĞůŽƚǁĂƐ ƐƵƌǀĞLJǁŝƚŚƚŚĞƌĞŐĂƌĚƐƚŽƚŚĞ ůŝƐƚĞĚŝƚĞŵƐ͘EŽŶĞĞĚĨŽƌĂŶLJ ĂĚĚŝƚŝŽŶĂůƐƵƌǀĞLJĂŶĚĂůů ŝŵƉƌŽǀĞŵĞŶƚƐŚĂǀĞďĞĞŶ ĐŽŵƉůĞƚĞĚ͘ MRB MRB MRB MRB MRB MRB MRB February 25, 2020 Prospect Industrial Park 2590 Midpoint Drive B1607516 Fort Collins, CO 8720206018 18 20170014544 Michael R. Beach 8/23/2019 //1 Page 2 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12. Final site cleanup has been completed. 13. I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14. Based on this information, I certify that (check one): Ƒ The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). Ƒ The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date MRB MRB MRB MRB MRB ✔ Michael R. Beach mbeach@ridgetopeng.com 970-663-4552 Ridgetop Engineering 541 E. Garden Drive Windsor, CO 80550 PROPOSED DETENTION POND - STAGE/STORAGE Pond: 1 (AS-BUILT RECORDS) Location: Lot 18 Calculated By: MRB Date: 3/5/2020 V = 1/3 d (A + B + sqrt(A*B)) V = Volume between Contours, ft^2 d = Depth between Contours, ft A = Surface Area of Contour, ft^2 96 0 96.5 254 0.001 0.001 97 522 0.004 0.005 WQCV = 97.5 768 0.007 0.013 0.000 98 1026 0.010 0.023 0.010 99 1563 0.030 0.052 0.040 100‐Year WSEL = 100 2228 0.043 0.096 0.083 Required Detention Volume = 0.076 See "Detention Volume Calculations" Provided Detention = 0.083 Required WQCV = 0.005 See "WQCV" RG Calc Sheet Provided WQCV = 0.013 Total Required Volume = 0.081 Total Volume Provided = 0.096 Stage        (ft) Surface  Area  (ft^2) Incremental  Storage        (ac‐ft) Total  Storage  (ac‐ft) Detention  Storage (ac‐ ft) PROPOSED DETENTION POND - STAGE/STORAGE Pond: 2 (AS-BUILT RECORDS) Location: Lot 18 Calculated By: MRB Date: 3/5/2020 V = 1/3 d (A + B + sqrt(A*B)) V = Volume between Contours, ft^2 d = Depth between Contours, ft A = Surface Area of Contour, ft^2 96.5 0 96.66 230 0.0003 0.0003 97 316 0.0021 0.0024 WQCV = 97.66 675 0.007 0.010 98 1132 0.007 0.017 0.007 100‐Year WSEL = 99.3 5971 0.097 0.113 0.103 Required Detention Volume = 0.087 See "Detention Volume Calculations" Provided Detention = 0.103 Required WQCV = 0.008 See "WQCV" RG Calc Sheet Provided WQCV = 0.010 Total Required Volume = 0.095 Total Volume Provided = 0.113 Stage        (ft) Surface  Area  (ft^2) Incremental  Storage        (ac‐ft) Total  Storage  (ac‐ft) Detention  Storage (ac‐ ft) March 18, 2020  Dan Mogen  Development Review Engineer  City of Fort Collins  700 Wood Street  PO Box 580  Fort Collins, CO 80522  RE: 2590 Midpoint Drive, PDP160010  Stormwater Pond Completion  Mr. Mogen:  This letter is to confirm the storm drainage ponds for the above referenced project are substantially  complete.   Based on a site visit by myself as well as follow up pictures provided by Elder  Construction today, the two outlet structures, orifice plates, bottom pond areas, scour stop, rip‐rap  pad, and side slopes have been constructed according to design plans.    Please contact me at (970) 663‐4552 if you have any questions or concerns regarding this letter.  Sincerely,  Mike Beach, P.E.  Managing Owner  MI D P O I N T D R I V E LOT 18 BUILDING 9,047 SF FFE = 4901 MI D P O I N T D R I V E LOT 18 1.0' W I D E BLO C K W A L L 1.0' W I D E BLO C K W A L L ST ST ST ST ST ST ST 160.5' 55 . 4 ' 110.5' 5. 0 ' 50.0' 60 . 4 ' Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION DATE SEAL DATE PREPARED FOR R TIDGEOPENGINEERING & CONSULTING 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com DRAWN BY: CHECKED BY: PROJECT NO.: R4 ARCHITECTS LOT 18, PROSPECT INDUSTRIAL PARK 226 REMINGTON, UNIT 3 FORT COLLINS, CO 2590 MIDPOINT DR FORT COLLINS, CO 16015002 MRB BSA 11 SUBMITTAL FINAL DEVELOPMENT PLAN 7/27/2016 CITY COMMENTS 09/02/2016 CITY COMMENTS 02/27/2017 CONSTRUCTION CHANGES 04/28/2017 MINOR AMENDMENT 05/10/2017 GRADING PLAN C-2.0 6 GRADING NOTESLEGEND RFI-003 05/24/2017 MIN. AMEND. COMMENT 06/01/2017 POND CURB INSTALL.10/26/2017 ASBUILT 03/18/2020 1/19 Page 1 of 2 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. • Use “Yes” for items completed as described. • Use “N/A” for items that are not applicable to the site being certified. • If any blanks are “No,” attach an explanation referencing the item number below. Project Name: Merit Office Building Date: 9/15/17 Building Permit Numbers: B1607516 I. Compaction A. Yes All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II. Storm Drain Pipe Installation Requirements A. Yes The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0 A. Riprap 1. Yes The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. 2. Yes A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. 