HomeMy WebLinkAboutSite Certifications - 10/29/2021
NORTHERNENGINEERING.COM | 970.221.4158
FORT COLLINS | GREELEY 1 | 3
October 4, 2021
Dan Mogen
City of Fort Collin
700 Wood Street
Fort Collins, CO 80522
RE: NEW BELGIUM BREWING PROJECTS -
OFFICE ADDITION, LIQUID CENTER ADDITION, MEDICAL CLINIC, BEER GARDEN & EAST RAIN
GARDEN
Dear Mr. Mogen,
This Overall Site and Drainage Certification Letter is provided to verify as-constructed conditions for the several
New Belgium Brewing projects spanning the last six years, and include information collect for the Office
Addition, Liquid Center Addition, Medical Clinic, Beer Garden Minor Amendment, and East Rain Garden
Amendment projects. Northern Engineering’s involvement with New Belgium Brewing regarding these
certifications began in 2018, when Northern Engineering was contracted to provide certification on the Office
Expansion, Liquid Center Addition, and Medical Clinic projects designed by Farnsworth Group engineering firm
and constructed by Brinkman Partners (now Brinkman Construction). Subsequently, Northern Engineering was
contracted to design and certify the Beer Garden and East Rain Garden projects. Every effort was made to
compile all required and relevant construction and certification information needed for the certification of the
Office Addition, Liquid Center Addition, and Medical Clinic projects. Northern Engineering completed survey
work for the Rain Garden project on July 6, 2021, and for the other projects on August 21, 2019, to verify general
compliance with the following plan sets:
· New Belgium Office Addition Grading and Drainage Plan dated October 2, 2015, by Farnworth Group
· New Belgium Liquid Center Addition Grading and Drainage Plan dated October 28, 2015, by Farnworth
Group
· New Belgium Medical Clinic Grading and Drainage Plan dated June 15, 2015, by Farnworth Group
· New Belgium – Beer Garden Grading and Erosion Control Plan dated October 21, 2019, by Northern
Engineering
· New Belgium – East Rain Garden Amendment dated January 26, 2021, by Northern Engineering
Included in this drainage certification submittal are the following:
Appendix A - City of Fort Collins Overall Site and Drainage Certification Form.
Appendix B - City of Fort Collins During Construction Inspection Checklist and photographs provided by
contractor.
Appendix C - As-constructed LID treatment exhibits.
Appendix D - As-constructed record drawings for Grading Plan sheets.
We have concluded, based on the attached information and personal site inspection, that the drainage features
for the project site have been constructed in substantial compliance with the above referenced Final Utility
Plans, with the following exceptions:
NORTHERNENGINEERING.COM | 970.221.4158
FORT COLLINS | GREELEY 2 | 3
· Item I.A: Pond E final condition improvements south of Medical Center were not completed. At New
Belgium’s request, the City and New Belgium Brewing monitored the pond to determine if soil
conditions in the interim condition, including soil permeability, would allow the pond to function as
constructed per interim design with no issues experienced from standing/ponding water nor
persistently wet soils. It was determined the existing “interim” pond condition would be accepted as
“final” at this time. In the interim condition, the pond has a detention volume of 3.56 ac-ft, satisfying
the interim detention requirement of 3.28 ac-ft stated in the Final Drainage Report – New Belgium
Medical Clinic by Farnsworth Group dated June 3, 2016.
· Item I.A.5: Pond release rate was not modified with Medical Center improvements.
· Item I.B: Based on survey information, existing Pond E is relatively flat to flat. Bottom grades were to
be improved to 2% minimum and concrete pan was to be installed in future condition. This deficiency
was noted in the drainage report and was to be correct after the completion of the City’s Buckingham
and Lincoln Outfall project. At New Belgium’s request, the City and New Belgium Brewing monitored
the pond to determine if soil conditions in the interim condition, including soil permeability, would
allow the pond to function as constructed per interim design with no issues experienced from
standing/ponding water nor persistently wet soils. It was determined the existing “interim” pond
condition would be accepted as “final” at this time.
· Item I.B.3: Pond E spillway location was not indicated in Medical Center Grading Plans, nor in the
Drainage Report, and was not modified as part of this project. Only reference is the elevation – 4953.50,
which appears to be the concrete walk and berm on the south side of the pond adjacent to Buckingham
Street.
· Item i.B.4: Existing outlet structure was not modified as part of the Medical Center project.
· Item ii.A: No major channels or swales were part of these projects.
· Item iii.A: Northern Engineering has not performed any capacity analysis of the drainage systems
elements, other than for the East Rain Garden project, and in no way verifies said pipes meets
requirements of the associated drainage study.
· Item iii.A.1: Where able, size and material were verified.
· Item iii.A.2: Where able, slope was determined and noted. Storm drainage elements of these projects
have been functional for up to six years at this time and precedent would dictate that any deficient pipe
slopes have little to no affect. One underdrain pipe in the East Rain Garden project was installed at
0.0% (flat) rather than at the design slope of 0.2%. This will have no effect on the underdrain system.
· Item III.A.3: Inverts were noted where able on grading plans.
· Item III.B: Northern Engineering did not observe construction. Northern Engineering was unable to
verify installation.
· Item III.B.1: Northern Engineering did not observe construction. Northern Engineering was unable to
verify cover in any buried locations, with the exception to the East Rain Garden project, in which case
minimum cover was maintained.
NORTHERNENGINEERING.COM | 970.221.4158
FORT COLLINS | GREELEY 3 | 3
· Item III.B.2: Northern Engineering did not observe construction. Northern Engineering was unable to
verify encasements and clearances specified in plans in any buried locations, with the exception to the
East Rain Garden project, in which case minimum clearance was maintained.
· Item III.B.3: Northern Engineering did not observe construction. Northern Engineering was unable to
verify the joint types or construction methods used for the storm drain pipes.
· Item IV.A: Pan proposed with future Pond E improvements not yet constructed. At New Belgium’s
request, the City and New Belgium Brewing monitored the pond to determine if soil conditions in the
interim condition, including soil permeability, would allow the pond to function as constructed per
interim design with no issues experienced from standing/ponding water nor persistently wet soils. It
was determined the existing “interim” pond condition would be accepted as “final” at this time.
· Item V.A: All storm inlets are private drain basins or trench drain. Invert and grate elevations were not
compared to original design, only noted in as-built drawings to show general conformance and
functionality as-constructed.
· Item VI.A: Culverts were only noted in as-built drawings to show general conformance and
functionality as-constructed.
· Item iX.A.3: Sidewalk culverts were only noted in as-built drawings to show general conformance and
functionality as-constructed.
· Item XII.A.3: This is an ongoing issue that the owners are discussing with the City Erosion Control
Department.
Please feel free to contact me with any questions that you may have.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Benjamin Ruch, PE
Project Engineer
10/4/2021
Appendix A
Overall Site and Drainage Certification Form
MA200079 (Rain Garden project)
Appendix B
During Construction Inspection Checklist
Medical Clinic
Rain Garden
1/19 Page 1 of 2
DURING CONSTRUCTION INSPECTION CHECKLIST
To be completed by Construction Superintendent
This checklist is to be completed during construction and included with the Overall Site and Drainage Certification.
Use “Yes” for items completed as described.
Use “N/A” for items that are not applicable to the site being certified.
If any blanks are “No,” attach an explanation referencing the item number below.
Project Name: New Belgium Rain Garden Date: 5/12/21
Building Permit Numbers: MA200079
I. Compaction
A. All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the
City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content
and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction.
Provide testing log from contractor/engineer.
II. Storm Drain Pipe Installation Requirements
A. The pipe trenches have been compacted in accordance with Section 02225‐3.07.A.1. of the Fort Collins Development Construction
Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas
are to be at 90%, both in accordance with ASTM D698).
III. Energy Dissipation and Erosion Protection ‐ FCSCM Chapter 9, Section 7.0
A. Riprap
1. The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans.
2. A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an
approved equal. Provide documentation for an approved equal.
3. The riprap is the gradation shown on the approved construction plans with a D50 of .
4. The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown.
5. The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.)
B. Permanent Erosion Control Fabric ‐ FCSCM Vol.1, Ch.7
1. All fabric was installed per manufacturer’s specifications.
1/19 Page 2 of 2
IV. Other Permanent BMPs
A. All cut‐off walls have been installed in accordance with the approved construction plans. (Cut‐off walls are required for irrigation
ditch crossings of storm drain pipes.)
V. Extended Detention Basins
A. Installation of this facility was verified via inspection by a City‐Stormwater Inspector at the point of installation of the water quality
control box(es). Provide date of inspection and name of inspector:
Included certification sheet(s):
Please check the appropriate box(es) for the Low Impact Development
(LID) facilities found on this site and complete the corresponding
certification sheets.
☐ Permeable Interlocking Concrete Pavers
☒ Bioretention Cells (Rain Gardens)
☐ Sand Filters
☐ Vegetated Buffers
☐ Underground Infiltration
☐ Other LID – For certification of Dry Wells, Tree Filters,
Constructed Wetland Channels & Ponds, etc., contact City Staff
to determine requirements to exhibit the LID facility has been
constructed and functions as intended per the approved
drainage report.
