Loading...
HomeMy WebLinkAboutSite Certifications - 10/30/2018Accepted 10/30/2018 WL 12/15 Page 1 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. I.Compaction A.All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II.Storm Drain Pipe Installation Requirements A.The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A.The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. B.A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. C.The riprap is the gradation shown on the approved construction plans with a D50 of . D.The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. E.The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) IV. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A.All fabric was installed per manufacturer’s specifications. V. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes and at the end of flared end sections.) 12/15 Page 2 Permeable Interlocking Concrete Pavers Post-excavation infiltration rates are consistent with design infiltration capacity (for “full or partial infiltration” designs) Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Any penetrations of the impermeable liner have been sealed and checked for water-tightness. Meets specifications for: -Dimensions -Reinforcement -Footings Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test Base coarse (e.g., #2/4) has 90% fractured faces Bedding coarse (e.g., #89) is thoroughly washed Sub-base materials are installed and compacted according to manufacturer’s specifications PICP area is protected from construction site sediment, including runoff from the upstream catchment and Close Out 12/15 Page 3 Bioretention Cells Heavy equipment did not travel over bioretention cell during excavation Bottom of cell was “ripped” after excavation Photograph before/after “ripping” Bottom of cell is flat and level Photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction Photograph Overflow inlet elevation is set above bioretention media per plan (typically 12 inches) Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) Measure/record distance between inlet and top of containment wall/berm Upstream catchment drains to inlet Forebay is installed according to design specifications Forebay has flat, concrete bottom Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media filter Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test 12/15 Page 4 Filter Media Filter media composition is per design specifications Filter media was “machine mixed” by supplier prior to delivery Filter media installed flat and level Other Structural Components Containment wall/berm is continuous and level Landscaping Final landscaping does NOT include sod Final landscaping (wood/rock mulch) is flat and level Vegetation is planted according to landscape design specifications Verify that weed barrier is not installed Temporary irrigation installed If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell Signature: Name: Title: Email: Phone: Company: Address: Design Point Basins Area (ac) %Imp C2 C 100 Q2 (cfs) Q100 (cfs) 1 1 0.14 80% 0.60 0.75 0.2 1.3 2 2 0.43 77% 0.56 0.72 0.7 3.9 3 3 0.40 73% 0.52 0.70 0.6 3.5 4 4 0.22 78% 0.57 0.73 0.3 1.8 5 5 0.37 76% 0.55 0.71 0.5 2.9 6 6 0.16 24%0.19 0.56 0.1 0.8 Harmony Commons - Lot 6 Developed Site Hydrology Basin Area of Paver Cell (sqft) Trbutary Area (sqft) Tributary Area Ratio Max 3:1 Allowance Tributary Impervious Area (sqft) LID Credit Area (sqft) 2 1,136 0 0.0 3,408 0 1,136 2 851 854 1.0 2,553 345 1,196 3 688 985 1.4 2,064 315 1,003 3 1,610 3,252 2.0 4,830 3,252 4,862 5 4,800 11,172 2.3 14,400 8,464 13,264 2 334 342 1.0 1,002 342 676 2 412 357 0.9 1,236 0 412 3 342 347 1.0 1,026 199 541 3 453 400 0.9 1,359 0 453 23,543 Percentage of Treated Site Impervious Area =48.5% LID - Paver Credit Tabulation