3. Yes The riprap is the gradation shown on the approved construction plans with a D50 of 6”. 4. Yes The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. 5. Yes The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 1. Yes All fabric was installed per manufacturer’s specifications. 1/19 Page 2 of 2 IV. Other Permanent BMPs A. N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes.) V. Extended Detention Basins A. Yes Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality control box(es). Provide date of inspection and name of inspector: 9/25/17 I do not know the name of the inspector Included certification sheet(s): Please check the appropriate box(es) for the Low Impact Development (LID) facilities found on this site and complete the corresponding certification sheets. ☐ Permeable Interlocking Concrete Pavers ☒ Bioretention Cells (Rain Gardens) ☐ Sand Filters ☐ Vegetated Buffers ☐ Underground Infiltration ☒ Other LID – For certification of Dry Wells, Tree Filters, Constructed Wetland Channels & Ponds, etc., contact City Staff to determine requirements to exhibit the LID facility has been constructed and functions as intended per the approved drainage report. *Please provide photographic documentation of the installation of all stages of all LID facilities. **Please contact the City Stormwater Inspector at stormwaterinspection@fcgov.com to discuss inspection requirements for each LID facility and request inspections. ***All facilities being certified must be “clean” – free of sediment & construction debris – prior to certification or acceptance of the facility. Completed by: Name: Bob Shonka Title: Superintendent Email: bob.shonka@elderconstructioninc.com Phone: 970-821-5250 Company: Elder Construction Inc. Address: 7380 Greendale Rd. Windsor, CO 80550 1/19 Page 1 of 2 Permeable Interlocking Concrete Pavers Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☐ ☐ ☒ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Sub-surface inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and sub-base courses (per design in Final Plan Documents) ☐ ☐ ☒ Record date(s) of inspection and inspector’s name Surface inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pavers and joint fill material ☐ ☐ ☒ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction) ☐ ☐ ☒ Bottom of cell was “ripped” after excavation ☐ ☐ ☒ Provide photographs before and after “ripping” Bottom surface of cell is flat and level ☐ ☐ ☒ Provide photograph Impermeable Liner Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered material Impermeable liner is attached to concrete perimeter wall ☐ ☐ ☒ Provide photograph Impermeable liner is buried with no exposure ☐ ☐ ☒ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☐ ☒ Provide photograph (if necessary) Edge Restraint and Concrete Cut-Off Wall The required edge restraint meets design specifications ☐ ☐ ☒ Provide specification of installation Concrete cut-off wall meets design specifications for: ☐ ☐ ☒ Provide specification of installation - Dimensions ☐ ☐ ☒ - Reinforcement ☐ ☐ ☒ - Footings ☐ ☐ ☒ Underdrain System Underdrain pipe meets design specifications ☐ ☐ ☒ Provide photograph At least one cleanout is provided per underdrain lateral ☐ ☐ ☒ Provide photograph 1/19 Page 2 of 2 Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☒ Provide photograph Cleanout covers are installed and watertight ☐ ☐ ☒ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☒ Provide photograph Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☒ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐ ☐ ☒ Provide documentation of test results Aggregate Sub-base Course(e.g., #2/4): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is installed to the required design depth ☐ ☐ ☒ Provide load ticket, photographs, and record depth installed Basecourse (e.g., #57): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is installed to the required design depth ☐ ☐ ☒ Provide load ticket, photographs, and record depth installed Leveling Course / Joint Fill (e.g., crushed #89): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is dry screened - Is installed to the required design depth and to the top of the paver joints ☐ ☐ ☒ Provide load ticket, photographs, and record depth installed Aggregate materials are installed and compacted according to manufacturer’s and/or design specifications ☐ ☐ ☒ Provide photographs and documentation of compaction Protection During Construction PICP area is protected from construction site sediment, including runoff from