*Please provide photographic documentation of the installation of all
stages of all LID facilities.
**Please contact the City Stormwater Inspector at
stormwaterinspection@fcgov.com to discuss inspection requirements
for each LID facility and request inspections.
***All facilities being certified must be “clean” – free of sediment &
construction debris – prior to certification or acceptance of the facility.
Completed by:
Name: Michelle Case
Title: Project Manager
Email: michelle@waterwiselandscapes.com
Phone: 970‐221‐4051
Company: Waterwise Land and Waterscapes
Address: 1930 N. Whitcomb Street
Fort Collins, CO 80524
1/19 Page 1 of 2
Permeable Interlocking Concrete Pavers
Item/Activity Yes No N/A Submittal Requirements Submitted?/Response
Stormwater Inspection
Pre‐construction meeting was held with City‐Stormwater
Inspector to discuss installation, inspection, checklist, and
protection from sedimentation
☐ ☐ ☐
Record date, inspector name, meeting
location (i.e. DCP, initial erosion control
inspection, etc.)
Sub‐surface inspection(s): Installation of this facility was
verified via inspection by a City‐Stormwater Inspector at the
point of installation of the outlet, underdrain, geomembrane
layer, and sub‐base courses (per design in Final Plan
Documents)
☐ ☐ ☐
Record date(s) of inspection and
inspector’s name
Surface inspection(s): Installation of this facility was verified via
inspection by a City‐Stormwater Inspector at the point of
installation of the pavers and joint fill material
☐ ☐ ☐
Record date(s) of inspection and
inspector’s name
Excavation
Heavy equipment did not encroach into the excavated area
(prevents over‐compaction) ☐ ☐ ☐
Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after
“ripping”
Bottom surface of cell is flat and level ☐ ☐ ☐ Provide photograph
Impermeable Liner
Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered
material
Impermeable liner is attached to concrete perimeter wall ☐ ☐ ☐ Provide photograph
Impermeable liner is buried with no exposure ☐ ☐ ☐
Any penetrations of the impermeable liner have been sealed
and checked for water‐tightness ☐ ☐ ☐ Provide photograph (if necessary)
Edge Restraint and Concrete Cut‐Off Wall
The required edge restraint meets design specifications ☐ ☐ ☐ Provide specification of installation
Concrete cut‐off wall meets design specifications for: ☐ ☐ ☐ Provide specification of installation
‐ Dimensions ☐ ☐ ☐
‐ Reinforcement ☐ ☐ ☐
‐ Footings ☐ ☐ ☐
Underdrain System
Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph
At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph
1/19 Page 2 of 2
Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph
Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph
Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph
Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph
Underdrain integrity tested after backfilling using TV and/or
water test ☐ ☐ ☐ Provide documentation of test results
Aggregate
Sub‐base Course(e.g., #2/4):
‐ Has 90% fractured faces
‐ Is thoroughly washed (virtually free of fine sediment)
‐ Is installed to the required design depth
☐ ☐ ☐
Provide load ticket, photographs, and
record depth installed
Basecourse (e.g., #57):
‐ Has 90% fractured faces
‐ Is thoroughly washed (virtually free of fine sediment)
‐ Is installed to the required design depth
☐ ☐ ☐
Provide load ticket, photographs, and
record depth installed
Leveling Course / Joint Fill (e.g., crushed #89):
‐ Has 90% fractured faces
‐ Is thoroughly washed (virtually free of fine sediment)
‐ Is dry screened
‐ Is installed to the required design depth and to the top
of the paver joints
☐ ☐ ☐
Provide load ticket, photographs, and
record depth installed
Aggregate materials are installed and compacted according to
manufacturer’s and/or design specifications ☐ ☐ ☐ Provide photographs and documentation
of compaction
Protection During Construction
PICP area is protected from construction site sediment,
including runoff from the upstream catchment and
construction equipment traffic ☐ ☐ ☐
Specify how the area was covered and/or
otherwise protected to prevent
construction runoff from entering the
pavement
Close Out
Cracked/broken paver units have been removed and replaced ☐ ☐ ☐
Paver height offsets are no more than 1/4” between adjacent
units & surface contains no deformations
(depressions/settlement) exceeding 1/2"
☐ ☐ ☐
Upstream catchment is stabilized prior to diverting runoff into
PICP system ☐ ☐ ☐
1/19 Page 1 of 3
Bioretention Cells (Rain Gardens)
Item/Activity Yes No N/A Submittal Requirements Submitted?/Response
Stormwater Inspection
Pre‐construction meeting was held with City‐Stormwater
Inspector to discuss installation, inspection, checklist, and
protection from sedimentation
☒ ☐ ☐
Record date, inspector name, meeting
location (i.e. DCP, initial erosion control
inspection, etc.)
Chandler Arellano met
onsite 2/3/21
Underdrain and basecourse inspection(s): Installation of this
facility was verified via inspection by a City‐Stormwater
Inspector at the point of installation of the outlet, underdrain,
geomembrane layer, and base course (per design in Final Plan
Documents)
☐ ☒ ☐
Record date(s) of inspection and
inspector’s name
Not available during
construction to meet
schedule. See
documentation photos.
Pea gravel and BSM inspection(s): Installation of this facility
was verified via inspection by a City‐Stormwater Inspector at
the point of installation of the pea gravel and bioretention
sand media
☐ ☒ ☐
Record date(s) of inspection and
inspector’s name
Not available during
construction to meet
schedule. See
documentation photos.
Excavation
Heavy equipment did not encroach into the excavated area
(prevents over‐compaction) ☒ ☐ ☐ 5psi equipment
Bottom of cell was “ripped” after excavation ☒ ☐ ☐ Provide photographs before and after
“ripping”
Bottom surface of cell is flat and level ☒ ☐ ☐ Provide photograph
Excavated area is protected/surrounded by sediment/runoff
control measures during construction ☒ ☐ ☐ Provide photograph
Intake
Upstream catchment drains to inlet/bioretention cell per plan
and flows are fully captured ☒ ☐ ☐
Forebay
Forebay is installed according to design specifications ☒ ☐ ☐ Provide photograph
There is a minimum 3” drop at the forebay entrance ☒ ☐ ☐ Provide photograph
Forebay will drain fully and not hold standing water ☒ ☐ ☐
Outlet Structure/Overflow
Emergency overflow elevation is confirmed
☒ ☐ ☐
Measure and record distance from
overflow to top of media filter; provide
photograph
10.5”, 9”, 12”, 28”
Overflow inlet elevation is set above bioretention media per
plan ☒ ☐ ☐ Provide photograph
1/19 Page 2 of 3
Overflow inlet invert elevation is at least 3 inches below
containment wall/berm (to direct overflow into inlet) ☒ ☐ ☐
Measure and record distance between
inlet and top of containment wall/berm;
provide photograph
5.5”, 4”, 4.5”, 9”
Overflow path and check dams, if used, are armored to protect
from erosion and maintain elevations ☒ ☐ ☐ Provide photograph
Impermeable Liner
Impermeable liner meets design specifications ☐ ☐ ☒ Provide specifications of delivered
material
Impermeable liner is appropriately anchored ☐ ☐ ☒ Provide photograph
Impermeable liner is buried with no exposure ☐ ☐ ☒
Any penetrations of the impermeable liner have been sealed
and checked for water‐tightness ☐ ☐ ☒ Provide photograph (if necessary)
Underdrain System
Underdrain pipe meets design specifications ☒ ☐ ☐ Provide photograph
At least one cleanout is provided per underdrain lateral ☒ ☐ ☐ Provide photograph
Cleanout pipe is solid (not perforated/slotted) ☒ ☐ ☐ Provide photograph
Cleanout covers are installed and watertight ☒ ☐ ☐ Provide photograph
Verify the underdrain is NOT wrapped in geotextile fabric ☒ ☐ ☐ Provide photograph
Verify there is no orifice plate on the underdrain outfall ☒ ☐ ☐ Provide photograph
Underdrain integrity tested after backfilling using TV and/or
water test ☒ ☐ ☐ Provide documentation of test results
Filter Media and Aggregate
Reservoir aggregate layer (ASTM #57 or #67):
‐ meets design specifications
‐ is installed to the required design depth
☒ ☐ ☐
Provide load ticket, photographs, and
record depth installed
4”
Diaphragm aggregate layer (“Pea Gravel” with gradation ASTM
#8, #89, or #9):
‐ meets design specifications
‐ is installed to the required design depth
☒ ☐ ☐
Provide load ticket, photographs, and
record depth installed
8”
Bioretention Sand Media (BSM) composition:
‐ meets design specifications
‐ is installed to the required design depth
☒ ☐ ☐
Provide load ticket, photographs, and
record depth installed
18”
BSM was “machine mixed” by supplier prior to delivery ☒ ☐ ☐ Provide load ticket
BSM is installed flat and level ☒ ☐ ☐ Provide photograph
Other Structural Components
Containment wall/berm is continuous and level ☒ ☐ ☐
Landscaping
1/19 Page 3 of 3
Verify final landscaping is free of sod ☐ ☐ ☒ If sod is used, it must be shown to be
“sand‐grown”
Final landscaping (non‐floatable mulch) is flat and level ☒ ☐ ☐ Provide photograph
Vegetation is planted according to landscape design
specifications and final landscaping plan ☒ ☐ ☐ Provide photograph
Verify that weed barrier is NOT installed ☒ ☐ ☐
Temporary irrigation installed
☒ ☐ ☐
If N/A, then verify that permanent
irrigation is installed to establish/maintain
vegetation
Close Out
Upstream catchment stabilized prior to diverting runoff into
bioretention cell ☐ ☐ ☒
1/19 Page 1 of 1
Vegetated Buffers
Item/Activity Yes No N/A Submittal Requirements Submitted?/Response
Construction
Buffer area was sectioned off to eliminate site disturbance and
compaction during construction ☐ ☐ ☐ Provide photograph(s)
Level spreader has been installed per plan (if applicable) ☐ ☐ ☐ Provide photograph
Soils in the buffer area have been amended ☐ ☐ ☐ Record soil amendment certification with
Environmental & Regulatory Affairs
Vegetation is planted according to landscape design
specifications and final landscaping plan ☐ ☐ ☐ Provide photograph
1/19 Page 1 of 3
Sand Filters
Item/Activity Yes No N/A Submittal Requirements Submitted?/Response
Stormwater Inspection
Pre‐construction meeting was held with City‐Stormwater
Inspector to discuss installation, inspection, checklist, and
protection from sedimentation
☐ ☐ ☐
Record date, inspector name, meeting
location (i.e. DCP, initial erosion control
inspection, etc.)
