HomeMy WebLinkAboutLot Certifications - 01/10/20252/14/17 Page 1
CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2.Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
l Top of foundation/finished floor
l Finished grade on each side of the structure
l Quarter points along each lot line (not more than 50 feet apart)
l Break points/high points
l Swales
l Berms
l Retaining walls
l Air conditioning pads
l Window wells
l Any other appurtenance(s) within an easement
3.All elevations are within a 0.2 foot tolerance of the approved grading plan.
4.The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 33% (3:1).
7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8.All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
NR
NR
NR
Some elevations fall slightly outside of this tolerance, but do not significantly impact the designed drainage.
NR
NR
The northwest corner of the building adjacent to the driveway falls below the 5%, but is greater than
2%. This should not have a negative impact on building performance. NR
NR
NR
10/23/2024 Northfield
975 Landmark Way B2206434
9701459916
Units 1-12 BLDG 4C (Tract O)20200089924, 20210082267, 20220021500
Nick Reuter
10/15/2024
Tract P Grading/Stormwater Certification Accepted
(Certificate of Occupancy Released)
Accepted by:
Date:
☐ Escrow was held for CO and is now released
we Derek Lutz
01/10/2025
2/14/17 Page 2
9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10.The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11.Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping:
12.Final site cleanup has been completed.
13.I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions..
No Yes
No Yes
No Yes
No Yes
No Yes
14.Based on this information, I certify that (check one):
□The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
□The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
Email:
Phone:
Company:
Address:
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
PE Stamp
Sign and date
NR
NR
NR
NR
NR
Landmark Homes
Nick Reuter
nick@inspire-eng.com
(319) 631-5935
INSPIRE Engineering, LLC
4803 Innovation Drive, Suite 4
Fort Collins, CO
10/23/2024
TF=4959.70
FF=4959.70
2 Story Wood & Stone
w/ Covered Porches,
No Basement
ENTRY=4959.70
TF=4959.70
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
GAR=4959.20
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
S00°16'34"W 184.83'
N89°43'26"W 72.83'
N00°16'34"E 184.83'
S89°43'26"E 72.83'
AC Enclosure
AC Enclosure
12
.
2
'
3.0'
58
.
4
'
0.5'
24
.
4
'
0.5'
58
.
4
'
3.0'
12
.
2
'
34.7'
1.
1
'
29.0'
14
.
1
'
3.3'
15
.
5
'
1.4'
13
.
8
'
1.4'
12
.
8
'
3.3'
15
.
7
'
3.3'
9.
8
'
3.3'
13
.
0
'
3.3'
6.8'
16
.
1
'
5.0'
14
.
5
'
1.5'
15
.
5
'
3.3'
13
.
8
'
29.0'1.
0
'
34.7'
2.3'x2.3'
2.3'x2.3'
2.3'x2.3'
2.3'x2.3'
2.3'x2.3'
2.3'x2.3'
2.3'x2.3'
2.3'x2.3'
2.3'x2.3'
BUILDING 4C
EASEMENT
EXCLUSION
NOTE #1
NOTE #2
THE ATTACHED DRAWING SHOWS THE ELEVATIONS AND DRAINAGE PATTERNS THAT ARE THE REGISTERED LAND SURVEYORS
CERTIFIED FINDINGS OF THE FINISHED GROUND GRADES FOR THE ABOVE DESCRIBED PROPERTY ON THE DATE PROVIDED
ABOVE. THE ELEVATIONS AS DEPICTED HEREON MAY CHANGE SUBSEQUENT TO THE DATE OF THE SURVEY DUE TO NATURAL
AND/OR ARTIFICIAL ACTIONS.
COLORADO P.L.S. NO. 38316
MATT E. LOCKWOOD, PROFESSIONAL LAND SURVEYOR DATE
_____________________________________ ________________
INFORMATION
RECORDED ON:
OCTOBER 7, 2024
-TOP OF FOUNDATION: 4959.70
-FINISHED FLOOR: 4959.70
-GARAGE: 4959.20
-MOE: 4959.20
NOTICE: ALL BEARINGS, DISTANCES, AND
EASEMENTS ARE PER THE SUBDIVISION PLAT
UNLESS OTHERWISE NOTEDLANDMARK HOMES
S:\SURVEY JOBS\374-047\DWG\ILC-GC\374-047 NORTHFIELD.DWG
NOTES:
#1 - N10°28'08"E 837.52' TO THE
NORTH CORNER OF TRACT A,
NORTHFIELD, LS 32444, 15.0'
W.C.
#2 - S00°15'07"W, 441.59' TO
THE NORTHWEST CORNER OF
ALTA VISTA SUB., LS 32444
LEGAL DESCRIPTION:
BUILDING 4C,
NORTHFIELD, CITY OF
FORT COLLINS, COUNTY
OF LARIMER, STATE OF
COLORADO
ADDRESS: 975
LANDMARK WAY, UNITS
1-12
1" = 20'
FOUNDATION PLACEMENT
BASED ON OVERALL
SUBDIVISION BOUNDARY
AS-BUILT ELEVATIONS
FOR A DRAINAGE
CERTIFICATE
for
LANDMARK
HOMES
No.REVISION BY DATE
DATE: 10/11/2024DRAWN BY: MAKPROJECT #: 374-047FORT COLLINS | GREELEY | MESA | GOODYEAR | TUSCON | NORTH PHOENIX | FORT WORTH
northernengineering.com970.221.4158
10/15/2024
BLDG 4C
CA
T
H
E
R
I
N
E
L
A
N
E
LA
N
D
M
A
R
K
W
A
Y
(8
6
'
R
I
G
H
T
-
O
F
-
W
A
Y
)
TRACT P
(D,U,AE)
N
W E
S
0
SCALE: 1" = 20'
2010
PLOT PLAN
FOR LANDMARK HOMES
PARCEL DESCRIPTION: BUILDING 4C, NORTHFIELD, CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
HIGHLAND
DEVELOPMENT SERVICES
6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550
PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.com
DRAWN BYDATE
SCALE (H)HDS PROJ #
OFSHEET
NORTHFIELD
975 Landmark Way
UNITS 1-12
6/13/22
1" = 20'
JTC
20-1023-00
PLOT PLAN
1 1
NOTE:
1. PROVIDE A MINIMUM OF 10% GRADE AWAY FROM FOUNDATIONS AND WINDOW WELLS FOR THE FIRST
5 TO 10 FEET, UNLESS AT BUILDING ENTRIES OR OTHERWISE NOTED.
2. THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM 6 INCHES BELOW THE
TOP OF FOUNDATION (TF).
3. TOP OF FOUNDATION (TF) ELEVATION IS EQUAL TO TOP OF SLAB (TOS) ELEVATION.
4. MINIMUM SLOPES ON THE LOT SHALL NOT BE LESS THAN 2% GRADE.
5. DRIVEWAY SLOPES ARE A MINIMUM OF 2% AND A MAXIMUM OF 10%, UNLESS OTHERWISE APPROVED.
5. DRIVEWAY SLOPES & STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND TO BE VERIFIED IN THE
FIELD.
ABBREVIATIONS
D,U&AE DRAINAGE, UTILITY, & ACCESS,
EASEMENT
EAE EMERGENCY ACCESS
EASEMENT
FG FINISHED GRADE
TOS TOP OF SLAB
UE UTILITY EASEMENT
B2206434
üý þ ÿ