the upstream catchment and construction equipment traffic ☐ ☐ ☒ Specify how the area was covered and/or otherwise protected to prevent construction runoff from entering the pavement Close Out Cracked/broken paver units have been removed and replaced ☐ ☐ ☒ Paver height offsets are no more than 1/4” between adjacent units & surface contains no deformations (depressions/settlement) exceeding 1/2" ☐ ☐ ☒ Upstream catchment is stabilized prior to diverting runoff into PICP system ☐ ☐ ☒ 1/19 Page 1 of 3 Bioretention Cells (Rain Gardens) Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☒ ☐ ☐ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) City offices Underdrain and basecourse inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and base course (per design in Final Plan Documents) ☒ ☐ ☐ Record date(s) of inspection and inspector’s name Unknown Inspector Pea gravel and BSM inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pea gravel and bioretention sand media ☒ ☐ ☐ Record date(s) of inspection and inspector’s name Unknown Inspector Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction) ☒ ☐ ☐ Bottom of cell was “ripped” after excavation ☐ ☒ ☐ Provide photographs before and after “ripping” Bottom surface of cell is flat and level ☒ ☐ ☐ Provide photograph Excavated area is protected/surrounded by sediment/runoff control measures during construction ☒ ☐ ☐ Provide photograph Intake Upstream catchment drains to inlet/bioretention cell per plan and flows are fully captured ☒ ☐ ☐ Forebay Forebay is installed according to design specifications ☐ ☐ ☒ Provide photograph There is a minimum 3” drop at the forebay entrance ☐ ☐ ☒ Provide photograph Forebay will drain fully and not hold standing water ☐ ☐ ☒ Outlet Structure/Overflow Emergency overflow elevation is confirmed ☒ ☐ ☐ Measure and record distance from overflow to top of media filter; provide photograph Overflow inlet elevation is set above bioretention media per plan ☒ ☐ ☐ Provide photograph 1/19 Page 2 of 3 Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) ☒ ☐ ☐ Measure and record distance between inlet and top of containment wall/berm; provide photograph Overflow path and check dams, if used, are armored to protect from erosion and maintain elevations ☒ ☐ ☐ Provide photograph Impermeable Liner Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered material Impermeable liner is appropriately anchored ☐ ☐ ☒ Provide photograph Impermeable liner is buried with no exposure ☐ ☐ ☒ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☐ ☒ Provide photograph (if necessary) Underdrain System Underdrain pipe meets design specifications ☒ ☐ ☐ Provide photograph At least one cleanout is provided per underdrain lateral ☒ ☐ ☐ Provide photograph Cleanout pipe is solid (not perforated/slotted) ☒ ☐ ☐ Provide photograph Cleanout covers are installed and watertight ☒ ☐ ☐ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☒ ☐ ☐ Provide photograph Verify there is no orifice plate on the underdrain outfall ☒ ☐ ☐ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☒ ☐ ☐ Provide documentation of test results Water Test 4/6/20 Filter Media and Aggregate Reservoir aggregate layer (ASTM #57 or #67): - meets design specifications - is installed to the required design depth ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed Diaphragm aggregate layer (“Pea Gravel” with gradation ASTM #8, #89, or #9): - meets design specifications - is installed to the required design depth ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed Bioretention Sand Media (BSM) composition: - meets design specifications - is installed to the required design depth ☒ ☐ ☐ Provide load ticket, photographs, and record depth installed BSM was “machine mixed” by supplier prior to delivery ☒ ☐ ☐ Provide load ticket BSM is installed flat and level ☒ ☐ ☐ Provide photograph Other Structural Components Containment wall/berm is continuous and level ☒ ☐ ☐ Landscaping 1/19 Page 3 of 3 Verify final landscaping is free of sod ☒ ☐ ☐ If sod is used, it must be shown to be “sand-grown” Final landscaping (non-floatable mulch) is flat and level ☒ ☐ ☐ Provide photograph Vegetation is planted according to landscape design specifications and final landscaping plan ☒ ☐ ☐ Provide photograph Verify that weed barrier is NOT installed ☒ ☐ ☐ Temporary irrigation installed ☐ ☒ ☐ If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell ☒ ☐ ☐ 1/19 Page 1 of 1 Vegetated Buffers Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Construction Buffer area was sectioned off to