Underdrain and basecourse inspection(s): Installation of this
facility was verified via inspection by a City‐Stormwater
Inspector at the point of installation of the outlet, underdrain,
geomembrane layer, and base course (per design in Final Plan
Documents)
☐ ☐ ☐
Record date(s) of inspection and
inspector’s name
Pea gravel and filter media inspection(s): Installation of this
facility was verified via inspection by a City‐Stormwater
Inspector at the point of installation of the pea gravel and filter
media
☐ ☐ ☐
Record date(s) of inspection and
inspector’s name
Excavation
Heavy equipment did not encroach into the excavated area
(prevents over‐compaction) ☐ ☐ ☐
Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after
“ripping”
Bottom surface of cell is flat and level ☐ ☐ ☐ Provide photograph
Excavated area is protected/surrounded by sediment/runoff
control measures during construction ☐ ☐ ☐ Provide photograph
Intake
Upstream catchment drains to inlet/sand filter per plan and
flows are fully captured ☐ ☐ ☐
Forebay (If Applicable)
Forebay is installed according to design specifications ☐ ☐ ☐ Provide photograph
There is a minimum 3” drop at the forebay entrance ☐ ☐ ☐ Provide photograph
Forebay will drain fully and not hold standing water ☐ ☐ ☐
Outlet Structure/Overflow
Overflow inlet elevation is set above sand filter media per plan
(typically 1 to 3 feet) ☐ ☐ ☐ Provide photograph
Overflow inlet invert elevation is at least 3 inches below
containment wall/berm (to direct overflow into inlet) ☐ ☐ ☐
Measure and record distance between
inlet and top of containment wall/berm;
provide photograph
1/19 Page 2 of 3
Overflow path and check dams, if used, are armored to protect
from erosion and maintain elevations ☐ ☐ ☐ Provide photograph
Impermeable Liner (If Applicable)
Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered
material
Impermeable liner is appropriately anchored to the perimeter
wall ☐ ☐ ☐ Provide photograph
Impermeable liner is buried with no exposure ☐ ☐ ☐
Any penetrations of the impermeable liner have been sealed
and checked for water‐tightness ☐ ☐ ☐ Provide photograph (if necessary)
Underdrain System
Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph
At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph
Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph
Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph
Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph
Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph
Underdrain integrity tested after backfilling using TV and/or
water test ☐ ☐ ☐ Provide documentation of test results
Filter Media
Filter media composition (e.g. ASTM C 33 Sand):
‐ meets design specifications
‐ is installed to the required design depth
☐ ☐ ☐
Provide load ticket, photographs, and
record depth installed
Pea gravel layer:
‐ meets design specifications
‐ is installed to the required design depth
☐ ☐ ☐
Provide load ticket, photographs, and
record depth installed
Filter Media is installed flat and level ☐ ☐ ☐
Other Structural Components
Containment wall/berm is continuous and level ☐ ☐ ☐
Landscaping
Verify final landscaping is free of sod ☐ ☐ ☐ If sod is used, it must be shown to be
“sand‐grown”
Final landscaping (non‐floatable mulch) is flat and level ☐ ☐ ☐ Provide photograph
Vegetation is planted according to landscape design
specifications and final landscaping plan ☐ ☐ ☐ Provide photograph
Verify that weed barrier is NOT installed ☐ ☐ ☐
1/19 Page 3 of 3
Temporary irrigation installed
☐ ☐ ☐
If N/A, then verify that permanent
irrigation is installed to establish/maintain
vegetation
Close Out
Upstream catchment stabilized prior to diverting runoff into
sand filter cell ☐ ☐ ☐
1/19 Page 1 of 2
Underground Infiltration
Item/Activity Yes No N/A Submittal Requirements Submitted?/Response
Stormwater Inspection
Manufacturer’s representative pre‐construction meeting: A
pre‐construction meeting was completed with the
manufacturer’s representative and installers
☐ ☐ ☐
Record date and who was present at the
meeting
Pre‐construction meeting was held with City‐Stormwater
Inspector to discuss installation, inspection, checklist, and
protection from sedimentation
☐ ☐ ☐
Record date, inspector name, meeting
location (i.e. DCP, initial erosion control
inspection, etc.)
Inspection(s): Installation of this facility was verified via
inspection by a City‐Stormwater Inspector at the point at which
the chambers had been laid/prior to backfilling.
Correct fabric placement was confirmed.
☐ ☐ ☐
Record date(s) of inspection and
inspector’s name
Excavation
Heavy equipment did not travel across underground cell area
during excavation (prevents over‐compaction) ☐ ☐ ☐
Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after
“ripping”
Bottom of cell is flat and level, or graded per approved grading
plans ☐ ☐ ☐ Provide photograph
Non‐woven fabric is installed per manufacturer’s specifications
and was not damaged during construction (around system) ☐ ☐ ☐ Provide photograph
Woven fabric is installed per manufacturer’s specifications and
was not damaged during construction (beneath chambers) ☐ ☐ ☐ Provide photograph
Excavated area is protected/surrounded by sediment/runoff
control BMPs during construction ☐ ☐ ☐ Provide photograph
Impermeable Liner
Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered
material
Impermeable liner is not exposed ☐ ☐ ☐
Any penetrations of the impermeable liner have been sealed
and checked for water‐tightness. ☐ ☐ ☐ Provide photograph (if necessary)
Aggregate
Foundation and embedment materials are installed and
compacted according to design and manufacturer’s
specifications
☐ ☐ ☐
Provide load ticket and photograph(s)
Underdrain System
1/19 Page 2 of 2
Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph
At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph
Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph
Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph
Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph
Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph
Underdrain integrity tested after backfilling using TV and/or
water test ☐ ☐ ☐ Provide documentation of test results
Manifold system
Overflow weir elevation is set at/above water quality storm
elevation ☐ ☐ ☐ Record weir elevation on survey
Maintenance access is provided for each Isolator Row ☐ ☐ ☐
At least one inspection port has been provided for each Isolator
Row (located in middle third of each row) ☐ ☐ ☐
Upstream catchment drains to inlet/intake properly ☐ ☐ ☐
Underground Detention Chambers
All chambers were installed per approved Utility Plans and
manufacturer’s specifications ☐ ☐ ☐ Photograph
Close Out
Upstream catchment is stabilized prior to diverting runoff into
Underground Detention system ☐ ☐ ☐
All Isolator Rows, chambers, and pipes are cleaned and
sediment/debris has been removed ☐ ☐ ☐
Rain Garden at New Belgium Brewery – Photographs of Construciton from February through May 2021
Top Basin – excavation, setting elevations, preparing the soil
Top Basin – Geotech liner
Top Basin – Underdrain pipe and reservoir aggregate layer
Top Basin – check dam
First Basin Diaphragm Aggregate Layer
Second Basin Excavation, elevation set, and soil prep
Second Basin – Geotech Liner, Reservoir aggregate and underdrain pipe
Second Basin – Diaphragm Aggregate layer
Second Basin – Check dam
Basin One & Two – Diaphragm aggregate layer, cleanout pipes, and check dams
Third Basin
Third Basin – Reservoir Aggregate
Third Basin Underdrain Pipe
Third Basin – Diaphragm Aggregate Layer
Berm and Bridge and Spillway Construction
Bioretention Sand Media
Adjacent Berm Soil Prepared
Lower Basin Area excavation and Underground PVC Carrier Pipe
Forebay & Cobble Swale Installed
Irrigation
Contractor
Rain Garden Biomedia
Subgrade Sketch
Contractor
Rain Garden Biomedia
Subgrade Sketch
Appendix C
As-constructed LID Treatment Exhibits
This unofficial copy was downloaded on Jan-26-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA
From Office Expansion
Drainage Report
