Loading...
HomeMy WebLinkAboutLot Certifications - 10/01/2019//1 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2. Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: z Top of foundation/finished floor z Finished grade on each side of the structure z Quarter points along each lot line (not more than 50 feet apart) z Break points/high points z Swales z Berms z Retaining walls z Air conditioning pads z Window wells z Any other appurtenance(s) within an easement ϯ͘All elevations are within a 0.2 foot tolerance of the approved grading plan. ϰ͘The top of foundation is at least 6 inches above the highest grade surrounding the structure. ϱ͘There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. ϲ͘All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than ϯϯ% (ϯ:1). ϳ͘All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. ϴ͘All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes HND HND HND HND HND HND HND HND September 27, 2019 Paragon Point P.U.D. Phase Two 6449 Southride Greens Blvd B1706272 8607311022 22 n/a Helena Dopita 9/15/2019 //1 Page 2 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12. Final site cleanup has been completed. 13. I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14. Based on this information, I certify that (check one): Ƒ The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). Ƒ The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date HND HND HND HND HND Site was visited by Kelby York, PE Homeowner, Ashwin Gudidevuni ✔ Helena N. Dopita helena@yorkengr.com 720-990-5900 York Engineering 7955 E Arapahoe Ct, Ste 3300 Centennial, CO 80112 * Date: September 27, 2019 Attn: Fort Collins Building Department Subject: Grade Certificate, 6449 Southridge Greens Blvd In accordance with applicable standards of practice, I hereby certify the grading pattern is in substantial conformance with the approved site and grading plan for 6449 Southridge Greens Blvd (Lot 22 Paragon Point PUD Phase Two). An as-built survey was performed on September 15, 2019 and a York Engineering representative visited the site on September 26 2019. Elevations denoted with ( ) on the redlined site and grading plan attached mean an elevation is not within construction tolerance however drainage pattern is in substantial conformance with approved site and grading plan. · Main finished floor elevation is 06.24. · Basement finished floor elevation is 96.37. This certificate is neither an express nor implied guaranty or warranty. Elevations and patterns may change subsequent to this certificate as a result of natural and/or man-made occurrences. This letter is not an improvement location certificate or land survey plat. Please feel free to call with any questions or concerns. Respectfully Yours, Helena N. Dopita, P.E. Structural Design (720) 990-5900 00.37 02.55 02.59 97.6496.67 5.5% ** * * ** 05.04 04.06 9%14% 10 % Accepted 11/21/2017 WL