eliminate site disturbance and compaction during construction ☐ ☐ ☒ Provide photograph(s) Level spreader has been installed per plan (if applicable) ☐ ☐ ☒ Provide photograph Soils in the buffer area have been amended ☐ ☐ ☒ Record soil amendment certification with Environmental & Regulatory Affairs Vegetation is planted according to landscape design specifications and final landscaping plan ☐ ☐ ☒ Provide photograph 1/19 Page 1 of 3 Sand Filters Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☐ ☐ ☒ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Underdrain and basecourse inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and base course (per design in Final Plan Documents) ☐ ☐ ☒ Record date(s) of inspection and inspector’s name Pea gravel and filter media inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pea gravel and filter media ☐ ☐ ☒ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction) ☐ ☐ ☒ Bottom of cell was “ripped” after excavation ☐ ☐ ☒ Provide photographs before and after “ripping” Bottom surface of cell is flat and level ☐ ☐ ☒ Provide photograph Excavated area is protected/surrounded by sediment/runoff control measures during construction ☐ ☐ ☐ Provide photograph Intake Upstream catchment drains to inlet/sand filter per plan and flows are fully captured ☐ ☐ ☒ Forebay (If Applicable) Forebay is installed according to design specifications ☐ ☐ ☒ Provide photograph There is a minimum 3” drop at the forebay entrance ☐ ☐ ☒ Provide photograph Forebay will drain fully and not hold standing water ☐ ☐ ☒ Outlet Structure/Overflow Overflow inlet elevation is set above sand filter media per plan (typically 1 to 3 feet) ☐ ☐ ☒ Provide photograph Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) ☐ ☐ ☒ Measure and record distance between inlet and top of containment wall/berm; provide photograph 1/19 Page 2 of 3 Overflow path and check dams, if used, are armored to protect from erosion and maintain elevations ☐ ☐ ☒ Provide photograph Impermeable Liner (If Applicable) Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered material Impermeable liner is appropriately anchored to the perimeter wall ☐ ☐ ☒ Provide photograph Impermeable liner is buried with no exposure ☐ ☐ ☒ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☐ ☒ Provide photograph (if necessary) Underdrain System Underdrain pipe meets design specifications ☐ ☐ ☒ Provide photograph At least one cleanout is provided per underdrain lateral ☐ ☐ ☒ Provide photograph Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☒ Provide photograph Cleanout covers are installed and watertight ☐ ☐ ☒ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☒ Provide photograph Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☒ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐ ☐ ☒ Provide documentation of test results Filter Media Filter media composition (e.g. ASTM C 33 Sand): - meets design specifications - is installed to the required design depth ☐ ☐ ☒ Provide load ticket, photographs, and record depth installed Pea gravel layer: - meets design specifications - is installed to the required design depth ☐ ☐ ☒ Provide load ticket, photographs, and record depth installed Filter Media is installed flat and level ☐ ☐ ☒ Other Structural Components Containment wall/berm is continuous and level ☐ ☐ ☒ Landscaping Verify final landscaping is free of sod ☐ ☐ ☒ If sod is used, it must be shown to be “sand-grown” Final landscaping (non-floatable mulch) is flat and level ☐ ☐ ☒ Provide photograph Vegetation is planted according to landscape design specifications and final landscaping plan ☐ ☐ ☒ Provide photograph Verify that weed barrier is NOT installed ☐ ☐ ☒ 1/19 Page 3 of 3 Temporary irrigation installed ☐ ☐ ☒ If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into sand filter cell ☐ ☐ ☒ 1/19 Page 1 of 2 Underground Infiltration Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Manufacturer’s representative pre-construction meeting: A pre-construction meeting was completed with the manufacturer’s representative and installers ☐ ☐ ☒ Record date and who was present at the meeting Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☐ ☐ ☒ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point at which the chambers had been laid/prior to backfilling. Correct fabric placement was confirmed. ☐ ☐ ☒ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not travel across underground cell area during excavation (prevents over-compaction) ☐ ☐ ☒ Bottom of cell was “ripped” after excavation ☐ ☐ ☒ Provide photographs