This unofficial copy was downloaded on Jan-26-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA
From Office Expansion
Drainage Report
Rain Garden Design
This unofficial copy was downloaded on Jan-26-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA
From Office Expansion
Drainage Report
Rain Garden Design
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
4" P
V
C
18" PVC
3:1
AS-BUILT RAIN GARDEN
SITE CERTIFICATION EXHIBIT
FORT COLLINS, CO
NEW BELGIUM BREWING - OFFICE ADDITION
E N G I N E E R N GI
EHTRON R N
JULY 30, 2021
P:\1431-001\DRAINAGE\DRNGCERT\OVERALL SITE CERT\01-BUILDING ADDITION\1431-001_RG EXHIBIT.DWG
( IN FEET )
0
1 INCH = 10 FEET
10 10
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =64.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.640
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.20 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 9,480 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =2.86 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =1,052 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =121 sq ft
D) Actual Flat Surface Area AActual =705 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1400 sq ft
F) Rain Garden Total Volume VT=1,053 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =cu ft
iii) Orifice Diameter, 3/8" Minimum DO = in
Design Procedure Form: Rain Garden (RG)
Certifier - Benjamin Ruch, PE
Northern Engineering
July 30, 2021
New Belgium Brewing - Office Addition Certification
Fort Collins, CO
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
UD-BMP_v3.07.xlsm, RG 7/30/2021, 11:50 AM
As-built
Rain Garden
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Certifier - Benjamin Ruch, PE
Northern Engineering
July 30, 2021
New Belgium Brewing - Office Addition Certification
Fort Collins, CO
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
UD-BMP_v3.07.xlsm, RG 7/30/2021, 11:50 AM
FE S
FE S
ST
7.0'
88.9'
5.1'
630 SF 374 SF
NORTH
As-built
Bioswale
Design treatment area =
6,300 sf
At time of survey treatment
area = 3,740 sf
This unofficial copy was downloaded on Mar-06-2019 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA
From Liquid Center
Drainage Report
This unofficial copy was downloaded on Mar-06-2019 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA
From Liquid Center
Drainage Report
From Medical Clinic
Drainage Report
From Medical Clinic
Drainage Report
Rain Garden Design
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =41.6 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.416
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.15 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 5,380 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.43 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =66 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =7 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =45 sq ft
D) Actual Flat Surface Area AActual =350 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1130 sq ft
F) Rain Garden Total Volume VT=432 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =cu ft
iii) Orifice Diameter, 3/8" Minimum DO = in
Design Procedure Form: Rain Garden (RG)
Certifier - Benjamin Ruch, PE
Northern Engineering
July 30, 2021
New Belgium Brewing - Medical Center
Fort Collins, CO
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
UD-BMP_v3.07.xlsm, RG 7/30/2021, 2:11 PM
As-built
Rain Garden
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Certifier - Benjamin Ruch, PE
Northern Engineering
July 30, 2021
New Belgium Brewing - Medical Center
Fort Collins, CO
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
UD-BMP_v3.07.xlsm, RG 7/30/2021, 2:11 PM
ST
ST
ST
ST
ST
ST
ST
AS-BUILT RAIN GARDEN
SITE CERTIFICATION EXHIBIT
FORT COLLINS, CO
NEW BELGIUM BREWING - MEDICAL CLINIC
E N G I N E E R N GI
EHTRON R N
JULY 30, 2021
P:\1431-001\DRAINAGE\DRNGCERT\OVERALL SITE CERT\03-MEDICAL CENTER\1431-001_MC-RG EXHIBIT.DWG
( IN FEET )
0
1 INCH = 10 FEET
10 10
Project: New Belgium Medical Center
Basin Description: Pond E Interm Stage Storage
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,948.800 2.80 N/A N/A 0.00 N/A 0.00
4,949.000 30.94 0.200 3.37 3.37 2.87 2.87
4,949.200 3,828.24 0.200 385.92 389.29 280.22 283.09
4,949.400 7,160.04 0.200 1098.83 1488.12 1081.58 1364.68
4,949.600 15,928.62 0.200 2308.87 3796.99 2251.20 3615.88
4,949.800 17,304.93 0.200 3323.36 7120.34 3322.41 6938.28
4,950.000 18,196.02 0.200 3550.09 10670.44 3549.72 10488.01
4,950.200 18,968.87 0.200 3716.49 14386.92 3716.22 14204.23
4,950.400 19,735.51 0.200 3870.44 18257.36 3870.19 18074.41
4,950.600 20,507.76 0.200 4024.33 22281.69 4024.08 22098.49
4,950.800 21,305.07 0.200 4181.28 26462.97 4181.03 26279.52
4,951.000 22,541.36 0.200 4384.64 30847.62 4384.06 30663.58
4,951.200 24,723.48 0.200 4726.48 35574.10 4724.80 35388.39
4,951.400 27,784.60 0.200 5250.81 40824.91 5247.83 40636.22
4,951.600 31,780.83 0.200 5956.54 46781.45 5952.07 46588.29
4,951.800 39,034.59 0.200 7081.54 53862.99 7069.13 53657.42
4,952.000 44,110.04 0.200 8314.46 62177.46 8309.29 61966.71
4,952.200 47,822.59 0.200 9193.26 71370.72 9190.76 71157.47
4,952.400 52,137.09 0.200 9995.97 81366.69 9992.86 81150.34
4,952.600 57,716.77 0.200 10985.39 92352.08 10980.66 92131.00
4,952.800 74,004.49 0.200 13172.13 105524.20 13138.43 105269.43
4,953.000 77,086.94 0.200 15109.14 120633.35 15108.09 120377.52
4,953.200 89,725.53 0.200 16681.25 137314.59 16665.26 137042.79
4,953.400 91,911.29 0.200 18163.68 155478.28 18163.24 155206.03
3.56 Ac-ft
FORT COLLINS: 301 North Howes Street, Suite 100, 80521 | 970.221.4158
GREELEY: 820 8th Street, 80631 | 970.395.9880 | WEB: www.northernengineering.com
October 14, 2019
City of Fort Collins - Stormwater
700 Wood Street
Fort Collins, Colorado 80524
RE: New Belgium - Beer Garden Minor Amendment
Fort Collins, Colorado
Dear Staff:
The site improvements planned for the New Belgium Brewery – Beer Garden Minor Amendment focus on
renovating and improving the functionality of the existing beer garden area. The site currently is a grassy area
with sparse vegetation due to heavy foot traffic
The site improvements will not alter the existing drainage pattern. The existing grass is to be removed and
replaced with permeable artificial turf. An existing subdrain system will be refurbished to provided drainage
for the artificial turf. A new concrete patio will drain to existing inlets located in the turfed area. Water will
then flow thought existing storm pipes to an existing bioswale for water quality treatment before flowing into
the existing New Belgium detention pond located on the north side of Buckingham Street. Site improvements
will add no additional flow flowing off-site.
The site improvements propose to add 2,192 sf of impervious area to the site in the form of a concrete patio.
Per City LID requirements, 50% of the new impervious area needs to be treated for water quality. This will be
achieved using the existing bioswale located on site. The bioswale was designed to have a bottom area of
630 sf, allowing it to treat 6,300 sf of impervious area created with the Liquid Center and Office Expansion
Projects. In determining the capacity of the existing bioswale, it was found that it only had a bottom area of
375 sf, making it insufficient for treating the existing impervious area. The site improvements will refurbish
and increase the bottom area to 740 sf, allowing for better functionality in treating the existing impervious
area, and 1,100 sf of the new impervious area, or just over 50% of the new impervious area.
If you should have any questions as you review this report, please feel free to contact us.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Benjamin Ruch, PE
Project Engineer
10/14/19
V.P.
LID
LID
LID
LID
C.O.
CONTROL
IRRCONTROL
IRR
SSSS
SS
3" W
3" W
3" W
3" W
3" W
3" W
3" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
SS
SS
SS
SS
SS
SS
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
V.P.
V.P.
V.P.
V.P.
V.P.
V.P.
V.P.
CP BIKERACK
OVERFLOW
ELEV = 56.89
FLAT BOTTOM ELEV = ±55.92
AREA = 174 SF
TOP ELEV = 56.89
AREA = 251 SF
FLAT BOTTOM ELEV = ±55.02
AREA = 233 SF
OVERFLOW
ELEV = 55.89
TOP ELEV = 55.89
AREA = 271 SF
11.64"
PONDING
10.44"
PONDING
OVERFLOW
ELEV = 54.53
FLAT BOTTOM ELEV = ±53.96
AREA = 261 SF
6.84"
PONDING
TOP ELEV = 54.53
AREA = 274 SF
OVERFLOW
ELEV = 53.00
FLAT BOTTOM ELEV = ±52.42
AREA = 220 SF
TOP ELEV = 53.00
AREA = 350 SF
AS-BUILT
BASIN #1
6.96"
PONDING
AS-BUILT
BASIN #2
AS-BUILT
BASIN #3
AS-BUILT
BASIN #4
PONDING & FLAT AREA
AS-BUILT RAIN GARDEN
FORT COLLINS, CO
E N G I N E E R N GI
EHTRON R N
SEPTEMBER 1, 2021
P:\1431-002\DRAINAGE\DRNGCERT\AB-RG VOL EXHIBIT.DWG
NEW BELGIUM - EAST RAIN GARDEN
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 1.000
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 17,558 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =585 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =10 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = Varies ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =351 sq ft
D) Actual Flat Surface Area AActual =708 sq ft
E) Area at Design Depth (Top Surface Area)ATop =990 sq ft
F) Rain Garden Total Volume VT=708 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =N/A cu ft
iii) Orifice Diameter, 3/8" Minimum DO =N/A in
Design Procedure Form: Rain Garden (RG)
Benjamin Ruch
November 18, 2020
New Belgium - Warehouse Roof
UD-BMP (Version 3.06, November 2016)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Brewery Roof_RG_UD-BMP_v3.06.xlsm, RG 11/18/2020, 8:51 AM
East Rain Garden
Warehouse Roof
Rain Garden Design
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
PROVIDE A 30 MIL (MIN) PVC LINER WITH CDOT CLASS B
GEOTEXTILE ABOVE IT. USE THE SAME GEOTEXTILE BELOW
THE LINER IF THE SUBGRADE IS ANGULAR
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Benjamin Ruch
November 18, 2020
New Belgium - Warehouse Roof
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Brewery Roof_RG_UD-BMP_v3.06.xlsm, RG 11/18/2020, 8:51 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 1.000
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 4,576 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =153 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =92 sq ft
D) Actual Flat Surface Area AActual =239 sq ft
E) Area at Design Depth (Top Surface Area)ATop =383 sq ft
F) Rain Garden Total Volume VT=155 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =N/A cu ft
iii) Orifice Diameter, 3/8" Minimum DO =N/A in
Design Procedure Form: Rain Garden (RG)
Benjamin Ruch
November 18, 2020
New Belgium - Loading Dock
UD-BMP (Version 3.06, November 2016)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Loading Dock_RG_UD-BMP_v3.06.xlsm, RG 11/18/2020, 8:52 AM
East Rain Garden
Loading Dock
Rain Garden Design
Total
Loading
Dock
Impervious
Area =
4574 sf
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
PROVIDE A 30 MIL (MIN) PVC LINER WITH CDOT CLASS B
GEOTEXTILE ABOVE IT. USE THE SAME GEOTEXTILE BELOW
THE LINER IF THE SUBGRADE IS ANGULAR
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Benjamin Ruch
November 18, 2020
New Belgium - Loading Dock
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Loading Dock_RG_UD-BMP_v3.06.xlsm, RG 11/18/2020, 8:52 AM
Note - Total
impervious area
treated by these rain
garden = 0.4 ac
Brewery roof + 0.105
ac Loading Dock =
21,998 sf of design
treatment
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 1.000
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 6,180 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =206 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = Varies ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =124 sq ft
D) Actual Flat Surface Area AActual =174 sq ft
E) Area at Design Depth (Top Surface Area)ATop =251 sq ft
F) Rain Garden Total Volume VT=206 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =N/A cu ft
iii) Orifice Diameter, 3/8" Minimum DO =N/A in
Design Procedure Form: Rain Garden (RG)
Benjamin Ruch
September 1, 2021
As Built Basin #1-New Belgium - Warehouse Roof
UD-BMP (Version 3.06, November 2016)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Brewery Roof_RG_UD-BMP_v3.06.xlsm, RG 9/1/2021, 1:51 PM
East Rain Garden
Brewery Roof - Basin #1
Rain Garden As-Built
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 1.000
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 6,575 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =219 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =10 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = Varies ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =132 sq ft
D) Actual Flat Surface Area AActual =233 sq ft
E) Area at Design Depth (Top Surface Area)ATop =271 sq ft
F) Rain Garden Total Volume VT=219 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =N/A cu ft
iii) Orifice Diameter, 3/8" Minimum DO =N/A in
Design Procedure Form: Rain Garden (RG)
Benjamin Ruch
September 1, 2021
As Built Basin #2-New Belgium - Warehouse Roof
UD-BMP (Version 3.06, November 2016)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
AB Brewery Roof_RG_UD-BMP_v3.06.xlsm, RG 9/1/2021, 1:55 PM
East Rain Garden
Brewery Roof - Basin #2
Rain Garden As-Built
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 1.000
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 4,570 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =152 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =7 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = Varies ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =91 sq ft
D) Actual Flat Surface Area AActual =261 sq ft
E) Area at Design Depth (Top Surface Area)ATop =274 sq ft
F) Rain Garden Total Volume VT=152 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =N/A cu ft
iii) Orifice Diameter, 3/8" Minimum DO =N/A in
Design Procedure Form: Rain Garden (RG)
Benjamin Ruch
September 1, 2021
As Built Basin #3-New Belgium - Warehouse Roof
UD-BMP (Version 3.06, November 2016)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
AB Brewery Roof_RG_UD-BMP_v3.06.xlsm, RG 9/1/2021, 1:56 PM
East Rain Garden
Brewery Roof - Basin #3
Rain Garden As-Built
Total Brewery Roof
Impervious Treated =
17,325 sf of 17,424 sf
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 1.000
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 4,955 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =165 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =7 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =99 sq ft
D) Actual Flat Surface Area AActual =220 sq ft
E) Area at Design Depth (Top Surface Area)ATop =350 sq ft
F) Rain Garden Total Volume VT=165 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =N/A cu ft
iii) Orifice Diameter, 3/8" Minimum DO =N/A in
Design Procedure Form: Rain Garden (RG)
Benjamin Ruch
September 1, 2021
As- Built - New Belgium - Loading Dock
UD-BMP (Version 3.06, November 2016)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
AB_Loading Dock_RG_UD-BMP_v3.06.xlsm, RG 9/1/2021, 1:53 PM
East Rain Garden
Loading Dock - Basin #4
Rain Garden As-Built
Total Loading Dock
Impervious Treated =
4,574 sf of 4,574 sf
Project
Added Impervious
Area (SF)
50% Impervious
Treatment (SF)
As-built LID Treatment
Capcity (SF)
As Built
Deficit/Surplus (SF)Sum (SF)
Office Addition 24,116 12,058 9,807 (2,251) (2,251)
Liquid Center Addition 4,357 2,179 - (2,179) (4,430)
Medical Clinic 5,380 2,690 2,690 - (4,430)
Beer Garden 2,200 1,100 - (1,100) (5,530)
East Rain Garden - - 21,899 21,899 16,370
Impervious Treatment Areas
As-constructed LID
treatment surplus with
50% new impervious area
treated = 32,740 sf of new
impervious area credit.
Appendix D
Record Drawings
FE S
DFES
FE S
ST STST
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
WSOV.P.
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STST
ST
ST ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
THE
S
E
R
E
C
O
R
D
D
R
A
W
I
N
G
S
,
P
R
O
D
U
C
E
D
B
Y
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
SER
V
I
C
E
S
,
I
N
C
.
,
A
R
E
B
A
S
E
D
I
N
W
H
O
L
E
,
O
R
I
N
P
A
R
T
,
U
P
O
N
I
N
F
O
R
M
A
T
I
O
N
PRO
V
I
D
E
D
B
Y
O
T
H
E
R
S
.
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
S
E
R
V
I
C
E
S
,
I
N
C
.
A
S
S
U
M
E
S
NO L
I
A
B
I
L
I
T
Y
F
O
R
T
H
E
A
C
C
U
R
A
C
Y
O
R
C
O
M
P
L
E
T
E
N
E
S
S
O
F
T
H
I
S
I
N
F
O
R
M
A
T
I
O
N
.
REC
O
R
D
D
R
A
W
I
N
G
07.30.21
THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERINGSERVICES, INC., ARE INTENDED ONLY TO SHOW GENERAL CONFORMANCEAND FUNCTIONALITY OF THE AS-CONSTRUCTED CONDITIONS. NORTHERNENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THEACCURACY OR COMPLETENESS OF THIS INFORMATION.
RECORD INFO.ONLY(SEE NOTE)
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
INLET
GRATE=4958.00
INV=1956.67
THE
S
E
R
E
C
O
R
D
D
R
A
W
I
N
G
S
,
P
R
O
D
U
C
E
D
B
Y
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
SER
V
I
C
E
S
,
I
N
C
.
,
A
R
E
B
A
S
E
D
I
N
W
H
O
L
E
,
O
R
I
N
P
A
R
T
,
U
P
O
N
I
N
F
O
R
M
A
T
I
O
N
PRO
V
I
D
E
D
B
Y
O
T
H
E
R
S
.
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
S
E
R
V
I
C
E
S
,
I
N
C
.
A
S
S
U
M
E
S
NO L
I
A
B
I
L
I
T
Y
F
O
R
T
H
E
A
C
C
U
R
A
C
Y
O
R
C
O
M
P
L
E
T
E
N
E
S
S
O
F
T
H
I
S
I
N
F
O
R
M
A
T
I
O
N
.
REC
O
R
D
D
R
A
W
I
N
G
07.30.21
THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERINGSERVICES, INC., ARE INTENDED ONLY TO SHOW GENERAL CONFORMANCEAND FUNCTIONALITY OF THE AS-CONSTRUCTED CONDITIONS. NORTHERNENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THEACCURACY OR COMPLETENESS OF THIS INFORMATION.
RECORD INFO.ONLY(SEE NOTE)
F E S
F E S
D
18"x30" HERCP
FL=4951.788" PVC
FL=4951.85
8" PVC
FL=4950.96
8" PVC
FL=4949.37
4" PVC
FL=4949.74
8" PVC
FL=4950.43
4" PVC
FL=4948.87
24" PVC
FL=4950.07
30"x46" HERCP
FL=4949.79
FL=4952.76
FES
FES
DSTST
ST
ST
ST
ST
ST
ST
THE
S
E
R
E
C
O
R
D
D
R
A
W
I
N
G
S
,
P
R
O
D
U
C
E
D
B
Y
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
SER
V
I
C
E
S
,
I
N
C
.
,
A
R
E
B
A
S
E
D
I
N
W
H
O
L
E
,
O
R
I
N
P
A
R
T
,
U
P
O
N
I
N
F
O
R
M
A
T
I
O
N
PRO
V
I
D
E
D
B
Y
O
T
H
E
R
S
.
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
S
E
R
V
I
C
E
S
,
I
N
C
.
A
S
S
U
M
E
S
NO L
I
A
B
I
L
I
T
Y
F
O
R
T
H
E
A
C
C
U
R
A
C
Y
O
R
C
O
M
P
L
E
T
E
N
E
S
S
O
F
T
H
I
S
I
N
F
O
R
M
A
T
I
O
N
.
REC
O
R
D
D
R
A
W
I
N
G
07.30.21
THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERINGSERVICES, INC., ARE INTENDED ONLY TO SHOW GENERAL CONFORMANCEAND FUNCTIONALITY OF THE AS-CONSTRUCTED CONDITIONS. NORTHERNENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THEACCURACY OR COMPLETENESS OF THIS INFORMATION.
RECORD INFO.ONLY(SEE NOTE)
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
WSOV.P.
CONTROL
IRR
X
X
X
X
X
X
G
G
GG
G E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
EXISTING
"NEW BELGIUM"
SIGN
EXISTING DOG WASTE STATION SIGN
TO BE RELOCATED
EXISTING
"BEER, TOURS,
GIFTERY" SIGN
EXISTING "NO
BEER BEYOND
THIS POINT" SIGN
4"
P
V
C
EXISTING INLET
RIM=4955.46
INV=4952.42 (W)
INV=4952.34 (NE)
INV=4952.25 (E)
EXISTING INLET
RIM=4956.56
INV=4953.53 (SW)
93
.
2
0
L
F
8
"
P
V
C
@
0
.
8
9
%
4" PV
C
EXISTING INLET
RIM=4956.78
INV=4954.77 (W)
INV=4953.12 (N, S)
EXISTING EDGE
OF CONCRETE
EXISTING EDGE
OF CONCRETE
EXISTING EDGE
OF CONCRETE
EXISTING
FENCE POST
EXISTING SPRINKLER (TYP.)
EXISTING
STORM DRAIN
EXISTING BASIN
RIM TO BE RAISED 5.5"
APPROXIMATE LOCATION
EXISTING ELECTRIC (TYP.)
APPROXIMATE LOCATION
EXISTING ELECTRIC (TYP.)
APPROXIMATE LOCATION
EXISTING ELECTRIC (TYP.)
APPROXIMATE LOCATION
EXISTING GAS
MATCH EXISTING
PAVEMENT
MATCH EXISTING
PAVEMENT
EXISTING 6" WIDE
CONCRETE WALL
EXISTING 6" WIDE
CONCRETE WALL
EXISTING 6" WIDE
CONCRETE WALL
EXISTING 6" WIDE
CONCRETE RIBBON CURB
EXISTING
IRRIGATION
CONTROL
DECK
MATCH EXISTING
PAVEMENT
MATCH EXISTING
PAVEMENT
APPROXIMATE LOCATION
EXISTING SUBDRAIN (TYP.)
(SEE NOTE #7)
E
E
E
E
E E E
±10 LF OF EXISTING CURB
TO BE REMOVED
EXISTING TREES
TO BE REMOVED
1.
3
%
1.
6
%
1.6
%
1.
2
%
1.
3
%
2.5%
BUC
K
I
N
G
H
A
M
S
T
R
E
E
T
LIN
D
E
N
S
T
R
E
E
T
INLET PROTECTION MAY BE REMOVED AFTER
INSTALLATION OF ARTIFICIAL TURF
ROCK SOCK CAN THEN BE INSTALLED
TO PREVENT SEDIMENTATION OF INLET
INLET PROTECTION MAY BE REMOVED AFTER
INSTALLATION OF ARTIFICIAL TURF
ROCK SOCK CAN THEN BE INSTALLED
TO PREVENT SEDIMENTATION OF INLET
INLET PROTECTION MAY BE REMOVED AFTER
INSTALLATION OF ARTIFICIAL TURF
ROCK SOCK CAN THEN BE INSTALLED
TO PREVENT SEDIMENTATION OF INLET
(5
7
.
3
2
)
(5
7
.
3
6
)
(57
.
3
3
)
(57
.
3
9
)
(57
.
2
3
)
(57
.
0
2
)
(5
6
.
5
5
)
(56
.
8
8
)
(57
.
1
1
)
(56.87)
(56
.
8
5
)
(57
.
3
5
)
56.7
8
57.2
0
57.2
9
56.80
56.7
0
56.6
6
56.0
5
56.6
0
56.63
57.0
9
56.7
8
57.01
56.84
56.1
556.7
6
57.24
56.5
5
56.8
0
56.9
6
57
.
1
3
57.2
1
56.2
6
56.4
9
56.6
8
56.8
8
57.0
4
57.0
6
56
.
2
0
56.5
0
56.7
1
56.9
1
57.0
7
56.8
9
56.3
5
56.56
56.7
6
56.9
5
57.0
7
56.9
4
57
.
3
1
56.4
5
56.6
4
56.8
0
56.9
7
57.1
5
57.1
1
57.33
56.7
7
56.7
4
56.8
1
56.9
0
57.0
8
57.2
5
56.6
2
56.7
4
56.9
7
57.09
57.0
2
57.2
9
56.35
57.1
3
(57
.
2
3
)
(57.0
9
)
(56.84)
(5
6
.
8
7
)
(5
6
.
5
9
)
(5
7
.
1
4
)
(5
6
.
8
1
)
56.9
3
56.6
2
56.7
7
57.0
8
(5
7
.
5
5
)
56.38
(57.1
9
)
57.1
0
57
.
1
5
56.9
3
57.23
56.5
6
FE SFES
ST
EXPAND BIOSWALE TO
PROVIDE 740 SF OF
TREATMENT AREA
EXISTING FES
FL=4950.46
EXISTING FES
FL=4950.70
8.22'
±90'
2.0' BLOCK OR
CONCRETE WALL
CHECK DAMS
30'
30'
EXISTING SIDEWALK
TURF REINFORCING
MAT
EXISTING 18"
STORM DRAIN
EXISTING
30"x46" HERCP
STORM DRAIN
EXISTING BIOSWALE AREA
TO BE EXPANDED & EXISTING
BIOMEDIA TO BE
RECONDITIONED
8' x 8.22' x 1.5' DEEP
TYPE L RIPRAP
EXISTING
12" STORM DRAIN
CONSTRUCT WALL
AROUND EXISTING
STORM DRAIN PIPE
CONSTRUCT WALL
AROUND EXISTING
STORM DRAIN PIPE
CONSTRUCT WALL
AROUND EXISTING
STORM DRAIN PIPE
FL = 4950.46
4' x 4' x 1.5' DEEP
TYPE L RIPRAP
3:
1
5:1
4:
1
5:
1
4:1
3:
1
0.3%
52.4
6
50.
7
0
52.4
6
50.70
50.
4
6
52.4
6
50.4
6
52.4
6
STRAW MATTING TO
PREVENT SEED
MIGRATION
STRAW MATTING TO
PREVENT SEED
MIGRATION
STRAW MATTING TO
PREVENT SEED
MIGRATION
WALL HEIGHT VARIES
(2' MAX)
BU
I
L
D
I
N
G
4" SLOTTED PVC UNDERDRAIN
MIN. 8" THICK
CDOT NO. 4 AGGREGATE
MIN. 6" THICK
PEA GRAVEL
MIN. 12" THICK
BIORETENTION SAND MEDIA
MIN. 30-MIL HDPE
IMPERVIOUS MEMBRANE
/////////////////////////////////////
TRM
PLANT BIOSWALE
PER SEED MIX DETAIL
SEE SHEET C101
Sheet
NE
W
B
E
L
G
I
U
M
-
B
E
E
R
G
A
R
D
E
N
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
FO
R
T
C
O
L
L
I
N
S
:
3
0
1
N
o
r
t
h
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
,
8
0
5
2
1
GR
E
E
L
E
Y
:
8
2
0
8
t
h
S
t
r
e
e
t
,
8
0
6
3
1
97
0
.
2
2
1
.
4
1
5
8
no
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
of 21
C100
GR
A
D
I
N
G
&
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
NORTH
( IN FEET )
1 inch = ft.
Feet01010
10
20 30
LEGEND:
PROPOSED CONTOUR
EXISTING CONTOUR
PROPOSED SPOT ELEVATION 33.43
PROPOSED SLOPES
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND
UTILITIES.
2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3.ALL SPOTS ARE FINISHED GRADE ELEVATIONS.
4.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88.
5.THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL
CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING
ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS
REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN.
6.ADD 4900-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED.
7.CONTRACTOR SHALL RECONDITION EXISTING SUBDRAIN BEDDING AS NEEDED TO PROVIDE
SUITABLE DRAINAGE FOR NEW ARTIFICIAL LAWN.
NOTES:
2.0%
(47.45
)
EXISTING SPOT ELEVATION
EXISTING STORM
PROPOSED SWALE
PART OF LOT 1, NEW BELGIUM 4TH FILING LOCATED IN THE NORTH ONE-HALF OF SECTION 12,
TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
GRADING AND EROSION CONTROL PLAN FOR
NEW BELGIUM - BEER GARDEN MINOR AMENDMENT
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what's below.
before you dig.Call
R
PROPOSED TURF REINFORCEMENT MAT
BIOSWALE GRADING PLAN
PROPOSED BIO-MEDIA
BIOSWALE DETAIL
1" = 2'
INLET PROTECTION
PORTABLE CONCRETE WASHOUT AREA
RIPRAP PROTECTION
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION
Project: New Belgium-Beer Garden Minor Amendment
CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING
BEST MANAGEMENT PRACTICES (BMPS)
Structural "Installation"
Flow Barriers (Bales, Wattles, etc.) (RS)
UTILITIES
INSTALLATION
FLAT WORK
INSTALLATION
VERTICAL
INSTALLATION LANDSCAPE DEMOBILIZATION
Concrete Washout Area (CWA)
* All Temporary BMPs to be Removed once Construction is Complete
Permanent
Rip Rap (RP)
1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR.
STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT
BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE
CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES.
2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR
ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND
COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT
HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED.
4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE
CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION.
5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN
GARDENS UNTIL SITE IS FULLY STABILIZED.
6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM
DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT.
7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e.,
STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP
MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING
MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE.
9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING
ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED.
10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS
STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND BUILDING PAD SIDES TO ENSURE
AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE.
PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION
(i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER,
WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET
IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO
A BODY OF WATER, WETLAND OR DRAINAGE WAY.
13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE
LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES
MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE
WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE
GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY
CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE
INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE.
15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING
OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS
APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION.
16.CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT RAIN GARDENS AND MODIFIED RAIN GARDEN FROM
SEDIMENTATION. THIS INCLUDES EDUCATING SUBCONTRACTORS ON-SITE.
17.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER
PERMANENT SITE STABILIZATION METHODS.
18.DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND
CLEANED IMMEDIATELY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR.
19.CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM.
20.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND
DIRT FROM ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. LOOSE MATERIALS SHALL NOT BE
STORED ON THE PERMEABLE PAVEMENT AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE
PAVEMENT AREA. TEMPORARILY DIVERT RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO
REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE PAVEMENT. SURFACE PROTECTION COULD INCLUDE COVERING
AREAS OF THE PAVEMENT, PROVIDING ALTERNATIVE CONSTRUCTION VEHICLE ACCESS, AND PROVIDING EDUCATION TO
ALL PARTIES WORKING ONSITE.
EROSION CONTROL NOTES:
ROCK SOCK
Inlet Protection (IP)
Turf Reinforcement Mat (TRM)
Mulching/Sealant
Permanent Seed Planting
TABLE OF CALCULATIONS
Project: New Belgium-Beer Garden Minor Amendment
Total Disturbed Project Area
Total "Onsite" Area of Disturbance
Total Storage/Staging Area
Total Haul Roads Area
Est. Percent of Project Area Exposed
Est. Percent Existing Vegetative Cover
Existing Soil Type
Groundwater Depth
Total "Offsite" Area of Disturbance
Acres
Acres
Acres
Construction Vehicle Traffic Area
Number of Phases w/ Project
Total Volume of Import (+)/Exported (-) Materials
Total Area of Stockpiling of Fill or Borrow Areas Offsite
Steepest Slope
Distance from a Riparian Area or Sensitive Area
Density
Feet
CY
SF
H:V
Feet
0.32
0.32
0
Acres
N/A
N/A
100%
0
~90%
Type D Caruso Clay Loam
N/A
N/A
0
0
3:1
660
CHECK DAM
THE
S
E
R
E
C
O
R
D
D
R
A
W
I
N
G
S
,
P
R
O
D
U
C
E
D
B
Y
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
SER
V
I
C
E
S
,
I
N
C
.
,
A
R
E
B
A
S
E
D
I
N
W
H
O
L
E
,
O
R
I
N
P
A
R
T
,
U
P
O
N
I
N
F
O
R
M
A
T
I
O
N
PRO
V
I
D
E
D
B
Y
O
T
H
E
R
S
.
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
S
E
R
V
I
C
E
S
,
I
N
C
.
A
S
S
U
M
E
S
NO L
I
A
B
I
L
I
T
Y
F
O
R
T
H
E
A
C
C
U
R
A
C
Y
O
R
C
O
M
P
L
E
T
E
N
E
S
S
O
F
T
H
I
S
I
N
F
O
R
M
A
T
I
O
N
.
REC
O
R
D
D
R
A
W
I
N
G
07.30.21
RECORD INFO.ONLY(SEE NOTE)
FE SFES
C.O.
C.O.
C.O.
C.O.
CONTROL
IRR
C.O.
C.O.
C.O.
W
V.P.
V.P.
LID
LID
LID
LID
C.O.
CONTROL
IRRCONTROL
IRR
ELEC
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSS
SS
SS
SS
SS
SS
SS
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
3" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
6" W
2" W
2" W
2" W
2" W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
LOA
D
I
N
G
D
O
C
K
3:1
2.0
%
CAP EXISTING PIPE
INV. OUT=4952.62 (SW)
FG=4953.18
CO A5
INV. OUT=4954.20 (SE)
FG=4957.28
BASIN A4 w SOLID LID
INV. IN=4954.18 (NW)
INV. OUT=4953.21 (SE)
FG=4957.20
BASIN A3 w SOLID LID
INV. IN=4953.17 (NW)
INV. OUT=4952.20 (SE)
FG=4956.20
CO A1-1
INV. OUT=4950.63 (NW)
FG=4955.90
BASIN A2 w SOLID LID
INV. IN=4952.18 (NW)
INV. OUT=4952.18 (E)
FG=4955.20
BASIN A1 w 8 DOMED GRATE
INV. IN=4950.56 (W)
INV. IN=4950.56 (E)
INV. OUT=4950.56 (S)
FG=4953.12
PIPE END w CONC. COLLAR A
INV. IN=4950.21 (N)
FG=4950.80
27
.
2
5
L
F
6"
P
V
C
@
1
.
3
0
%
35.45
L
F
4" PVC
@ 4.55
%
34.09
L
F
4" PE
R
F
.
H
D
P
E
@ 0.2
0
%
12.
9
4
L
F
4" P
E
R
F
.
H
D
P
E
@ 0
.
2
0
%
21
.
4
6
L
F
4"
P
E
R
F
.
H
D
P
E
@ 0
.
2
0
%
9.5
7
L
F
4" P
E
R
F
.
H
D
P
E
@ 0
.
2
0
%
7' CURB CUT
EXISTING SWING
TO REMAIN
EXISTING TREES
TO BE PROTECTED
IN PLACE (TYP.)
EXISTING TREES
TO BE PROTECTED
IN PLACE (TYP.)
FLAGSTONE OR
COBBLE OVERFLOW
PROTECTION
(RE: LANDSCAPE)
EXISTING OUTFALL
CURB & GUTTER
EXISTING
BREWERY
EXISTING
BREWERY
EXISTING
BREWERY
EXISTING
DOWNSPOUT (TYP.)
EXISTING TREE & STUMP
TO BE REMOVED
EXISTING MEMORIAL TREE
TO BE RELOCATED
RAIN GARDEN
BIOMEDIA AREA
RAIN GARDEN
BIOMEDIA AREA
RAIN GARDEN
BIOMEDIA AREA
RAIN GARDEN
BIOMEDIA AREA
(56.71)
(56.7
5
)
(57.60)
(57.07)
(57.20)
(57.17)
(57.07)
(51.26)
(50.94)
(49.86)
55.63
54.20
54.20
56.04
56.20
(57.0
5
)
56.2
0
52.75
52.62
53.70
54
.
1
4
(56.22)
(56.53)
52.6
2
52.62
53.56
53.56
55.79
54.20
54.
2
0
(56.5
0
)
(55
.
2
0
)
55.20
55.20
55.20
56.20
57.0
1
57.0
1
56.
2
0
(55.74)
(55.13)
(54.45)
(55.12)
(54.46)
(55.21)
(56.7
1
)
(56.74)
(56.84)
(57.73)
(57.77)
(57.73)
(57.75)
(57.67)
(57.63)
(57.33)
57.04
TOW
56.04
TOW
55.17
TOW
56
.
4
2
56
.
3
8
55.85
54
.
8
5
56.
2
4
56.3
8
56.
0
5
56.
1
7
55
.
5
6
54
.
3
9
53.
6
2
LANDSCAPE BOULDERS
(RE: LANDSCAPE)
LANDSCAPE BOULDERS
(RE: LANDSCAPE)
EXISTING BIOSWALE
3.7%
3:1
3:1
3:1
3:1
8:1
6:
1
8:1
5:
1
3:1
55.97
BRIDGE
55.84
BRIDGE
55.85
BRIDGE
55.97
BRIDGE
STONE STAIRS
(RE: LANDSCAPE)
PATH EDGERS
(RE: LANDSCAPE)
(57.67)57.4
0
57.65
PROPOSED GROUTED
COBBLE FOREBAY
w/ 2'x2' CONCRETE BOTTOM
52.3752.62
52.62
(55.40)(54.33)
(54.58)
(54.14)
APPROXIMATE LOCATION
EXISTING SANITARY SEWER SERVICE
APPROXIMATE LOCATION
EXISTING 3" WATER SERVICE
APPROXIMATE LOCATION
EXISTING 6" FIRE SERVICE
APPROXIMATE LOCATION
EXISTING 6" FIRE SERVICE
APPROXIMATE LOCATION
EXISTING 2" WATER SERVICE
APPROXIMATE LOCATION
EXISTING 3" WATER & 6" FIRE SERVICES
EXISTING ELEVATION IS APPROXIMATELY
MAINTAINED WITH PROPOSED DESIGN.
CONTRACTOR SHALL EXERCISE
CAUTION DURING CONSTRUCTION
ACTIVITIES AND BIOMEDIA INSTALLATION.
MINIMUM COVER SHALL BE MAINTAINED
OVER EXISTING SERVICES.
ENGINEER SHALL BE NOTIFIED IF
MINIMUM COVER CANNOT BE MAINTAINED.
APPROXIMATE LOCATION
EXISTING SANITARY SEWER SERVICE
V.P.
V.P.
V.P.
V.P.
V.P.
V.P.
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
V.P.
Sheet
NE
W
B
E
L
G
I
U
M
-
E
A
S
T
R
A
I
N
G
A
R
D
E
N
A
M
E
N
D
M
E
N
T
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
FO
R
T
C
O
L
L
I
N
S
:
3
0
1
N
o
r
t
h
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
,
8
0
5
2
1
GR
E
E
L
E
Y
:
8
2
0
8
t
h
S
t
r
e
e
t
,
8
0
6
3
1
97
0
.
2
2
1
.
4
1
5
8
no
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
of 2
01/26/21
1
C100
GR
A
D
I
N
G
&
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
PART OF LOT 1, NEW BELGIUM 4TH FILING LOCATED IN THE NORTH ONE-HALF OF SECTION 12,
TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
GRADING AND EROSION CONTROL PLAN FOR
NEW BELGIUM - EAST RAIN GARDEN AMENDMENT
1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR.
STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR
DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO
CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES.
2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO
SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND
COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR
PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED.
4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE
CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION.
5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS
AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED.
6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE
STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT.
7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND
CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1.
CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR
SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE.
9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM
MIGRATING ONTO AND ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE
FULLY STABILIZED.
10.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH
BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND BUILDING
PAD SIDES TO ENSURE AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
11.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE
OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE
AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS
FOR PAVEMENT, ETC.)
12.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER,
WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST
BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR
BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY.
13.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS)
SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY.
SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY
FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS
SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
14.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION
INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST
WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE.
15.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING
OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS
APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION.
16.CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT RAIN GARDENS AND MODIFIED RAIN GARDEN FROM
SEDIMENTATION. THIS INCLUDES EDUCATING SUBCONTRACTORS ON-SITE.
17.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND
OTHER PERMANENT SITE STABILIZATION METHODS.
18.DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM
AND CLEANED IMMEDIATELY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR.
19.CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM.
20.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT,
DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. LOOSE
MATERIALS SHALL NOT BE STORED ON THE PERMEABLE PAVEMENT AREA. MUD AND SEDIMENT-LADEN RUNOFF
SHOULD BE KEPT AWAY FROM THE PAVEMENT AREA. TEMPORARILY DIVERT RUNOFF OR INSTALL SEDIMENT
CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE PAVEMENT.
SURFACE PROTECTION COULD INCLUDE COVERING AREAS OF THE PAVEMENT, PROVIDING ALTERNATIVE
CONSTRUCTION VEHICLE ACCESS, AND PROVIDING EDUCATION TO ALL PARTIES WORKING ONSITE.
EROSION CONTROL NOTES:
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION
Project: New Belgium - East Rain Garden Amendment
CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING
BEST MANAGEMENT PRACTICES (BMPS)
Structural "Installation"
Flow Barriers (Bales, Wattles, etc.) (RS)
UTILITIES
INSTALLATION
FLAT WORK
INSTALLATION
VERTICAL
INSTALLATION LANDSCAPE DEMOBILIZATION
* All Temporary BMPs to be Removed once Construction is Complete
Permanent
Scourstop Mat (SM)
Inlet Protection (IP)
Turf Reinforcement Mat (TRM)
NORTH
( IN FEET )
1 inch = ft.
Feet055
5
10 15
LEGEND:
PROPOSED CONTOUR
EXISTING CONTOUR
PROPOSED SPOT ELEVATION 33.43
PROPOSED SLOPES
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND
UTILITIES.
2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3.ALL SPOTS ARE FINISHED GRADE ELEVATIONS.
4.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88.
5.THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL
CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING
ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS
REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN.
6.ADD 4900-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED.
7.CONTRACTOR SHALL RECONDITION EXISTING SUBDRAIN BEDDING AS NEEDED TO PROVIDE
SUITABLE DRAINAGE FOR NEW ARTIFICIAL LAWN.
NOTES:
2.0%
(47.45
)
EXISTING SPOT ELEVATION
EXISTING STORM
PROPOSED SWALE
PROPOSED TEMPORARY TURF REINFORCEMENT MAT
PROPOSED BIO-MEDIA
INLET PROTECTION
ROCK SOCK
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what's below.
before you dig.Call
R
TABLE OF CALCULATIONS
Project: New Belgium - East Rain Garden Amendment
Total Disturbed Project Area
Total "Onsite" Area of Disturbance
Total Storage/Staging Area
Total Haul Roads Area
Est. Percent of Project Area Exposed
Est. Percent Existing Vegetative Cover
Existing Soil Type
Groundwater Depth
Total "Offsite" Area of Disturbance
Acres
Acres
Acres
Construction Vehicle Traffic Area
Number of Phases w/ Project
Total Volume of Import (+)/Exported (-) Materials
Total Area of Stockpiling of Fill or Borrow Areas Offsite
Steepest Slope
Distance from a Riparian Area or Sensitive Area
Density
Feet
CY
SF
H:V
Feet
0.08
0.08
0
Acres
N/A
N/A
100%
0
~95%
Type D Caruso Clay Loam
N/A
N/A
0
0
3:1
660
PROPOSED SCOURSTOP MAT Permanent Seed Planting
07.30.21
RECORD INFO.ONLY(SEE NOTE)
THE
S
E
R
E
C
O
R
D
D
R
A
W
I
N
G
S
,
P
R
O
D
U
C
E
D
B
Y
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
SER
V
I
C
E
S
,
I
N
C
.
,
A
R
E
B
A
S
E
D
I
N
W
H
O
L
E
,
O
R
I
N
P
A
R
T
,
U
P
O
N
I
N
F
O
R
M
A
T
I
O
N
PRO
V
I
D
E
D
B
Y
O
T
H
E
R
S
.
N
O
R
T
H
E
R
N
E
N
G
I
N
E
E
R
I
N
G
S
E
R
V
I
C
E
S
,
I
N
C
.
A
S
S
U
M
E
S
NO L
I
A
B
I
L
I
T
Y
F
O
R
T
H
E
A
C
C
U
R
A
C
Y
O
R
C
O
M
P
L
E
T
E
N
E
S
S
O
F
T
H
I
S
I
N
F
O
R
M
A
T
I
O
N
.
REC
O
R
D
D
R
A
W
I
N
G