HomeMy WebLinkAboutSite Certifications - 08/30/20191/19 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as- built construction to the approved drainage and grading plans, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) x Use “Yes” for items completed as described. x Use “N/A” for items that are not applicable to the site being certified. x If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I. Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3. All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4. Stage-storage-discharge tables are provided on a separate document. 5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a. The cover sheet from the approved drainage report b. The stamped certification page from the approved drainage report c. As-built topographic survey d. Stamped certification page from the Overall Site & Drainage Certification e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet Christian Brothers Automotive 5.17.19 B1800922 Yes Yes Yes Yes Yes Yes N.J.N.$13,150 escrowed on 4/12/2019 to release CO in advance of certification. Certification accepted and escrow released 8/30/2019 DJM 1/19 Page 2 B. Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1. Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b. Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c. Soft pan for low flow in detention basin. x Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3. Spillway: The following items must be field verified: a. The location of the spillway is indicated on the as-built plan. b. The width of the spillway is indicated on the as-built plan. c. The elevation(s) of the spillway is shown on the as-built plan. d. A concrete ribbon defines the location and grade of the spillway. e. There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes N/A Yes N/A Yes Yes Yes Yes Yes Yes L 6 Yes 1/19 Page 3 4. Outlet Structure: a. The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. The well screen is the correct material and is installed as shown on the construction plans. e. 100-year overflow grate elevation is . (Elev. A on detail D-46) f. The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II. Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. All swales are located within the drainage easements as shown on the construction plans. 2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) Yes Yes Yes Yes Yes 4928.83 Yes 4926.44 Yes Yes N/A N.J.N N.J.N 1/19 Page 4 III. Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1. All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2. The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B. Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1. The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2. All encasements and clearances as specified on the approved construction plans have been met. 3. Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV. Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1. The concrete pans are the correct size/width as shown on the approved construction plans. 2. The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes Yes Yes Yes 1/19 Page 5 V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1. The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2. The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4. The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5. The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6. All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI. Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1. All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2. The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4. The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII. Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1. The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. Yes Yes Yes Yes Yes Yes Yes N/A N/A 1/19 Page 6 3. The cover requirements per the construction plans are provided. 4. The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5. The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII. Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1. The size (width) of the curb cut opening is as shown on the approved construction plans. 2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX. Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1. The size (width and length) of the culverts are as shown on the approved construction plans. 2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1. The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. Yes Yes Yes N/A Yes Yes 1/19 Page 7 2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI. Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1. All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2. All fabric has been installed in the locations and sizes indicated on the approved construction plans. a. All fabric was installed per the details on the approved construction plans. XII. Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1. All construction debris has been removed except in staging area(s). 2. All ruts have been smoothed out in all construction areas. 3. All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII. Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. XIV. Certification of Other Permanent BMPs A. The construction of other permanent BMPs not specifically addressed in this certification is in accordance with the approved plan. This may include grade control structures, rundowns, bridges, stream access/improvements, etc. Please specify other permanent BMPs included on this site: N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes N.J.N N.J.N. 1/19 Page 8 XV. Certification and Erosion Control Measures - FCSCM Ch. 3 A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing this certification there are any erosion control measures still remaining on the site, please note them in the narrative and verify that they need to remain at this time. If in doubt as to the need for any control measure, please consult with the Erosion Control Inspector at erosion@fcgov.com. XVI. Statement of Compliance - FCSCM Ch. 3 A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage facilities are as described in the above form and in the enclosed as-built plans. B. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. XVII. Signature and Stamp by a Colorado-Registered Professional Engineer Engineer’s contact information: Name: Email: Phone: Company: Address: Sign and date over stamp Noah J Nemmers noah@baselinecorp.com 303.482.7712 Baseline Engineering 112 N Ruby Drive Golden, CO 80403 5.24.19 39820NOAH J. NEMMER S COLORADO L ICENSED PROFESSIONAL ENGINEER Know what's below. before you dig.CallR RECORD DRAWING 6.20.19 AS CONSTRUCTED SEWERC.O.(TYP.) AS CONSTRUCTED SEWERMH (TYP.) AS CONSTRUCTED WATERMETER AS CONSTRUCTED IRR.VALVE AS CONSTRUCTED CURBSTOP AS CONSTRUCTED 4"SEWER TAP GRATE ELEV.= 4929.70INV 15" RCP (N)= 4926.19 INV 15" RCP (S)= 4926.05 GRATE=4926.40INV 15" RCP (E)=4923.81 RIM=4929.88INV 24" RCP (N)=4922.83INV 24" RCP (S)=4922.78INV 15" RCP (W)=4823.48 AS CONSTRUCTED 32 LF 34" WATERSERVICE INV 4" PVC (S)= 4926.77 WATER SERVICENOT CONSTRUCTED 39820NOAH J. NEMMER S COLORADO L ICENSED PROFESSIONAL ENGINEER RECORD DRAWING 6.20.19 5,140 SF AUTOMOTIVE REPAIR FACILITY FFE=4932.69' 31.16 31.19 30.81 30.71 30.88 31.42 30.19 30.14 30.90 30.76 30.62 30.17 30.23 30.41 30.68 30.98 31.76 32.15 31.88 32.05 32.50 32.18 33.34 32.41 32.75 32.51 32.45 32.79 32.70 32.62 32.73 4929.884922.83 (24") 4923.48 (15")4922.78 (24") 4923.81 54.5 LF 0.61% 102.7 LF 2.14% 26.04 23.84 4929.68 4929.19 509 19.2 LF 0.73% 49 2 6 . 1 9 49 2 6 . 0 5 4" PVCINV = 4926.77 49 2 3 . 8 1 54.5 LF 0.61% 49 2 9 . 6 8 49 2 3 . 4 8 49 2 9 . 8 8 39820NOAH J. NEMMER S COLORADO L ICENSED PROFESSIONAL ENGINEER RECORD DRAWING 6.20.19 39820NOAH J. NEMMER S COLORADO L ICENSED PROFESSIONAL ENGINEER 4926.44 1/4" RECORD DRAWING 4928.83 6.20.19 July 31, 2019 Stormwater Engineering & Development Review Division City of Fort Collins Utilities 281 N College Fort Collins, CO 80524 RE: Christian Brothers Automotive As-Built Memo To whom it may concern, This memo is to address the as-built deficiencies for the Christian Brothers Automotive development located at 1500 Academy Court as noted per your email correspondence dated 7/30/2019. 1. Impermeable liner not being fully attached and buried- Cobble stones have been placed to cover exposed areas. The small holes in the liner are ok as they are located above the high-water level so it will not impact the intended function. The liner is attached at the curb cut and we are ok with the location where it is not attached. 2. Erosion at curb cut – Cobble stones have ben added to the curb cut to reduce erosion. 3. Regular water flow is causing washout in the rain garden, and will perpetually cause issues with getting vegetation established - Cobble stones have been added to the outfall from the parking lot into the rain garden to reduce washout. 4. Cleanout pipes adjacent to the curb cut have been left unnecessarily high/long and are unsightly- The contractor has coordinated this with you and was told that it was ok to leave them as is. Conclusion The outstanding items for the as-built requirements for the Christian Brothers Automotive development have been address in order to meet the City of Fort Collin’s as-built requirements. Please let us know once we get final approval from the City of Fort Collins and when the escrow funds are released. Sincerely, Noah J. Nemmers, P.E. Baseline Engineering PE No. 50682 Christian Brothers Automotive - DetentionPond As-Built Stage Storage.txt Detention Pond Volume Project: CBA Fort Collins Basin Description: Contour Contour Depth Incremental Cumulative Cumulative Incremental Cumulative Cumulative Elevation Area (ft) Volume Volume Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Avg. End Conic Conic Conic (cu. ft) (cu. ft) (ac-ft) (cu. ft) (cu. ft) (ac-ft) 4,924 14 N/A N/A 0 0.00 N/A 0 0.00 4,925 896 1.00 455 455 0.010 340 340 0.008 4,926 1,897 1.00 1396 1851 0.043 1365 1705 0.039 WQCV 4,927 2,770 1.00 2333 4184 0.096 2320 4025 0.092 4,928 3,687 1.00 3229 7413 0.170 3218 7242 0.170 100-YR 4,929 4,654 1.00 4171 11583 0.266 4161 11404 0.262 Page 1 Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.020 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] Watershed Length =60 ft 0.00 14 0.00 0.00 Watershed Area = 0.79 acres 0.10 896 0.10 0.00 Watershed Imperviousness = 90.0%percent 1.10 1,897 1.10 0.01 Percentage Hydrologic Soil Group A =percent 2.10 2,770 2.10 0.35 Percentage Hydrologic Soil Group B = 100.0%percent 3.10 3,687 3.10 0.41 Percentage Hydrologic Soil Groups C/D =percent 4.10 4,654 4.10 0.46 User Input 17    WQCV Treatment Method = 12.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif create a new stormwater facility, and  attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year One‐Hour Rainfall Depth =0.75 0.87 1.15 1.45 2.44 2.98 in Calculated Runoff Volume =0.021 0.050 0.068 0.089 0.155 0.194 acre‐ft OPTIONAL Override Runoff Volume =acre‐ft Inflow Hydrograph Volume =0.020 0.049 0.067 0.089 0.155 0.194 acre‐ft Time to Drain 97% of Inflow Volume =3.2 4.9 5.6 6.4 8.3 9.3 hours Time to Drain 99% of Inflow Volume =3.5 5.3 6.1 6.9 9.1 10.1 hours Maximum Ponding Depth =1.08 1.75 2.06 2.40 3.22 3.62 ft Maximum Ponded Area =0.03 0.05 0.05 0.06 0.08 0.09 acres Maximum Volume Stored =0.015 0.040 0.056 0.075 0.135 0.172 acre‐ft Stormwater Detention and Infiltration Design Data Sheet CHRISTIAN BROTHERS AUTOMOTIVE FORT COLLINS, COLORADO Location for 1‐hr Rainfall Depths (use dropdown): Workbook Protected Worksheet Protected 15298 SDI_Design_Data_v1.08, Design Data 5/20/2019, 3:22 PM WQCV_Trigger = 1 RunOnce= 1 CountA=1 Draintime Coeff 0.8 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Stormwater Detention and Infiltration Design Data Sheet Area Discharge 0 1 2 3 4 5 6 7 8 9 0.1 1 10 FL O W  [c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 0.1 1 10 100 PO N D I N G  DE P T H  [f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV 15298 SDI_Design_Data_v1.08, Design Data 5/20/2019, 3:22 PM Triax Engineering, LLC ◆ Geotechnical Engineering ◆ Construction Materials Testing ◆ Environmental Site Assessments 12445 E 39th Avenue, Suite 517 Denver CO 80239 PH: 720.230.1931 FAX: 720.230.5471 Email: info@triaxgeo.com FAX/EMAIL TRANSMITTAL To: Mr. Lon Metzger Email: lonm@idealco.net Fax: 937.832.2133 Pages: Phone: 937.771.2369 Date: 7.19.2019 Re: CBA Fort Collins, Co CC: Urgent x For Review Please Comment Please Reply Please Recycle Comments: Christian Brothers, Fort Collins, Co. Materials Testing Report #6 Distribution: Name Company Email Mr. Rick Thompson Ideal CO rlt515@hotmail.com Mr. James A. Dickey Ideal Co. jimd@idealco.net Project: D18T162 Christian Brothers Automotive 1500 Academy Court Fort Collins Co. Project #: The Ideal Company Inc. 8313 North Kimmel Rd Clayton OH 45315 Client: Location Depth (ft) LL (%) PI (%) % Fines USCS Class. AASHTO Class. MDD (pcf) OMC (%)Soil Description Building pad Subgrade -1' to -3' 29 14 54.1%CL A-6(4)116.6 13.5Reddish Brown Sandy Lean Clay ASTM D698Test Method: Parking Area Subgrade -1' 27 9 58.3%CL A-4(3)113.2 13.6Reddish Brown Sandy Lean Clay ASTM D698Test Method: Triax Engineering, LLC 12445 E 39th Avenue Unit 517 Denver CO 80239 PH: 720.230.1931 FAX: 720.230.5471 EMAIL: info@triaxgeo.com LL= Liquid Limit (%)PI= Plasticity Index (%) For one point moisture density relationship MDD=DD and OMC=MC MDD= Maximum Dry Density (PCF)OMC= Optimum Moisture Content (%) Project: D18T162 Christian Brothers Automotive1500 Academy Court Fort Collins Co. Project #: The Ideal Company Inc. 8313 North Kimmel Rd OH 45315 Client: SITE OBSERVATION REPORT Glenn AleredgeTechnician:7/17/2019Date: Clayton The Ideal Company Inc.Contractor Name: General ContractorContractor Discipline: Detention pond burnActivity: soil and AggregateDiscipline: Detention pond berm between Rain garden and detention poundWork Performed: Field Compaction Testing - Nuclear Method ASTM D6938Tests Performed: Site SuperintendentOnsite Communication: No Delays Encountered: None Non Conformance: Corrective Actions: YesPhotographsTaken: Equipment used by Contractor: Triax Engineering, LLC 12445 E 39th Avenue Unit 517 Denver CO 80239 PH: 720.230.1931 FAX: 720.230.5471 EMAIL: info@triaxgeo.com Project: D18T162 Christian Brothers 1500 Academy Court Fort Collins Co. Project #: The Ideal Company Inc. 8313 North Kimmel Rd OH 45315Clayton Client: Test #Elevation MDD (pcf) Location Soil ID OMC (%) DD (pcf) MC (%) % Comp. Specs Met Soil Field Compaction Test Report - Nuclear Method [ASTM D6938/AASHTO T310] The Ideal Company Inc.Contractor: General ContractorContractor Discipline: 93FAmbient Temp (F): Partly CloudyWeather: 7/17/2019Date: Detention pond burnActivity Name: soil and AggregateDiscipline: Detention pond berm between Rain garden and detention pound Work Performed: Field Compaction Testing - Nuclear Method ASTM D6938Tests Performed: Glenn AleredgeTechnician:Gauge #4: Troxler 3510 S/N: 23855 Gauge: 692MS: 2843DS: Gauge Information Equipment Used: Detention pond berm at 1500 Academy Court, Fort Collins, CO Test Location: 25-00 Sub -6"10' E. of Bldg. @ north detention pond berm 1 113.2pcf 13.6%111.0pcf 13.7%98.1%Yes Comments: 26-00 Sub -12"20' E. of Bldg. @ north detention pond berm 1 113.2pcf 13.6%109.2pcf 14.0%96.5%Yes Comments: Triax Engineering, LLC 12445 E 39th Avenue Unit 517 Denver CO 80239 PH: 720.230.1931 FAX: 720.230.5471 EMAIL: info@triaxgeo.com MDD- Max. Dry Density, OMC- Optimum Moisture Conten, DD- Dry Density, MC- Moisture Content, RG- Rough grade at the time of testing, BG- Below Grade Site SuperintendentCommunication: NoDelays Encountered: Test Comments: Project: D18T162 Christian Brothers Automotive1500 Academy Court Fort Collins Co. Project #: The Ideal Company Inc. 8313 North Kimmel Rd OH 45315 Client: SITE PHOTOGRAPHS Glenn AleredgeTechnician:7/17/2019Date: Clayton Photograph Date:7/17/2019 Scope: Triax Engineering, LLC 12445 E 39th Avenue Unit 517 Denver CO 80239 PH: 720.230.1931 FAX: 720.230.5471 EMAIL: info@triaxgeo.com Project: D18T162 Christian Brothers Automotive1500 Academy Court Fort Collins Co. Project #: The Ideal Company Inc. 8313 North Kimmel Rd OH 45315 Client: SITE PHOTOGRAPHS Glenn AleredgeTechnician:7/17/2019Date: Clayton Photograph Date:7/17/2019 Scope: Triax Engineering, LLC 12445 E 39th Avenue Unit 517 Denver CO 80239 PH: 720.230.1931 FAX: 720.230.5471 EMAIL: info@triaxgeo.com Project: D18T162 Christian Brothers Automotive1500 Academy Court Fort Collins Co. Project #: The Ideal Company Inc. 8313 North Kimmel Rd OH 45315 Client: SITE PHOTOGRAPHS Glenn AleredgeTechnician:7/17/2019Date: Clayton Photograph Date:7/17/2019 Scope: Triax Engineering, LLC 12445 E 39th Avenue Unit 517 Denver CO 80239 PH: 720.230.1931 FAX: 720.230.5471 EMAIL: info@triaxgeo.com 1/19 Page 1 of 2 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. • Use “Yes” for items completed as described. • Use “N/A” for items that are not applicable to the site being certified. • If any blanks are “No,” attach an explanation referencing the item number below. Project Name: Christian Brothers Automotive Date: 6/7/19 Building Permit Numbers: B1800922 I. Compaction A. Yes All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II. Storm Drain Pipe Installation Requirements A. N/A The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0 A. Riprap 1. N/A The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. 2. N/A A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. 3. N/A The riprap is the gradation shown on the approved construction plans with a D50 of . 4. N/A The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. 5. N/A The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 1. Yes All fabric was installed per manufacturer’s specifications. 1/19 Page 2 of 2 IV. Other Permanent BMPs A. N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes.) V. Extended Detention Basins A. Yes Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality control box(es). Provide date of inspection and name of inspector: 3/27/19 Kim Keiswetter Included certification sheet(s): Please check the appropriate box(es) for the Low Impact Development (LID) facilities found on this site and complete the corresponding certification sheets. ☐ Permeable Interlocking Concrete Pavers ☒ Bioretention Cells (Rain Gardens) ☐ Sand Filters ☐ Vegetated Buffers ☐ Underground Infiltration ☐ Other LID – For certification of Dry Wells, Tree Filters, Constructed Wetland Channels & Ponds, etc., contact City Staff to determine requirements to exhibit the LID facility has been constructed and functions as intended per the approved drainage report. *Please provide photographic documentation of the installation of all stages of all LID facilities. **Please contact the City Stormwater Inspector at stormwaterinspection@fcgov.com to discuss inspection requirements for each LID facility and request inspections. ***All facilities being certified must be “clean” – free of sediment & construction debris – prior to certification or acceptance of the facility. Completed by: Name: Rick Thompson Title: Site Superintendent Email: rlt515@hotmail.com Phone: 937-604-5495 Company: The Ideal Co., Inc. Address: 8313 N. Kimmel Rd. Clayton, Ohio 45315 1/19 Page 1 of 3 Bioretention Cells (Rain Gardens) was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and ☒ ☐ ☐ location (i.e. DCP, initial erosion control Underdrain and basecourse inspection(s): facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and base course (per design in Final Plan ☒ ☐ ☐ inspector’s name Pea gravel and BSM inspection(s): was verified via inspection by a City-Stormwater Inspector at the point of installation of the pea gravel and bioretention ☒ ☐ ☐ inspector’s name Excavation ☒ ☐ ☐ ☐ ☒ ☐ ☒ ☐ ☐ Provide photograph Excavated area is protected/surrounded by sediment/runoff control measures during construction ☒ ☐ ☐ Intake ☒ ☐ ☐ Forebay ☐ ☐ ☒ Provide photograph There is a minimum 3” drop at the forebay entrance ☐ ☐ ☒ Provide photograph Forebay will drain fully and not hold standing water ☐ ☐ ☒ Outlet Structure/Overflow Emergency overflow elevation is confirmed ☒ ☐ ☐ overflow to top of media filter; provide ☒ ☐ ☐ 1/19 Page 2 of 3 Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) ☒ ☐ ☐ inlet and top of containment wall/berm; ☒ ☐ ☐ Impermeable Liner ☒ ☐ ☐ ☒ ☐ ☐ Provide photograph Impermeable liner is buried with no exposure ☒ ☐ ☐ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☐ ☒ Underdrain System ☒ ☐ ☐ Provide photograph At least one cleanout is provided per underdrain lateral ☒ ☐ ☐ Provide photograph Cleanout pipe is solid (not perforated/slotted) ☒ ☐ ☐ Provide photograph Cleanout covers are installed and watertight ☒ ☐ ☐ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☒ ☐ ☐ Provide photograph Verify there is no orifice plate on the underdrain outfall ☒ ☐ ☐ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐ ☒ ☐ Filter Media and Aggregate - meets design specifications ☒ ☐ ☐ record depth installed #8, #89, or #9): - meets design specifications ☒ ☐ ☐ record depth installed - meets design specifications ☒ ☐ ☐ record depth installed ☒ ☐ ☐ Provide load ticket BSM is installed flat and level ☒ ☐ ☐ Provide photograph Other Structural Components Containment wall/berm is continuous and level ☒ ☐ ☐ Landscaping 1/19 Page 3 of 3 Verify final landscaping is free of sod ☒ ☐ ☐ ☒ ☐ ☐ Provide photograph Vegetation is planted according to landscape design specifications and final landscaping plan ☒ ☐ ☐ ☒ ☐ ☐ Temporary irrigation installed ☐ ☐ ☒ irrigation is installed to establish/maintain has been installed and Close Out ☒ ☐ ☐ Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 1.000 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area)Area = 16,354 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =545 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =327 sq ft D) Actual Flat Surface Area AActual =509 sq ft E) Area at Design Depth (Top Surface Area)ATop =907 sq ft F) Rain Garden Total Volume VT=708 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO =N/A in Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Todd Rand, PE Baseline Engineering Corporation June 13, 2019 Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO Design Procedure Form: Rain Garden (RG) Todd Rand, PE Baseline Engineering Corporation June 13, 2019 Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO UD-BMP (Version 3.06, November 2016) Choose One Choose One Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO 18" Rain Garden Growing Media Other (Explain): YES NO YES NO UD-BMP_v3.06 RAIN GARDEN as built, RG 6/13/2019, 11:02 AM as built flat area as built top area From:Rick Thompson To:Dan Mogen Subject:Rain Garden Pictures Christian Brothers Date:Tuesday, June 11, 2019 7:11:14 AM Get Outlook for Android