before and after “ripping” Bottom of cell is flat and level, or graded per approved grading plans ☐ ☐ ☒ Provide photograph Non-woven fabric is installed per manufacturer’s specifications and was not damaged during construction (around system) ☐ ☐ ☒ Provide photograph Woven fabric is installed per manufacturer’s specifications and was not damaged during construction (beneath chambers) ☐ ☐ ☒ Provide photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction ☐ ☐ ☒ Provide photograph Impermeable Liner Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered material Impermeable liner is not exposed ☐ ☐ ☒ Any penetrations of the impermeable liner have been sealed and checked for water-tightness. ☐ ☐ ☒ Provide photograph (if necessary) Aggregate Foundation and embedment materials are installed and compacted according to design and manufacturer’s specifications ☐ ☐ ☒ Provide load ticket and photograph(s) Underdrain System 1/19 Page 2 of 2 Underdrain pipe meets design specifications ☐ ☐ ☒ Provide photograph At least one cleanout is provided per underdrain lateral ☐ ☐ ☒ Provide photograph Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☒ Provide photograph Cleanout covers are installed and watertight ☐ ☐ ☒ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☒ Provide photograph Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☒ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐ ☐ ☒ Provide documentation of test results Manifold system Overflow weir elevation is set at/above water quality storm elevation ☐ ☐ ☒ Record weir elevation on survey Maintenance access is provided for each Isolator Row ☐ ☐ ☒ At least one inspection port has been provided for each Isolator Row (located in middle third of each row) ☐ ☐ ☒ Upstream catchment drains to inlet/intake properly ☐ ☐ ☒ Underground Detention Chambers All chambers were installed per approved Utility Plans and manufacturer’s specifications ☐ ☐ ☒ Photograph Close Out Upstream catchment is stabilized prior to diverting runoff into Underground Detention system ☐ ☐ ☒ All Isolator Rows, chambers, and pipes are cleaned and sediment/debris has been removed ☐ ☐ ☒ 11 / 1 8 ®i iE Proctor Designation A Maximum Dry Density (pcf)104.5 Optimum Moisture Content (%)16.5% Required Moisture Variance OMC +/-2% Required Percent Compaction 95% Laboratory Method ASTM D-698 Compliance with Project Specs Elev. / Lift No. Material (Proctor) Percent Moisture Dry Density Moisture (Pass / Fail) %Comp. (Pass / Fail) 92 4/8 1 Elevated Berm - South Pond (Midpoint Rain Garden) - West Side FG A 16.6%99.2 0.1%95%Pass Pass 93 4/8 2 Elevated Berm - South Pond (Midpoint Rain Garden) - East Side FG A 16.4%99.4 -0.1%95%Pass Pass EARTH ENGINEERING CONSULTANTS, LLC Approximate Test Location / Notes Da i l y T e s t Nu m b e r Da t e Co n s e c u t i v e Te s t N u m b e r Mo i s t u r e Va r i a n c e Pe r c e n t Co m p a c t i o n Field Test Results Merit Office BuildingProject Name: SUMMARY OF FIELD DENSITY TESTS Location: Fort Collins, Colorado Project No: Date: 1174034 April 2020 0% 10% 20% 30% Project:Merit Office Building Fort Collins, Colorado Project No:1174034 Date March 2017 Proctor Designation Rock Correction (AASHTO T 224) Maximum Dry Density (pcf)Optimum Moisture Content (%) 7.2 Retained 3/4" O 125.0 O-10 126.9 8.0 130.9 5.6 O-20 128.8 6.4 O-30 90 95 100 105 110 115 120 125 130 135 140 145 0 5 10 15 20 25 30 35 Dr y D e n s i t y ( P o u n d s p e r C u b i c F o o t ) Percent Moisture Earth Engineering Consultants, LLC Summary of Laboratory Classification/ Moisture-Density Relationship Curves for 100% Saturation For Specific Gravity Equal to: 2.80 2.70 2.60 Material Designation: Sample Location: Description: A Building Subgrade Sandy Lean Clay (CL) Atterberg Limits (ASTM D-4318) Liquid Limit: Plastic Limit: Plasticity Index: 34 19 15 Passing No. 200 Sieve (AASHTO T 11/ASTM C 117):66.7% Standard Proctor (ASTM D-698) Maximum Dry Density: Optimum Moisture Content: 104.5 pcf 16.5% Material Designation:A Sample Location:Building Subgrade Material Description:Sandy Lean Clay (CL) Project:Merit Office Building Fort Collins, Colorado Project No: Date March 2017 98% 66.7% 96% 87% 1174034 No. 40 No. 10 No. 200 Sieve Size Percent Passing No. 4 Earth Engineering Consultants, LLC Summary of Laboratory Gradation Test 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0.0010.010.1110100 Pe r c e n t F i n e r b y W e i g h t Grain Size in Millimeters This unofficial copy was downloaded on Jun-01-2017 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA